Highways Department Tender

... More
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Highways Department Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date6 Sep 2024
Closing Date23 Sep 2024
Tender Amount₹ 3,64,00,000 
Notes
Download

Costs

Summary

Omalur (h) Candm Sub Division (slm-41)

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam of specified thickness, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory soil compactor to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 111, 112, 406 & 900 of MORTH Vth Revision

1370.33

3030155

2211.26

... More
Providing and laying Prime Coat over WMM surface using 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 111, 112, 501, 502 & 900 of MORTH Vth Revision

5556.3

454060

81.72

... More
Providing and laying Tack Coat over WMM surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 111, 112, 501, 503 & 900 of MORTH Vth Revision

5556.3

104791

18.86

... More
Providing and laying Tack Coat over Existing BT surface using 2.00Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 111, 112, 501, 503 & 900 of MORTH Vth Revision

11431

309665

27.09

... More
Providing and laying Tack Coat over Dry Lean Cement Concrete surface using 3.00 Kg of Bitumen Emulsion (RS1) per10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 111, 112, 501, 503 & 900 of MORTH Vth Revision

131.04

2796

21.34

... More
Advance patch work 50mm thick using 45 mm IRC size HBG metal for making the pot holes and patching using VG 10 grade bitumen including mixing at the rate of 44 Kg / Cum of chips after trimming the pot holes or depression to proper shape and depth side painting with tack coat and compacting the layers as directed by Departmental officers etc., complete as per clause 111, 112, 501, 3004 & 900 of MORTH Vth Revision

15.24

56751

3723.84

... More
Providing, laying 85mm consolidated thick Dense Bituminous Macadam using 0.40cum of 37.50-13.20mm, 0.35 cum of 13.20-2.36 mm and 0.36 cum of 2.36 mm & below size IRC metal with 71.30 kgs of VG30 grade bitumen for premixing per 10 sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing the min the required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to site, spreading the mix to uniform thickness of 85 mm with mechanical paver to the specified grades and cross section sand consolidated by Vibratory Roller to the required density etc., including labour for attending to paver to site etc.,including hire and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and allother tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per MoRTH specification clause No.111,112,501,505 & 900 - Grading I

472.28

4376255

9266.23

... More
Providing, laying 50mm consolidated thick Bituminous Macadam using 0.20cum of 26.50-13.20mm, 0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRC metal with 37Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 504 of MORTH Rev-5 Grading II

556.97

4764644

8554.58

... More
Providing and laying Bituminous Concrete to 30mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per clause No. 111, 112, 501, 507 & 900 of MORTH vth Revision Grading-II

517.79

5610151

10834.8

... More
Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with power roller, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification. For making up of low berms as per clause No. 111, 112, 301 to 305 & 900 of MORTH Vth Revision (Labour and Hire charges only)

667.41

17799

26.67

... More
Excavation including removal and satisfactory disposal of all materias necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer formation of Diversion Road using Carted Earth with an avearge lead of 2 Kms. as per MORTH specification clause No. 111, 112, 301 to 305 & 900 of MORTH vth Revision

-

-

-

... More
1.1.Reconstruction of Box Culvert at Km 2/2, 2/4, 2/6, 2/8 of Tharamangalam -K.R. Thoppur (via) Pothanur road

375

65066

173.51

... More
1.2.Reconstruction of Box Culvert at Km 3/6, 3/8 of Tharamangalam -K.R. Thoppur (via) Pothanur road

187.5

32533

173.51

... More
1.3.Widening of Box Culvert at km. 4/0 and Reconstruction of Box Culvert at Km 4/4 of Tharamangalam -K.R. Thoppur (via) Pothanur road

187.5

32533

173.51

... More
Gravel for Sub Base 150mm thick including cost and conveyance of gravel to worksite laying anmd filling in layers of 75mm thick tamping including watering with all leads for water and all other incidental charges etc.,complete for Diversion road as per clause 111,112,401&900 of MORTH Vth Revision

-

-

-

... More
1.1.Reconstruction of Box Culvert at Km 2/2, 2/4, 2/6, 2/8 of Tharamangalam -K.R. Thoppur (via) Pothanur road

99

25854

261.16

... More
1.2.Reconstruction of Box Culvert at Km 3/6, 3/8 of Tharamangalam -K.R. Thoppur (via) Pothanur road

49.5

12927

261.16

... More
1.3.Widening of Box Culvert at km. 4/0 and Reconstruction of Box Culvert at Km 4/4 of Tharamangalam -K.R. Thoppur (via) Pothanur road

49.5

12927

261.16

... More
Dismantling Cut Stone Slab Culverts and other structures Dismantling salvaging and removal and disposing of resulting materials and back filling the resulting trenches and pits etc as per clause No. 111, 112, 202 of MORTH vth Revision Dismantling Plain Cement Concrete

-

-

-

... More
1.1.Reconstruction of Box Culvert at Km 2/2, 2/4, 2/6, 2/8 of Tharamangalam -K.R. Thoppur (via) Pothanur road

33.75

17311

512.93

... More
1.2.Reconstruction of Box Culvert at Km 3/6, 3/8 of Tharamangalam -K.R. Thoppur (via) Pothanur road

16.88

8658

512.93

... More
1.3.Widening of Box Culvert at km. 4/0 and Reconstruction of Box Culvert at Km 4/4 of Tharamangalam -K.R. Thoppur (via) Pothanur road

9.05

4642

512.93

... More
Earth Work excavation in all classes of soil except hard rock not requiring blasting and deposting on bank with all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges and sheeting, shoring, bracing and their subsequent removal of all logs, stumps and other deleteriuos matter and obstructions, trimming of bottom of excavation, backfilling and clearing the site and disposal of all surplus materials etc.,complete as per standard specification for Foundation of Box Culvert and Retaining wall, Well Protective wall as per clause 111, 112, 201, 202, 301 to 305 & 900 of MORTH Vth Revision

-

-

-

... More
1.1.Reconstruction of Box Culvert at Km 2/2, 2/4, 2/6, 2/8 of Tharamangalam -K.R. Thoppur (via) Pothanur road

223.27

27520

123.26

... More
1.2.Reconstruction of Box Culvert at Km 3/6, 3/8 of Tharamangalam -K.R. Thoppur (via) Pothanur road

95.22

11736

123.26

... More
1.3.Widening of Box Culvert at km. 4/0 and Reconstruction of Box Culvert at Km 4/4 of Tharamangalam -K.R. Thoppur (via) Pothanur road

82.8

10205

123.26

... More
1.4.Construction of Retaining wall at km.3/6 of Tharamangalam -K.R. Thoppur (via) Pothanur road

216

26624

123.26

... More
1.5.Construction of Well protective wall at km.3/4, 4/6 of Tharamangalam -K.R. Thoppur (via) Pothanur road

68.26

8413

123.26

... More
Vibrated Cement Concrete of grade M15 Nominal Mix using 40mm ISS size HBG metal including cost and conveyance of all materials to site complying with required standards and specifications. including cost of formwork, mixing, laying and compacting using vibrator including hire and fuel charges for all Tools and Plants and incidental charges such as maintaining of protective bunds, coffer dams strutting etc., complete as per relevant standard specification for Base Concrete of Culverts and Retaining wall as per clause as per clause 1000, 1500, 1700, 2100, 2200 & 2908 of MORTH Vth Revision

-

-

-

... More
1.1.Reconstruction of Box Culvert at Km 2/2, 2/4, 2/6, 2/8 of Tharamangalam -K.R. Thoppur (via) Pothanur road

60.93

380707

6248.27

... More
1.2.Reconstruction of Box Culvert at Km 3/6, 3/8 of Tharamangalam -K.R. Thoppur (via) Pothanur road

25.09

156997

6257.37

... More
1.3.Widening of Box Culvert at km. 4/0 and Reconstruction of Box Culvert at Km 4/4 of Tharamangalam -K.R. Thoppur (via) Pothanur road

23.01

144233

6268.31

... More
1.4.Construction of Retaining wall at km.3/6 of Tharamangalam -K.R. Thoppur (via) Pothanur road

81

507160

6261.24

... More
Vibrated Cement Concrete of grade M20 Nominal Mix using 40mm ISS size HBG metal including cost and conveyance of all materials to site complying with required standards and specifications. including cost of formwork, mixing, laying and compacting using vibrator including hire and fuel charges for all Tools and Plants and incidental charges such as maintaining of protective bunds, coffer dams strutting etc., complete as per relevant standard specification for Base Concrete of Well Protective wall as per clause 1000, 1500, 1700, 2100, 2200 & 2908 of MORTH Vth Revision

-

-

-

... More
1.5.Construction of Well protective wall at km.3/4, 4/6 of Tharamangalam -K.R. Thoppur (via) Pothanur road

29.26

186682

6380.13

... More
Vibrated Cement Concrete of grade M20 Nominal Mix using 40mm ISS size HBG metal including cost and conveyance of all materials to site complying with required standards and specifications. including cost of formwork, mixing, laying and compacting using vibrator including hire and fuel charges for all Tools and Plants and incidental charges such as maintaining of protective bunds, coffer dams strutting etc., complete as per relevant standard specification for Stem of Retaining wall as per clause 1000, 1500, 1700, 2100, 2200 & 2908 of MORTH Vth Revision

-

-

-

... More
1.4.Construction of Retaining wall at km.3/6 of Tharamangalam -K.R. Thoppur (via) Pothanur road

216

1857643

8600.2

... More
1.5.Construction of Well protective wall at km.3/4, 4/6 of Tharamangalam -K.R. Thoppur (via) Pothanur road

76.5

703559

9196.86

... More
Vibrated Reinforced Cement Concrete of grade M25 (Design mix) using 20mm and below ISS HBG metal including cost and conveyance of all materials to site and cost of cement excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for tools and plants including all other incidental charges etc., complete for Base Slab, Side Walls, Top Slab of Box Culvert as per clause 900, 1000, 1500, 1600, 1700, 2100, 2200 & 2300 of MORTH Vth Revision

-

-

-

... More
1.1.Reconstruction of Box Culvert at Km 2/2, 2/4, 2/6, 2/8 of Tharamangalam -K.R. Thoppur (via) Pothanur road

111.28

1279271

11495.97

... More
1.2.Reconstruction of Box Culvert at Km 3/6, 3/8 of Tharamangalam -K.R. Thoppur (via) Pothanur road

34.6

446981

12918.53

... More
1.3.Widening of Box Culvert at km. 4/0 and Reconstruction of Box Culvert at Km 4/4 of Tharamangalam -K.R. Thoppur (via) Pothanur road

24.22

315411

13022.79

... More
Vibrated Cement Concrete of grade M20 (Nominal mix) using 40mm ISS size HBG metal including cost and conveyance of all materials to site and cost cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths Tools and Plants and incidental charges etc., complete as per relevent standard specification for Wing wall and Parapet as per clause 1000, 1500, 1700, 2100, 2200 & 2908 of MORTH Vth Revision

-

-

-

... More
1.1.Reconstruction of Box Culvert at Km 2/2, 2/4, 2/6, 2/8 of Tharamangalam -K.R. Thoppur (via) Pothanur road

136.68

1199368

8775.01

... More
1.2.Reconstruction of Box Culvert at Km 3/6, 3/8 of Tharamangalam -K.R. Thoppur (via) Pothanur road

44.06

405543

9204.35

... More
1.3.Widening of Box Culvert at km. 4/0 and Reconstruction of Box Culvert at Km 4/4 of Tharamangalam -K.R. Thoppur (via) Pothanur road

44.06

406001

9214.74

... More
1.4.Construction of Retaining wall at km.3/6 of Tharamangalam -K.R. Thoppur (via) Pothanur road

9.72

109234

11238.09

... More
Supply and fabrication of STEEL grade Fe500 D for all the reinforced cement concrete items of work involved in the schedule including cost of steel, cost of fabrication, labour charges for cleaning the rods, straightening, cutting, bending, tying grills, hoisting and placing the reinforcement in position as specified in the drawing including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete. as per standard specification as per clause 1000, 1500, 1600, 1700, 2100 & 2300 of MORTH Vth Revision

-

-

-

... More
1.1.Reconstruction of Box Culvert at Km 2/2, 2/4, 2/6, 2/8 of Tharamangalam -K.R. Thoppur (via) Pothanur road

8.15

779024

95609.27

... More
1.2.Reconstruction of Box Culvert at Km 3/6, 3/8 of Tharamangalam -K.R. Thoppur (via) Pothanur road

3.15

301169

95609.27

... More
1.3.Widening of Box Culvert at km. 4/0 and Reconstruction of Box Culvert at Km 4/4 of Tharamangalam -K.R. Thoppur (via) Pothanur road

2.23

212921

95609.27

... More
Providing and fixing 100mm dia PVC Seepage Pipes of required length for abutment and wing, retaining wall including cost and conveyance of all materials to worksite, cost and labour for semi-spherical backfill arrangements with 100mm size broken granite stones at the periphery and labour charges for fixing etc., complete to drain the backfill in the Abutment and wings as per clause 2700 of MORTH Vth Revision

-

-

-

... More
1.4.Construction of Retaining wall at km.3/6 of Tharamangalam -K.R. Thoppur (via) Pothanur road

88.5

17036

192.5

... More
1.5.Construction of Well protective wall at km.3/4, 4/6 of Tharamangalam -K.R. Thoppur (via) Pothanur road

36

6930

192.5

... More
Filling behind the Box Culvert with Stone Dust including cost and conveyance to site including labour charges for filling in layers , watering , tamping under optimum moisture content to get the maximum density and all other incidental charges etc., complete as per clause 304 & 2907 of MORTH Vth Revision

-

-

-

... More
1.1.Reconstruction of Box Culvert at Km 2/2, 2/4, 2/6, 2/8 of Tharamangalam -K.R. Thoppur (via) Pothanur road

17.16

5338

311.12

... More
1.2.Reconstruction of Box Culvert at Km 3/6, 3/8 of Tharamangalam -K.R. Thoppur (via) Pothanur road

8.89

2827

318.04

... More
1.3.Widening of Box Culvert at km. 4/0 and Reconstruction of Box Culvert at Km 4/4 of Tharamangalam -K.R. Thoppur (via) Pothanur road

5.78

1869

323.37

... More
Supply of NP3 Class RCC Pipe conforming to IS 458/2003 including cost of pipe as a finished work including all other incidental charges, testing charges including loading, unloading, transport and delivery in good condition at work site etc., complete, as directed by the Departmental Officers, as per standard specifications.

-

-

-

... More
1.3.Widening of Box Culvert at km. 4/0 and Reconstruction of Box Culvert at Km 4/4 of Tharamangalam -K.R. Thoppur (via) Pothanur road

10

42768

4276.8

... More
Filling behind Retaining wall with clean good gritty gravel in including cost and conveyance to site including labour charges for filling in layers , watering , tamping under optimum moisture content to get the maximum density and all other incidental charges etc., complete as per clause 304 & 2907 of MORTH Vth Revision

-

-

-

... More
1.4.Construction of Retaining wall at km.3/6 of Tharamangalam -K.R. Thoppur (via) Pothanur road

216

59905

277.34

... More
Filling behind the Retaining Wall & Well Protective Wall with excavated earth including labour charges for filling in layers , watering , tamping under optimum moisture content to get the maximum density and all other incidental charges etc., complete as per clause 304 & 2907 of MORTH Vth Revision (Labour charges Only)

-

-

-

... More
1.4.Construction of Retaining wall at km.3/6 of Tharamangalam -K.R. Thoppur (via) Pothanur road

216

9255

42.85

... More
1.5.Construction of Well protective wall at km.3/4, 4/6 of Tharamangalam -K.R. Thoppur (via) Pothanur road

105

4499

42.85

... More
Calculation of SubTotal, GST and Total Amount carried out by system automatically

-

-

-

... More
Basic cost of value put to tender as per estimate

1

-

30845688

... More
Add GST at 18%

1

-

5552224

... More
Total Value put to Tender

1

-

36397912

... More
Negotiated Percentage

1

-

-

... More
Final Negotiated Value

1

-

-

... More
Add GST at 18% of Final Negotiated Value

1

-

-

... More
Total Value of Contract Including 18% of GST

1

-

-

... More
Basic cost of value put to tender as per Estimate

-

30845688

-

... More
Quoted Rate in Figures (Total Value of Contract Including 18% of GST )

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.