Highways Department Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Highways Department Tender
Civil And Construction
Road Construction
Eprocure
Opening Date6 Sep 2024
Closing Date23 Sep 2024
Tender Amount₹ 1,89,00,000
Costs
EMD
₹ 1,05,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_HWAY_481659_1Tender No
TN.No.9/2024-25/HDO Dt.28.08.2024Tender Authority
Highways Department ViewPurchaser Address
-Website
http://https://tnhighways.gov.in/index.php/en/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Road C
3750
101475
27.06
... More
Road F
7500
202950
27.06
... More
Road G
4256.26
115174
27.06
... More
Providing, laying 50mm consolidated thick Bituminous Macadam using 0.20cum of 26.50- 13.20mm, 0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRC metal with 37 Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 504 of MORTH Rev-5 (Grade-II)
-
-
-
... More
Road A
51.46
434240
8438.4
... More
Road B
15.76
132989
8438.4
... More
Road C
28.89
243785
8438.4
... More
Road F
62.64
528581
8438.4
... More
Road G
51.8
437109
8438.4
... More
Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 (Grade-II)
-
-
-
... More
Road A
126.73
1356042
10700.25
... More
Road B
180
1926045
10700.25
... More
Road C
112.5
1203778
10700.25
... More
Road F
225
2407556
10700.25
... More
Road G
127.69
1366314
10700.25
... More
Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with power roller, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification. For making up of low berms with conveyance
-
-
-
... More
Road A
118.2
47269
399.91
... More
Road B
320
105520
329.75
... More
Road C
200
58538
292.69
... More
Road F
380
111222
292.69
... More
Road G
136
57567
423.29
... More
Vibrated Cement Concrete of grade M20 (Nominal mix) using40mm HBG metal with M-Sand including cost and conveyance of all materials to site and cement at site including cost of formwork, centering, soft water, labour charges for mixing, transporting, laying and curing concrete working at depths, Tools and Plants and incidental charges etc., complete as per relevant standard specification for ABOVE SILL LEVEL as per MORTH No. 111, 112, 900, 1000, 1500, 1700, 2200
-
-
-
... More
Road D
10.44
115477
11061.09
... More
Road E
1.35
16271
12052.97
... More
Road H
9.9
107634
10872.18
... More
Chipping salvaging and removal and disposing of resulting materials and back filling the resulting trenches and pits including all labour, materials, tools, equipment, safe guards, incidental necessary to complete the work as directed by the Engineer for concrete and roughening the surface as per MORTH No.111,112,202
-
-
-
... More
Road D
37
1493
40.37
... More
Plastering with CM 1:4 with 20mm thick using P.Sand including cost and conveyance of all material to site including cost of cement which will be procured by the contractor himself with his own cost including all labour and all other incidental charges etc to complete.
-
-
-
... More
Road D
37
21400
578.38
... More
Calculation of SubTotal, GST and Total Amount carried out by system automatically
-
-
-
... More
Basic cost of value put to tender as per estimate
1
-
11375108
... More
Add GST at 18%
1
-
2047519
... More
Total Value put to Tender
1
-
13422627
... More
Difference in Value
1
-
-
... More
Bidder quoted value
1
-
-
... More
Add GST at 18% of Final quoted Value
1
-
-
... More
Total Value of Contract Including 18% of GST
1
-
-
... More
Basic cost of value put to tender as per Estimate
-
11375108
-
... More
Quoted Rate in Figures (Total Value of Contract Including 18% of GST )
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements