Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Highways Department Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date19 Sep 2024
Closing Date14 Oct 2024
Tender Amount₹ 5,59,50,000 
Notes
Download

Costs

Summary

Tnv-32- Sankarankovil C And M Sub Division

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Road A

3693.75

80671

21.84

... More
Granular Sub-Base with Close Graded Material Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory soil compactor to achieve the desired density, complete as per clause 401 For Grading-V Material as per MORTH Rev. V Clause No. 111, 112, 401 & 900.

-

-

-

... More
Road A

954.39

2076237

2175.46

... More
WET MIX MACADAM Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam 250mm thick, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory soil compactor to acheive the desired density including cost of material, labour charges, rentals for machinery,fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5 Clause No. 111, 112, 406 & 900..

-

-

-

... More
Road A

2395.19

5110976

2133.85

... More
Prime Coat Over WBM/ WMM Surface Prime Coat Over WBM/ WMM Surface Providing and laying Prime Coat over WBM/ WMM surface using 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 502 of MORTH Rev-5 Clause No. 111,112,501,502 &900 .

-

-

-

... More
Road A

16213.72

1325633

81.76

... More
Tack Coat Over Primed Surface Providing and laying Tack Coat over WBM/ WMM surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 503 of MORTH Rev-5 as per Clause No.111, 112,501, 503 & 900.

-

-

-

... More
Road A

16213.72

305790

18.86

... More
BM (Grade-II) 50mm Thick Using VG30 Providing, laying 50mm consolidated thick Bituminous Macadam using 0.20cum of 26.50- 13.20mm, 0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRC metal with 37 Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 504 of MORTH Rev-5

-

-

-

... More
Road A

810.68

6966805

8593.78

... More
BC 30/40mm Thick (Grade-II) Using VG30 Bitumen Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 Clause No. 111, 112, 501,507 & 900.

-

-

-

... More
Road A

487.57

5348496

10969.7

... More
Filling with Box cut Earth Filling with Box cut Earth including cost and conveyance of the same to work site including stacking the same to departmental gauge for premeasurement including all labour charges for laying spreading etc complete and as directed by departmental engineers for making up of berm including compaction by Power Roller as per MORTH Rev. V Clause No. 111, 112,202, 301 to 305, 900

-

-

-

... More
Road A

1326.57

56843

42.85

... More
Earthwork excavation in all classes of soils except hard rock requring blasting depositing on bank with all leads and lifts as per SS 20B including cost of all labour,materials, tools, equipments and all incidential charges such as bailing out water providing and maintaining necessary conferdams, sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and cleaning the site and disposal of all surplus materials etc complete as per relevant standard specifiation FOUNDATION.

-

-

-

... More
Road A [ Drain at Km 1/0-1/4 L/S & 1/0-1/10 R/S)]

2569.32

316694

123.26

... More
Cement Concrete M10 using 40mm ISS HBG size hard broken granite graded metal including cost and conveyance of all materials to site, but excluding cost and fabrication of steel but including cost and labour charges for form work and centering, labour charges, for laying compacting finishing and curing including all incidental charges etc., complete as per standard specifications for levelling course base slab

-

-

-

... More
Road A [ Drain at Km 1/0-1/4 L/S & 1/0-1/10 R/S)]

219.6

1170544

5330.35

... More
Vibrated Reinforced Cement Concrete M25 Grade using 20mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for formwork and centering, labour charges, compacting, curing, and all incidental charges etc., complete for BOTTOM SLAB OF DRAIN

-

-

-

... More
Road A [ Drain at Km 1/0-1/4 L/S & 1/0-1/10 R/S)]

390.4

3599144

9219.12

... More
Vibrated Reinforced Cement Concrete M25 Grade using 20mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for formwork and centering, labour charges, compacting, curing, and all incidental charges etc., complete for Side wall of DRAIN

-

-

-

... More
Road A [ Drain at Km 1/0-1/4 L/S & 1/0-1/10 R/S)]

585.21

7490266

12799.28

... More
Vibrated Reinforced Cement Concrete M25 Grade using 20mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for formwork and centering, labour charges, compacting, curing, and all incidental charges etc., complete for TOP SLAB OF Drain

-

-

-

... More
Road A [ Drain at Km 1/0-1/4 L/S & 1/0-1/10 R/S)]

244

3571474

14637.19

... More
Supply and fabrication of steel Grade Fe-500 / required for all RCC items of works involved in the schedule including cost of steel cost of fabrication labour charges for cleaning the bars straightening cutting bending tying grills hoisting and placing the reinforcement in position as specified in the drawings including cost of binding wire provision of spacer bars, cover blocks and all other incidental charges etc. complete as per standard specification.

-

-

-

... More
Road A [ Drain at Km 1/0-1/4 L/S & 1/0-1/10 R/S)]

65.88

6298738

95609.27

... More
Providing Weep holes in brick masonry/plain/Reinforced concrete abutment, wing wall / return wall with 100mm dia AC pipe, extending through the full width of the structure with slope of 1 V:20H towards drawing force. Complete as per drawing and technical specifications

-

-

-

... More
Road A [ Drain at Km 1/0-1/4 L/S & 1/0-1/10 R/S)]

244

43310

177.5

... More
Earthwork excavation in all classes of soils except hard rock requring blasting depositing on bank with all leads and lifts as per SS 20B including cost of all labour,materials, tools, equipments and all incidential charges such as bailing out water providing and maintaining necessary conferdams, sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and cleaning the site and disposal of all surplus materials etc complete as per relevant standard specifiation FOUNDATION OF RETAINING WALL

-

-

-

... More
Road A [Retainig wall at Km 2/2-2/6]

245.52

30262

123.26

... More
Plain Cement Concrete M20 grade mix using 40mm ISS size hard granite broken metal including cost and conveyance of all materials to site, including cost of cement at site including cost of form work soft water labour charges for mixing transporting laying and curing concrete working at heights,hire charges for all tools and plants and maintaining of protective bunds, coffer dams, shoring strutting etc., complete as per standard specification for Foundation of Retaining Wall

-

-

-

... More
Road A [Retainig wall at Km 2/2-2/6]

81.84

501930

6133.07

... More
Vibrated Cement Concrete M20 grade using 40mm ISS size HBG metal including cost and conveyance of all materials to site, including cost of cement at site including cost of form work soft water labour charges for mixing transporting laying and curing concrete working at heights, tools and plants and maintaining of protective bunds, coffer dams, shoring strutting etc., complete as per standard specification for STEM OF PCC RETAINING WALL (below sill level)

-

-

-

... More
Road A [Retainig wall at Km 2/2-2/6]

106.76

806160

7551.15

... More
Vibrated Cement Concrete M20 grade using 40mm ISS size HBG metal including cost and conveyance of all materials to site, including cost of cement at site including cost of form work soft water labour charges for mixing transporting laying and curing concrete working at heights, tools and plants and maintaining of protective bunds, coffer dams, shoring strutting etc., complete as per standard specification for STEM OF PCC RETAINING WALL (Above sill level)

-

-

-

... More
Road A [Retainig wall at Km 2/2-2/6]

208.66

2042184

9787.14

... More
Providing and fixing 110mm dia PVC SEEPAGE PIPES of required length for abutment and wing, retaining wall including cost and conveyance of all materials to worksite cost and labour for semi-sperical back fill arrangements with 100mm size broken granite stones at the periphery and labour charges for fixing etc., complete to drain the back fill as per standard specifications in Retaining wall

-

-

-

... More
Road A [Retainig wall at Km 2/2-2/6]

62

12592

203.1

... More
Refilling with Site Earth available including cost and Conveyence of all materials to site and Labour Charges etc., complete for over pipes & in between pipes as per Specification

-

-

-

... More
Road A [Retainig wall at Km 2/2-2/6]

90.21

14984

166.11

... More
Refilling with excavated Earth available including cost and Conveyence of all materials to site and Labour Charges etc., complete for over pipes & in between pipes as per Specification

-

-

-

... More
Road A [Retainig wall at Km 2/2-2/6]

245.52

10520

42.85

... More
Calculation of SubTotal, GST and Total Amount carried out by system automatically

-

-

-

... More
Basic cost of value put to tender as per estimate

1

-

47399373

... More
Add GST at 18%

1

-

8531887

... More
Total Value put to Tender

1

-

55931260

... More
Negotiated Percentage

1

-

-

... More
Final Negotiated Value

1

-

-

... More
Add GST at 18% of Final Negotiated Value

1

-

-

... More
Total Value of Contract Including 18% of GST

1

-

-

... More
Basic cost of value put to tender as per Estimate

-

47399373

-

... More
Quoted Rate in Figures (Total Value of Contract Including 18% of GST )

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.