Highways Department Tender
... More
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Highways Department Tender
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date19 Jul 2024
Closing Date5 Aug 2024
Tender Amount₹ 46,10,000
Costs
EMD
₹ 33,500Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
03 Tn No 09 2024 25 Sdo Dated 16 07 2024
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_HWAY_460279_1Bid Award Id
ViewTender No
03 TN No 09 2024 25 SDO Dated 16 07 2024Tender Authority
Highways Department ViewPurchaser Address
-Website
http://tntenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
ACSR Panther Consuctor
1.1
158423
144021.4
... More
90kN Insulators
90
41542
461.58
... More
120kN Insulators
320
181241
566.38
... More
Single Suspension fitting for panther
12
15879
1323.31
... More
Single Tension fitting ofr Panther
15
29894
1992.94
... More
Double Tension fitting for Panther
12
54386
4532.21
... More
SB damber for panther
24
18000
750
... More
MSJ for panther
6
3300
550
... More
Repair sleeve for panther
6
1890
315
... More
Supply of OPGW - 48 Flbre with all accessories
0.3
56613
188710.2
... More
D" Shackle 16 mm dia
27
3643
134.94
... More
Number plate
2
567
283.5
... More
Phase plate (set of three)
2
636
318.18
... More
Danger Board
2
760
380.1
... More
16mm U bolt
12
1899
158.31
... More
Storage charges 3% of Cost of the Materials Suppplied at Site
1
60589
60589.12
... More
Junqle Clearance Clearing juliflora jungle with uprotting including cost of clearing away the site with all labour, lead, lift, T&P etc completer.
1680
12936
7.7
... More
Check survey and Pit marking including clearing bushes, removing, levelling the location
2
2182
1091
... More
Earthwork excavation in hard stiff clay stiff black cotton hard red earth, shales, murram, gravel stoney earth, earth mixed with small size boulders and hard qravelly soil for foundation
146
32718
224.1
... More
Earthwork excavation SDR not requring blasting
88
29374
333.8
... More
Removing MR & DMR requiring blasting in earthwork excavation
59
48922
829.2
... More
Transporting of template and stubs from store to site and assembling at site and shifting the template from loc to loc and back to stores KCR+6 (W)
2
89652
44826
... More
PCC 1:3:6 using 40 mm metal without formwork for foundation etc
6
38412
6402
... More
PCC 1:2:4 using 20 mm metal with steel frustum box for foundation, concrete etc
55
644655
11721
... More
Refilling with the excavated earth other than sand including watering consolidation in 150mm layers and forming platform with excess earth in the leg of the tower etc complete
230
8050
35
... More
supply & Providing pipe type earthing including necessar excavation for fixing 3m long 25mm dia GI "B" class pipe and refilling with excavated earth mixed with salt charcoal and connect the earthstrip with the leg of the stub including all cost of materials lead lift etc complete
2
8130
4065
... More
Removal of surplus earth in a low lying area to a averae distance of 200m by head load.
61
7015
115
... More
Dewatering charges per hour including hire charges for 3/S HP Diesel motor with Pump
6
2436
406
... More
Providing shoring and shuttering in foundation using wooden planks and scantling
119
33082
278
... More
Labour charges for erection of GI tower angles, square cross arm including cost of materials, T&P, labour, lead, lift etc complete.as per approved drawing and specification
16
297088
18568
... More
Labour charges for Hoisting of 7 units of suspension 90 KN insulatos with all allited hardwares, including all labour charcges lead and lift etc. complete. Without PA rod
12
14136
1178
... More
Labout charges for Hoisting of 8 units of single tension 120 KN insulators with all allied hardwares, including all labour charcges lead and lift etc complete
15
18810
1254
... More
Labour charges for Hoisting of 8 units of Double tension 120 KN insulators with all affied hardwates, including all labour charcges lead and lift etc completer
12
30096
2508
... More
Transport of 6 Nos of Panther conductor, payingout, jointing,rough sagging, tensioning, clipping, provinging vibraion dambers of tension locations including giving jumber connection for power conductor including transport charges, providing trussels wherever necessary loading unloading lead lift etc complete Single Span with L.C (Road crossing Transport of 3 Nos of Panther conductor, payingout, jointing,rough sagging, tensioning, clipping, provinging vibraion dambers of tension locations including giving jumber connection for power conductor including transport charges, providing trussets wherever necessay loading unloading lead lift etc complete.
1
98844
98844
... More
Single Span with LC
1
49422
49422
... More
Labour charges for releasing , restringing the existing OPGW-48 fibre & ADSS cable
0.6
31532
52554.6
... More
Final checking and conduction end to end test to the standard as directed by the Engineer at site
0.28
350
1250
... More
PCC 1:2:4 using 20 mm metal for muffing coping concrete with form work including coast of all materials, labour, lead, life etc complete.
2
25916
12958
... More
Plastering with CM 1:3,12 mm thick for muffing coping conrete including cost of all materials,labour,lead,lift etc complete.
11
3575
325
... More
Providing full welding of all bolts and nuts in the erected towers from ground level to the cross arm bottom level in the tower including painting of bolts and nuts with two coats of best quality of cold galvanised paint having atieast 90% zinc content and approved by the Engineer at site including cost of paint and all other maerials, hire charges for diesel generator and welding transformer, al labour, transport charges etc complete
2029
30435
15
... More
Painting with two coats of anticorrosive paint over tower leg at a height of 45cm including all cost of materials, labour, lead lift etc complete
2
742
371
... More
supply and Labour Charges for fixing of number plates, danger board, phase plate including all cost of materials, labour transport, lead, lift,etc complete
6
4152
692
... More
Supply,fabrication and fixing of name board with 18 gauge plate including coast of materials, labour for writing name of the line etc complete
2
2442
1221
... More
Labour Charges for removal of Large trees
10
1610
161
... More
Labour Charges for removal of small trees
10
1160
116
... More
Provinding temporary guys wherever necessary including excavation,buryingout of anchor tighening,dismantling the same after completion of works including cost of allmaterials lead lift labour etc complete
5
18385
3677
... More
Lowering the HT/LT Line during stringing of power conductor and earthwire after restringing the same in original postion including labour,lead, lift etc complete
5
42020
8404
... More
Providing trussels for majour and minor road crossing including cost of all mertials,labour, lead lift etc. complete
2
7192
3596
... More
Dismantling of existing tower and devoluted to store including cost of all labour charges, lead, lift, transport etc complete.
3.6
33422
9284
... More
Releasing and lowering and devoluted to store of 6 Nos of single trnsion polymer insulator including all labour lead lifts, and T & P etc completer.
6
12288
2048
... More
Releasing , lowering and devoluted to stores the existing 6 Nos. conductor including all labours, lead ,lifts, T&P. etc omplete
0.75
18661
24982
... More
Releasing and lowering and restringing of existing panther conductor including all labour, lead.lifts.T&P.etc complete.
2
118972
59486
... More
Transport charges on the scrap materials to be devoluted to stores
1
5230
5230
... More
Calculation of SubTotal, GST and Total Amount carried out by system automatically
-
-
-
... More
Basic cost of value put to tender as per estimate
1
-
3904274
... More
Add GST at 18%
1
-
702769
... More
Total Value put to Tender
1
-
4607043
... More
Excess/Less Percentage
1
-
-
... More
Final Value
1
-
-
... More
Add GST at 18% of Final Value
1
-
-
... More
Total Value of Contract Including 18% of GST
1
-
-
... More
Basic cost of value put to tender as per Estimate
-
3904274
-
... More
Quoted Rate in Figures (Total Value of Contract Including 18% of GST )
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements