Highways Department Tender

... More
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Highways Department Tender

Works
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date19 Jul 2024
Closing Date5 Aug 2024
Tender Amount₹ 46,10,000 
Notes
Download

Costs

Summary

03 Tn No 09 2024 25 Sdo Dated 16 07 2024

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
ACSR Panther Consuctor

1.1

158423

144021.4

... More
90kN Insulators

90

41542

461.58

... More
120kN Insulators

320

181241

566.38

... More
Single Suspension fitting for panther

12

15879

1323.31

... More
Single Tension fitting ofr Panther

15

29894

1992.94

... More
Double Tension fitting for Panther

12

54386

4532.21

... More
SB damber for panther

24

18000

750

... More
MSJ for panther

6

3300

550

... More
Repair sleeve for panther

6

1890

315

... More
Supply of OPGW - 48 Flbre with all accessories

0.3

56613

188710.2

... More
D" Shackle 16 mm dia

27

3643

134.94

... More
Number plate

2

567

283.5

... More
Phase plate (set of three)

2

636

318.18

... More
Danger Board

2

760

380.1

... More
16mm U bolt

12

1899

158.31

... More
Storage charges 3% of Cost of the Materials Suppplied at Site

1

60589

60589.12

... More
Junqle Clearance Clearing juliflora jungle with uprotting including cost of clearing away the site with all labour, lead, lift, T&P etc completer.

1680

12936

7.7

... More
Check survey and Pit marking including clearing bushes, removing, levelling the location

2

2182

1091

... More
Earthwork excavation in hard stiff clay stiff black cotton hard red earth, shales, murram, gravel stoney earth, earth mixed with small size boulders and hard qravelly soil for foundation

146

32718

224.1

... More
Earthwork excavation SDR not requring blasting

88

29374

333.8

... More
Removing MR & DMR requiring blasting in earthwork excavation

59

48922

829.2

... More
Transporting of template and stubs from store to site and assembling at site and shifting the template from loc to loc and back to stores KCR+6 (W)

2

89652

44826

... More
PCC 1:3:6 using 40 mm metal without formwork for foundation etc

6

38412

6402

... More
PCC 1:2:4 using 20 mm metal with steel frustum box for foundation, concrete etc

55

644655

11721

... More
Refilling with the excavated earth other than sand including watering consolidation in 150mm layers and forming platform with excess earth in the leg of the tower etc complete

230

8050

35

... More
supply & Providing pipe type earthing including necessar excavation for fixing 3m long 25mm dia GI "B" class pipe and refilling with excavated earth mixed with salt charcoal and connect the earthstrip with the leg of the stub including all cost of materials lead lift etc complete

2

8130

4065

... More
Removal of surplus earth in a low lying area to a averae distance of 200m by head load.

61

7015

115

... More
Dewatering charges per hour including hire charges for 3/S HP Diesel motor with Pump

6

2436

406

... More
Providing shoring and shuttering in foundation using wooden planks and scantling

119

33082

278

... More
Labour charges for erection of GI tower angles, square cross arm including cost of materials, T&P, labour, lead, lift etc complete.as per approved drawing and specification

16

297088

18568

... More
Labour charges for Hoisting of 7 units of suspension 90 KN insulatos with all allited hardwares, including all labour charcges lead and lift etc. complete. Without PA rod

12

14136

1178

... More
Labout charges for Hoisting of 8 units of single tension 120 KN insulators with all allied hardwares, including all labour charcges lead and lift etc complete

15

18810

1254

... More
Labour charges for Hoisting of 8 units of Double tension 120 KN insulators with all affied hardwates, including all labour charcges lead and lift etc completer

12

30096

2508

... More
Transport of 6 Nos of Panther conductor, payingout, jointing,rough sagging, tensioning, clipping, provinging vibraion dambers of tension locations including giving jumber connection for power conductor including transport charges, providing trussels wherever necessary loading unloading lead lift etc complete Single Span with L.C (Road crossing Transport of 3 Nos of Panther conductor, payingout, jointing,rough sagging, tensioning, clipping, provinging vibraion dambers of tension locations including giving jumber connection for power conductor including transport charges, providing trussets wherever necessay loading unloading lead lift etc complete.

1

98844

98844

... More
Single Span with LC

1

49422

49422

... More
Labour charges for releasing , restringing the existing OPGW-48 fibre & ADSS cable

0.6

31532

52554.6

... More
Final checking and conduction end to end test to the standard as directed by the Engineer at site

0.28

350

1250

... More
PCC 1:2:4 using 20 mm metal for muffing coping concrete with form work including coast of all materials, labour, lead, life etc complete.

2

25916

12958

... More
Plastering with CM 1:3,12 mm thick for muffing coping conrete including cost of all materials,labour,lead,lift etc complete.

11

3575

325

... More
Providing full welding of all bolts and nuts in the erected towers from ground level to the cross arm bottom level in the tower including painting of bolts and nuts with two coats of best quality of cold galvanised paint having atieast 90% zinc content and approved by the Engineer at site including cost of paint and all other maerials, hire charges for diesel generator and welding transformer, al labour, transport charges etc complete

2029

30435

15

... More
Painting with two coats of anticorrosive paint over tower leg at a height of 45cm including all cost of materials, labour, lead lift etc complete

2

742

371

... More
supply and Labour Charges for fixing of number plates, danger board, phase plate including all cost of materials, labour transport, lead, lift,etc complete

6

4152

692

... More
Supply,fabrication and fixing of name board with 18 gauge plate including coast of materials, labour for writing name of the line etc complete

2

2442

1221

... More
Labour Charges for removal of Large trees

10

1610

161

... More
Labour Charges for removal of small trees

10

1160

116

... More
Provinding temporary guys wherever necessary including excavation,buryingout of anchor tighening,dismantling the same after completion of works including cost of allmaterials lead lift labour etc complete

5

18385

3677

... More
Lowering the HT/LT Line during stringing of power conductor and earthwire after restringing the same in original postion including labour,lead, lift etc complete

5

42020

8404

... More
Providing trussels for majour and minor road crossing including cost of all mertials,labour, lead lift etc. complete

2

7192

3596

... More
Dismantling of existing tower and devoluted to store including cost of all labour charges, lead, lift, transport etc complete.

3.6

33422

9284

... More
Releasing and lowering and devoluted to store of 6 Nos of single trnsion polymer insulator including all labour lead lifts, and T & P etc completer.

6

12288

2048

... More
Releasing , lowering and devoluted to stores the existing 6 Nos. conductor including all labours, lead ,lifts, T&P. etc omplete

0.75

18661

24982

... More
Releasing and lowering and restringing of existing panther conductor including all labour, lead.lifts.T&P.etc complete.

2

118972

59486

... More
Transport charges on the scrap materials to be devoluted to stores

1

5230

5230

... More
Calculation of SubTotal, GST and Total Amount carried out by system automatically

-

-

-

... More
Basic cost of value put to tender as per estimate

1

-

3904274

... More
Add GST at 18%

1

-

702769

... More
Total Value put to Tender

1

-

4607043

... More
Excess/Less Percentage

1

-

-

... More
Final Value

1

-

-

... More
Add GST at 18% of Final Value

1

-

-

... More
Total Value of Contract Including 18% of GST

1

-

-

... More
Basic cost of value put to tender as per Estimate

-

3904274

-

... More
Quoted Rate in Figures (Total Value of Contract Including 18% of GST )

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.