Highways Department Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Highways Department Tender

Works
Civil And Construction
Bridge Construction
Eprocure
Opening Date11 Oct 2024
Closing Date29 Oct 2024
Tender Amount₹ 2,69,00,000 
Notes
Download

Costs

Summary

Tnv- 21 Sattur And Aruppukottai H C And M Sub Division

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Granular Sub-Base with Close Graded Material Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory soil compactor to achieve the desired density, complete as per clause 401 For Grading-V Material (Filter/ Separation Layer at Bottom) Clause No. 111, 112, 401 & 900.

-

-

-

... More
Road A

27.16

1839

49959.19

... More
Road B

132.19

1984

262349.56

... More
Road C

327.84

1879

616024.47

... More
Granular Sub-Base with Close Graded Material Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory soil compactor to achieve the desired density, complete as per clause 401 For Grading-III Material (Drainage Layer at Top)Material as per MORTH Rev. V Clause No. 111, 112, 401 & 900.

-

-

-

... More
Road A

18.1

1929

34923.59

... More
Road B

109.05

2074

226243.85

... More
Road C

213.09

1969

419591.26

... More
Picking 5cm to 10cm old metalled surface and sectioning 1Sqm. Picking the existing BT surface upto 50mm depth as directed by the departmental officers and collecting the picked up salvaged metal and stacking the same for reuse including all other incidental charges etc., complete as per standard specifications as per MORTH Rev. V Clause No. 111, 112, 202,305.4.3 & 501.

-

-

-

... More
Road c

3000

21

65520

... More
Road D

192.08

21

4195.03

... More
Road E

192.5

21

4204.2

... More
WET MIX MACADAM Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory soil compactor to acheive the desired density including cost of material, labour charges, rentals for machinery,fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5 Clause No. 111, 112, 406 & 900.

-

-

-

... More
Road A

90.5

2291

207404.28

... More
Road B

165.23

2291

378667.51

... More
Road C

890.72

2291

2041316.47

... More
Road D

86.44

2278

196949.22

... More
Road E

86.63

2278

197382.12

... More
Prime Coat Over WBM/ WMM Surface Providing and laying Prime Coat over WBM/ WMM surface using 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 502 of MORTH Rev-5 as per MORTH Rev. V Clause No. 111,112,501,502 &900 .

-

-

-

... More
Road A

362

81

29665.9

... More
Road B

660.93

81

54169.82

... More
Road C

4795.39

81

392982.21

... More
Road D

576.25

81

47212.16

... More
Road E

577.5

81

47297.25

... More
Tack Coat Over Primed Surface Providing and laying Tack Coat over WBM/ WMM surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 503 of MORTH Rev-5 as per MORTH Rev. V Clause No.111, 112,501, 503 & 900.

-

-

-

... More
Road A

362

18

6856.28

... More
Road B

660.93

18

12518.01

... More
Road C

4795.39

18

90824.69

... More
Road D

576.25

18

10908.41

... More
Road E

577.5

18

10926.3

... More
Tack Coat Over Existing BT Surface Providing and laying Tack Coat over Existing BT surface using 2 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel andall other incidental charges etc., complete as perClause 503 of MORTH Rev-5 as per MORTH Rev. V Clause No.111, 112,501, 503 & 900.

-

-

-

... More
Road A

770

27

20905.5

... More
Road B

1931.57

27

52461.44

... More
Road C

449.76

27

12210.98

... More
Road D

2561.25

27

69537.94

... More
Road E

3822.5

27

103742.65

... More
Tack Coat over Dry Lean Cement Concrete Surface Providing and laying Tack Coat over Dry Lean Cement Concrete surface using 3.00 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery,fuel and all other incidental charges etc., complete as perClause 503 of MORTH Rev-5

-

-

-

... More
Road A

28.86

21

618.76

... More
Road C

73.37

21

1573.05

... More
DBM (Grade-II) 50mm Thick Using VG30 Providing, laying 50mm consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50- 13.20mm, 0.25cum of 13.20-2.36mm and 0.23cum of 2.36mm & below and with 53.20Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in the required temperature in Central Hot Mix Plant 20-30 ton capacity, conveying the mix by tipper trucks to work site, spreading the mix to uniform thickness of 50mm using paver to the specified grades and cross sections and compacted by Vibratory/ Pneumatic Roller to the required density etc., including labour for attending to paver at site etc., including hire and fuel charges for 20-30ton CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory rollers and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5

-

-

-

... More
Road C

239.76

10405

2494726.78

... More
DBM (Grade-II)-75mm Thick using VG 40 -Providing ,laying 75mm consolidated thick Dense Bituminous Macadam using 0.40cum of 37.50-13.20mm ,0.35cum of13.20-2.36mm and 0.36cum of 2.36mm & below size IRC metal with 71.30kgs of VG40 grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in the required temperature in centra hot mix plant 20-30 ton capacity ,conveying the mix by tipper trucks to site, spreading the mix to uniform thickness of 75mm with mechanical paver to the specified grades and cross sections and consolidated by Vibratory Roller to the required density etc. ,including labour for attending to paver to site etc.,including hire and fuel charges for 20-30t CMP with bitumen boiler ,tippe rtrucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 505 of MORTH

-

-

-

... More
Road B

107.32

9849

1057041.9

... More
BM (Grade -II) - 50mm Thick using VG 30- Providing, laying 50mm consolidated thick Bituminous Macadam using 0.20cum of 26.50- 13.20mm, 0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRC metal with 37 Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 504 of MORTH Rev-5

-

-

-

... More
Road A

56.6

8858

501379.78

... More
Road D

39.14

8861

346843.02

... More
Road E

52.25

8861

463018.6

... More
BC 30/40mm Thick (Grade - II) - using VG 30 - Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5

-

-

-

... More
Road A

33.96

11287

383333.01

... More
Road C

157.35

11287

1776132.18

... More
Road D

94.13

11303

1064001.28

... More
Road E

132

11303

1492065.96

... More
BC (Grade -II) - 50mm Thick using VG 30 - Providing and laying Bituminous Concrete to 50mm thick using 0.22 cum of 26.5-13.20mm, 0.24 cum of 13.20-2.36mm and 0.26cum of 2.36 & below IRC HBG metal with 62.40 kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc.,complete as per specification using CMP clause 507 of MORTH.

-

-

-

... More
Road A

1.44

10772

15512.26

... More
Road C

3.67

10772

39534.71

... More
Providing and laying Bituminous Concrete to 30/40mm thick using 0.13cum of 19.00-9.50mm, 0.17cumof9.50-2.36mm and 0.26cum of 2.36 and below with 50.30kgs of VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperatur ein central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidate dby 8-10 tonne Vibratory Roller to the required density etc. ,including labour for attending to paver to site etc.,including hire charges and fuel charges for 20-30 t CMP with bitumen boiler ,tipper trucks ,Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc.,complete as per specification using CMP as per clause 507 of MORTH Rev-5

-

-

-

... More
Road B

77.78

11571

900042.94

... More
Providing compaction for embankment/ making upo flow berms using the available box cut earth including all hire and fuel charges for power roller for compaction, water sprinkler, including all labour charges for laying, spreading, watering etc., complete and as directed by the departmental engineers.

-

-

-

... More
Road B

406.47

26

10848.68

... More
Road C

658.03

26

17562.82

... More
Providing and laying of earth for berms including cost and conveyance of the same to work site with an average lead of 5Km including stacking the same to departmental gauge for premeasurement including all labour charges for laying,spreading etc.,complete and as directed by the departmental engineers for making up of low berms including compaction by power roller as per MORTH Rev.V clasue No.111,112,202,301-305 & 900.

-

-

-

... More
Road D

200

238

47610

... More
Road E

312

238

74271.6

... More
Cement Concrete kerb of M20 grade, Nominal Mix 1:1:5:3 using 20mm ISS size with top and bottom width 115 mm and 165mm respectively,200 mm high and foundation of 125 mm thick and kerb stone laid with kerb laying machine and cost and conveyance of all materials to site and cement at site including labour charges for mixing,transporting, laying, and curing concrete,working at heights,hire charges for tools and plants, including all other incidental charges,etc.,complete as per standard specification for Bodywall of Kerb wall.

-

-

-

... More
Road B

2.08

5170

10753.68

... More
Dismantling the existing Random Rubble Masonry in Cement Mortar in the existing causeway / bridge and clearing away from the work site and carefully stacking the usefull materials for reuse on the road side as directed by the departmental officers including all labour and incidental charges etc., complete

-

-

-

... More
Road A

4.63

283

1310.94

... More
Road C - Box Culvert -Km -0/10

45.9

283

12996.13

... More
Road C - Box Culvert -Km - 1/4(ii)

3.5

283

990.99

... More
Removal of existing RCC in the existing causeway / bridge and clearing away from the work site and carefully stacking the usefull materials for reuse on the road side as directed by the departmental officers including all labour and incidental charges etc., complete.

-

-

-

... More
Road C- Box Culvert -Km -0/10

75

512

38469.75

... More
Earthwork excavation in all classes of soils except hard rock requring blasting depositing on bank with all leads and lifts as per SS 20B including cost of all labour,materials, tools, equipments and all incidential charges such as bailing out water providing and maintaining necessary conferdams, sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and cleaning the site and disposal of all surplus materials etc complete as per relevant standard specifiation for FOUNDATION OF Box Culvert AND RETURN WALL

-

-

-

... More
Road A

55.61

123

6854.49

... More
Road C - Box Culvert -Km -0/10

147.9

123

18230.15

... More
Road C - Box Culvert -Km - 1/4(ii)

49.3

123

6076.72

... More
Plain Cement Concrete M20 gradeMix using 40mm ISS size hard granite broken metal including cost and conveyance of all materials to site, including cost of cement at site including cost of form work soft water labour charges for mixing transporting laying and curing concrete working at heights,hire charges for all tools and plants and maintaining of protective bunds, coffer dams, shoring strutting etc., complete as per standard specification forLEVELLING COURSE OF BOX CULVERT.

-

-

-

... More
Road A

6.95

6524

45346.8

... More
Road C- Box Culvert -Km -0/10

16.74

6538

109451.64

... More
Road C - Box Culvert -Km - 1/4(ii)

5.81

6551

38066.71

... More
Vibrated Reinforced Cement Concrete M25 Grade using 20mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for formwork and centering, labour charges, compacting, curing, and all incidental charges etc., complete for BOTTOM SLAB OF BOX CULVERT.

-

-

-

... More
Road A

16.42

10103

165897.5

... More
Road C - Box Culvert -Km -0/10

53.7

9773

524861.12

... More
Road C - Box Culvert -Km - 1/4(ii)

13.68

10166

139081

... More
Vibrated Reinforced Cement Concrete M25 Grade using 20mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for formwork and centering, labour charges, compacting, curing, and all incidental charges etc., complete for BODY WALL OF BOX CULVERT.

-

-

-

... More
Road A

14.94

16554

247322.74

... More
Road C - Box Culvert -Km -0/10

36.16

11900

430323.89

... More
Road C - Box Culvert -Km - 1/4(ii)

12.46

16610

206964.46

... More
Vibrated Reinforced Cement Concrete M25 Grade using 20mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for formwork and centering, labour charges, compacting, curing, and all incidental charges etc., complete for TOP SLAB OF BOX CULVERT.

-

-

-

... More
Road A

13.26

11934

158252

... More
Road C - Box Culvert -Km -0/10

54.77

11592

634913.01

... More
Road C - Box Culvert -Km - 1/4(ii)

10.66

12057

128531.99

... More
Supply and fabrication of steel Grade Fe-500 / required for all RCC items of works involved in the schedule including cost of steel cost of fabrication labour charges for cleaning the bars straightening cutting bending tying grills hoisting and placing the reinforcement in position as specified in the drawings including cost of binding wire provision of spacer bars, cover blocks and all other incidental charges etc. complete as per standard specification.

-

-

-

... More
Road A

2.97

95609

283672.7

... More
Road C - Box Culvert -Km -0/10

11.55

95609

1104191.46

... More
Road C - Box Culvert -Km - 1/4(ii)

2.48

95609

237493.43

... More
Vibrated Cement Concrete M20 Grade using 40mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for formwork and centering, labour charges, compacting, curing, and all incidental charges etc., complete for Parapet.

-

-

-

... More
Road A

1.17

12142

14207.06

... More
Road C - Box Culvert -Km -0/10

4.83

11539

55738.15

... More
Road C - Box Culvert -Km - 1/4(ii)

1.17

12170

14238.9

... More
Vibrated Cement Concrete of grade M20 Nominal Mix, using 40mm ISS size HBG graded metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for FOOTINGS OF RETURN WALL.

-

-

-

... More
Road A

6.72

6524

43846.12

... More
Road C - Box Culvert -Km -0/10

29.11

6615

192565.85

... More
Road C - Box Culvert -Km - 1/4(ii)

11.27

6551

73840.25

... More
Vibrated Cement Concrete of grade M20 Nominal Mix, using 40mm ISS size HBG graded metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for STEM OF RETURN WALL- BELOW SILL LEVEL

-

-

-

... More
Road A

3.49

8279

28896.92

... More
Road C - Box Culvert -Km -0/10

9.32

7944

74045.44

... More
Road C - Box Culvert -Km - 1/4(ii)

5.24

8156

42737.49

... More
Vibrated Cement Concrete of grade M20 Nominal Mix, using 40mm ISS size HBG graded metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for STEM OF RETURN WALL- ABOVE SILL LEVEL

-

-

-

... More
Road A

12.67

10098

127941.79

... More
Road C - Box Culvert -Km -0/10

34.94

9645

336998.75

... More
Road C - Box Culvert -Km - 1/4(ii)

19

9936

188784.95

... More
Excavation including removal and satisfactory disposal of all materials necessary for the construction of road way and side drains in accordance with specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer for Carted Eath with a lead of 5 km for formation of Diversion Road for 95% compacion.

-

-

-

... More
Road C - Box Culvert -Km -0/10

832.82

206

171594.23

... More
Road C - Box Culvert -Km - 1/4(ii)

621.62

206

128078.59

... More
Excavation including removal and satisfactory disposal of all materials necessary for the construction of road way and side drains in accordance with specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer for Carted Eath with a lead of 5 km for formation of Diversion Road for 97% compacion and for approach road on both sides of culvert

-

-

-

... More
Road A

31.32

207

6484.49

... More
Road C - Box Culvert -Km -0/10

118

207

24430.72

... More
Road C - Box Culvert -Km - 1/4(ii)

88.5

207

18323.04

... More
Supply and Hoisting of NP 3 class RCC 1000 mm dia. pipes supplied by the Contractor at his own cost specified below confirming to IS 458 / 1989 cost of pipe as a finished work including all other incidental charges, testing charges including loading and unloading transport and delivery in good condition at work site as directed by the departmental officers etc., complete.

-

-

-

... More
Road C - Box Culvert -Km -0/10

12.5

4543

56787.5

... More
Road C - Box Culvert -Km - 1/4(ii)

12.5

4543

56787.5

... More
Providing and laying Gravel soling for specified thick with clean good gritty gravel over the well prepared sub grade from the approved quarry including cost and conveyance of material, laying in accordance with the requirements and specification. The materials shall be laid in one or more layers as sub-base according to the line and grade and cross action shown in the drawing or as directed by the Engineers for DIVERSION ROAD

-

-

-

... More
Road C - Box Culvert -Km -0/10

132

323

42741.6

... More
Road C - Box Culvert -Km - 1/4(ii)

99

324

32125.5

... More
Calculation of SubTotal, GST and Total Amount carried out by system automatically

-

-

-

... More
Basic cost of value put to tender as per estimate

1

22780236

-

... More
Add GST at 18%

1

4100442

-

... More
Total Value put to Tender

1

26880678

-

... More
Negotiated Percentage

1

-

-

... More
Final Negotiated Value

1

-

-

... More
Add GST at 18% of Final Negotiated Value

1

-

-

... More
Total Value of Contract Including 18% of GST

1

-

-

... More
Basic cost of value put to tender as per Estimate

-

-

22780236

... More
Quoted Rate in Figures (Total Value of Contract Including 18% of GST )

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.