Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Highways Department Tender

Civil And Construction
Bridge Construction
Eprocure
Opening Date9 Jun 2022
Closing Date5 Jul 2022
Tender Amount₹ 5,27,00,000 
Notes
Download

Costs

Summary

Construction Of High Level Bridge At Km 24 2 Of Thoothukudi Tiruchendur Kanniyakumari Road

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of High Level Bridge at Km 24/2 of Thoothukudi - Tiruchendur - Kanniyakumari Road

5400.08

-

307

... More
Providing and Fixing and Drain of 500mm dia up to refusal depth sparingat 1.5m centre to centre by driving of caring of appropiate length and diameter fixed with close and value and having a nominal inner dia of 500mm and the MS. Tube is driven to the required depth by means of drop hammer operated by a winch and the sand is poured into the carying tube the saturated with water and the caring tube shall be tamped sufficently and gradually with draw and ensure that the sand occuples the full length with required compaction and this the sand drain is formed including charges for driving cost of sand and other required incidentals to the work.

-

-

-

... More
Construction of High Level Bridge at Km 24/2 of Thoothukudi - Tiruchendur - Kanniyakumari Road

5420

-

1086.55

... More
Providing sand blanket on the sand drain for 300mm depth including cost and conveyance of sand, labour charges for spreading saturating by watering tampering etc., complete as per the standard.

-

-

-

... More
Construction of High Level Bridge at Km 24/2 of Thoothukudi - Tiruchendur - Kanniyakumari Road

1046.87

-

1557

... More
Providing PVC Pipe wrapped with Geofabric to avoid clogging shallbe laid at the bottom of the sandblanket along the sand blanket boundary with proper gradient including Labour and materials all other incidental charges, etc., complete as per relevant standard specification

-

-

-

... More
Construction of High Level Bridge at Km 24/2 of Thoothukudi - Tiruchendur - Kanniyakumari Road

775.46

-

310

... More
Vibrated Plain Cement Concrete M15 (Nominal mix), using 40 mm ISS HBG graded metal including cost and conveyance of all materials to site and cost of cement at site including soft water, labour charges for mixing, transporting, laying, compacting, curing concrete tools and plants and incidental charges such as bailing out water, forming and maintaining of protective bunds, cofferdams, shoring, strutting, etc., complete as per relevant standard specification for LEVELLING COURSE BELOW FOUNDATION.

-

-

-

... More
Construction of High Level Bridge at Km 24/2 of Thoothukudi - Tiruchendur - Kanniyakumari Road

208.2

-

5589

... More
Vibrated Reinforced Cement Concrete M30 (Design mix), using 20mm ISS HBG Graded metal as the max. size of coarse aggregate, including cost and conveyance of all materials to site and cost of cement at site, but excluding cost and fabrication of steel, but including cost of form work, soft water,labour charges for mixing, transporting, laying, curing concrete working at depths, hire charges for tools and plants, including all other incidental charges, etc., complete as per relevant standard specification for Cutoff Walls.

-

-

-

... More
Construction of High Level Bridge at Km 24/2 of Thoothukudi - Tiruchendur - Kanniyakumari Road

528.62

-

12469

... More
Vibrated Reinforced Cement Concrete M35 (Design mix), using 20mm ISS HBG Graded metal as the max. size of coarse aggregate, including cost and conveyance of all materials to site and cost of cement at site but excluding cost and fabrication of steel, but including labour charges for mixing, transporting, laying, curing concrete,working at depths, hire charges for tools and plants including all other incidental charges, etc., complete for Box Culvert, Kerbs & Footpath.

-

-

-

... More
Construction of High Level Bridge at Km 24/2 of Thoothukudi - Tiruchendur - Kanniyakumari Road

1251.69

-

10248.8

... More
Vibrated Reinforced Cement Concrete M30 (Design mix), using 20mm ISS HBG Graded metal as the max.size ofcoarse aggregate as including cost and conveyance of all materials to site and cost of cement at site,but excluding cost and fabrication of steel, but including cost of form work, labour charges for mixing, transporting,laying, curing concrete, working at heights, softwater, hire charge for tools and Plants,including all other incidental charges, etc.,complete, for HANDRAILS AND POSTS

-

-

-

... More
Construction of High Level Bridge at Km 24/2 of Thoothukudi - Tiruchendur - Kanniyakumari Road

96.26

-

1242

... More
Vibrated Reinforced Cement Concrete M40 (Design mix), using 20mm ISS HBG metal as the max. size of coarse aggregate, as including cost and conveyance of all materials to site and cost of cement at site but excluding cost and fabrication of steel, but including cost of form work, labour charges for mixing, transporting, laying, curing concrete, working at heights, potable water, hirecharge for tools and Plants, including all other incidental charges, etc., complete, for CRASH BARRIER on inner edge of footpath

-

-

-

... More
Construction of High Level Bridge at Km 24/2 of Thoothukudi - Tiruchendur - Kanniyakumari Road

25.12

-

15023

... More
Providing and fixing of G.I. DRAINAGE SPOUTS 100mm dia as per GOI drawing SD/205 with grating arrangements at top as shown in the drawing and 100mm dia drainage spout projecting atleast 300mm beyond the bottom of deck slab as shown in the drawing, including cost and conveyance of Galvanised Iron pipes and flats and fixing them in position, etc.,. complete

-

-

-

... More
Construction of High Level Bridge at Km 24/2 of Thoothukudi - Tiruchendur - Kanniyakumari Road

14

-

2216

... More
Vibrated Cement Concrete M15 (Nominal mix 1:2:4) using 40 mm ISS HBG metal including cost and conveyance of all materials to site and cost of cement at site, including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, soft water, Tools and plants and incidental charges etc., complete as per relevant standard specification, for CC PARAPET OVER RETURN WALL.

-

-

-

... More
Construction of High Level Bridge at Km 24/2 of Thoothukudi - Tiruchendur - Kanniyakumari Road

7.91

-

10803

... More
Supplying and installation of Approved Type EXPANSION joint system conforming to spectifications for Road and Bridge Works _ IV th Revision:2001 published by Ministry of Surface Transport(Roads Wing) in the 20mm wide expansion gap provided in between decks over piers and in between deck and dirt wall over abutment with fatigue tested structural steel section at the nosing and anchorage assembly , including cost and conveyance of all materials , cost of testing as per the MOST specifications, including lablour ,equipment and incidental charges for fixing the joints complete in all respects,as per specifications

-

-

-

... More
Construction of High Level Bridge at Km 24/2 of Thoothukudi - Tiruchendur - Kanniyakumari Road

36

-

580

... More
Vibrated Cement Concrete M15 (Nominal mix 1:2:4) using 40mm ISS metal , including cost and conveyance of all materials to site and cost of cement at site,including all lablour charges for mixing Concrete, laying, hire charges for Tools and plants , compacting, curing with all leads for soft water, including all other incidental charges, form work etc., complete,For BASE COURSE BELOW APPROACH SLAB, FOOTPATH RAMP & FOOTPATH RAMP.

-

-

-

... More
Construction of High Level Bridge at Km 24/2 of Thoothukudi - Tiruchendur - Kanniyakumari Road

22.36

-

5866

... More
Vibrated reinforced Cement Concrete M30 (Design mix) using 20 mm ISS HBG graded metal, including cost and conveyance of all materials to site and cost of cement at site,but excluding cost and fabrication of steel but including labour charges for mixing , laying, curing concrete, working at heights, soft water, hire charges for Tools and Plants, including all other incidental charges, etc., complete For APPROACH SLABS

-

-

-

... More
Construction of High Level Bridge at Km 24/2 of Thoothukudi - Tiruchendur - Kanniyakumari Road

18.27

-

8133

... More
Vibrated Reinforced Cement Concrete M30 (Design mix), 75mm uniform thick with surface reinforcement using ISS HBG Graded metal, including cost and conveyance of all materials to work site including cost of cement at site, including all labour charges for mixing concrete, laying, hire charges for Tools and plants, compacting, curing with all leads for softwater, including all other incidental charges formwork, cost of premoulded expansion joints and fixing the same in position, etc., complete, for WEARING COAT OVER BOX CULVERT AND APPROACH SLABS

-

-

-

... More
Construction of High Level Bridge at Km 24/2 of Thoothukudi - Tiruchendur - Kanniyakumari Road

387.23

-

564.7

... More
Providing and Fixing KRAFT PAPER for full width od seating Box Culvert and including cost and conveyance to worksite, labour for fixing the same in correct position and all other incidental charges etc, complete.

-

-

-

... More
Construction of High Level Bridge at Km 24/2 of Thoothukudi - Tiruchendur - Kanniyakumari Road

7.2

-

100

... More
Granite Rough Stone dry packing for the Specified thickness for apron using good size granite rough stone, properly wedge with quarry spalls including cost and conveyance of all materials to site labour charge for packing the same in position and all other incidental charges etc, complete for FLEXIBLE APRON.

-

-

-

... More
Construction of High Level Bridge at Km 24/2 of Thoothukudi - Tiruchendur - Kanniyakumari Road

322.86

-

1768.28

... More
Granite Flat Stone 150 thickness embedded in 300 thick concrete dry packing for the Specified thickness for apron using good size granite rough stone, properly wedge with quarry spalls including cost and conveyance of all materials to site labour charge for packing the same in position and all other incidental charges etc, complete for FLOOR APRON.

-

-

-

... More
Construction of High Level Bridge at Km 24/2 of Thoothukudi - Tiruchendur - Kanniyakumari Road

122.52

-

1811.18

... More
Providing and fixing CLASS I PVC SEEPAGE PIPES of 110 mm dia. of required lengths for abutments and returnwalls including costs and conveyance of all materials to work site and labour charges for fixing , etc., complete to drain the backfill

-

-

-

... More
Construction of High Level Bridge at Km 24/2 of Thoothukudi - Tiruchendur - Kanniyakumari Road

80

-

193.5

... More
Providing FILTER MEDIA behind Abutment and wings for 600mm thickness using filter material conforming to clause 309.3.2.B of MOST well packed with smaller size towards the soil and bigger size towards the wall including cost and conveyance to worksite including all other incidental charges, etc complete.

-

-

-

... More
Construction of High Level Bridge at Km 24/2 of Thoothukudi - Tiruchendur - Kanniyakumari Road

89.46

-

1223

... More
FILLING behind Box Cells & Return Walls with filling materials having Phi value more than 35° conveyance of material to worksite , laying, handling charges and filling in layers tamping under optimum moisture content to get the maximum density, including watering, with all leads for water and all other incidental charges, etc., complete. Per CI.710.1.4 & Appendix-6 of IRC:78-2014.

-

-

-

... More
Construction of High Level Bridge at Km 24/2 of Thoothukudi - Tiruchendur - Kanniyakumari Road

245.85

-

437.36

... More
Supply and fabrication of Fe-500 steel required for all RCC items of works involved in the schedule, including cost of steel at site and cost of fabrication labour charges for cleaning the rods straightening,cutting,bending,tying grills, including over laping to the required length wherever necessary and providing to the reinforcement placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges , etc., complete

-

-

-

... More
Construction of High Level Bridge at Km 24/2 of Thoothukudi - Tiruchendur - Kanniyakumari Road

126.11

-

83689

... More
Supply and fabrication of Fe-500 steel required in the schedule including cost of steel at site cost of providing and cost of fabrication, labour charges for cleaning the rods, straightening, cutting, bending, tying grills including over lapping to the required length wherever necessary and providing to the reinforcement, placing the reinforcement in position as specified in the drawings including cost of binding wire ,provision of spacer bars, cover blocks and all other incidental charges etc complete, Fe-240 grade for mesh reinforcement

-

-

-

... More
Construction of High Level Bridge at Km 24/2 of Thoothukudi - Tiruchendur - Kanniyakumari Road

2.37

-

83689

... More
Supply and fixing of high quality of PVC pipes of 150mm dia. Including cost and conveyance of pipes to the site and fixing in position to proper grade and level, including labour charges for fixing and including all other incidental charges etc complete for providing utility services in footpaths

-

-

-

... More
Construction of High Level Bridge at Km 24/2 of Thoothukudi - Tiruchendur - Kanniyakumari Road

6

-

399.8

... More
Sub Estimate for Approach Road

-

-

-

... More
Forming Sub-Grade 500mm thick using carted earth with a CBR of 10 including filling the same in layer as per drawing and as directed by the engineer incharge laying watering and consolidatation by power roller rolling to give 97% Compaction including conveyance , labour , and hire charges for roller compaction employed etc., complete for preparation of embankment with lead of 5Km (for filling 97% compaction for new formation) as per clause 301 - 305 of MORT &H specifications.

-

-

-

... More
Construction of High Level Bridge at Km 24/2 of Thoothukudi - Tiruchendur - Kanniyakumari Road

180

-

324.95

... More
Granular Sub-base with Graded Material (Table:- 400-1) - Plant Mix Method (Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 ) - for Garding-V Material as per MORTH Rev. V Clause No. 111, 112, 401 & 900.

-

-

-

... More
Construction of High Level Bridge at Km 24/2 of Thoothukudi - Tiruchendur - Kanniyakumari Road

75

-

1547.76

... More
Wet Mix Macadam (Table 400-13) (Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density, Complete as per clause 406) as per MORTH Rev. V Clause No. 111, 112 406 & 900.

-

-

-

... More
Construction of High Level Bridge at Km 24/2 of Thoothukudi - Tiruchendur - Kanniyakumari Road

93.76

-

1876.95

... More
Prime Coat (Providing and applying primer coat with bitumen emulsion (SS-I type) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per clause 502) - over WMM/ WBM as per MORTH Rev. V Clause No. 111, 112, 502 & 900.

-

-

-

... More
Construction of High Level Bridge at Km 24/2 of Thoothukudi - Tiruchendur - Kanniyakumari Road

375

-

75.04

... More
Tack Coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 - over bituminous surfaces as per MORTH Rev. V Clause No. 111, 112, 503 & 900.

-

-

-

... More
Construction of High Level Bridge at Km 24/2 of Thoothukudi - Tiruchendur - Kanniyakumari Road

375

-

18.29

... More
Dense Bituminous Macadam (Table - 500-10) (Providing and laying Dense Bituminous Macadam 85mm thick with Hot Mix Plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade 30) at percentage specified by JMF by weight of total mix of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No.505) Grading I.

-

-

-

... More
Construction of High Level Bridge at Km 24/2 of Thoothukudi - Tiruchendur - Kanniyakumari Road

18.76

-

11380.7

... More
Bituminous Concrete (Table 500-17) (Providing and laying bituminous concrete with hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade) at percentage specified by JMF of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects) - Grading II

-

-

-

... More
Construction of High Level Bridge at Km 24/2 of Thoothukudi - Tiruchendur - Kanniyakumari Road

15

-

12376.6

... More
Excavation including removal and satisfactory disposal of all materials necessary for the construction of road way and side drains in accordance with specification and the lines grades and cross section shown in the drawing or as indicated by the Engineer as per MORTH Rev.V Clause 111, 112, 201, 202, 301 to 305.

-

-

-

... More
Construction of High Level Bridge at Km 24/2 of Thoothukudi - Tiruchendur - Kanniyakumari Road

81

-

233.33

... More
Sub Estimate for Diversion Road

-

-

-

... More
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201.

-

-

-

... More
Construction of High Level Bridge at Km 24/2 of Thoothukudi - Tiruchendur - Kanniyakumari Road

171

-

5.05

... More
Forming Sub-Grade 500mm thick using carted earth with a CBR of 10 including filling the same in layer as per drawing and as directed by the engineer incharge laying watering and consolidatation by power roller rolling to give 95% Compaction including conveyance , labour , and hire charges for roller compaction employed etc., complete for preparation of embankment with lead of 10Km (for filling 95% compaction for new formation) as per clause 301 - 305 of MORT&H specifications.

-

-

-

... More
Construction of High Level Bridge at Km 24/2 of Thoothukudi - Tiruchendur - Kanniyakumari Road

2047.5

-

309.49

... More
Forming Sub-Grade using carted earth with a CBR of 10 including filling the same in layer as per drawing and as directed by the engineer incharge laying watering and consolidatation by power roller rolling to give 97% Compaction including conveyance , labour , and hire charges for roller compaction employed etc., complete for preparation of embankment with lead of 10Km (for filling 97% compaction for new formation) as per clause 301 - 305 of MORT&H specifications.

-

-

-

... More
Construction of High Level Bridge at Km 24/2 of Thoothukudi - Tiruchendur - Kanniyakumari Road

226.5

-

324.95

... More
Granular Sub-base with Graded Material (Table:- 400-1) - Plant Mix Method (Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 ) - for Garding-V Material as per MORTH Rev. V Clause No. 111, 112, 401 & 900.

-

-

-

... More
Construction of High Level Bridge at Km 24/2 of Thoothukudi - Tiruchendur - Kanniyakumari Road

231

-

1547.76

... More
Wet Mix Macadam (Table 400-13) (Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density, Complete as per clause 406) as per MORTH Rev. V Clause No. 111, 112 406 & 900.

-

-

-

... More
Construction of High Level Bridge at Km 24/2 of Thoothukudi - Tiruchendur - Kanniyakumari Road

175

-

1876.85

... More
Prime Coat (Providing and applying primer coat with bitumen emulsion (SS-I type) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per clause 502) - over WMM/ WBM as per MORTH Rev. V Clause No. 111, 112, 502 & 900.

-

-

-

... More
Construction of High Level Bridge at Km 24/2 of Thoothukudi - Tiruchendur - Kanniyakumari Road

700

-

75.04

... More
Tack Coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 - over bituminous surfaces as per MORTH Rev. V Clause No. 111, 112, 503 & 900.

-

-

-

... More
Construction of High Level Bridge at Km 24/2 of Thoothukudi - Tiruchendur - Kanniyakumari Road

700

-

18.29

... More
Providing and laying Bituminous Macadam 50mm thick with Hot Mix Plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade 30) at percentage specified by JMF by weight of total mix of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No.505) Grading II as per MORTH Rev. V Clause No. 111, 112, 505 & 900.

-

-

-

... More
Construction of High Level Bridge at Km 24/2 of Thoothukudi - Tiruchendur - Kanniyakumari Road

35

-

9570.7

... More
Bituminous Concrete (Table 500-17) (Providing and laying bituminous concrete with hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade-30) at percentage specified by JMF of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects) - Grading II

-

-

-

... More
Construction of High Level Bridge at Km 24/2 of Thoothukudi - Tiruchendur - Kanniyakumari Road

21

-

12376.6

... More
Supply & Fixing NP3 RCC Pipes (1000mm dia) as per drawing and technical specification including laying and fixing and as per MORT & H specification.

-

-

-

... More
Construction of High Level Bridge at Km 24/2 of Thoothukudi - Tiruchendur - Kanniyakumari Road

100

-

4034

... More
Sub Estimate for Coffer Dam

-

-

-

... More
Providing and maintaing of cofferdam to required length using ISMC 200 for vertical and cross stay and casurina poles horizontal branching and 2" country wood planks to hold sand bags including cost of sand bags and labour charges for fabrication and CW planks and their subsequent removal and all other labour and incidental charges etc. complete.

-

-

-

... More
Construction of High Level Bridge at Km 24/2 of Thoothukudi - Tiruchendur - Kanniyakumari Road

1500

-

493.29

... More
Calculation of SubTotal, GST and Total Amount carried out by system automatically

-

-

-

... More
Basic cost of value put to tender as per estimate

1

-

47005200

... More
Add GST at 12%

1

-

5640624

... More
Total Value put to Tender

1

-

52645824

... More
Negotiated Percentage

1

-

-

... More
Final Negotiated Value

1

-

-

... More
Add GST at 12% of Final Negotiated Value

1

-

-

... More
Total Value of Contract Including 12% of GST

1

-

-

... More
Basic cost of value put to tender as per Estimate

-

-

-

... More
Quoted Rate in Figures (Total Value of Contract Including 12% of GST )

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.