Highways Department Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Highways Department Tender

Works
Civil And Construction
Bridge Construction
Eprocure
Opening Date8 Feb 2024
Closing Date14 Feb 2024
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
ROAD - C

14

19999

1428.56

... More
ROAD - D

10.5

14999

1428.56

... More
ROAD - E

7.5

10714

1428.56

... More
ROAD - F

15

21428

1428.56

... More
ROAD - G

3

4285

1428.56

... More
ROAD - K

2.25

3214

1428.56

... More
ROAD - L

10.5

14999

1428.56

... More
ROAD - L Km 3/10

10.5

14999

1428.56

... More
ROAD - L Km 4/6

10.5

14999

1428.56

... More
ROAD - L Km 4/10

7.5

10714

1428.56

... More
Wet Mix Macadam (Table 400-13) (Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density, Complete as per clause 406) as per MORTH Rev. V Clause No. 111, 112, 406 & 900.

-

-

-

... More
ROAD - A

18.75

34537

1842.01

... More
ROAD - B

18.75

34537

1842.01

... More
ROAD - C

35

64470

1842.01

... More
ROAD - D

18.75

34537

1842.01

... More
ROAD - E

18.75

34537

1842.01

... More
ROAD - F

37.5

69075

1842.01

... More
ROAD - G

9.38

17278

1842.01

... More
ROAD - H

5.5

10131

1842.01

... More
ROAD - K

9.38

17278

1842.01

... More
ROAD - L

28.13

51815

1842.01

... More
ROAD - L Km 3/10

28.13

51815

1842.01

... More
ROAD - L Km 4/6

28.13

51815

1842.01

... More
ROAD - L Km 4/10

18.75

34537

1842.01

... More
Prime Coat (Providing and applying primer coat with bitumen emulsion (SS-I type) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per clause 502) - over WMM as per MORTH Rev. V Clause No. 111,112,501,502 &900 .

-

-

-

... More
ROAD - A

75

5635

75.14

... More
ROAD - B

75

5636

75.15

... More
ROAD - C

140

10523

75.17

... More
ROAD - D

75

5636

75.15

... More
ROAD - E

75

5636

75.15

... More
ROAD - F

150

11275

75.17

... More
ROAD - G

37.5

2818

75.15

... More
ROAD - H

22

1653

75.16

... More
ROAD - K

37.5

2818

75.16

... More
ROAD - L

112.5

8454

75.15

... More
ROAD - L Km 3/10

112.5

8454

75.15

... More
ROAD - L Km 4/6

112.5

8454

75.15

... More
ROAD - L Km 4/10

75

5636

75.15

... More
Tack Coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared granular surface cleaned with mechanical broom as per clause 503 - over granular surfaces treated with primer as per MORTH Rev. V Clause No.111, 112,501, 503 & 900.

-

-

-

... More
ROAD - A

75

1261

16.82

... More
ROAD - B

75

1261

16.82

... More
ROAD - C

140

2356

16.83

... More
ROAD - D

75

1261

16.82

... More
ROAD - E

75

1261

16.82

... More
ROAD - F

150

2524

16.83

... More
ROAD - G

37.5

630

16.82

... More
ROAD - H

22

370

16.83

... More
ROAD - K

37.5

630

16.82

... More
ROAD - L

112.5

1892

16.82

... More
ROAD - L Km 3/10

112.5

1892

16.82

... More
ROAD - L Km 4/6

112.5

1892

16.82

... More
ROAD - L Km 4/10

75

1261

16.82

... More
Tack Coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom as per clause 503 - over Existing BT Surfaces as per MORTH Rev. V Clause No.111, 112,501, 503 & 900.

-

-

-

... More
ROAD - A

300

7266

24.22

... More
ROAD - B

300

7266

24.22

... More
ROAD - C

420

10176

24.23

... More
ROAD - D

300

7266

24.22

... More
ROAD - E

300

7266

24.22

... More
ROAD - F

450

10903

24.23

... More
ROAD - G

187.5

4541

24.22

... More
ROAD - H

16.5

399

24.23

... More
ROAD - K

187.5

4541

24.22

... More
ROAD - L

337.5

8174

24.22

... More
ROAD - L Km 3/10

337.5

8174

24.22

... More
ROAD - L Km 4/6

337.5

8174

24.22

... More
ROAD - L Km 4/10

300

7266

24.22

... More
Bituminous Macadam (Providing and laying 50mm bituminous macadam of specified grading premixed with bituminous binder (Viscosity Grade 30), transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction, complete as per clause 504) - Grading II as per MORTH Rev. V Clause No. 111, 112, 501, 504 & 900.

-

-

-

... More
ROAD - A

18.75

147982

7892.4

... More
ROAD - B

18.75

147982

7892.4

... More
ROAD - C

28

220987

7892.4

... More
ROAD - D

18.75

147982

7892.4

... More
ROAD - E

18.75

147982

7892.4

... More
ROAD - F

30

236772

7892.4

... More
ROAD - G

11.25

88789

7892.4

... More
ROAD - H

1.93

15232

7892.4

... More
ROAD - K

11.25

88789

7892.4

... More
ROAD - L

22.5

177579

7892.4

... More
ROAD - L Km 3/10

22.5

177579

7892.4

... More
ROAD - L Km 4/6

22.5

177579

7892.4

... More
ROAD - L Km 4/10

18.75

147982

7892.4

... More
Bituminous Concrete (Table 500-17) (Providing and laying bituminous concrete with hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade-30) at percentage specified by Job Mix Formula of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects) - Grading II as per MORTH Rev. V Clause No. 111, 112, 501,507 & 900.

-

-

-

... More
ROAD - A

11.25

113689

10105.7

... More
ROAD - B

11.25

113689

10105.7

... More
ROAD - C

16.8

169775

10105.7

... More
ROAD - D

11.25

113689

10105.7

... More
ROAD - E

11.25

113689

10105.7

... More
ROAD - F

18

181902

10105.7

... More
ROAD - G

6.75

68213

10105.7

... More
ROAD - H

1.16

11722

10105.7

... More
ROAD - K

6.75

68213

10105.7

... More
ROAD - L

13.5

136426

10105.7

... More
ROAD - L Km 3/10

13.5

136426

10105.7

... More
ROAD - L Km 4/6

13.5

136426

10105.7

... More
ROAD - L Km 4/10

11.25

113689

10105.7

... More
Dismantling the existing Random Rubble Masonry in Cement Mortar in the existing causeway / bridge and clearing away from the work site and carefully stacking the usefull materials for reuse on the road side as directed by the departmental officers including all labour and incidental charges etc., complete..

-

-

-

... More
ROAD - B

70.65

18185

257.4

... More
ROAD - C

10.83

2787

257.4

... More
ROAD - D

6.64

1709

257.4

... More
ROAD - E

18.48

4756

257.4

... More
ROAD - F

19.5

5019

257.4

... More
ROAD - K

6.5

1673

257.4

... More
ROAD - L Km 4/6

10

2574

257.4

... More
Dismantling the existing Plain cement Concrete Slab in the existing causeway and clearing away from the work site and carefully stacking the useful materials for reuse on the road side as directed by the departmental officers including all labour and incidental charges etc., complete.

-

-

-

... More
ROAD - B

65.88

29118

442

... More
ROAD - C

4.5

1989

442

... More
ROAD - D

9

3978

442

... More
ROAD - E

17.76

7849

442

... More
ROAD - F

9

3978

442

... More
ROAD - K

1.5

663

442

... More
ROAD - L Km 4/6

14

6188

442

... More
Earthwork excavation in all classes of soils except hard rock requring blasting depositing on bank with all leads and lifts as per SS 20B including cost of all labour,materials, tools, equipments and all incidential charges such as bailing out water providing and maintaining necessary conferdams, sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and cleaning the site and disposal of all surplus materials etc complete as per relevant standard specifiation for FOUNDATION OF BOX CULVERT, RETAINING WALL AND RETURN WALL

-

-

-

... More
ROAD - A

212.85

23849

112.05

... More
ROAD - B

162

18152

112.05

... More
ROAD - C

143.17

16042

112.05

... More
ROAD - D

71.55

8017

112.05

... More
ROAD - E

112.95

12656

112.05

... More
ROAD - F

137.72

15431

112.05

... More
ROAD - G

85.16

9542

112.05

... More
ROAD - H

76.22

8540

112.05

... More
ROAD - I

697.41

78144

112.05

... More
ROAD - J

178.2

19967

112.05

... More
ROAD - K

108.99

12212

112.05

... More
ROAD - L

41.01

4595

112.05

... More
ROAD - L Km 3/10

25.86

2897

112.05

... More
ROAD - L Km 4/6

25.86

2897

112.05

... More
ROAD - L Km 4/10

50.01

5603

112.05

... More
Cement Concrete M20 using 40mm ISS HBG size hard broken granite graded metal including cost and conveyance of all materials to site, but excluding cost and fabrication of steel but including cost and labour charges for form work and centering, labour charges, for laying compacting finishing and curing including all incidental charges etc., complete as per standard specifications for levelling course of Box Culvert

-

-

-

... More
ROAD - C

15.22

91633

6020.59

... More
ROAD - D

4.67

27425

5872.69

... More
ROAD - E

8.28

50218

6065

... More
ROAD - F

14.9

89194

5986.18

... More
ROAD - G

5.81

35237

6065

... More
ROAD - H

12.7

74876

5895.81

... More
ROAD - K

12.22

71225

5828.58

... More
ROAD - L

5.81

34432

5926.48

... More
ROAD - L Km 3/10

4.67

27676

5926.48

... More
ROAD - L Km 4/6

4.67

27739

5939.92

... More
ROAD - L Km 4/10

7.18

42648

5939.92

... More
Vibrated Reinforced Cement Concrete M25 Grade using 20mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for formwork and centering, labour charges, compacting, curing, and all incidental charges etc., complete for BOTTOM SLAB OF BOX CULVERT.

-

-

-

... More
ROAD - C

43.82

386232

8814.08

... More
ROAD - D

10.94

97646

8925.63

... More
ROAD - E

26.1

232877

8922.5

... More
ROAD - F

35.63

309195

8677.96

... More
ROAD - G

13.68

124174

9077.06

... More
ROAD - H

36.46

317754

8715.16

... More
ROAD - K

35.06

303426

8654.48

... More
ROAD - L

13.68

122279

8938.53

... More
ROAD - L Km 3/10

10.94

98234

8979.41

... More
ROAD - L Km 4/6

10.94

98381

8992.86

... More
ROAD - L Km 4/10

18.95

167299

8828.49

... More
Vibrated Reinforced Cement Concrete M25 Grade using 20mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for formwork and centering, labour charges, compacting, curing, and all incidental charges etc., complete for BODY WALL OF BOX CULVERT.

-

-

-

... More
ROAD - C

38.31

518507

13534.52

... More
ROAD - D

9.96

148770

14936.84

... More
ROAD - E

22.9

288148

12582.9

... More
ROAD - F

31.74

341044

10744.93

... More
ROAD - G

9.46

142479

15061.23

... More
ROAD - H

31.88

428451

13439.52

... More
ROAD - K

30.65

410128

13381.02

... More
ROAD - L

9.46

141168

14922.7

... More
ROAD - L Km 3/10

7.56

113233

14978.01

... More
ROAD - L Km 4/6

7.56

113335

14991.46

... More
ROAD - L Km 4/10

17.16

226714

13211.8

... More
Vibrated Reinforced Cement Concrete M25 Grade using 20mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for formwork and centering, labour charges, compacting, curing, and all incidental charges etc., complete for Top SLAB OF BOX CULVER

-

-

-

... More
ROAD - C

48.98

500277

10213.91

... More
ROAD - D

8.32

89954

10811.8

... More
ROAD - E

22.73

237771

10460.7

... More
ROAD - F

31.7

301640

9515.47

... More
ROAD - G

10.66

116393

10918.72

... More
ROAD - H

35.14

365194

10392.56

... More
ROAD - K

38.1

384743

10098.26

... More
ROAD - L

10.66

114916

10780.19

... More
ROAD - L Km 3/10

8.32

90401

10865.58

... More
ROAD - L Km 4/6

8.32

90513

10879.03

... More
ROAD - L Km 4/10

14.44

151726

10507.38

... More
Vibrated Cement concrete M 20 (Nominal mix) using 40 mm ISS HBG graded metal including cost & conveyance of all materials to site and cost of cement at site, including cost of form work , labour charges for mixing, transporting, laying and curing concrete, soft water, hire charges for T&P, etc., complete for PARAPET.

-

-

-

... More
ROAD - C

6.79

47205

6952.26

... More
ROAD - D

1.17

7909

6760.25

... More
ROAD - E

2.25

15643

6952.56

... More
ROAD - F

10.12

70008

6917.85

... More
ROAD - G

1.17

8134

6952.56

... More
ROAD - H

2.26

15430

6827.48

... More
ROAD - K

6.79

45902

6760.25

... More
ROAD - L

1.17

7972

6814.04

... More
ROAD - L Km 3/10

1.17

7972

6814.04

... More
ROAD - L Km 4/6

1.17

7988

6827.48

... More
ROAD - L Km 4/10

1.73

11811

6827.48

... More
Earthwork excavation in all classes of soil except soft rock / kankar not requiring blasting and hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for DRESSING THE BED UP TO SILL LEVEL.

-

-

-

... More
ROAD - A

108.42

12148

112.05

... More
ROAD - B

164.82

18468

112.05

... More
Earthwork excavation in all classes of soil not requiring blasting except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for FOUNDATION OF ABUTMENTS, PIERS AND WINGS.

-

-

-

... More
ROAD - A

49.75

9305

187.05

... More
ROAD - B

130.63

24434

187.05

... More
Earthwork excavation in Soft rock/ Kangar not requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for FOUNDATION OF ABUTMENTS AND WINGS

-

-

-

... More
ROAD - A

248.74

60170

241.9

... More
ROAD - B

522.49

126390

241.9

... More
Plain Cement Concrete of Grade M-20, using 40mm ISS HBG metal including cost and conveyance of all materials to site including cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification, etc, complete as per relevant standard specification for LEVELING COURSE UNDER FOOTINGS-1 Cum (Below sill level)

-

-

-

... More
ROAD - A

16.58

84470

5094.75

... More
ROAD - B

26.13

129741

4965.22

... More
Vibrated Cement Concrete of grade M20 Nominal Mix using 40mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for FOOTINGS OF ABUTMENT AND WINGS BELOW SILL LEVEL.

-

-

-

... More
ROAD - A

182.78

1231520

6737.72

... More
ROAD - B

368.15

2431697

6605.18

... More
Vibrated Cement Concrete of grade M20 Nominal Mix using 40mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and including all other incidental charges etc; complete as per relevant standard specifications, for SUBSTRUCTURE OF ABUTMENTS, WINGS, AND PIERS ABOVE SILL LEVEL.

-

-

-

... More
ROAD - A

53

472880

8922.27

... More
ROAD - B

135.01

1122922

8317.33

... More
Vibrated Reinforced Cement Concrete of grade M25 design mix using ISS size HBG graded metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants including all other incidental charges etc; complete as per relevant standard specifications, for DIRT WALL CUM BED BLOCK OVER ABUTMENTS AND BED BLOCK OVER PIERS.

-

-

-

... More
ROAD - A

7.52

105107

13977.05

... More
ROAD - B

11.17

146744

13137.38

... More
Providing and fixing seepage pipes of 110mm dia. PVC pipes of required lengths for abutments and wings including cost and conveyance of all materials to work site, cost and labour for 900mm dia. semi-spherical back fill arrangements with 100mm size broken granite chips at the periphery and labour charges for fixing, etc., to drain of the backfill IN THE ABUTMENTS AND WINGS, -

-

-

-

... More
ROAD - A

30

5325

177.5

... More
ROAD - B

60

10650

177.5

... More
ROAD - A - Retaining wall

108

19170

177.5

... More
ROAD - B - Retaining wall

73

12957

177.5

... More
ROAD - C

32

5680

177.5

... More
ROAD - F

24

4260

177.5

... More
ROAD - I

372

66030

177.5

... More
ROAD - K

20

3550

177.5

... More
Providing and fixing KRAFT PAPER for full width of seating of deck slab and including cost and conveyance to work site, labour charges for fixing the same in the correct position and all other incidental charges et., complete.

-

-

-

... More
ROAD - A

17.52

1752

100

... More
ROAD - B

31.56

3156

100

... More
Vibrated Reinforced Cement Concrete of grade M30 mesign mix using ISS size HBG graded metal including cost and conveyance of all materials to site including cost ofcement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants including all other incidental charges etc; complete as per relevant standard specifications, for DECK SLAB.

-

-

-

... More
ROAD - A

133.78

1411471

10550.69

... More
ROAD - B

171.23

1864996

10891.76

... More
Providing FILTER MEDIA behind abutment and wings for 600 mm thickness using filter materials as per Appendix - 6 of IRC: 78-2014 well packed with smaller size towards the soil and bigger size towards the wall including cost and conveyance to woksite including all other incidental charges etc., complete.

-

-

-

... More
ROAD - A

29.11

32701

1123.36

... More
ROAD - B

52.2

53862

1031.85

... More
FILLING behind the abutments and returns as per Appendix 6 of IRC: 78-2014 with clean gritty free draining material including cost and draining material having Phi value more than 35° conveyance of materials to work site , laying, handling charges and filling in layers tamping under optimum moisture content to get the maximum density, including wateing, with all leads for water and all other incidental charges etc., complete.

-

-

-

... More
ROAD - A

63.72

17414

273.3

... More
ROAD - B

118.96

35283

296.6

... More
Providing and fixing Bitumen Pad EXPANSION JOINT in between deck slabs over abutment and pier as shown in the drawing including cost and conveyence of expansion joints including shalimar pad and joint sealent etc, complete.

-

-

-

... More
ROAD - A

29.85

17730

594

... More
ROAD - B

48

28512

594

... More
ROAD - I

26.66

6246

234.3

... More
Supply and fabrication of Fe-500 STEEL required for all RCC items of works involved in the schedule, including cost of steel at site and cost of fabrication labour charges for cleaning the rods straightening, cutting, bending, tying grills, including over laping to the required length wherever necessary and providing to the reinforcement placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete.

-

-

-

... More
ROAD - A

13.49

1278909

94804.27

... More
ROAD - B

19.18

1817871

94804.27

... More
ROAD - C

9.39

890401

94804.27

... More
ROAD - D

2

189703

94804.27

... More
ROAD - E

4.7

445769

94804.27

... More
ROAD - F

7.91

749522

94804.27

... More
ROAD - G

2.29

217006

94804.27

... More
ROAD - H

7.8

739188

94804.27

... More
ROAD - J

0.66

62760

94804.27

... More
ROAD - K

7.5

711411

94804.27

... More
ROAD - L

2.29

217006

94804.27

... More
ROAD - L Km 3/10

1.84

174819

94804.27

... More
ROAD - L Km 4/6

1.84

174819

94804.27

... More
ROAD - L Km 4/10

3.26

308587

94804.27

... More
Vibrated Cement Concrete M15 grade Nominal Mix 1:2;4 using 40mm ISS hard granite broken metal including cost and conveyance of all materials to site and cement at site including cost of formwork,lead for soft water, labour charges for mixing , transporting, laying, and curing concrete working in heights and hire charges for tools and plants, and all other incidental charges etc complete as per relevant specification for BASE COURSE BELOW APPROACH SLAB.

-

-

-

... More
ROAD - A

13

84047

6465.16

... More
ROAD - B

10.46

70165

6707.98

... More
VRCC M 30 (design mix) using 20mm ISS HBG graded metal as the max. size of coarse aggreagates including cost & conveyance of all materials to site and cost of cement at site, but excluding cost & fabrication of steel, but including cost of form work, soft water, labour charges for mixing, transporting, laying, curing concrete working at heights, hire charges for T&P including all other incidental charges etc., complete as per relevant std specification for APPROACH SLAB.

-

-

-

... More
ROAD - A

18.27

162147

8875.06

... More
ROAD - B

26.51

232024

8752.34

... More
VRCC M30 (design mix) using 20mm ISS HBG graded metal as the max. size of coarse aggreagates including cost & conveyance of all materials to site and cost of cement at site, but excluding cost & fabrication of steel, but including cost of form work, soft water, labour charges for mixing, transporting, laying, curing concrete working at heights, hire charges for T&P including all other incidental charges etc., complete as per relevant std specification for WEARING COAT OVER DECK SLAB AND APPROACH SLAB.

-

-

-

... More
ROAD - A

193.5

133501

689.93

... More
ROAD - B

350.98

238841

680.5

... More
ROAD - C

83.84

53614

639.49

... More
ROAD - D

18.46

11534

624.82

... More
ROAD - E

40.5

25899

639.49

... More
ROAD - F

35.31

22487

636.85

... More
ROAD - G

23.66

15130

639.49

... More
ROAD - H

68.31

47175

690.61

... More
ROAD - K

65.43

40881

624.82

... More
ROAD - L

23.66

14880

628.93

... More
ROAD - L Km 3/10

18.46

11610

628.93

... More
ROAD - L Km 4/6

18.46

11628

629.95

... More
ROAD - L Km 4/10

27.26

17172

629.95

... More
VRCC M40 (design mix) using 20mm ISS HBG graded metal as the max. size of coarse aggreagates including cost & conveyance of all materials to site and cost of cement at site, but excluding cost & fabrication of steel, but including cost of form work, soft water, labour charges for mixing, transporting, laying, curing concrete working at heights, hire charges for T&P including all other incidental charges etc., complete as per relevant std specification for CRASH BARRIER on inner edge of footpath.

-

-

-

... More
ROAD - A

10.68

160428

15021.39

... More
ROAD - B

13.15

174044

13235.36

... More
Vibrated Cement concrete M 20 (nominal mix) using 40 mm ISS HBG graded metal including cost & conveyance of all materials to site and cost of cement at site, including cost of form work , labour charges for mixing, transporting, laying and curing concrete, soft water, hire charges for T&P, etc., complete for PARAPET OVER RETURNS.

-

-

-

... More
ROAD - A

6.07

63422

10448.47

... More
ROAD - B

7.11

71142

10006.01

... More
Providing and fixing of G.I. DRAINAGE SPOUTS 100mm dia as per GOI drawing SD/205 with grating arrangments at top as shown in the drawing and 100mm dia drainage spout projecting atleast 300mm beyond the bottom of deck slab as shown in the drawing, including cost and conveyance of Galvanished Iron pipes and flats and fixing them in position etc., complete.

-

-

-

... More
ROAD - A

4

9084

2271

... More
ROAD - B

6

13626

2271

... More
Excavation including removal and satisfactory disposal of all materials necessary for the construction of road way and side drains in accordance with specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer for Carted Eath with a lead of 5 km for formation of Diversion Road for 95% compacion.

-

-

-

... More
ROAD - A

846.74

164784

194.61

... More
ROAD - B

1062.55

206782

194.61

... More
ROAD - C

398.44

77540

194.61

... More
ROAD - D

452.45

88051

194.61

... More
ROAD - F

398.44

77540

194.61

... More
ROAD - G

452.45

88051

194.61

... More
ROAD - K

240.04

46714

194.61

... More
ROAD - L

279.39

54372

194.61

... More
Excavation including removal and satisfactory disposal of all materials necessary for the construction of road way and side drains in accordance with specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer for Carted Eath with a lead of 5 km for formation of Diversion Road for 97% compacion.

-

-

-

... More
ROAD - A

234.38

45851

195.63

... More
ROAD - B

312.5

61134

195.63

... More
ROAD - C

125

24453

195.63

... More
ROAD - F

125

24453

195.63

... More
ROAD - G

59

11542

195.63

... More
ROAD - K

78.13

15284

195.63

... More
Supply and Hoisting of NP 3 class RCC 1000 mm dia. pipes supplied by the Contractor at his own cost specified below confirming to IS 458 / 1989 cost of pipe as a finished work including all other incidental charges, testing charges including loading and unloading transport and delivery in good condition at work site as directed by the departmental officers etc., complete.

-

-

-

... More
ROAD - A

25

103250

4130

... More
ROAD - B

25

103250

4130

... More
ROAD - C

25

103250

4130

... More
ROAD - D

12.5

51625

4130

... More
ROAD - F

25

103250

4130

... More
ROAD - G

12.5

51625

4130

... More
ROAD - K

25

103250

4130

... More
ROAD - L

10

41300

4130

... More
Providing and laying Gravel soling for specified thick with clean good gritty gravel over the well prepared sub grade from the approved quarry including cost and conveyance of material, laying in accordance with the requirements and specification. The materials shall be laid in one or more layers as sub-base according to the line and grade and cross action shown in the drawing or as directed by the Engineers for DIVERSION ROAD

-

-

-

... More
ROAD - A

123.75

33820

273.3

... More
ROAD - B

165

45094

273.3

... More
ROAD - C

66

18037

273.3

... More
ROAD - D

66

22651

343.2

... More
ROAD - F

66

18037

273.3

... More
ROAD - G

66

21113

319.9

... More
ROAD - K

41.25

11273

273.3

... More
ROAD - L

49.5

12951

261.65

... More
Vibrated Cement Concrete M20 grade (Nominal Mix 1:1.5:3) using 40mm ISS size hard granite broken metal including cost and conveyance of all materials to site, including cost of cement at site including cost of form work soft water labour charges for mixing transporting laying and curing concrete working at heights,hire charges for all tools and plants and maintaining of protective bunds, coffer dams, shoring strutting etc., complete as per standard specification for FOOTINGS OF PCC RETAINING WALL and RETURN WALL

-

-

-

... More
ROAD - A

70.95

420504

5926.77

... More
ROAD - B

54

314949

5832.4

... More
ROAD - C

35.55

218294

6140.5

... More
ROAD - D

29.51

175362

5942.49

... More
ROAD - E

41.89

256986

6134.8

... More
ROAD - F

61.48

375033

6100.09

... More
ROAD - G

34.13

209380

6134.8

... More
ROAD - H

0.99

5949

6009.72

... More
ROAD - I

232.47

1365028

5871.85

... More
ROAD - J

48.6

291947

6007.15

... More
ROAD - K

24.75

147076

5942.49

... More
ROAD - L

5.94

35617

5996.28

... More
ROAD - L 4/10

5.87

35277

6009.72

... More
Vibrated Cement Concrete of Grade M20 (Nominal Mix) using 40mm ISS HBG graded metal including cost and conveyance of all materials to site and cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting,laying and curing concrete, working at depths, Tools and Plants and incidental Charges such as maintaining of protective bund, cofferdams, shoring, strutting etc.,complete as per relevant standard specification for Drain Side walls

-

-

-

... More
Road - J

54

375031

6945.03

... More
Vibrated Reinforced Cement Concrete of Grade M20 (Nominal Mix) using 40mm ISS HBG graded metal including cost and conveyance of all materials to site and cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting,laying and curing concrete, working at depths, Tools and Plants and incidental Charges such as maintaining of protective bund, cofferdams, shoring, strutting etc.,complete as per relevant standard specification for Drain Cover Slab

-

-

-

... More
Road - J

9

78436

8715.22

... More
Vibrated Cement ConcreteM20 grade (Nominal Mix 1:1.5:3) using 40mm ISS size HBG metal including cost and conveyance of all materials to site, including cost of cement at site including cost of form work soft water labour charges for mixing transporting laying and curing concrete working at heights, tools and plants and maintaining of protective bunds, coffer dams, shoring strutting etc., complete as per standard specification for STEM OF PCC RETAINING WALL and RETURN WALL (below sill level)

-

-

-

... More
ROAD - A

91.74

660005

7194.3

... More
ROAD - B

73.8

510697

6920.02

... More
ROAD - C

78.02

598560

7671.89

... More
ROAD - D

12.23

87848

7183.03

... More
ROAD - E

14.79

106202

7180.72

... More
ROAD - F

85.45

564856

6610.37

... More
ROAD - G

12.94

98230

7591.23

... More
ROAD - H

3.01

28639

9514.64

... More
ROAD - I

292.57

2120781

7248.8

... More
ROAD - K

54.52

409719

7515.04

... More
ROAD - L

2.88

22372

7768.37

... More
ROAD - L Km 4/10

4.11

30309

7374.56

... More
Vibrated Cement ConcreteM20 grade (Nominal Mix 1:1.5:3) using 40mm ISS size HBG metal including cost and conveyance of all materials to site, including cost of cement at site including cost of form work soft water labour charges for mixing transporting laying and curing concrete working at heights, tools and plants and maintaining of protective bunds, coffer dams, shoring strutting etc., complete as per standard specification for STEM OF PCC RETAINING WALL and RETURN WALL (above sill level)

-

-

-

... More
ROAD - A

171.44

1531802

8934.92

... More
ROAD - B

167.03

1406942

8423.29

... More
ROAD - D

44.33

368849

8320.54

... More
ROAD - E

68.44

557658

8148.13

... More
ROAD - G

36.16

322491

8918.46

... More
ROAD - I

504.5

4586611

9091.4

... More
ROAD - L

8.03

77923

9704.06

... More
ROAD - L Km 4/10

18.93

166850

8814.09

... More
Filling with Carted earth including cost and conveyance of earth to work site including labour charges for filling in layers as specified by the departmental officers including watering with all leads for water including labour charges for compacting,tamping and ramming under optimum moisture to obtain the maximun density and all other incidential charges etc., complete as per standard specification

-

-

-

... More
ROAD - A

66.55

13033

195.85

... More
ROAD - B

95.07

18619

195.85

... More
ROAD - I

141.75

27761

195.85

... More
Filling with excavated earth excluding cost and conveyance of earth to work site including labour charges for filling in layers as specified by the departmental officers including watering with all leads for water including labour charges for compacting,tamping and ramming under optimum moisture to obtain the maximun density and all other incidential charges etc., complete as per standard specification

-

-

-

... More
ROAD - A

212.85

8290

38.95

... More
ROAD - B

162

6309

38.95

... More
ROAD - I

697.41

27164

38.95

... More
Calculation of SubTotal, GST and Total Amount carried out by system automatically

-

-

-

... More
Basic cost of value put to tender as per estimate

1

-

52704570

... More
Add GST at 18%

1

-

9486823

... More
Total Value put to Tender

1

-

62191393

... More
Negotiated Percentage

1

-

-

... More
Final Negotiated Value

1

-

-

... More
Add GST at 18% of Final Negotiated Value

1

-

-

... More
Total Value of Contract Including 18% of GST

1

-

-

... More
Basic cost of value put to tender as per Estimate

-

52704570

-

... More
Quoted Rate in Figures (Total Value of Contract Including 18% of GST )

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.