Highways Department Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Highways Department Tender

Works
Civil And Construction
Eprocure
Opening Date30 Sep 2024
Closing Date17 Oct 2024
Tender Amount₹ 3,08,50,000 
Notes
Download

Costs

Summary

Harur (h) Candm Sub Division (slm-105)

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
2.Widening from Single Lane to Intermediate Lane and Strengthening at km 1/4 - 3/0 of Morappur - Kallavi road including Reconstruction of culvert at Km 2/4.

1627.12

200558

123.26

... More
Construction of granular sub-base by providing close graded Material,mixing in a mechanical mixplant at OMC, carriage of mixed Material to worksite, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory soil compactor to achieve the desired density, complete as per clause 111, 112, 401 & 900 of MORTH Vth Revision etc., complete - for Grading- V Material

-

-

-

... More
2.Widening from Single Lane to Intermediate Lane and Strengthening at km 1/4 - 3/0 of Morappur - Kallavi road including Reconstruction of culvert at Km 2/4.

479.88

889519

1853.63

... More
Construction of granular sub-base by providing close graded Material,mixing in a mechanical mixplant at OMC, carriage of mixed Material to worksite, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory soil compactor to achieve the desired density, complete as per clause 111, 112, 401 & 900 of MORTH Vth Revision etc., complete - for Grading- III Material

-

-

-

... More
2.Widening from Single Lane to Intermediate Lane and Strengthening at km 1/4 - 3/0 of Morappur - Kallavi road including Reconstruction of culvert at Km 2/4.

290.74

565024

1943.4

... More
Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam of 150mm thickness, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory soil compactor to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 111, 112, 406 & 900 of MORTH Vth Revision

-

-

-

... More
1.Improvements to Riding Quality at km 15/0-18/4 of Morappur - Marandahalli road

56.19

126519

2251.63

... More
Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam of 250mm thickness, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory soil compactor to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 111, 112, 406 & 900 of MORTH Vth Revision

-

-

-

... More
2.Widening from Single Lane to Intermediate Lane and Strengthening at km 1/4 - 3/0 of Morappur - Kallavi road including Reconstruction of culvert at Km 2/4.

726.87

1636642

2251.63

... More
Providing and laying Prime Coat over WMM surface using 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 111, 112, 501, 502 & 900 of MORTH Vth Revision

-

-

-

... More
1.Improvements to Riding Quality at km 15/0-18/4 of Morappur - Marandahalli road

374.5

30240

80.75

... More
2.Widening from Single Lane to Intermediate Lane and Strengthening at km 1/4 - 3/0 of Morappur - Kallavi road including Reconstruction of culvert at Km 2/4.

2907.45

234776

80.75

... More
Providing and laying Tack Coat over WMM surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 111, 112, 501, 503 & 900 of MORTH Vth Revision

-

-

-

... More
1.Improvements to Riding Quality at km 15/0-18/4 of Morappur - Marandahalli road

374.5

6924

18.49

... More
2.Widening from Single Lane to Intermediate Lane and Strengthening at km 1/4 - 3/0 of Morappur - Kallavi road including Reconstruction of culvert at Km 2/4.

2907.45

53758

18.49

... More
Providing and laying Tack Coat over Existing BT surface using 2 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 111, 112, 501, 503 & 900 of MORTH Vth Revision

-

-

-

... More
1.Improvements to Riding Quality at km 15/0-18/4 of Morappur - Marandahalli road

24144.25

646824

26.79

... More
2.Widening from Single Lane to Intermediate Lane and Strengthening at km 1/4 - 3/0 of Morappur - Kallavi road including Reconstruction of culvert at Km 2/4.

5990.25

160478

26.79

... More
Providing and laying Tack Coat over Dry Lean Cement Concrete surface using 3.00 Kg of Bitumen Emulsion (RS1) per10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 111, 112, 501, 503 & 900 of MORTH Vth Revision

-

-

-

... More
2.Widening from Single Lane to Intermediate Lane and Strengthening at km 1/4 - 3/0 of Morappur - Kallavi road including Reconstruction of culvert at Km 2/4.

28.86

603

20.9

... More
Providing and laying 50 mm thick Bituminous Macadam using course aggregate and VG-30 Bitumen which shall consist of construction in a single course base/binder course confirming to the specification on a previously prepared base (using Mini Mix Plant and Power Roller) including cost of material,labour charges,rentals for machinary,fuel and all other incidental charges etc.,complete as per clause 111,112,504 & 900 of MORTH Rev-5 (For Patch Works)

-

-

-

... More
1.Improvements to Riding Quality at km 15/0-18/4 of Morappur - Marandahalli road

26.47

209884

7929.13

... More
Providing, laying 70mm consolidated thick Bituminous Macadam using 0.20cum of 26.50-13.20mm, 0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRC metal with 37Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 70mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 504 of MORTH Rev-5 Grading II

-

-

-

... More
2.Widening from Single Lane to Intermediate Lane and Strengthening at km 1/4 - 3/0 of Morappur - Kallavi road including Reconstruction of culvert at Km 2/4.

203.85

1693443

8307.3

... More
Providing, laying 50mm consolidated thick Bituminous Macadam using 0.20cum of 26.50-13.20mm, 0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRC metal with 37Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 504 of MORTH Rev-5 Grading II

-

-

-

... More
1.Improvements to Riding Quality at km 15/0-18/4 of Morappur - Marandahalli road

230.65

1916078

8307.3

... More
2.Widening from Single Lane to Intermediate Lane and Strengthening at km 1/4 - 3/0 of Morappur - Kallavi road including Reconstruction of culvert at Km 2/4.

300.73

2498254

8307.3

... More
Providing and laying Bituminous Concrete to 40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per clause No. 111, 112, 501, 507 & 900 of MORTH vth Revision Grade II

-

-

-

... More
1.Improvements to Riding Quality at km 15/0-18/4 of Morappur - Marandahalli road

980.75

10249033

10450.2

... More
Providing and laying Bituminous Concrete to 30mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per clause No. 111, 112, 501, 507 & 900 of MORTH vth Revision Grading - II

-

-

-

... More
2.Widening from Single Lane to Intermediate Lane and Strengthening at km 1/4 - 3/0 of Morappur - Kallavi road including Reconstruction of culvert at Km 2/4.

267.81

2798668

10450.2

... More
Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with power roller, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification. For making up of low berms as per clause No. 111, 112, 301 to 305 & 900 of MORTH Vth Revision (Labour and Hire charges only)

-

-

-

... More
2.Widening from Single Lane to Intermediate Lane and Strengthening at km 1/4 - 3/0 of Morappur - Kallavi road including Reconstruction of culvert at Km 2/4.

465

12406

26.68

... More
Excavation including removal and satisfactory disposal of all materials necessary for the construction of road way and side drains in accordance with specifications and the lines, grades and corss sections shown in the drawings or as indicated by the engineer disposal the earth for average lead of 4 Km. 111, 112, 201, 202, 301 to 305, 900 of MORTH Vth Revision.

-

-

-

... More
2.Widening from Single Lane to Intermediate Lane and Strengthening at km 1/4 - 3/0 of Morappur - Kallavi road including Reconstruction of culvert at Km 2/4.

1162.12

54805

47.16

... More
Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with power roller, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification. For making up of low berms as per clause No. 111, 112, 301 to 305 & 900 of MORTH Vth Revision

-

-

-

... More
1.Improvements to Riding Quality at km 15/0-18/4 of Morappur - Marandahalli road

1005

123876

123.26

... More
Dismantling Culverts and other structures Dismantling salvaging and removal and disposing of resulting materials and back filling the resulting trenches and pits etc as per clause No. 111, 112, 202 of MORTH vth Revision Dismantling Cut stone slab culvert

-

-

-

... More
2.1. Reconstruction of culvert at km 2/4 of Morappur - Kallavi road

26.88

13787

512.93

... More
Earth Work excavation in all classes of soil except hard rock not requiring blasting and deposting on bank with all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges and sheeting, shoring, bracing and their subsequent removal of all logs, stumps and other deleteriuos matter and obstructions, trimming of bottom of excavation, backfilling and clearing the site and disposal of all surplus materials etc.,complete as per standard specification for Foundation of Box Culvert as per clause 111, 112, 201, 202, 301 to 305 & 900 of MORTH Vth Revision

-

-

-

... More
2.1. Reconstruction of culvert at km 2/4 of Morappur - Kallavi road

335.5

41353

123.26

... More
Plain Cement Concrete of grade M15 Nominal Mix using 40mm ISS size HBG metal including cost and conveyance of all materials to site complying with required standards and specifications. including cost of formwork, mixing, laying and compacting using vibrator including hire and fuel charges for all Tools and Plants and incidental charges such as maintaining of protective bunds, coffer dams strutting etc., complete as per relevant standard specification for Base Concrete of Culverts as per clause as per clause 1000, 1500, 1700, 2100, 2200 & 2908 of MORTH Vth Revision

-

-

-

... More
2.1. Reconstruction of culvert at km 2/4 of Morappur - Kallavi road

15.29

93409

6109.16

... More
Vibrated Reinforced Cement Concrete of grade M25 (Design mix) using 20mm and below ISS HBG metal including cost and conveyance of all materials to site and cost of cement excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for tools and plants including all other incidental charges etc., complete for Base Slab, Side Walls, Top Slab of Box Culvert as per clause 900, 1000, 1500, 1600, 1700, 2100, 2200 & 2300 of MORTH Vth Revision

-

-

-

... More
2.1. Reconstruction of culvert at km 2/4 of Morappur - Kallavi road

98.37

1288862

13102.19

... More
Supply and fabrication of STEEL grade Fe500 D for all the reinforced cement concrete items of work involved in the schedule including cost of steel, cost of fabrication, labour charges for cleaning the rods, straightening, cutting, bending, tying grills, hoisting and placing the reinforcement in position as specified in the drawing including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete. as per standard specification as per clause 1000, 1500, 1600, 1700, 2100 & 2300 of MORTH Vth Revision

-

-

-

... More
2.1. Reconstruction of culvert at km 2/4 of Morappur - Kallavi road

6.01

574324

95609.27

... More
Providing and fixing drainage PVC pipes and seepage pipe of 100mm dia. & 600 mm length PVC pipes of required lengths for end wall and wings including cost and conveyance of all materials to work site, cost and labour charges for fixing, etc., to drain of rain water for Box culvert as per clause 2905 & 2906 of MORTH Vth Revision

-

-

-

... More
2.1. Reconstruction of culvert at km 2/4 of Morappur - Kallavi road

4

770

192.5

... More
Supplying and fixing of bituminous pad 20 mm thick conforming to specifications for Roads and Bridges works_ V th Revision :2013 published by ministry of surface transport (Roads wing) including cost and conveyance of all materials, cost of testing as per MORT&H specifications, including labour, equipment and incidental charges for fixing the joints complete in all respects as per specifications for Expansion joint / Construction joint as per clause 2905 & 2906 of MORTH Vth Revision

-

-

-

... More
2.1. Reconstruction of culvert at km 2/4 of Morappur - Kallavi road

3.4

2444

719

... More
Vibrated Cement Concrete of grade M20 (Nominal mix) using 40mm ISS size HBG metal including cost and conveyance of all materials to site and cost cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths Tools and Plants and incidental charges etc., complete as per relevent standard specification for Wing wall and Parapet as per clause 1000, 1500, 1700, 2100, 2200 & 2908 of MORTH Vth Revision

-

-

-

... More
2.1. Reconstruction of culvert at km 2/4 of Morappur - Kallavi road

1.17

12819

10957.12

... More
Calculation of SubTotal, GST and Total Amount carried out by system automatically

-

-

-

... More
Basic cost of value put to tender as per estimate

1

-

26138820

... More
Add GST at 18%

1

-

4704988

... More
Total Value put to Tender

1

-

30843808

... More
Negotiated Percentage

1

-

-

... More
Final Negotiated Value

1

-

-

... More
Add GST at 18% of Final Negotiated Value

1

-

-

... More
Total Value of Contract Including 18% of GST

1

-

-

... More
Basic cost of value put to tender as per Estimate

-

26138820

-

... More
Quoted Rate in Figures (Total Value of Contract Including 18% of GST )

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.