Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Highways Department Tender

Works
Road Construction
Eprocure
Opening Date5 Dec 2024
Closing Date11 Dec 2024
Tender Amount₹ 34,07,00,000 
Notes
Download

Costs

Summary

Widening From Two Lane To Two Lane With Paved Shoulders And Strengthening At Km 4/8 - 6/0, 7/0 - 15/0 Of Namakkal - Kananur Road Including Junction Improvements, Construction Of Retaining Wall

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
1.16) Providing Junction Improvements at Km 9/8 (LHS), 11/10 (RHS), 14/6 (RHS) and Branch road easing at Km 4/10 (LHS), 5/4 (LHS), 5/4 (RHS), 5/10 (LHS), 9/8 (RHS), 10/2 (RHS), 10/8 (LHS), 10/10 (RHS), 11/4 (LHS), 11/8 (LHS), 12/10 (LHS), 13/2 (RHS) and 13/10 (LHS) of Namakkal - Kananur road

2629.54

123

324117.1

... More
1.17) Providing bus lay bye at km Km 5/4 (L/s), (R/s), 9/8 (L/s), 9/10 (R/s), 11/10 (L/s), (R/s), 12/10 (L/s) of Namakkal - Kananur road

1089

123

134230.14

... More
Providing compaction for embankment / making up of low berms using the available box cut earth including all hire and fuel charges for power roller for compaction, water sprinkler, including all labour charges for laying, spreading, watering etc., complete and as directed by the departmental engineers.. For making embankment as per MORTH specification clause No. 111, 112, 301 to 305 & 900 of MORTH vth Revision (labour and Hire Charges Only)

10740

26

286543.2

... More
Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with power roller, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification. For making embankment and making up of low berms with conveyance of 5 km as per MORTH specification clause No. 111, 112, 301 to 305 & 900 of MORTH vth Revision

2183

238

519641.32

... More
1.3) Dismantling and Forming diversion road for reconstruction of Minor bridge at Km 8/8 of Namakkal-Kannanur Road

800

238

190432

... More
Providing and laying of Gravel including cost and conveyance of the same to work site from approved quarry including stacking the same to departemental gauge for premeasurement including all labour charges for laying, spreading, including all hire and fuel charges for power roller for compaction, etc., complete and as directed by the departmental engineers For making embankment with conveyance of 5 km as per MORTH specification clause No. 111, 112, 301 to 305 & 900 of MORTH vth Revision

-

-

-

... More
1.3) Dismantling and Forming diversion road for reconstruction of Minor bridge at Km 8/8 of Namakkal-Kannanur Road

640

353

226169.6

... More
Construction of granular sub-base by providing close graded Material,mixing in a mechanical mixplant at OMC, carriage of mixed Material to worksite, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory soil compactor to achieve the desired density, complete as per clause 111, 112, 401 & 900 of MORTH Vth Revision etc., complete - for Grading- V Material

4359

1726

7526510.94

... More
1.16) Providing Junction Improvements at Km 9/8 (LHS), 11/10 (RHS), 14/6 (RHS) and Branch road easing at Km 4/10 (LHS), 5/4 (LHS), 5/4 (RHS), 5/10 (LHS), 9/8 (RHS), 10/2 (RHS), 10/8 (LHS), 10/10 (RHS), 11/4 (LHS), 11/8 (LHS), 12/10 (LHS), 13/2 (RHS) and 13/10 (LHS) of Namakkal - Kananur road

815.39

1726

1407901.3

... More
1.17) Providing bus lay bye at km Km 5/4 (L/s), (R/s), 9/8 (L/s), 9/10 (R/s), 11/10 (L/s), (R/s), 12/10 (L/s) of Namakkal - Kananur road

354

1700

601892.04

... More
Construction of granular sub-base by providing close graded Material,mixing in a mechanical mixplant at OMC, carriage of mixed Material to worksite, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory soil compactor to achieve the desired density, complete as per clause 111, 112, 401 & 900 of MORTH Vth Revision etc., complete - for Grading- III Material

2459

1815

4464658.76

... More
1.16) Providing Junction Improvements at Km 9/8 (LHS), 11/10 (RHS), 14/6 (RHS) and Branch road easing at Km 4/10 (LHS), 5/4 (LHS), 5/4 (RHS), 5/10 (LHS), 9/8 (RHS), 10/2 (RHS), 10/8 (LHS), 10/10 (RHS), 11/4 (LHS), 11/8 (LHS), 12/10 (LHS), 13/2 (RHS) and 13/10 (LHS) of Namakkal - Kananur road

518.33

1815

941100.68

... More
1.17) Providing bus lay bye at km Km 5/4 (L/s), (R/s), 9/8 (L/s), 9/10 (R/s), 11/10 (L/s), (R/s), 12/10 (L/s) of Namakkal - Kananur road

210

1789

375740.4

... More
Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam of specified thickness, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory soil compactor to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 111, 112, 406 & 900 of MORTH Vth Revision

10203

2133

21772181.7

... More
1.3) Dismantling and Forming diversion road for reconstruction of Minor bridge at Km 8/8 of Namakkal-Kannanur Road

168

2133

358495.2

... More
1.16) Providing Junction Improvements at Km 9/8 (LHS), 11/10 (RHS), 14/6 (RHS) and Branch road easing at Km 4/10 (LHS), 5/4 (LHS), 5/4 (RHS), 5/10 (LHS), 9/8 (RHS), 10/2 (RHS), 10/8 (LHS), 10/10 (RHS), 11/4 (LHS), 11/8 (LHS), 12/10 (LHS), 13/2 (RHS) and 13/10 (LHS) of Namakkal - Kananur road

1295.78

2133

2765064.94

... More
1.17) Providing bus lay bye at km Km 5/4 (L/s), (R/s), 9/8 (L/s), 9/10 (R/s), 11/10 (L/s), (R/s), 12/10 (L/s) of Namakkal - Kananur road

525

2133

1120297.5

... More
Providing and laying Prime Coat over WMM surface using 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 111, 112, 501, 502 & 900 of MORTH Vth Revision

43583

80

3524557.21

... More
1.3) Dismantling and Forming diversion road for reconstruction of Minor bridge at Km 8/8 of Namakkal-Kannanur Road

1120

80

90574.4

... More
1.16) Providing Junction Improvements at Km 9/8 (LHS), 11/10 (RHS), 14/6 (RHS) and Branch road easing at Km 4/10 (LHS), 5/4 (LHS), 5/4 (RHS), 5/10 (LHS), 9/8 (RHS), 10/2 (RHS), 10/8 (LHS), 10/10 (RHS), 11/4 (LHS), 11/8 (LHS), 12/10 (LHS), 13/2 (RHS) and 13/10 (LHS) of Namakkal - Kananur road

5164.27

80

417634.51

... More
1.17) Providing bus lay bye at km Km 5/4 (L/s), (R/s), 9/8 (L/s), 9/10 (R/s), 11/10 (L/s), (R/s), 12/10 (L/s) of Namakkal - Kananur road

2100

80

169827

... More
Providing and laying Tack Coat over WMM surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 111, 112, 501, 503 & 900 of MORTH Vth Revision

43583

18

807592.99

... More
1.3) Dismantling and Forming diversion road for reconstruction of Minor bridge at Km 8/8 of Namakkal-Kannanur Road

1120

18

20753.6

... More
1.16) Providing Junction Improvements at Km 9/8 (LHS), 11/10 (RHS), 14/6 (RHS) and Branch road easing at Km 4/10 (LHS), 5/4 (LHS), 5/4 (RHS), 5/10 (LHS), 9/8 (RHS), 10/2 (RHS), 10/8 (LHS), 10/10 (RHS), 11/4 (LHS), 11/8 (LHS), 12/10 (LHS), 13/2 (RHS) and 13/10 (LHS) of Namakkal - Kananur road

5164.27

18

95693.92

... More
1.17) Providing bus lay bye at km Km 5/4 (L/s), (R/s), 9/8 (L/s), 9/10 (R/s), 11/10 (L/s), (R/s), 12/10 (L/s) of Namakkal - Kananur road

2100

18

38913

... More
Providing and laying Tack Coat over Existing BT surface using 2 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 111, 112, 501, 503 & 900 of MORTH Vth Revision

45568

26

1222589.44

... More
1.16) Providing Junction Improvements at Km 9/8 (LHS), 11/10 (RHS), 14/6 (RHS) and Branch road easing at Km 4/10 (LHS), 5/4 (LHS), 5/4 (RHS), 5/10 (LHS), 9/8 (RHS), 10/2 (RHS), 10/8 (LHS), 10/10 (RHS), 11/4 (LHS), 11/8 (LHS), 12/10 (LHS), 13/2 (RHS) and 13/10 (LHS) of Namakkal - Kananur road

8908.41

26

239012.64

... More
Providing, laying 50mm consolidated thick Dense Bituminous Macadam using 0.40cum of 37.50-13.20mm, 0.35 cum of 13.20-2.36 mm and 0.36 cum of 2.36 mm & below size IRC metal with 71.30 kgs of VG40 grade bitumen for premixing per 10 sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing the min the required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to site, spreading the mix to uniform thickness of 50 mm with mechanical paver to the specified grades and cross section sand consolidated by Vibratory Roller to the required density etc., including labour for attending to paver to site etc.,including hire and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and allother tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per MoRTH specification clause No.111,112,501,505 & 900 - Grading II

7505

9800

73551401.6

... More
1.16) Providing Junction Improvements at Km 9/8 (LHS), 11/10 (RHS), 14/6 (RHS) and Branch road easing at Km 4/10 (LHS), 5/4 (LHS), 5/4 (RHS), 5/10 (LHS), 9/8 (RHS), 10/2 (RHS), 10/8 (LHS), 10/10 (RHS), 11/4 (LHS), 11/8 (LHS), 12/10 (LHS), 13/2 (RHS) and 13/10 (LHS) of Namakkal - Kananur road

211.5

9800

2072767.68

... More
1.17) Providing bus lay bye at km Km 5/4 (L/s), (R/s), 9/8 (L/s), 9/10 (R/s), 11/10 (L/s), (R/s), 12/10 (L/s) of Namakkal - Kananur road

105

9800

1029033.6

... More
Providing, laying 50mm consolidated thick Bituminous Macadam using 0.20cum of 26.50- 13.20mm, 0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRC metal with 37 Kgs of VG40 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 111, 112, 501, 504 & 900 of MORTH Vth Revision- Grading II (Table 500-7)

-

-

-

... More
1.16) Providing Junction Improvements at Km 9/8 (LHS), 11/10 (RHS), 14/6 (RHS) and Branch road easing at Km 4/10 (LHS), 5/4 (LHS), 5/4 (RHS), 5/10 (LHS), 9/8 (RHS), 10/2 (RHS), 10/8 (LHS), 10/10 (RHS), 11/4 (LHS), 11/8 (LHS), 12/10 (LHS), 13/2 (RHS) and 13/10 (LHS) of Namakkal - Kananur road

607.23

8358

5075459.09

... More
Providing and laying Bituminous Concrete to 40/30mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG 40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per clause No. 111, 112, 501, 507 & 900 of MORTH vth Revision

3567

10627

37907686.11

... More
1.16) Providing Junction Improvements at Km 9/8 (LHS), 11/10 (RHS), 14/6 (RHS) and Branch road easing at Km 4/10 (LHS), 5/4 (LHS), 5/4 (RHS), 5/10 (LHS), 9/8 (RHS), 10/2 (RHS), 10/8 (LHS), 10/10 (RHS), 11/4 (LHS), 11/8 (LHS), 12/10 (LHS), 13/2 (RHS) and 13/10 (LHS) of Namakkal - Kananur road

441.46

10627

4691541.1

... More
1.17) Providing bus lay bye at km Km 5/4 (L/s), (R/s), 9/8 (L/s), 9/10 (R/s), 11/10 (L/s), (R/s), 12/10 (L/s) of Namakkal - Kananur road

84

10627

892695.72

... More
Providing laying and compacting Close graded premix carpet 20mm thick with a liauid seal coat which is shall consist of open graded carpet of 20mm thickness in a single course composed of suitable small sized aggregated premixed with bituminous binder with application of liquid seal coat for sealing the viods in a bituminous surface conforming to the specifications.

-

-

-

... More
1.3) Dismantling and Forming diversion road for reconstruction of Minor bridge at Km 8/8 of Namakkal-Kannanur Road

1120

192

215230.4

... More
Dismantling Culverts, bridges and other structures Dismantling salvaging and removal and disposing of resulting materials and back filling the resulting trenches and pits etc as per clause No. 111, 112, 202 of MORTH vth Revision Dismantling Stone Masonry

-

-

-

... More
1.10) Widening of Minor bridge at Km 14/2 (ii) of Namakkal - Kannanur road

23.9

283

6767.05

... More
Dismantling Culverts, Bridges and other Structures Dismantling salvaging and removal and disposing of resulting materials and back filling the resulting trenches and pits etc as per clause No. 111, 112, 202 of MORTH vth Revision Dismantling Reinforced Cement Concrete

-

-

-

... More
1.1) Widening of Slab Culvert at Km 5/4 of Namakkal -Kannanur Road.

3.29

4308

14175.62

... More
1.3) Dismantling and Forming diversion road for reconstruction of Minor bridge at Km 8/8 of Namakkal-Kannanur Road

264

4308

1137496.8

... More
1.8) Widening of Slab Culvert at Km 13/10 (ii) of Namakkal -Kannanur Road

3.29

4308

14175.62

... More
1.10) Widening of Minor bridge at Km 14/2 (ii) of Namakkal - Kannanur road

60.07

4308

258823.61

... More
Dismantling Culverts, Bridges and other Structures Dismantling salvaging and removal and disposing of resulting materials and back filling the resulting trenches and pits etc as per clause No. 111, 112, 202 of MORTH vth Revision Dismantling Plain Cement Concrete

-

-

-

... More
1.1) Widening of Slab Culvert at Km 5/4 of Namakkal -Kannanur Road.

5.88

486

2858.86

... More
1.3) Dismantling and Forming diversion road for reconstruction of Minor bridge at Km 8/8 of Namakkal-Kannanur Road

70.88

486

34461.86

... More
1.4) Construction of Box culvert (1.50mx1.50m) at Km 5/10, Reconstruction of Box culvert (1.50mx1.50m) at Km 9/6, 13/8, 13/10, 14/2 (iii) of Namakkal - Kannanur Road

59.87

486

29108.79

... More
1.5) Reconstruction of Box culvert (3.00m x 2.00m) at Km 11/2 of Namakkal - Kannanur Road

3.58

486

1740.6

... More
1.6) Reconstruction of Box culvert (3.00mx1.50m) at Km 12/2 of Namakkal - Kannanur Road

19.34

486

9403.11

... More
1.7) Reconstruction of Box culvert (2.00mx2.00m) at Km 12/10 of Namakkal - Kannanur Road

4.57

486

2221.93

... More
1.8) Widening of Slab Culvert at Km 13/10 (ii) of Namakkal -Kannanur Road

5.88

486

2858.86

... More
1.9) Widening of Slab Culvert at Km 14/2 (i), 14/6 of Namakkal -Kannanur Road.

1.22

486

593.16

... More
1.10) Widening of Minor bridge at Km 14/2 (ii) of Namakkal - Kannanur road

5.54

486

2693.55

... More
1.11) Widening of Box culvert (1.50m x 1.50m) at Km 14/4 (i), (ii) of Namakkal - Kannanur Road

1.22

486

593.16

... More
Earth Work excavation in all classes of soil except hard rock not requiring blasting and deposting on bank with all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges and sheeting, shoring, bracing and their subsequent removal of all logs,stumps and other deleteriuos matter and obstructions,trimming of bottom of excavation,backfilling and clearing the site and disposal of all surplus materials etc.,complete as per standard specification for Foundation of Culvert and Retaining Wall as per clause 111, 112, 201, 202, 301 to 305 & 900 of MORTH Vth Revision

-

-

-

... More
1.4) Construction of Box culvert (1.50mx1.50m) at Km 5/10, Reconstruction of Box culvert (1.50mx1.50m) at Km 9/6, 13/8, 13/10, 14/2 (iii) of Namakkal - Kannanur Road

594.5

123

73278.07

... More
1.5) Reconstruction of Box culvert (3.00m x 2.00m) at Km 11/2 of Namakkal - Kannanur Road

265.71

123

32751.41

... More
1.6) Reconstruction of Box culvert (3.00mx1.50m) at Km 12/2 of Namakkal - Kannanur Road

168.83

123

20809.99

... More
1.7) Reconstruction of Box culvert (2.00mx2.00m) at Km 12/10 of Namakkal - Kannanur Road

191.28

123

23577.17

... More
1.9) Widening of Slab Culvert at Km 14/2 (i), 14/6 of Namakkal -Kannanur Road.

71.79

123

8848.84

... More
1.11) Widening of Box culvert (1.50m x 1.50m) at Km 14/4 (i), (ii) of Namakkal - Kannanur Road

152.2

123

18760.17

... More
1.13) Construction of Retaining wall at Km 13/8-14/2 (L/s) (Lake bund) of Namakkal - Kananur road

1072.5

123

132196.35

... More
1.14) Construction of Strom Water drain at Km 9/8, 9/10 of Namakkal - Kannanur road

288

123

35498.88

... More
1.15) Construction of Well protective wall at Km 8/8, 10/8, 13/6 of Namakkal - Kananur road including well protective wall raising at Km 11/2

64

123

7888.64

... More
Earth work Excavation in all classes of soils except hard rock not requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges and sheeting, shoring, Strutting, Walling, Formation and maintaining of Protectivebunds/ coffer dams bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavtion backfilling, and clearing the site and disposal of all surplus materials and lifting charges etc. complete as per standard specification for Foundation of Abutments and Piers of Slab Culverts, Minor Bridge and Retaining Wall of Tank Bund Portion as per clause 111, 112, 201, 202, 301 to 305 & 900 of MORTH Vth Revision i) For Depth 0m to 2.0m

-

-

-

... More
1.1) Widening of Slab Culvert at Km 5/4 of Namakkal -Kannanur Road.

88.18

263

23231.9

... More
i) For Depth 0m to 2.0m 1.2) Reconstruction of Minor bridge at Km 8/8 of Namakkal-Kannanur Road

776.51

323

251480.53

... More
ii) Depth 2m to 3m 1.2) Reconstruction of Minor bridge at Km 8/8 of Namakkal-Kannanur Road

363.52

335

121950.05

... More
ii) Depth 3m to 4m 1.2) Reconstruction of Minor bridge at Km 8/8 of Namakkal-Kannanur Road

36.36

347

12619.83

... More
i) For Depth 0m to 2.0m 1.8) Widening of Slab Culvert at Km 13/10 (ii) of Namakkal -Kannanur Road

114.94

263

30282.09

... More
1.10) Widening of Minor bridge at Km 14/2 (ii) of Namakkal - Kannanur road

134.55

263

35448.54

... More
ii) For Depth 2m to 3m 1.8) Widening of Slab Culvert at Km 13/10 (ii) of Namakkal -Kannanur Road

5.74

275

1578.9

... More
1.10) Widening of Minor bridge at Km 14/2 (ii) of Namakkal - Kannanur road

23.55

275

6477.9

... More
1.12) Construction of Retaining Wall at Km 7/0-8/2 (Tank bund) of Namakkal - Kananur road

4697.72

281

1320106.3

... More
Plain Cement Concrete of grade M10 Nominal Mix using 40mm ISS size HBG metal including cost and conveyance of all materials to site complying with required standards and specifications. including cost of formwork, mixing, laying and compacting using vibrator including hire and fuel charges for all Tools and Plants and incidental charges such as maintaining of protective bunds, coffer dams strutting etc., complete as per relevant standard specification Levelling course below the drain bottom slab as per clause 1000, 1500, 1700, 2100, 2200 & 2908 of MORTH Vth Revision

-

-

-

... More
1.14) Construction of Strom Water drain at Km 9/8, 9/10 of Namakkal - Kannanur road

19.2

5298

101731.58

... More
Plain Cement Concrete of grade M15 Nominal Mix using 40mm ISS size HBG metal including cost and conveyance of all materials to site complying with required standards and specifications. including cost of formwork, mixing, laying and compacting using vibrator including hire and fuel charges for all Tools and Plants and incidental charges such as maintaining of protective bunds, coffer dams strutting etc., complete as per relevant standard specification for Base Concrete of Culverts and Retaining Wall as per clause as per clause 1000, 1500, 1700, 2100, 2200 & 2908 of MORTH Vth Revision

-

-

-

... More
1.4) Construction of Box culvert (1.50mx1.50m) at Km 5/10, Reconstruction of Box culvert (1.50mx1.50m) at Km 9/6, 13/8, 13/10, 14/2 (iii) of Namakkal - Kannanur Road

60.6

5972

361958.95

... More
1.5) Reconstruction of Box culvert (3.00m x 2.00m) at Km 11/2 of Namakkal - Kannanur Road

17.13

5999

102770.58

... More
1.6) Reconstruction of Box culvert (3.00mx1.50m) at Km 12/2 of Namakkal - Kannanur Road

16.41

5994

98364

... More
1.7) Reconstruction of Box culvert (2.00mx2.00m) at Km 12/10 of Namakkal - Kannanur Road

14.51

5988

86886.9

... More
1.11) Widening of Box culvert (1.50m x 1.50m) at Km 14/4 (i), (ii) of Namakkal - Kannanur Road

10.15

5981

60717.2

... More
1.12) Construction of Retaining Wall at Km 7/0-8/2 (Tank bund) of Namakkal - Kananur road

273.89

5957

1631562.73

... More
1.13) Construction of Retaining wall at Km 13/8-14/2 (L/s) (Lake bund) of Namakkal - Kananur road

321.75

5982

1924708.5

... More
1.15) Construction of Well protective wall at Km 8/8, 10/8, 13/6 of Namakkal - Kananur road including well protective wall raising at Km 11/2

24

5983

143604.72

... More
Vibrated Cement concrete of grade M15 (Nominal mix) using 40mm ISS HBG granite metal including cost and conveyance of all materials to site including cement at site, including cost of form work, soft water, labour charges for mixing, transporting, laying and curing concrete, worikingat depths, Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevent standard specification for LEVELLING COURSE BELOW Footing under Abutments & Piers as per clause as per clause 1000, 1500, 1700, 2100, 2200 & 2908 of MORTH Vth Revision

-

-

-

... More
1.1) Widening of Slab Culvert at Km 5/4 of Namakkal -Kannanur Road.

5.52

6007

33160.02

... More
1.2) Reconstruction of Minor bridge at Km 8/8 of Namakkal-Kannanur Road

41.3

6044

249633.31

... More
1.8) Widening of Slab Culvert at Km 13/10 (ii) of Namakkal -Kannanur Road

5.74

6058

34777.34

... More
1.9) Widening of Slab Culvert at Km 14/2 (i), 14/6 of Namakkal -Kannanur Road.

6.54

6058

39624.42

... More
1.10) Widening of Minor bridge at Km 14/2 (ii) of Namakkal - Kannanur road

6.74

6058

40836.11

... More
Vibrated Cement Concrete of grade M20 (Nominal mix) using 40mm ISS size HBG metal including cost and conveyance of all materials to site and cost cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths Tools and Plants and incidental charges etc., complete as per relevent standard specification for Substructure of Abutments, Return walls and Piers Below sill as per clause 1000, 1500, 1700, 2100, 2200 & 2908 of MORTH Vth Revision

-

-

-

... More
1.1) Widening of Slab Culvert at Km 5/4 of Namakkal -Kannanur Road.

64.58

7085

457575.13

... More
1.2) Reconstruction of Minor bridge at Km 8/8 of Namakkal-Kannanur Road

823.56

6836

5630169.11

... More
1.8) Widening of Slab Culvert at Km 13/10 (ii) of Namakkal -Kannanur Road

93.5

7235

676497.75

... More
1.10) Widening of Minor bridge at Km 14/2 (ii) of Namakkal - Kannanur road

115.95

7235

838929.56

... More
Vibrated Cement Concrete of grade M20 (Nominal mix) using 40mm ISS size HBG metal including cost and conveyance of all materials to site and cost cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths Tools and Plants and incidental charges etc., complete as per relevent standard specification for Substructure of Abutments, Return walls and Piers Above sill as per clause 1000, 1500, 1700, 2100, 2200 & 2908 of MORTH Vth Revision

-

-

-

... More
1.1) Widening of Slab Culvert at Km 5/4 of Namakkal -Kannanur Road.

25.38

9112

231273.47

... More
1.2) Reconstruction of Minor bridge at Km 8/8 of Namakkal-Kannanur Road

342.69

8202

2810959.27

... More
1.8) Widening of Slab Culvert at Km 13/10 (ii) of Namakkal -Kannanur Road

35.86

9140

327780.48

... More
1.10) Widening of Minor bridge at Km 14/2 (ii) of Namakkal - Kannanur road

41.61

9070

377419.76

... More
Vibrated Cement Concrete of grade M20 (Nominal mix) using 40mm ISS size HBG metal including cost and conveyance of all materials to site and cost cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths Tools and Plants and incidental charges etc., complete as per relevent standard specification for wing wall and parapets as per clause 1000, 1500, 1700, 2100, 2200 & 2908 of MORTH Vth Revision

-

-

-

... More
1.4) Construction of Box culvert (1.50mx1.50m) at Km 5/10, Reconstruction of Box culvert (1.50mx1.50m) at Km 9/6, 13/8, 13/10, 14/2 (iii) of Namakkal - Kannanur Road

279.05

7870

2196129.08

... More
1.5) Reconstruction of Box culvert (3.00m x 2.00m) at Km 11/2 of Namakkal - Kannanur Road

80.75

7708

622483.18

... More
1.6) Reconstruction of Box culvert (3.00mx1.50m) at Km 12/2 of Namakkal - Kannanur Road

52.92

8141

430854.53

... More
1.7) Reconstruction of Box culvert (2.00mx2.00m) at Km 12/10 of Namakkal - Kannanur Road

76.69

7724

592370.43

... More
1.9) Widening of Slab Culvert at Km 14/2 (i), 14/6 of Namakkal -Kannanur Road.

21.62

9372

202631.5

... More
1.11) Widening of Box culvert (1.50m x 1.50m) at Km 14/4 (i), (ii) of Namakkal - Kannanur Road

30.63

8987

275299.38

... More
1.12) Construction of Retaining Wall at Km 7/0-8/2 (Tank bund) of Namakkal - Kananur road

176.8

10652

1883441.56

... More
1.13) Construction of Retaining wall at Km 13/8-14/2 (L/s) (Lake bund) of Namakkal - Kananur road

1526.41

7888

12040367.87

... More
1.15) Construction of Well protective wall at Km 8/8, 10/8, 13/6 of Namakkal - Kananur road including well protective wall raising at Km 11/2

76.37

9248

706327.8

... More
Providing Barrier Type Kerb for median / islands using vibrated cement concrete of grade M20 (1:1.5:3) using 20 and 12mm ISS HBG metal fro map proved quarry, including cost and conveyance of all materials to worksite, including hire and fuel charges of all the machineries employed for this work, including all labour charges for mixing, laying, curing including all other incidental charges etc., complete as per drawing and standard specification. clause 1500,1700 & 2200 for Kerb wall.

-

-

-

... More
1.16) Providing Junction Improvements at Km 9/8 (LHS), 11/10 (RHS), 14/6 (RHS) and Branch road easing at Km 4/10 (LHS), 5/4 (LHS), 5/4 (RHS), 5/10 (LHS), 9/8 (RHS), 10/2 (RHS), 10/8 (LHS), 10/10 (RHS), 11/4 (LHS), 11/8 (LHS), 12/10 (LHS), 13/2 (RHS) and 13/10 (LHS) of Namakkal - Kananur road

479.38

484

232063.06

... More
Vibrated Reinforced Cement Concrete of grade M25 (Design mix) using 20mm and below ISS HBG graded metal including cost and conveyance of all materials to site and cost of cement excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for tools and plants including all other incidental charges etc., complete for Base Slab, Side Walls, Top Slab, Cover Slab of Box Culvert as per clause 900, 1000, 1500, 1600, 1700, 2100, 2200 & 2300 of MORTH Vth Revision

-

-

-

... More
1.4) Construction of Box culvert (1.50mx1.50m) at Km 5/10, Reconstruction of Box culvert (1.50mx1.50m) at Km 9/6, 13/8, 13/10, 14/2 (iii) of Namakkal - Kannanur Road

168.2

12965

2180872.79

... More
1.5) Reconstruction of Box culvert (3.00m x 2.00m) at Km 11/2 of Namakkal - Kannanur Road

73.4

11589

850678.11

... More
1.6) Reconstruction of Box culvert (3.00mx1.50m) at Km 12/2 of Namakkal - Kannanur Road

68.5

11339

776781.78

... More
1.7) Reconstruction of Box culvert (2.00mx2.00m) at Km 12/10 of Namakkal - Kannanur Road

54.25

12205

662136.44

... More
1.9) Widening of Slab Culvert at Km 14/2 (i), 14/6 of Namakkal -Kannanur Road.

15.63

12613

197151.82

... More
1.11) Widening of Box culvert (1.50m x 1.50m) at Km 14/4 (i), (ii) of Namakkal - Kannanur Road

36.91

12539

462824.82

... More
1.14) Construction of Strom Water drain at Km 9/8, 9/10 of Namakkal - Kannanur road

112.8

14214

1603419.29

... More
Vibrated Reinforced Cement Concrete of grade M25 (Design mix) using 20mm and below ISS HBG metal including cost and conveyance of all materials to site and cost of cement excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for tools and plants including all other incidental charges etc., complete for Bed block cum Dirt wall as per clause 1000, 1500, 1700, 2100, 2200 & 2908 of MORTH Vth Revision

-

-

-

... More
1.1) Widening of Slab Culvert at Km 5/4 of Namakkal -Kannanur Road.

1.48

13353

19763.83

... More
1.8) Widening of Slab Culvert at Km 13/10 (ii) of Namakkal -Kannanur Road

3.4

13136

44664.34

... More
1.10) Widening of Minor bridge at Km 14/2 (ii) of Namakkal - Kannanur road

5.41

13206

71448.3

... More
Vibrated Reinforced Cement Concrete of grade M25 Design Mix using 20mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and including all other incidental charges etc; complete as per relevant standard specifications, for RCC Retaining Wall BELOW SILL LEVEL as per clause 1000, 1500, 1700, 2100, 2200 & 2908 of MORTH Vth Revision

-

-

-

... More
1.2) Reconstruction of Minor bridge at Km 8/8 of Namakkal-Kannanur Road

19.5

9854

192165.87

... More
1.12) Construction of Retaining Wall at Km 7/0-8/2 (Tank bund) of Namakkal - Kananur road

1763.21

9405

16584559.31

... More
Vibrated Reinforced Cement Concrete of grade M25 Design Mix using 20mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and including all other incidental charges etc; complete as per relevant standard specifications, for RCC Retaining Wall ABOVE SILL LEVEL as per clause 1000, 1500, 1700, 2100, 2200 & 2908 of MORTH Vth Revision

-

-

-

... More
1.2) Reconstruction of Minor bridge at Km 8/8 of Namakkal-Kannanur Road

12.94

15179

196425.71

... More
1.12) Construction of Retaining Wall at Km 7/0-8/2 (Tank bund) of Namakkal - Kananur road

813.04

14046

11420634.66

... More
Vibrated Reinforced Cement Concrete of grade M30 (Design mix) using 20mm and below ISS HBG metal including cost and conveyance of all materials to site and cost of cement excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for tools and plants including all other incidental charges etc., complete for Bed block cum Dirt wall as per clause 1000, 1500, 1700, 2100, 2200 & 2908 of MORTH Vth Revision

-

-

-

... More
1.2) Reconstruction of Minor bridge at Km 8/8 of Namakkal-Kannanur Road

16.58

12676

210172.23

... More
Vibrated Reinforced Cement Concrete of grade M30 (Design mix) using 20mm and below ISS hard broken granite metal including cost and conveyance of all materials to site and cost of cement excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for tools and plants including all other incidental charges etc., complete for Deck slab as per clause 1000, 1500, 1600, 1700, 2100, 2200 & 2300 of MORTH Vth Revision

-

-

-

... More
1.1) Widening of Slab Culvert at Km 5/4 of Namakkal -Kannanur Road.

6.62

11793

78070.19

... More
1.2) Reconstruction of Minor bridge at Km 8/8 of Namakkal-Kannanur Road

384.59

12281

4723176.71

... More
1.8) Widening of Slab Culvert at Km 13/10 (ii) of Namakkal -Kannanur Road

13.22

13518

178710.87

... More
1.10) Widening of Minor bridge at Km 14/2 (ii) of Namakkal - Kannanur road

27.38

15081

412924.08

... More
Vibrated Reinforced cement concrete of grade M40 (Design mix) using 20mm and below ISS hard broken granite metal including cost and conveyance of all materials to site and cost of cement excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for tools and plants including all other incidental charges etc., complete for Inner Crash Barrier as per clause 1000, 1500, 1600, 1700, 2100, 2200 & 2300 of MORTH Vth Revision

-

-

-

... More
1.1) Widening of Slab Culvert at Km 5/4 of Namakkal -Kannanur Road.

3.29

18104

59565.06

... More
1.2) Reconstruction of Minor bridge at Km 8/8 of Namakkal-Kannanur Road

31.01

17943

556421.11

... More
1.8) Widening of Slab Culvert at Km 13/10 (ii) of Namakkal -Kannanur Road

3.29

18156

59734.56

... More
1.10) Widening of Minor bridge at Km 14/2 (ii) of Namakkal - Kannanur road

3.38

17910

60538.81

... More
Vibrated cement concrete M15 (Nominal mix) using 40mm ISS size hard broken granite metal including cost and conveyance of all materials to site including cost and labour charges for formwork, centering, labour charges for laying, compacting, curing all incidental charges etc., complete for Parapet as per clause as per clause 1000, 1500, 1700, 2100, 2200 & 2908 of MORTH Vth Revision

-

-

-

... More
1.1) Widening of Slab Culvert at Km 5/4 of Namakkal -Kannanur Road.

3.68

13313

48994.82

... More
1.2) Reconstruction of Minor bridge at Km 8/8 of Namakkal-Kannanur Road

10.93

9949

108742.79

... More
1.8) Widening of Slab Culvert at Km 13/10 (ii) of Namakkal -Kannanur Road

5.46

13119

71634.27

... More
1.10) Widening of Minor bridge at Km 14/2 (ii) of Namakkal - Kannanur road

2.74

12886

35307.69

... More
Vibrated cement concrete M15 (Nominal mix) 1:2:4 using 40mm ISS size hard broken granite metal including cost and conveyance of all materials to site including cost and labour charges for formwork, centering, labour charges for laying, compacting, curing all incidental charges etc., complete for BASE COURSE BELOW APPROACH SLAB as per clause as per clause 1000, 1500, 1700, 2100, 2200 & 2908 of MORTH Vth Revision

-

-

-

... More
1.1) Widening of Slab Culvert at Km 5/4 of Namakkal -Kannanur Road.

1.92

7402

14212.22

... More
1.2) Reconstruction of Minor bridge at Km 8/8 of Namakkal-Kannanur Road

11.45

6795

77808.7

... More
1.8) Widening of Slab Culvert at Km 13/10 (ii) of Namakkal -Kannanur Road

4.8

6622

31786.18

... More
1.10) Widening of Minor bridge at Km 14/2 (ii) of Namakkal - Kannanur road

5.26

6228

32762.8

... More
Vibrated reinforced cement concrete M30 Grade (Design mix) using HBG graded metal of 20mm and below ISS size including cost and conveyance of all materials to work site but excluding cost and conveyance and fabrication of steel but including cost and labour charges for form work and centering, labour charges for laying, compacting, curing including all other incidental charges etc.,complete for APPROACH SLAB as per clause 1000, 1500, 1600, 1700, 2100, 2200 & 2300 of MORTH Vth Revision

-

-

-

... More
1.1) Widening of Slab Culvert at Km 5/4 of Namakkal -Kannanur Road.

4.2

9807

41189.53

... More
1.2) Reconstruction of Minor bridge at Km 8/8 of Namakkal-Kannanur Road

26.86

9495

255047.25

... More
1.8) Widening of Slab Culvert at Km 13/10 (ii) of Namakkal -Kannanur Road

10.5

9393

98632.38

... More
1.10) Widening of Minor bridge at Km 14/2 (ii) of Namakkal - Kannanur road

11.55

9259

106946.42

... More
Vibrated Reinforced Cement Concrete of grade M30 (Design mix) using 20mm and below ISS hard broken granite metal including cost and conveyance of all materials to site cost of premoulded expansion joints and fixing the same in position including cost and labour charges for formwork, labour charges for laying, compacting, curing including all other incidental charges etc.,complete for WEARING COAT 75mm UNIFORM THICKNESS OVER DECK SLAB AND OVER APPROACH SLAB as per clause 1000, 1500, 1600, 1700, 2100, 2200 & 2300 of MORTH Vth Revision

-

-

-

... More
1.1) Widening of Slab Culvert at Km 5/4 of Namakkal -Kannanur Road.

95.2

655

62424.54

... More
1.2) Reconstruction of Minor bridge at Km 8/8 of Namakkal-Kannanur Road

493.64

658

325066.88

... More
1.4) Construction of Box culvert (1.50mx1.50m) at Km 5/10, Reconstruction of Box culvert (1.50mx1.50m) at Km 9/6, 13/8, 13/10, 14/2 (iii) of Namakkal - Kannanur Road

131

658

86315.9

... More
1.5) Reconstruction of Box culvert (3.00m x 2.00m) at Km 11/2 of Namakkal - Kannanur Road

48.47

660

32033.34

... More
1.6) Reconstruction of Box culvert (3.00mx1.50m) at Km 12/2 of Namakkal - Kannanur Road

48.47

660

32014.44

... More
1.7) Reconstruction of Box culvert (2.00mx2.00m) at Km 12/10 of Namakkal - Kannanur Road

34.06

660

22480.96

... More
1.8) Widening of Slab Culvert at Km 13/10 (ii) of Namakkal -Kannanur Road

64

659

42213.12

... More
1.9) Widening of Slab Culvert at Km 14/2 (i), 14/6 of Namakkal -Kannanur Road.

39.3

659

25921.49

... More
1.10) Widening of Minor bridge at Km 14/2 (ii) of Namakkal - Kannanur road

206.63

659

136289.02

... More
1.11) Widening of Box culvert (1.50m x 1.50m) at Km 14/4 (i), (ii) of Namakkal - Kannanur Road

88.62

659

58451.98

... More
Providing and fixing KRAFT PAPER for full width of seating of deck slab and including cost and conveyance to work site, labour charges for fixing the same in the correct position and all other incidental charges et., complete as per clause 2600 of MORTH Vth Revision

-

-

-

... More
1.1) Widening of Slab Culvert at Km 5/4 of Namakkal -Kannanur Road.

2.68

110

294.8

... More
1.2) Reconstruction of Minor bridge at Km 8/8 of Namakkal-Kannanur Road

48.24

110

5306.4

... More
1.8) Widening of Slab Culvert at Km 13/10 (ii) of Namakkal -Kannanur Road

5.34

110

587.4

... More
1.10) Widening of Minor bridge at Km 14/2 (ii) of Namakkal - Kannanur road

10.81

110

1189.1

... More
Providing and fixing PVC Expansion Joints in between deck slabs over abutment and piers as shown in the drawing including cost and conveyence of expansion joints including shalimar pad and joint sealent and fixing them in position etc., complete (Rev - V) as per clause 2600 of MORTH Vth Revision

-

-

-

... More
1.1) Widening of Slab Culvert at Km 5/4 of Namakkal -Kannanur Road.

2.28

653

1489.75

... More
1.2) Reconstruction of Minor bridge at Km 8/8 of Namakkal-Kannanur Road

68.91

653

45025.79

... More
1.8) Widening of Slab Culvert at Km 13/10 (ii) of Namakkal -Kannanur Road

4.56

653

2979.5

... More
1.10) Widening of Minor bridge at Km 14/2 (ii) of Namakkal - Kannanur road

18.64

653

12179.38

... More
Supply and fabrication of STEEL grade Fe500 D for all the reinforced cement concrete items of work involved in the schedule including cost of steel, cost of fabrication, labour charges for cleaning the rods, straightening, cutting, bending, tying grills, hoisting and placing the reinforcement in position as specified in the drawing including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete. as per standard specification as per clause 1000, 1500, 1600, 1700, 2100 & 2300 of MORTH Vth Revision

-

-

-

... More
1.1) Widening of Slab Culvert at Km 5/4 of Namakkal -Kannanur Road.

2.24

95609

213686.72

... More
1.2) Reconstruction of Minor bridge at Km 8/8 of Namakkal-Kannanur Road

40.64

95609

3885369.51

... More
1.4) Construction of Box culvert (1.50mx1.50m) at Km 5/10, Reconstruction of Box culvert (1.50mx1.50m) at Km 9/6, 13/8, 13/10, 14/2 (iii) of Namakkal - Kannanur Road

13.13

95609

1255349.72

... More
1.5) Reconstruction of Box culvert (3.00m x 2.00m) at Km 11/2 of Namakkal - Kannanur Road

6.73

95609

643259.17

... More
1.6) Reconstruction of Box culvert (3.00mx1.50m) at Km 12/2 of Namakkal - Kannanur Road

5.78

95609

553004.02

... More
1.7) Reconstruction of Box culvert (2.00mx2.00m) at Km 12/10 of Namakkal - Kannanur Road

3.81

95609

364271.32

... More
1.8) Widening of Slab Culvert at Km 13/10 (ii) of Namakkal -Kannanur Road

3.84

95609

367426.42

... More
1.9) Widening of Slab Culvert at Km 14/2 (i), 14/6 of Namakkal -Kannanur Road.

1.39

95609

132896.89

... More
1.10) Widening of Minor bridge at Km 14/2 (ii) of Namakkal - Kannanur road

6.03

95609

576810.73

... More
1.11) Widening of Box culvert (1.50m x 1.50m) at Km 14/4 (i), (ii) of Namakkal - Kannanur Road

3.27

95609

312355.49

... More
1.12) Construction of Retaining Wall at Km 7/0-8/2 (Tank bund) of Namakkal - Kananur road

122.17

95609

11680584.52

... More
1.14) Construction of Strom Water drain at Km 9/8, 9/10 of Namakkal - Kannanur road

5.67

95609

542295.78

... More
Supplying and fixing of Reinforced Cement Concrete Manhole cover 750mm x 750mm with frames as per IRC 50 -1979 as directed by the Departmental officers including labour charges for fixing at every intervals of 5m along the drain including all other incidental charges etc., complete

-

-

-

... More
1.14) Construction of Strom Water drain at Km 9/8, 9/10 of Namakkal - Kannanur road

24

2971

71304

... More
Providing and fixing of M.S Gratings of 300 x 200 mm size with M.S flats of 25x10 mm for outer frames, 20x10 mm for inner braces with mild steel grating and fixing them in position as directed by the Deparmental Officers etc.,complete.

-

-

-

... More
1.14) Construction of Strom Water drain at Km 9/8, 9/10 of Namakkal - Kannanur road

24

569

13656

... More
Supplying and fixing GI DRAINAGE SPOUTS 100mm dia as per GOI drawing SD/205 with grating arrangements at top as shown in the drawing and 100mm dia drainage spout projecting atleast 300mm beyond the bottom of deck slab as shown in the drawing, including cost and conveyance of Galvanised iron pipes and flats and fixing them in position, etc., complete as per clause 2705 of MORT&H specification. (Vth Revision)

-

-

-

... More
1.1) Widening of Slab Culvert at Km 5/4 of Namakkal -Kannanur Road.

2

2498

4996.2

... More
1.2) Reconstruction of Minor bridge at Km 8/8 of Namakkal-Kannanur Road

8

2498

19984.8

... More
1.8) Widening of Slab Culvert at Km 13/10 (ii) of Namakkal -Kannanur Road

2

2498

4996.2

... More
1.10) Widening of Minor bridge at Km 14/2 (ii) of Namakkal - Kannanur road

6

2498

14988.6

... More
Providing FILTER MEDIA behind abutments and return walls for 600mm thickness using filter material conforming to clause 309.3.2.B of MORTH well packed with smaller size towards the soil and bigger size towards the wall including cost and conveyance of all materials to worksite and including labour charges and all other incidental charges etc.,complete.

-

-

-

... More
1.1) Widening of Slab Culvert at Km 5/4 of Namakkal -Kannanur Road.

14.17

1192

16891.77

... More
1.2) Reconstruction of Minor bridge at Km 8/8 of Namakkal-Kannanur Road

70.43

1227

86449.3

... More
1.4) Construction of Box culvert (1.50mx1.50m) at Km 5/10, Reconstruction of Box culvert (1.50mx1.50m) at Km 9/6, 13/8, 13/10, 14/2 (iii) of Namakkal - Kannanur Road

94.3

1227

115748.54

... More
1.5) Reconstruction of Box culvert (3.00m x 2.00m) at Km 11/2 of Namakkal - Kannanur Road

28.89

1262

36482.87

... More
1.6) Reconstruction of Box culvert (3.00mx1.50m) at Km 12/2 of Namakkal - Kannanur Road

21.21

1251

26534.35

... More
1.7) Reconstruction of Box culvert (2.00mx2.00m) at Km 12/10 of Namakkal - Kannanur Road

28.44

1239

35243.99

... More
1.8) Widening of Slab Culvert at Km 13/10 (ii) of Namakkal -Kannanur Road

22.57

1227

27703.55

... More
1.10) Widening of Minor bridge at Km 14/2 (ii) of Namakkal - Kannanur road

21.06

1227

25850.1

... More
Providing and fixing Class I PVC seepage pipes of 110mm dia of required lengths for abutments and return walls including costs and conveyance of all materials to work site and labour charges for fixing etc., complete to drain from the back fill as per section 2706 of MORTH specification (Rev- V)

-

-

-

... More
1.1) Widening of Slab Culvert at Km 5/4 of Namakkal -Kannanur Road.

24.64

218

5373.98

... More
1.2) Reconstruction of Minor bridge at Km 8/8 of Namakkal-Kannanur Road

146.55

218

31962.56

... More
1.4) Construction of Box culvert (1.50mx1.50m) at Km 5/10, Reconstruction of Box culvert (1.50mx1.50m) at Km 9/6, 13/8, 13/10, 14/2 (iii) of Namakkal - Kannanur Road

64.8

218

14132.88

... More
1.5) Reconstruction of Box culvert (3.00m x 2.00m) at Km 11/2 of Namakkal - Kannanur Road

16.3

218

3555.03

... More
1.6) Reconstruction of Box culvert (3.00mx1.50m) at Km 12/2 of Namakkal - Kannanur Road

14.78

218

3223.52

... More
1.7) Reconstruction of Box culvert (2.00mx2.00m) at Km 12/10 of Namakkal - Kannanur Road

23.47

218

5118.81

... More
1.8) Widening of Slab Culvert at Km 13/10 (ii) of Namakkal -Kannanur Road

38.4

218

8375.04

... More
1.10) Widening of Minor bridge at Km 14/2 (ii) of Namakkal - Kannanur road

27.56

218

6010.84

... More
1.12) Construction of Retaining Wall at Km 7/0-8/2 (Tank bund) of Namakkal - Kananur road

782.85

218

170739.59

... More
1.13) Construction of Retaining wall at Km 13/8-14/2 (L/s) (Lake bund) of Namakkal - Kananur road

824.04

218

179723.12

... More
1.15) Construction of Well protective wall at Km 8/8, 10/8, 13/6 of Namakkal - Kananur road including well protective wall raising at Km 11/2

54.02

218

11781.76

... More
Providing and fixing Class I PVC seepage pipes of 160mm dia of required lengths for abutments and return walls including costs and conveyance of all materials to work site and labour charges for fixing etc., complete to drain from the back fill as per section 2706 of MORTH specification (Rev- V)

-

-

-

... More
1.2) Reconstruction of Minor bridge at Km 8/8 of Namakkal-Kannanur Road

80.02

434

34784.69

... More
Filling with Quarry fines including cost and conveyance of material to work site including labour charges for filling, laying, compacting by manual labour under optimum moisture content to get the maximum density flooding with water as layers or built - up to the bottom level inclusive all other incidental charges etc., complete as per clause 304 & 2907 of MORTH Vth Revision

-

-

-

... More
1.4) Construction of Box culvert (1.50mx1.50m) at Km 5/10, Reconstruction of Box culvert (1.50mx1.50m) at Km 9/6, 13/8, 13/10, 14/2 (iii) of Namakkal - Kannanur Road

344.5

249

86000.98

... More
1.5) Reconstruction of Box culvert (3.00m x 2.00m) at Km 11/2 of Namakkal - Kannanur Road

105.02

277

29170.36

... More
1.6) Reconstruction of Box culvert (3.00mx1.50m) at Km 12/2 of Namakkal - Kannanur Road

77.27

268

20738.5

... More
1.7) Reconstruction of Box culvert (2.00mx2.00m) at Km 12/10 of Namakkal - Kannanur Road

102.85

259

26640.21

... More
1.9) Widening of Slab Culvert at Km 14/2 (i), 14/6 of Namakkal -Kannanur Road.

4.41

249

1100.91

... More
1.11) Widening of Box culvert (1.50m x 1.50m) at Km 14/4 (i), (ii) of Namakkal - Kannanur Road

30.6

249

7638.98

... More
Filling behind Abutments and return walls with clean gritty freed raining gravel including cost of gravel having pi value less than 6, conveyance of gravel to worksite. Laying,handling charges and filling in layers tamping under optimum moiture content to get the maximum density, including watering, with all leads and lifts for water and all other incidental charges etc., complete as per clause 304 & 2907 of MORTH Vth Revision (For Culvert, Drain, Retaining Wall, Well Protective Wall and Center Median)

-

-

-

... More
1.1) Widening of Slab Culvert at Km 5/4 of Namakkal -Kannanur Road.

8.35

301

2514.85

... More
1.2) Reconstruction of Minor bridge at Km 8/8 of Namakkal-Kannanur Road

218.25

301

65732.54

... More
1.8) Widening of Slab Culvert at Km 13/10 (ii) of Namakkal -Kannanur Road

44.59

301

13429.62

... More
1.10) Widening of Minor bridge at Km 14/2 (ii) of Namakkal - Kannanur road

51.95

301

15646.3

... More
1.12) Construction of Retaining Wall at Km 7/0-8/2 (Tank bund) of Namakkal - Kananur road

7094.01

369

2621662.34

... More
1.13) Construction of Retaining wall at Km 13/8-14/2 (L/s) (Lake bund) of Namakkal - Kananur road

1943.7

301

585403.57

... More
1.14) Construction of Strom Water drain at Km 9/8, 9/10 of Namakkal - Kannanur road

33.6

328

11038.61

... More
1.15) Construction of Well protective wall at Km 8/8, 10/8, 13/6 of Namakkal - Kananur road including well protective wall raising at Km 11/2

62.21

301

18736.41

... More
1.16) Providing Junction Improvements at Km 9/8 (LHS), 11/10 (RHS), 14/6 (RHS) and Branch road easing at Km 4/10 (LHS), 5/4 (LHS), 5/4 (RHS), 5/10 (LHS), 9/8 (RHS), 10/2 (RHS), 10/8 (LHS), 10/10 (RHS), 11/4 (LHS), 11/8 (LHS), 12/10 (LHS), 13/2 (RHS) and 13/10 (LHS) of Namakkal - Kananur road

171.1

301

51531.9

... More
1.18) Providing Stone Pitching at Km 5/4, 8/8, 13/10, 14/2 of Namakkal - Kananur road

277.8

301

83667.8

... More
Randam Rubble Masonry in Cement Mortar 1:5 with simultaneous pointing for Panel Type Revetment works using new good sized Rough Stone and 10% of Bond Stone including cost and conveyance of all materials from approved Quarry to site including cost of cement and all labour charges for mixing mortar,watering with all leads for good water and curing and all other incidental charges etc., complete as per relevant standard specification as per clause 1400, 1405,1406,1407 & 2908 of MORTH Vth Revision

-

-

-

... More
1.18) Providing Stone Pitching at Km 5/4, 8/8, 13/10, 14/2 of Namakkal - Kananur road

549.97

5406

2973302.81

... More
Rough Stone dry Packing for Revetment using new good sized blue granite rough stone including cost and conveyance from approved quarry including all other labour charges required for breaking, packing the stones in position and other incidental charges etc., complete as per clause 1400, 1405,1406,1407 & 2908 of MORTH Vth Revision

-

-

-

... More
1.18) Providing Stone Pitching at Km 5/4, 8/8, 13/10, 14/2 of Namakkal - Kananur road

280.62

1956

549111.6

... More
Painting two coats with Ready mix plastic enamel paint and approved colour including priming coat over the cement surface complete including scrapping clean removal of dirt of parts over cement surface for Crash Barrier and Parapet walls as directed by departmental officers etc.,complete

-

-

-

... More
1.1) Widening of Slab Culvert at Km 5/4 of Namakkal -Kannanur Road.

48.5

250

12128.88

... More
1.2) Reconstruction of Minor bridge at Km 8/8 of Namakkal-Kannanur Road

333.46

250

83391.68

... More
1.8) Widening of Slab Culvert at Km 13/10 (ii) of Namakkal -Kannanur Road

58.24

250

14564.66

... More
1.10) Widening of Minor bridge at Km 14/2 (ii) of Namakkal - Kannanur road

45.16

250

11293.61

... More
Supply of NP3 class RCC 1000mm dia hume pipes of 2.50m length confirming to IS458/1989 cost of pipes including all other incidental charges , testing charges, including Loading and Unloading charges, transport and delivery in good condition at work site as directed by the departmental officers etc., complete as per clause 1013,2900 & 2911 of MORTH Vth Revision

-

-

-

... More
1.3) Dismantling and Forming diversion road for reconstruction of Minor bridge at Km 8/8 of Namakkal-Kannanur Road

100

4276

427680

... More
Hoisting and fixing of 1000 mm dia pipes to proper gradient including all labour charges and allother incidental charges etc.,complete as per clause 2905 & 2906 of MORTH Vth Revision

-

-

-

... More
1.3) Dismantling and Forming diversion road for reconstruction of Minor bridge at Km 8/8 of Namakkal-Kannanur Road

100

266

26620

... More
Calculation of SubTotal, GST and Total Amount carried out by system automatically

-

-

-

... More
Basic cost of value put to tender as per estimate

1

288716415

-

... More
Add GST at 18%

1

51968955

-

... More
Total Value put to Tender

1

340685370

-

... More
Negotiated Percentage

1

-

-

... More
Final Negotiated Value

1

-

-

... More
Add GST at 18% of Final Negotiated Value

1

-

-

... More
Total Value of Contract Including 18% of GST

1

-

-

... More
Basic cost of value put to tender as per Estimate

-

-

288716415

... More
Quoted Rate in Figures (Total Value of Contract Including 18% of GST )

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.