Highways Department Tender
... More
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Highways Department Tender
Civil And Construction
Road Construction
Eprocure
Opening Date21 Sep 2024
Closing Date8 Oct 2024
Tender Amount₹ 1,02,70,000
Costs
EMD
₹ 61,500Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_HWAY_485630_1Bid Award Id
ViewTender No
063 - 2024 - 25Tender Authority
Highways Department ViewPurchaser Address
-Website
http://https://tnhighways.gov.in/index.php/en/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Road C
6316.8
171058
27.08
... More
Providing and Laying 50mm thick Bituminous Macadam using course aggregate and VG40 bitumen which shall consist of construction in a single course base/binder course confirming to the specfication on apreviously prepared base, (using Mini Hot Mix Plant and Power Roller) including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 504 MORTH Rev-5 (For Patch Works)
(Morth No. 111, 112, 501, 504, 900, 3004)
1
-
-
... More
Road A
37.66
304605
8088.3
... More
Road B
37.47
304344
8122.36
... More
Road C
31.33
255424
8152.72
... More
Providing and laying Bituminous Concrete to 40 mm thick using 0.13 cum of 19.00 9.50mm, 0.17 cum of 9.50-2.36 mm and 0.26 cum of 2.36 and below with 50.30 kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required densityetc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 Gr II
(Morth No. 111, 112, 501, 507,900)
1
-
-
... More
Road A
226.67
2449346
10805.78
... More
Road B
225
2431300
10805.78
... More
Road C
189.51
2047803
10805.78
... More
Earthwork excavation in all classes of soils except hard rock requiring blasting anddepositing on bank with all leads and lifts as per SS20B including cost of all labour charges,materials, tools, equipments and all incidental charges, including compacting with power roller, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, trimming of bottom of excavation back filling,clearing up the site and disposal of all surplus materials etc., complete as per standardspecification. For site Earth with compaction for making up of low berms(Morth No.111, 112, 401, 900)
1
-
-
... More
Road A
700.8
118855
169.6
... More
Road B
688.68
116800
169.6
... More
Road C
549.66
93222
169.6
... More
Calculation of SubTotal, GST and Total Amount carried out by system automatically
-
-
-
... More
Basic cost of value put to tender as per estimate
1
-
8700473
... More
Add GST at 18%
1
-
1566085
... More
Total Value put to Tender
1
-
10266558
... More
Differnce Amount (Excess/less)
1
-
-
... More
Quoted Amount (Basic Rate Only)
1
-
-
... More
Add GST at 18% of Quoted Amount
1
-
-
... More
Total Value of Quoted Amount including 18% of GST
1
-
-
... More
Basic cost of value put to tender as per Estimate
-
8700473
-
... More
Quoted Rate in Figures (Total Value of Quoted Amount Including 18% of GST )
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements