Highways Department Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Highways Department Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date2 Sep 2024
Closing Date23 Sep 2024
Tender Amount₹ 3,67,05,000 
Notes
Download

Costs

Summary

Mdu No 045 Tn No 11 2024 25 Hdo Dated 22 08 2024

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
ROAD A

233.33

5095

21.84

... More
ROAD B

233.33

5095

21.84

... More
ROAD C

2122.5

46355

21.84

... More
Granular Sub-base with Graded Material (Table:- 400-1) - Plant Mix Method Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 of MORTH Specification 111,112,401,900 - for grading- V Material.

-

-

-

... More
ROAD C

549.73

1084760

1973.26

... More
ROAD C Box Culvert at km 0/6

20.71

40866

1973.26

... More
ROAD C Box Culvert at km 1/2,1/4

41.42

81732

1973.26

... More
Granular Sub-base with Graded Material (Table:- 400-1) - Plant Mix Method Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 of MORTH Specification 111,112,401,900 - for grading- III Material

-

-

-

... More
ROAD C

175

360983

2062.76

... More
ROAD C Box Culvert at km 0/6

0.55

1134

2062.76

... More
ROAD C Box Culvert at km 1/2,1/4

1.1

2269

2062.76

... More
Wet Mix Macadam (Table 400-13) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam 250m thick, including premixing the Material with water at OMC in mechanical mix plant conveyance of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory soil compactor to achieve the desired density including cost of material, labour cherges, rentals for machinery, fuel and all other incidental charegs etc, Complete as per clause 406 of MORTH Rev -5

-

-

-

... More
ROAD A

70

154741

2210.59

... More
ROAD B

70

154741

2210.59

... More
ROAD C

1702.88

3764369

2210.59

... More
ROAD C Box Culvert at km 0/6

1.38

3050

2210.59

... More
ROAD C Box Culvert at km 1/2,1/4

2.75

6079

2210.59

... More
Prime coat Providing and Laying primer coat over WBM/WMM surface using 7 kg of bitumen emulsion (SS-I ) per 10 sqm for preparetory to another bituminous construction over it, including cost of materials, labour charges, rentals for machinery, fuel and all other incidental charegs etc, complete as per clause 502 of MORTH Rev -5

-

-

-

... More
ROAD A

700

57316

81.88

... More
ROAD B

700

57330

81.9

... More
ROAD C

9371.5

767713

81.92

... More
Tack coat Providing and Laying Tack coat over WBM/WMM surface (treated with primer) using 2.50 kg of bitumen emulsion (RS-I ) per 10 sqm for preparetory to another bituminous construction over it, including cost of materials, labour charges, rentals for machinery, fuel and all other incidental charegs etc, complete as per clause 502 of MORTH Rev -5

-

-

-

... More
ROAD A

700

13237

18.91

... More
ROAD B

700

13244

18.92

... More
ROAD C

9371.5

177402

18.93

... More
Providing and laying Tack Coat over Dry Lean Cement Concrete surface using 3.00 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5.

-

-

-

... More
ROAD C Box Culvert at km 0/6

17.05

365

21.43

... More
ROAD C Box Culvert at km 1/2,1/4

34.1

730

21.43

... More
Tack coat Providing and Laying Tack coat over Existing BT surface using 2 kg of bitumen emulsion (RS-I ) per 10 sqm for preparetory to another bituminous construction over it, including cost of materials, labour charges, rentals for machinery, fuel and all other incidental charegs etc, complete as per clause 503 of MORTH Rev -5

-

-

-

... More
ROAD A

13465.63

365322

27.13

... More
ROAD B

14940.63

405488

27.14

... More
ROAD C

225

6106

27.14

... More
Tack coat - Providing and applying tack coat with bitumen emulsion(RS-I type) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the Existing CC surface cleaned with mechanical broom as per clause 503 of MORTH Specification 111,112,501,503,900- over the Existing CC surface.

-

-

-

... More
ROAD C

69.85

1496

21.43

... More
Providing and Laying 50mm thick Bituminous Macadam using course aggregate and VG30 bitumen which shall consist of construction in a single course base/binder course confirming to the specfication on a previously prepared base, (using Mini Hot Mix Plant and Power Roller) including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 504 MORTH Rev-5 (For Patch Works)

-

-

-

... More
ROAD A

49.3

410177

8320.04

... More
ROAD B

17.88

149911

8384.33

... More
Providing, laying 50mm consolidated thick Bituminous Macadam using 0.20cum of 26.50- 13.20mm, 0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRC metal with 37 Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 504 of MORTH Rev-5Grading II

-

-

-

... More
ROAD A

145.18

1250127

8610.88

... More
ROAD B

105.98

912581

8610.88

... More
ROAD C

473.58

4077940

8610.88

... More
Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc, complete as per specification using CMP as per clause 507 of MORTH Rev-5

-

-

-

... More
ROAD A

424.97

4645869

10932.23

... More
ROAD B

469.22

5129620

10932.23

... More
ROAD C

290.01

3170456

10932.23

... More
ROAD C Box Culvert at km 0/6

0.51

5575

10932.23

... More
ROAD C Box Culvert at km 1/2,1/4

1.02

11150

10932.23

... More
Refilling the Excavated Earth including removal and Satisfactory removal disposal of all materials necessary for the construction of Road way and side drains in accordance with the specification and the lines, grads and cross section shown in the drawings or as instructed by the Engineer. inclding compaction by power roller as per MORT & H Specification (Vth Revision) no.111,112,301, 300,900.

-

-

-

... More
ROAD C

468

12467

26.64

... More
Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with power roller, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification. For making up of low berms with conveyance Lead for Carted Earth: 2

-

-

-

... More
ROAD A

588.9

115995

196.97

... More
ROAD B

548.4

108018

196.97

... More
Dismantling of RR MASONRY walls,clearing away and carfully stacking useful materials for reuse etc., complete.

-

-

-

... More
ROAD C Box Culvert at km 0/6

6.54

1851

283.14

... More
ROAD C Box Culvert at km 1/2,1/4

15.14

7361

486.2

... More
Earthwork Excavation in all classes of soils except hard rock not requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges and sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavtion, backfilling, and clearing the site and disposal of all surplus materials etc. complete as per standard specification for Foundation of Abutments and Piers.

-

-

-

... More
ROAD C Box Culvert at km 0/6

177.55

51377

289.37

... More
ROAD C Box Culvert at km 1/2,1/4

283.88

82146

289.37

... More
Earthwork excavation including removal and satisfactory disposal of all materials necessary for the construction of road way and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer for forming Diversion road.Carted Earth with a lead of 5 km

-

-

-

... More
ROAD C Box Culvert at km 0/6

86.63

20617

238

... More
ROAD C Box Culvert at km 1/2,1/4

173.25

41233

238

... More
Plain Cement Concrete of grade M15 (Nominal mix) using 40mm ISS hard broken granite metal including cost and conveyance of all materials to site, including cost and labour charges for formwork and centering, labour charges for compacting, curing and all incidental charges etc., complete as per standard specification for LEVELLING COURSE BELOW Box Culvert and Wing wall.

-

-

-

... More
ROAD C Box Culvert at km 0/6

16.11

96480

5988.83

... More
ROAD C Box Culvert at km 1/2,1/4

27.72

166451

6004.75

... More
Vibrated Reinforced Cement Concrete of grade M25 (Design mix) using 20mm ISS hard broken granite metal including cost and conveyance of all materials to site and cost of cement excluding cost and fabrication of steel but including cost of formwork, labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for tools and plants including all other incidental charges etc., complete for Box culvert.

-

-

-

... More
ROAD C Box Culvert at km 0/6

33.38

409136

12256.94

... More
ROAD C Box Culvert at km 1/2,1/4

66.77

819411

12272.15

... More
Supply and fabrication of STEEL grade Fe 500 with suitable anti corrsive measure required for all the reinforced cement concrete items of work involved in the shedule including cost of steel,cost of fabrication, labou rcharges for cleaning the rods, straightening, cutting, bending, tying grills, hoisting and placing the reinforcement in position as specified in the drawing including cost of binding wire provision of spacer bars, cover blocks and all other incidental charges etc., complete.

-

-

-

... More
ROAD C Box Culvert at km 0/6

2.51

239979

95609.27

... More
ROAD C Box Culvert at km 1/2,1/4

5.02

479958

95609.27

... More
Vibrated cement concrete M20 (Nominalmix) using 40mm ISS size hard broken granite metal including cost and conveyance of all materials to site including cost and labour charges for formwork, centering, labour charges for laying, compacting, curing all incidental charges etc., complete for Wing wall and Parapet.

-

-

-

... More
ROAD C Box Culvert at km 0/6

50.82

416022

8186.19

... More
ROAD C Box Culvert at km 1/2,1/4

63.81

532378

8343.18

... More
Vibrated cement concrete M30 Grade (Design mix) using 25mm,12mm and 6mm IRC size hard broken granite metal including cost and conveyance of all materials to site cost of premoulded expansion joints and fixing the same in position including cost and labour charges for formwork, labour charges for laying, compacting, curing including all other incidental charges etc., complete for WEARING COAT 75mm UNIFORM THICKNESS OVER DECK SLAB AND OVER APPROACH SLAB.

-

-

-

... More
ROAD C Box Culvert at km 0/6

24.99

15598

624.18

... More
Calculation of SubTotal, GST and Total Amount carried out by system automatically

-

-

-

... More
Basic cost of value put to tender as per estimate

1

-

31101968

... More
Add GST at 18%

1

-

5598354

... More
Total Value put to Tender

1

-

36700322

... More
Excess/Less Percentage

1

-

-

... More
Final Value

1

-

-

... More
Add GST at 18% of Final Value

1

-

-

... More
Total Value of Contract Including 18% of GST

1

-

-

... More
Basic cost of value put to tender as per Estimate

-

31101968

-

... More
Quoted Rate in Figures (Total Value of Contract Including 18% of GST )

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.