Highways Department Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Highways Department Tender

Works
Civil And Construction
Eprocure
Opening Date30 Sep 2024
Closing Date17 Oct 2024
Tender Amount₹ 1,32,80,000 
Notes
Download

Costs

Summary

Tn.30/sl.no.01/tvlr Div/cridp 2024-25

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Road A

558.23

171036

306.39

... More
Granular Sub-base with Graded Material (Table:- 400-1) - Plant Mix Method (Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 ) - for grading- V Material

-

-

-

... More
Road A

173.06

519818

3003.69

... More
Granular Sub-base with Graded Material (Table:- 400-1) - Plant Mix Method (Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 ) - for grading- III Material

-

-

-

... More
Road A

111.64

345837

3097.79

... More
Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam 250mm thick, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base / Base course on well prepared surface and compacting with vibratory soil compactor to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5

-

-

-

... More
Road A

279.13

807874

2894.26

... More
Providing and laying Prime Coat over WBM/WMM surface using 7Kg of Emulsion Bitumen (SS1 ) per 10sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 502 of MORTH Rev-5

-

-

-

... More
Road A

1116.45

89874

80.5

... More
Providing and laying Tack Coat over Existing BT surface using 2Kg of Bitumen Emulsion (RS1) per 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fueland all other incidental charges etc., complete as perClause 503 of MORTH Rev-5

-

-

-

... More
Road A

1116.45

20542

18.4

... More
Providing and laying Tack Coat over WBM/WMM surface (treated with primer)using 2.50Kg of Bitumen Emulsion (RS1) per 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals formachinery, fuel andall other incidental charges etc., complete as perClause 503 of MORTH Rev-5

-

-

-

... More
Road A

3887.5

103874

26.72

... More
Providing, laying 75mm consolidated thick Dense Bituminous Macadam using 0.40cum of 37.50-13.20mm, 0.35cum of 13.20-2.36mm and 0.36cum of 2.36mm & below size IRC metal with 71.30kgs of VG40 grade bitumen for premixing per10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing the min the required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to site, spreading the mix to uniform thickness of 75mm with mechanical paver to the specified grades and cross sections and consolidated by Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher,Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 505 of MORTH rev-5

-

-

-

... More
Road A

111.64

1085983

9727.55

... More
Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.009.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5

-

-

-

... More
Road A

200.15

2239404

11188.63

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structures comprising of masonry, cement concrete, wood work, steel work, including T & P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres. (Existing Structure RCC)

-

-

-

... More
Road A

26.73

115171

4308.7

... More
Picking the existing BT surface upto 50mm depth as directed by the departmental officers and collecting the picked up salvaged metal and stacking the same for reuse and deposting the debris excluding cost of materials including all labour charges for picking and all other tools and plants employed for the work and including all other incidental charges etc., complete, as per MORTH Specification.

-

-

-

... More
Road A

49.93

1090

21.84

... More
Providing Barrier Type Kerb for median/ islands using vibrated cement concrete of grade M20 (1:1.5:3) using 20 and 12mm ISS HBG metal from approved quarry, including cost and conveyance of all materials to worksite, including hire and fuel charges of all the machineries employed for this work, including all labour charges for mixing, laying, curing, painting, including all other incidental charges etc., complete as per drawing and standard specification.

-

-

-

... More
Road A

232.28

134936

580.92

... More
Vibrated Reinforced Cement Concrete M25 (Design mix) using 20mm ISS HBG graded metal including cost and conveyance of all materials to site but exclud ing cost of cement at site inclu ding soft water, labour charges for mixing, transpo rting, laying and curing and compacting concrete, working at heights, hire charges for Tools and Plants and incidental Charges etc., complete as per standard specifications for Box Culvert.

-

-

-

... More
Road A

15.35

185642

12094

... More
Supply and fabrication of STEEL grade Fe500 D with suitable anticorrsive measure required for all the reinforced cement concrete items of work involved in the shedule including cost of steel, cost of fabrication, labour charges for cleaning the rods, straightening, cutting, bending, tying grills, hoisting and placing the reinforcement in position as specified in the drawing including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete.

-

-

-

... More
Road A

0.63

60425

95610

... More
Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with power roller, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification. For making up of with conveyance

-

-

-

... More
Road A

138.44

42416

306.39

... More
Manufacturing, Supplying and Fixing of Stainless Steel Hand rails for staircase using 50mm dia 304L Grade Stainless Steel pipe of 1.60mm thick at required locations to a height of 900mm from finished floor level welded to 38mm dia Stainless Steel pipe post of 1.00mm thick as vertical at 900mm centre with 2 Nos. of 25mm dia intermediate horizontal stainless steel pipe of 1.60mm thick in between. The vertical pipe has to be welded to the 100 X 100 X 6mm MS base plate encased in the base concrete. The rate is inclusive of the charges for cutting, bending, welding, grinding, polishing, conveyance, electrical charges, etc. complete

-

-

-

... More
Road A

258.68

1432052

5536

... More
Sub Estimate ReConstruction of Box Culvert at Km.23/0 of Thirumazhisai - Uthukottai Road Earthwork excavation in all classes of soil except soft rock not requiring blasting and hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for foundation

-

-

-

... More
Road A

565.73

164061

290

... More
Plain Cement Concrete M15 grade (Nominal mix) using 40mm ISS size HBG metal including cost and conveyance of all materials from approved quarry to work site including cost of cement which has to be procured by the contractor including cost and labour charges for mixing the concrete, transporting, laying, compacting, curing with all leads for soft portable water, working in all depths including hire, running and fuel charges for all tools and plants employed including as per MORTH Rev. V Specification No. 1000,1500,1700,2200 - for Foundation.

-

-

-

... More
Road A

32.45

208621

6429

... More
Vibrated Reinforced Cement concrete in M25 using ISS graded HBG metal including cost and conveyance of all materials to site and cost of cement at site including soft water, labour charges for form work, centering, mixing, transporting, laying and curing concrete, tools and plants and incidental charges excluding cost of steel etc., complete as per relevant standard specification for Base slab Side wall & Deck slab of CELL BOX

-

-

-

... More
Road A

127.64

1544780

12102.64

... More
Supply and fabrication of Tor steel grade Fe-500D steel required for all RCC items of works involved in the schedule including cost of steel, cost of fabrication, labour charges for cleaning the bars straightening, cutting, bending, tying grills, hoisting and palcing the reinforcement in position as specified in the drawings including cost of binding wire, provision for spacing bars, cover blocks and all other incidental charges etc., complete as per standard specifications No.1009,1600.

-

-

-

... More
Road A

9.08

868138

95610

... More
Vibrated Cement Concrete M20 grade (Nominal mix) using 40mm ISS size HBG metal including cost and conveyance of all materials from approved quarry to work site including cost of cement which has to be procured by the contractor including cost and labour charges for mixing the concrete, transporting, laying, compacting, curing with all leads for soft portable water, working in all depths including hire, running and fuel charges for all tools and plants employed including as per MORTH Rev. V Specification No.1000, 1500, 1700, 2200 for Parapet Wall and Wing wall

-

-

-

... More
Road A

115.88

958675

8273

... More
Calculation of SubTotal, GST and Total Amount carried out by system automatically

-

-

-

... More
Basic cost of value put to tender as per estimate

1

-

11252322

... More
Add GST at 18%

1

-

2025418

... More
Total Value put to Tender

1

-

13277740

... More
Quoted value

1

-

-

... More
Final Quoted Value

1

-

-

... More
Add GST at 18% of Final Quoted Value

1

-

-

... More
Total Value of Contract Including 18% of GST

1

-

-

... More
Basic cost of value put to tender as per Estimate

-

11252322

-

... More
Quoted Rate in Figures (Total Value of Contract Including 18% of GST )

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.