Highways Department Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Highways Department Tender

Works
Civil And Construction
Eprocure
Opening Date23 Sep 2024
Closing Date17 Oct 2024
Tender Amount₹ 2,56,40,000 
Notes
Download

Costs

Summary

Palacode (h) Candm Sub Division (slm-90)

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Advance patch work 50mm thick using 45 mm IRC size HBG metal for making the pot holes and patching using VG 10 grade bitumen including mixing at the rate of 44 Kg / Cum of chips after trimming the pot holes or depression to proper shape and depth side painting with tack coat and compacting the layers as directed by Departmental officers etc., complete as per clause 111, 112, 501, 3004 & 900 of MORTH Vth Revision

-

-

-

... More
2.Improvements to Riding Quality at km 13/670-16/670 of Ekkandahalli - Theertharapatti road

43.29

153360

3542.64

... More
Earth Work excavation in all classes of soil except hard rock not requiring blasting and deposting on bank with all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges and sheeting, shoring,bracing and their subsequent removal of all logs,stumps and other deleteriuos matter and obstructions,trimming of bottom of excavation,backfilling and clearing the site and disposal of all surplus materials etc.,complete as per standard specification for Boxing as per clause 111, 112, 201, 202, 301 to 305 & 900 of MORTH Vth Revision

-

-

-

... More
1.Widening from Intermediate Lane to Two lane and Strengthening at km 9/350 - 10/8 of Palacode - Kesarkuli road including Reconstruction of Culvert at Km 10/2,10/6

1221.23

150528

123.26

... More
Construction of granular sub-base by providing close graded Material,mixing in a mechanical mixplant at OMC, carriage of mixed Material to worksite, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory soil compactor to achieve the desired density, complete as per clause 111, 112, 401 & 900 of MORTH Vth Revision etc., complete - for Grading- III Material

-

-

-

... More
1.Widening from Intermediate Lane to Two lane and Strengthening at km 9/350 - 10/8 of Palacode - Kesarkuli road including Reconstruction of Culvert at Km 10/2,10/6

244.25

470686

1927.07

... More
Construction of granular sub-base by providing close graded Material,mixing in a mechanical mixplant at OMC, carriage of mixed Material to worksite, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory soil compactor to achieve the desired density, complete as per clause 111, 112, 401 & 900 of MORTH Vth Revision etc., complete - for Grading- V Material

-

-

-

... More
1.Widening from Intermediate Lane to Two lane and Strengthening at km 9/350 - 10/8 of Palacode - Kesarkuli road including Reconstruction of Culvert at Km 10/2,10/6

280.9

516232

1837.78

... More
Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam of 250mm thickness, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory soil compactor to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 111, 112, 406 & 900 of MORTH Vth Revision

-

-

-

... More
1.Widening from Intermediate Lane to Two lane and Strengthening at km 9/350 - 10/8 of Palacode - Kesarkuli road including Reconstruction of Culvert at Km 10/2,10/6

693.11

1511395

2180.6

... More
Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam of 150mm thickness, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory soil compactor to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 111, 112, 406 & 900 of MORTH Vth Revision

-

-

-

... More
2.Improvements to Riding Quality at km 13/670-16/670 of Ekkandahalli - Theertharapatti road

68.48

149327

2180.6

... More
Providing and laying Prime Coat over WMM surface using 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 111, 112, 501, 502 & 900 of MORTH Vth Revision

-

-

-

... More
1.Widening from Intermediate Lane to Two lane and Strengthening at km 9/350 - 10/8 of Palacode - Kesarkuli road including Reconstruction of Culvert at Km 10/2,10/6

2772.45

225705

81.41

... More
2.Improvements to Riding Quality at km 13/670-16/670 of Ekkandahalli - Theertharapatti road

456.5

37163

81.41

... More
Providing and laying Tack Coat over WMM surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 111, 112, 501, 503 & 900 of MORTH Vth Revision

-

-

-

... More
1.Widening from Intermediate Lane to Two lane and Strengthening at km 9/350 - 10/8 of Palacode - Kesarkuli road including Reconstruction of Culvert at Km 10/2,10/6

2772.45

51955

18.74

... More
2.Improvements to Riding Quality at km 13/670-16/670 of Ekkandahalli - Theertharapatti road

456.5

8554

18.74

... More
Providing and laying Tack Coat over Existing BT surface using 2 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 111, 112, 501, 503 & 900 of MORTH Vth Revision

-

-

-

... More
1.Widening from Intermediate Lane to Two lane and Strengthening at km 9/350 - 10/8 of Palacode - Kesarkuli road including Reconstruction of Culvert at Km 10/2,10/6

7892.5

213018

26.99

... More
2.Improvements to Riding Quality at km 13/670-16/670 of Ekkandahalli - Theertharapatti road

16043.5

433014

26.99

... More
Providing and laying Tack Coat over Dry Lean Cement Concrete surface using 3.00 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 503 of MORTH Rev-5

-

-

-

... More
1.Widening from Intermediate Lane to Two lane and Strengthening at km 9/350 - 10/8 of Palacode - Kesarkuli road including Reconstruction of Culvert at Km 10/2,10/6

44.52

943

21.2

... More
Providing, laying 85mm consolidated thick Dense Bituminous Macadam using 0.40cum of 37.50-13.20mm, 0.35 cum of 13.20-2.36 mm and 0.36 cum of 2.36 mm & below size IRC metal with 71.30 kgs of VG30 grade bitumen for premixing per 10 sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing the min the required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to site, spreading the mix to uniform thickness of 85mm with mechanical paver to the specified grades and cross section sand consolidated by Vibratory Roller to the required density etc., including labour for attending to paver to site etc.,including hire and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and allother tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per MoRTH specification clause No.111,112,501,505 & 900 - Grading I

-

-

-

... More
1.Widening from Intermediate Lane to Two lane and Strengthening at km 9/350 - 10/8 of Palacode - Kesarkuli road including Reconstruction of Culvert at Km 10/2,10/6

207.5

1891893

9117.56

... More
Providing, laying 50mm consolidated thick Bituminous Macadam using 0.20cum of 26.50-13.20mm, 0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRC metal with 37Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 504 of MORTH Rev-5 Grading II

-

-

-

... More
1.Widening from Intermediate Lane to Two lane and Strengthening at km 9/350 - 10/8 of Palacode - Kesarkuli road including Reconstruction of Culvert at Km 10/2,10/6

412.94

3480068

8427.54

... More
2. Improvements to Riding Quality at km 0/0-3/0 of Bothapuram -Kamalapuram road

130.74

1101816

8427.54

... More
Providing and laying Bituminous Concrete to 30mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per clause No. 111, 112, 501, 507 & 900 of MORTH vth Revision Grading II

-

-

-

... More
1.Widening from Intermediate Lane to Two lane and Strengthening at km 9/350 - 10/8 of Palacode - Kesarkuli road including Reconstruction of Culvert at Km 10/2,10/6

327.79

3493848

10658.8

... More
2.Improvements to Riding Quality at km 13/670-16/670 of Ekkandahalli - Theertharapatti road

498.05

5308615

10658.8

... More
Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with power roller, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification. For making up of low berms as per MORTH specification clause No. 111, 112, 301 to 305 & 900 of MORTH vth Revision

-

-

-

... More
2.Improvements to Riding Quality at km 13/670-16/670 of Ekkandahalli - Theertharapatti road

1192.5

146987

123.26

... More
Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with power roller, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification. For making up of low berms as per clause No. 111, 112, 301 to 305 & 900 of MORTH Vth Revision (Labour and Hire charges only)

-

-

-

... More
1. Widening from Intermediate Lane to Two lane and Strengthening at km 9/350 - 10/8 Palacode - Kesarkuli road including Reconstruction of Culvert at Km 10/2,10/6

617.63

16478

26.68

... More
Excavation including removal and satisfactory disposal of all materials necessary for the construction of road way and side drains in accordance with specifications and the lines, grades and corss sections shown in the drawings or as indicated by the engineer disposal the earth for average lead of 5 Km. 111, 112, 201, 202, 301 to 305, 900 of MORTH Vth Revision

-

-

-

... More
1.Widening from Intermediate Lane to Two lane and Strengthening at km 9/350 - 10/8 of Palacode - Kesarkuli road including Reconstruction of Culvert at Km 10/2,10/6

603.6

35582

58.95

... More
Blasting and removing the Hard rock measured in solid in the foundation and removing the blasted stones and stacking the same for pre-measurement at site including the all other labour and incidental charges including the cost of the blasting materials and all other tools and plants employed etc., complete as per standard specifications Earth work of Boxing Potion

-

-

-

... More
1.Widening from Intermediate Lane to Two lane and Strengthening at km 9/350 - 10/8 of Palacode - Kesarkuli road including Reconstruction of Culvert at Km 10/2,10/6

60

52291

871.53

... More
Providing and laying of Gravel including cost and conveyance of the same to work site from approved quarry including stacking the same to departemental gauge for premeasurement including all labour charges for laying, spreading, including all hire and fuel charges for power roller for compaction, etc., complete and as directed by the departmental engineers No. 111, 112, 301 to 305 & 900 of MORTH vth Revision for formation of Diversion road

-

-

-

... More
1.Widening from Intermediate Lane to Two lane and Strengthening at km 9/350 - 10/8 of Palacode - Kesarkuli road including Reconstruction of Culvert at Km 10/2,10/6

-

-

-

... More
1.1. Reconstruction of Culvert at km 10/2 of Palacode - Kesarkuli road

86.25

21509

249.38

... More
1.2 Reconstruction of Culvert at km 10/6 of Palacode - Kesarkuli road

86.25

21509

249.38

... More
Dismantling the Cut Stone in the existing Culverts and clearing away from the work site and carefully stacking the usefull materials for reuse on the road side as directed by the departmental officers including all labour and incidental charges etc., complete.

-

-

-

... More
1.Widening from Intermediate Lane to Two lane and Strengthening at km 9/350 - 10/8 of Palacode - Kesarkuli road including Reconstruction of Culvert at Km 10/2,10/6

-

-

-

... More
1.1. Reconstruction of Culvert at km 10/2 of Palacode - Kesarkuli road

10.55

5411

512.93

... More
1.2 Reconstruction of Culvert at km 10/6 of Palacode - Kesarkuli road

10.55

5411

512.93

... More
Earth Work excavation in all classes of soil except hard rock not requiring blasting and deposting on bank with all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges and sheeting, shoring, bracing and their subsequent removal of all logs, stumps and other deleteriuos matter and obstructions, trimming of bottom of excavation, backfilling and clearing the site and disposal of all surplus materials etc.,complete as per standard specification for Foundation of Box Culvert as per clause 111, 112, 201, 202, 301 to 305 & 900 of MORTH Vth Revision

-

-

-

... More
1.Widening from Intermediate Lane to Two lane and Strengthening at km 9/350 - 10/8 of Palacode - Kesarkuli road including Reconstruction of Culvert at Km 10/2,10/6

-

-

-

... More
1.1. Reconstruction of Culvert at km 10/2 of Palacode - Kesarkuli road

114.39

14099

123.26

... More
1.2 Reconstruction of Culvert at km 10/6 of Palacode - Kesarkuli road

109.44

13489

123.26

... More
Vibrated Cement Concrete of grade M15 Nominal Mix using 40mm ISS size HBG metal including cost and conveyance of all materials to site complying with required standards and specifications. including cost of formwork, mixing, laying and compacting using vibrator including hire and fuel charges for all Tools and Plants and incidental charges such as maintaining of protective bunds, coffer dams strutting etc., complete as per relevant standard specification for Base Concrete of Culverts as per clause as per clause 1000, 1500, 1700, 2100, 2200 & 2908 of MORTH Vth Revision

-

-

-

... More
1.Widening from Intermediate Lane to Two lane and Strengthening at km 9/350 - 10/8 of Palacode - Kesarkuli road including Reconstruction of Culvert at Km 10/2,10/6

-

-

-

... More
1.1. Reconstruction of Culvert at km 10/2 of Palacode - Kesarkuli road

16.84

102969

6114.57

... More
1.2 Reconstruction of Culvert at km 10/6 of Palacode - Kesarkuli road

16.34

99912

6114.57

... More
Vibrated Cement Concrete of grade M20 (Nominal mix) using 40mm ISS size HBG metal including cost and conveyance of all materials to site and cost cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths Tools and Plants and incidental charges etc., complete as per relevent standard specification for Wing wall and Parapet as per clause 1000, 1500, 1700, 2100, 2200 & 2908 of MORTH Vth Revision

-

-

-

... More
1.Widening from Intermediate Lane to Two lane and Strengthening at km 9/350 - 10/8 of Palacode - Kesarkuli road including Reconstruction of Culvert at Km 10/2,10/6

-

-

-

... More
1.1. Reconstruction of Culvert at km 10/2 of Palacode - Kesarkuli road

41.51

349050

8408.82

... More
1.2 Reconstruction of Culvert at km 10/6 of Palacode - Kesarkuli road

41.51

349050

8408.82

... More
Vibrated Reinforced Cement Concrete of grade M25 (Design mix) using 20mm and below ISS HBG metal including cost and conveyance of all materials to site and cost of cement excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for tools and plants including all other incidental charges etc., complete for Base Slab, Side Walls, Top Slab of Box Culvert as per clause 900, 1000, 1500, 1600, 1700, 2100, 2200 & 2300 of MORTH Vth Revision

-

-

-

... More
1.Widening from Intermediate Lane to Two lane and Strengthening at km 9/350 - 10/8 of Palacode - Kesarkuli road including Reconstruction of Culvert at Km 10/2,10/6

-

-

-

... More
1.1. Reconstruction of Culvert at km 10/2 of Palacode - Kesarkuli road

34.3

418888

12212.49

... More
1.2 Reconstruction of Culvert at km 10/6 of Palacode - Kesarkuli road

31.45

384416

12223.11

... More
Supply and fabrication of STEEL grade Fe500 D for all the reinforced cement concrete items of work involved in the schedule including cost of steel, cost of fabrication, labour charges for cleaning the rods, straightening, cutting, bending, tying grills, hoisting and placing the reinforcement in position as specified in the drawing including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete. as per standard specification as per clause 1000, 1500, 1600, 1700, 2100 & 2300 of MORTH Vth Revision

-

-

-

... More
1.Widening from Intermediate Lane to Two lane and Strengthening at km 9/350 - 10/8 of Palacode - Kesarkuli road including Reconstruction of Culvert at Km 10/2,10/6

-

-

-

... More
1.1. Reconstruction of Culvert at km 10/2 of Palacode - Kesarkuli road

2.62

250305

95609.27

... More
1.2 Reconstruction of Culvert at km 10/6 of Palacode - Kesarkuli road

2.36

226020

95609.27

... More
Providing and fixing 100 mm dia PVC SEEPAGE pipe of required length for abutment and wing including cost and conveyance of all materials to worksite, cost and labour for 110mm dia semi_spherical backfill arrangements with 100mm size broken granite chips at the periphery and labour charges for fixing etc., complete to drain the backfill. -1 No in Outer wall of Box culvert

-

-

-

... More
1.Widening from Intermediate Lane to Two lane and Strengthening at km 9/350 - 10/8 of Palacode - Kesarkuli road including Reconstruction of Culvert at Km 10/2,10/6

-

-

-

... More
1.1. Reconstruction of Culvert at km 10/2 of Palacode - Kesarkuli road

3.3

635

192.5

... More
1.2 Reconstruction of Culvert at km 10/6 of Palacode - Kesarkuli road

3.3

635

192.5

... More
Refilling behind Culvert by using Foundation Earth including cost and conveyance to site including Laber Chargers for filling in layers, watering taming under optimum moisture content to get the maximum density and all other incidental Chargers etc. complete as per clause 304 & 2907 of MORTH Vth Revision . (labour chargers only)

-

-

-

... More
1.Widening from Intermediate Lane to Two lane and Strengthening at km 9/350 - 10/8 of Palacode - Kesarkuli road including Reconstruction of Culvert at Km 10/2,10/6

-

-

-

... More
1.1. Reconstruction of Culvert at km 10/2 of Palacode - Kesarkuli road

41.76

1789

42.85

... More
1.2 Reconstruction of Culvert at km 10/6 of Palacode - Kesarkuli road

41.76

1789

42.85

... More
Calculation of SubTotal, GST and Total Amount carried out by system automatically

-

-

-

... More
Basic cost of value put to tender as per estimate

1

-

21720886

... More
Add GST at 18%

1

-

3909759

... More
Total Value put to Tender

1

-

25630645

... More
Negotiated Percentage

1

-

-

... More
Final Negotiated Value

1

-

-

... More
Add GST at 18% of Final Negotiated Value

1

-

-

... More
Total Value of Contract Including 18% of GST

1

-

-

... More
Basic cost of value put to tender as per Estimate

-

21720886

-

... More
Quoted Rate in Figures (Total Value of Contract Including 18% of GST )

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.