Highways Department Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Highways Department Tender
Civil And Construction
Road Construction
Eprocure
Opening Date6 Sep 2024
Closing Date23 Sep 2024
Tender Amount₹ 2,29,30,000
Costs
EMD
₹ 1,25,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Tiruchengode (h) Candm Sub Division (slm-54)
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_HWAY_481407_1Bid Award Id
ViewTender No
16 / 2024-2025 / HDO, Dated. 02.09.2024-3Tender Authority
Highways Department ViewPurchaser Address
-Website
http://https://tnhighways.gov.in/index.php/en/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Earth Work excavation in all classes of soil except hard rock not requiring blasting and deposting on bank with all leads and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges removal of other deleteriuos matter and obstructions, trimming of bottom of excavation, backfilling and clearing up the site and disposal of all surplus materials etc., complete as per standard specification for Boxing as per clause 111, 112, 201, 202, 301 to 305 & 900 of MORTH Vth Revision
-
-
-
1.Providing Junction Improvement at km 42/6 of Magudanchavadi - Komarapalayam road (via) Edappady
1092.47
134657
123.26
Construction of granular sub-base by providing close graded Material,mixing in a mechanical mixplant at OMC, carriage of mixed Material to worksite, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory soil compactor to achieve the desired density, complete as per clause 111, 112, 401 & 900 of MORTH Vth Revision etc., complete - for Grading- V Material
-
-
-
1.Providing Junction Improvement at km 42/6 of Magudanchavadi - Komarapalayam road (via) Edappady
275.67
589299
2137.7
Construction of granular sub-base by providing close graded Material,mixing in a mechanical mixplant at OMC, carriage of mixed Material to worksite, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory soil compactor to achieve the desired density, complete as per clause 111, 112, 401 & 900 of MORTH Vth Revision etc., complete - for Grading- III Material
-
-
-
1.Providing Junction Improvement at km 42/6 of Magudanchavadi - Komarapalayam road (via) Edappady
204.2
454708
2226.78
Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam of specified thickness, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory soil compactor to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 111, 112, 406 & 900 of MORTH Vth Revision
-
-
-
1.Providing Junction Improvement at km 42/6 of Magudanchavadi - Komarapalayam road (via) Edappady
620.76
1334298
2149.46
2.Improvements to Riding Quality at km 42/6 - 43/4 of Magudanchavadi - Komarapalayam road (via) Edappady
69.6
149602
2149.46
Providing and laying 50 mm thick Bituminous Macadam using course aggregate and VG-30 Bitumen which shall consist of construction in a single course base/binder course confirming to the specification on a previously prepared base (using Mini Mix Plant and Power Roller) including cost of material,labour charges,rentals for machinary,fuel and all other incidental charges etc.,complete as per clause 111,112,504 & 900 of MORTH Rev-5 (For Patch Works)
-
-
-
1.Providing Junction Improvement at km 42/6 of Magudanchavadi - Komarapalayam road (via) Edappady
10.59
88034
8313
2.Improvements to Riding Quality at km 42/6 - 43/4 of Magudanchavadi - Komarapalayam road (via) Edappady
26.16
217468
8313
Providing and laying Prime Coat over WMM surface using 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 111, 112, 501, 502 & 900 of MORTH Vth Revision
-
-
-
1.Providing Junction Improvement at km 42/6 of Magudanchavadi - Komarapalayam road (via) Edappady
2777
226464
81.55
2.Improvements to Riding Quality at km 42/6 - 43/4 of Magudanchavadi - Komarapalayam road (via) Edappady
464
37839
81.55
Providing and laying Tack Coat over WMM surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 111, 112, 501, 503 & 900 of MORTH Vth Revision
-
-
-
1.Providing Junction Improvement at km 42/6 of Magudanchavadi - Komarapalayam road (via) Edappady
2777
52179
18.79
2.Improvements to Riding Quality at km 42/6 - 43/4 of Magudanchavadi - Komarapalayam road (via) Edappady
464
8718
18.79
Providing and laying Tack Coat over Existing BT surface using 2 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 111, 112, 501, 503 & 900 of MORTH Vth Revision
-
-
-
1.Providing Junction Improvement at km 42/6 of Magudanchavadi - Komarapalayam road (via) Edappady
2501.1
67604
27.03
2.Improvements to Riding Quality at km 42/6 - 43/4 of Magudanchavadi - Komarapalayam road (via) Edappady
9524.38
257443
27.03
Providing, laying 50mm consolidated thick Bituminous Macadam using 0.20cum of 26.50- 13.20mm, 0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRC metal with 37 Kgs of VG 40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 111, 112, 501, 504 & 900 of MORTH Vth Revision- Grading II
-
-
-
2.Improvements to Riding Quality at km 42/6 - 43/4 of Magudanchavadi - Komarapalayam road (via) Edappady
91.45
785156
8585.64
Providing, laying 100mm consolidated thick Dense Bituminous Macadam using 0.40cum of 37.50-13.20mm, 0.35 cum of 13.20-2.36 mm and 0.36 cum of 2.36 mm & below size IRC metal with 71.30 kgs of VG 40 grade bitumen for premixing per 10 sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing the min the required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to site, spreading the mix to uniform thickness of 100 mm with mechanical paver to the specified grades and cross section sand consolidated by Vibratory Roller to the required density etc., including labour for attending to paver to site etc.,including hire and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and allother tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per MoRTH specification clause No.111,112,501,505 & 900 - Grading I
-
-
-
1.Providing Junction Improvement at km 42/6 of Magudanchavadi - Komarapalayam road (via) Edappady
277.7
2590599
9328.77
Providing, laying 50 mm consolidated thick Dense Bituminous Macadam using 0.24 cum of 26.50-13.20 mm, 0.25 cum of 13.20-2.36 mm and 0.23 cum of 2.36 mm & below and with 53.20 Kgs of VG 40 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in the required temperature in Central Hot Mix Plant 20-30 ton capacity, conveying the mix by tipper trucks to worksite, spread ing the mix to uniform thickness of 50 mm using paver to the specified grades and cross sections and compacted by Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver at site etc., including hire and fuel charges for 20-30ton CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory rollers and all other tools and plant required, including all other incidental charges etc.,complete as per specification using CMP as per clause No.111,112,501,505 & 900 - of MORTH rev-5.-Grading II
-
-
-
1.Providing Junction Improvement at km 42/6 of Magudanchavadi - Komarapalayam road (via) Edappady
125.06
1261712
10088.86
Providing and laying Bituminous Concrete to 40mm thick using 0.13cum of 19.00 - 9.50mm, 0.17cum of 9.50-2.36mm and 0.26cum of 2.36 and below with 50.30kgs of VG 40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMPsite, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mixplant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks,Paver Finisher,Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause No. 111, 112, 501, 507 & 900 of MORTH vth Revision
-
-
-
1.Providing Junction Improvement at km 42/6 of Magudanchavadi - Komarapalayam road (via) Edappady
211.11
2311935
10951.33
2.Improvements to Riding Quality at km 42/6 - 43/4 of Magudanchavadi - Komarapalayam road (via) Edappady
392.26
4295768
10951.33
Earth Work excavation in all classes of soil except hard rock not requiring blasting and deposting on bank with all leads and lifts as per SS20B including cost of all labour,materials,tools,equipments and all incidental charges and sheeting,shoring,bracing and their subsequent removal of all logs,stumps and other deleteriuos matter and obstructions,trimming of bottom of excavation,backfilling and clearing the site and disposal of all surplus materials etc.,complete as per standard specification for Foundation of Drain as per clause 111, 112, 201, 202, 301 to 305 & 900 of MORTH Vth Revision
-
-
-
1.1 Construction of Drain at km 42/6
538.56
66382
123.26
Vibrated Cement Concrete of grade M15 Nominal Mix using 40mm ISS size HBG metal including cost and conveyance of all materials to site complying with required standards and specifications. including cost of formwork, mixing, laying and compacting using vibrator including hire and fuel charges for all Tools and Plants and incidental charges such as maintaining of protective bunds, coffer dams strutting etc., complete as per relevant standard specification for foundation of Drain as per clause as per clause 1000, 1500, 1700, 2100, 2200 & 2908 of MORTH Vth Revision
-
-
-
1.1 Construction of Drain at km 42/6
32.64
209267
6411.37
Vibrated Reinforced Cement Concrete of grade M25 (Design mix) using 20mm and below ISS HBG metal including cost and conveyance of all materials to site and cost of cement excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for tools and plants including all other incidental charges etc., complete for Drain as per clause 900, 1000, 1500, 1600, 1700, 2100, 2200 & 2300 of MORTH Vth Revision
-
-
-
1.1 Construction of Drain at km 42/6
212.94
3023403
14198.38
Providing Barrier Type Kerb for median/ islands using vibrated cement concrete of grade M20 (1:1.5:3) using 20 and 12mm ISS HBG metal from approved quarry, including cost and conveyance of all materials to worksite, including hire and fuel charges of all the machineries employed for this work, including all labour charges for mixing, laying, curing, painting, including all other incidental charges etc., complete as per drawing and standard specification as per clause 1000, 1500, 1700, 2100, 2200 & 2908 of MORTH Vth Revision
-
-
-
1.Providing Junction Improvement at km 42/6 of Magudanchavadi - Komarapalayam road (via) Edappady
463.4
225013
485.57
Supply and fabrication of STEEL grade Fe500 D for all the reinforced cement concrete items of work involved in the schedule including cost of steel, cost of fabrication, labour charges for cleaning the rods, straightening, cutting, bending, tying grills, hoisting and placing the reinforcement in position as specified in the drawing including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete. as per standard specification as per clause 1000, 1500, 1600, 1700, 2100 & 2300 of MORTH Vth Revision
-
-
-
1.1 Construction of Drain at km 42/6
9.75
932190
95609.27
Providing and Fixing of FRP Gratings of 600 x 300 mm size with M.S Flats of size 25 x 10mm for outer frames 25 x 6mm for inner braces and PVC pipe 150mm dia fixed with mild steel gratings including cost and conveyance of pipes and gratings and fixing them in position (at 5m interval) as directed by departmental officers etc.,complete
-
-
-
1.1 Construction of Drain at km 42/6
38
19000
500
Supplying and fixing of Reinforced Cement Concrete Man hole cover 750 mm dia with frames as per IRC 50- 1979 as directed by the Departmental officers including labour charges for fixing at every intervals of 5 m along the drain including all other incidental charges etc., complete
-
-
-
1.1 Construction of Drain at km 42/6
19
56449
2971
Filling inbetween the Kerb wall Portion with gravel including cost and conveyance to site including labour charges for filling in layers , watering , tamping under optimum moisture content to get the maximum density and all other incidental charges etc., complete as per clause 304 & 2907 of MORTH Vth Revision
-
-
-
1.Providing Junction Improvement at km 42/6 of Magudanchavadi - Komarapalayam road (via) Edappady
79.12
23829
301.18
Calculation of SubTotal, GST and Total Amount carried out by system automatically
-
-
-
Basic cost of value put to tender as per estimate
1
-
19427757
Add GST at 18%
1
-
3496996
Total Value put to Tender
1
-
22924753
Negotiated Percentage
1
-
-
Final Negotiated Value
1
-
-
Add GST at 18% of Final Negotiated Value
1
-
-
Total Value of Contract Including 18% of GST
1
-
-
Basic cost of value put to tender as per Estimate
-
19427757
-
Quoted Rate in Figures (Total Value of Contract Including 18% of GST )
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements