Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Highways Department Tender

Civil And Construction
Civil Works Highways
Road Construction
Eprocure
Opening Date28 Feb 2022
Closing DateCancelled
Tender Amount₹ 51,10,00,000 
Notes
Download

Costs

Summary

Harur (h) Candm Sub Division (slm-93)

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Excavation for Roadway and drainage Excavation including removal and satisfactory disposal of all materias necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer as per MORTH specification clause No. 111, 112, 301 to 305 & 900 of MORTH vth Revision using carted earth with an average lead Box cutting for Widening Portion.

-

-

-

... More
1.Widening from Two Lane to Four Lane and Strengthening at km 50/8 - 60/0 of Thiruvannamalai - Arur (Via) Thanipadi road including Reconstruction of culvert at Km 50/6, 51/2, 52/2, 52/4, 52/10, 53/2, 53/4 (i), (ii), 54/6, 54/8, 55/2, 55/8, 56/2, 56/6, 58/2, 59/2, 59/10, Construction of cattle pass at km 51/4, 53/4 Construction of Retaining wall at km 52/4, 52/6, 53/6, 54/8, 55/2, 55/8, 56/6 and Construction of Drain at Km 55/10, 56/2, 57/8, 57/10, 58/2 (SH 6A)

34581

-

96.6

... More
1.21 Junction Improvements at km.55/4, 56/2, 56/8, 57/8 of Thiruvannamalai - Arur (Via) Thanipadi road

330.98

-

96.6

... More
Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with power roller, watering, including all hire and fuel charges for all tools and plants, removal ofother delete rious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification. For making up of low berms with conveyance

-

-

-

... More
1.Widening from Two Lane to Four Lane and Strengthening at km 50/8 - 60/0 of Thiruvannamalai - Arur (Via) Thanipadi road including Reconstruction of culvert at Km 50/6, 51/2, 52/2, 52/4, 52/10, 53/2, 53/4 (i), (ii), 54/6, 54/8, 55/2, 55/8, 56/2, 56/6, 58/2, 59/2, 59/10, Construction of cattle pass at km 51/4, 53/4 Construction of Retaining wall at km 52/4, 52/6, 53/6, 54/8, 55/2, 55/8, 56/6 and Construction of Drain at Km 55/10, 56/2, 57/8, 57/10, 58/2 (SH 6A)

200281.5

-

190.66

... More
Granular Sub-base with Graded Material (Table:- 400-1) - Plant Mix Method :Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 111, 112, 401 & 900 of MORTH Vth Revision etc., complete - for grading- V Material

-

-

-

... More
1.Widening from Two Lane to Four Lane and Strengthening at km 50/8 - 60/0 of Thiruvannamalai - Arur (Via) Thanipadi road including Reconstruction of culvert at Km 50/6, 51/2, 52/2, 52/4, 52/10, 53/2, 53/4 (i), (ii), 54/6, 54/8, 55/2, 55/8, 56/2, 56/6, 58/2, 59/2, 59/10, Construction of cattle pass at km 51/4, 53/4 Construction of Retaining wall at km 52/4, 52/6, 53/6, 54/8, 55/2, 55/8, 56/6 and Construction of Drain at Km 55/10, 56/2, 57/8, 57/10, 58/2 (SH 6A)

17502

-

1613.92

... More
1.21 Junction Improvements at km.55/4, 56/2, 56/8, 57/8 of Thiruvannamalai - Arur (Via) Thanipadi road

183.89

-

1613.92

... More
Granular Sub-base with Graded Material (Table:- 400-13) - Plant Mix Method :Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 111, 112, 401 & 900 of MORTH Vth Revision etc., complete - for grading- III Material

-

-

-

... More
1.Widening from Two Lane to Four Lane and Strengthening at km 50/8 - 60/0 of Thiruvannamalai - Arur (Via) Thanipadi road including Reconstruction of culvert at Km 50/6, 51/2, 52/2, 52/4, 52/10, 53/2, 53/4 (i), (ii), 54/6, 54/8, 55/2, 55/8, 56/2, 56/6, 58/2, 59/2, 59/10, Construction of cattle pass at km 51/4, 53/4 Construction of Retaining wall at km 52/4, 52/6, 53/6, 54/8, 55/2, 55/8, 56/6 and Construction of Drain at Km 55/10, 56/2, 57/8, 57/10, 58/2 (SH 6A)

8222

-

1705.7

... More
1.21 Junction Improvements at km.55/4, 56/2, 56/8, 57/8 of Thiruvannamalai - Arur (Via) Thanipadi road

147.1

-

1705.7

... More
Wet Mix Macadam (Table 400-13) :Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density, as per clause 111, 112, 406 & 900 of MORTH Vth Revision

-

-

-

... More
1.Widening from Two Lane to Four Lane and Strengthening at km 50/8 - 60/0 of Thiruvannamalai - Arur (Via) Thanipadi road including Reconstruction of culvert at Km 50/6, 51/2, 52/2, 52/4, 52/10, 53/2, 53/4 (i), (ii), 54/6, 54/8, 55/2, 55/8, 56/2, 56/6, 58/2, 59/2, 59/10, Construction of cattle pass at km 51/4, 53/4 Construction of Retaining wall at km 52/4, 52/6, 53/6, 54/8, 55/2, 55/8, 56/6 and Construction of Drain at Km 55/10, 56/2, 57/8, 57/10, 58/2 (SH 6A)

39404

-

1895.2

... More
1.21 Junction Improvements at km.55/4, 56/2, 56/8, 57/8 of Thiruvannamalai - Arur (Via) Thanipadi road

840.2

-

1895.2

... More
Prime coat :Providing and applying primer coat with bitumen emulsion (SS-I type) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per clause 111, 112, 501, 502 & 900 of MORTH Vth Revision - over WMM/ WBM

-

-

-

... More
1.Widening from Two Lane to Four Lane and Strengthening at km 50/8 - 60/0 of Thiruvannamalai - Arur (Via) Thanipadi road including Reconstruction of culvert at Km 50/6, 51/2, 52/2, 52/4, 52/10, 53/2, 53/4 (i), (ii), 54/6, 54/8, 55/2, 55/8, 56/2, 56/6, 58/2, 59/2, 59/10, Construction of cattle pass at km 51/4, 53/4 Construction of Retaining wall at km 52/4, 52/6, 53/6, 54/8, 55/2, 55/8, 56/6 and Construction of Drain at Km 55/10, 56/2, 57/8, 57/10, 58/2 (SH 6A)

137956

-

69.62

... More
1.21 Junction Improvements at km.55/4, 56/2, 56/8, 57/8 of Thiruvannamalai - Arur (Via) Thanipadi road

3360.8

-

69.62

... More
Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 111, 112, 501, 503 & 900 of MORTH Vth Revision - over granular surfaces treated with primer

-

-

-

... More
1.Widening from Two Lane to Four Lane and Strengthening at km 50/8 - 60/0 of Thiruvannamalai - Arur (Via) Thanipadi road including Reconstruction of culvert at Km 50/6, 51/2, 52/2, 52/4, 52/10, 53/2, 53/4 (i), (ii), 54/6, 54/8, 55/2, 55/8, 56/2, 56/6, 58/2, 59/2, 59/10, Construction of cattle pass at km 51/4, 53/4 Construction of Retaining wall at km 52/4, 52/6, 53/6, 54/8, 55/2, 55/8, 56/6 and Construction of Drain at Km 55/10, 56/2, 57/8, 57/10, 58/2 (SH 6A)

137956

-

16.35

... More
1.21 Junction Improvements at km.55/4, 56/2, 56/8, 57/8 of Thiruvannamalai - Arur (Via) Thanipadi road

3360.8

-

16.35

... More
Providing, laying 75mm consolidated thick Dense Bituminous acadam using 0.40cum of 37.50-13.20mm, 0.35cum of 13.20-2.36mm and 0.36cum of 2.36mm & below size IRC metal with 71.30kgs of VG40 grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in the required temperature in central hot mix plant 20-30 ton capacity, onveying the mix by tipper trucks to site, spreading the mix to uniform thickness of 75mm with mechanical paver to the pecified grades and cross sections and consolidated by Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 505 of MORTH rev-5 Grading-I

-

-

-

... More
1.Widening from Two Lane to Four Lane and Strengthening at km 50/8 - 60/0 of Thiruvannamalai - Arur (Via) Thanipadi road including Reconstruction of culvert at Km 50/6, 51/2, 52/2, 52/4, 52/10, 53/2, 53/4 (i), (ii), 54/6, 54/8, 55/2, 55/8, 56/2, 56/6, 58/2, 59/2, 59/10, Construction of cattle pass at km 51/4, 53/4 Construction of Retaining wall at km 52/4, 52/6, 53/6, 54/8, 55/2, 55/8, 56/6 and Construction of Drain at Km 55/10, 56/2, 57/8, 57/10, 58/2 (SH 6A)

12417

-

9259.61

... More
Providing, laying 50mm consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50- 13.20mm, 0.25cum of 13.20-2.36mm and 0.23cum of 2.36mm & below and with 53.20Kgs of VG40 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in the required temperature in Central Hot Mix Plant 20- 30 ton capacity, conveying the mix by tipper trucks to work site, spreading the mix to uniform thickness of 50mm using paver to the specified grades and cross sections and compacted by Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver at site etc., including hire and fuel charges for 20-30ton CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory rollers and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5 Grading-II

-

-

-

... More
1.21 Junction Improvements at km.55/4, 56/2, 56/8, 57/8 of Thiruvannamalai - Arur (Via) Thanipadi road

168.03

-

9979.36

... More
Bituminous Concrete (Table 500-17) :Providing and laying bituminous concrete of required thickness with central hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade-40) at percentage specified by JMF of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 111,112,501,507 & 900 of MORTH vth Revision complete in all respects - Grading II

-

-

-

... More
1.Widening from Two Lane to Four Lane and Strengthening at km 50/8 - 60/0 of Thiruvannamalai - Arur (Via) Thanipadi road including Reconstruction of culvert at Km 50/6, 51/2, 52/2, 52/4, 52/10, 53/2, 53/4 (i), (ii), 54/6, 54/8, 55/2, 55/8, 56/2, 56/6, 58/2, 59/2, 59/10, Construction of cattle pass at km 51/4, 53/4 Construction of Retaining wall at km 52/4, 52/6, 53/6, 54/8, 55/2, 55/8, 56/6 and Construction of Drain at Km 55/10, 56/2, 57/8, 57/10, 58/2 (SH 6A)

5519

-

10866.4

... More
1.21 Junction Improvements at km.55/4, 56/2, 56/8, 57/8 of Thiruvannamalai - Arur (Via) Thanipadi road

134.42

-

10866.4

... More
Providing compaction for berms using the box cut earth including all hire and fuel charges for power roller for compaction, water sprinkler, including all labour charges for laying, spreading, watering etc., complete and as directed by the departmental engineers for making up of low berms Filling For Embankment/Shoulder Fill. (Labour and Hire Charges only)

-

-

-

... More
1.Widening from Two Lane to Four Lane and Strengthening at km 50/8 - 60/0 of Thiruvannamalai - Arur (Via) Thanipadi road including Reconstruction of culvert at Km 50/6, 51/2, 52/2, 52/4, 52/10, 53/2, 53/4 (i), (ii), 54/6, 54/8, 55/2, 55/8, 56/2, 56/6, 58/2, 59/2, 59/10, Construction of cattle pass at km 51/4, 53/4 Construction of Retaining wall at km 52/4, 52/6, 53/6, 54/8, 55/2, 55/8, 56/6 and Construction of Drain at Km 55/10, 56/2, 57/8, 57/10, 58/2 (SH 6A)

34581

-

22.95

... More
1.21 Junction Improvements at km.55/4, 56/2, 56/8, 57/8 of Thiruvannamalai - Arur (Via) Thanipadi road

108

-

22.95

... More
Dismantling RR Stone masonry in cement mortar walls under 3m high clearing away from the work site and carefully stacking the usefull materials for reuse on the road side as directed by the departmental officers including all labour and incidental charges etc., complete.

-

-

-

... More
1.1 Reconstruction of Culvert at km. 50/6 of Thiruvannamlai - Arur (via) Thanipadi road.

73.8

-

221.9

... More
1.2 Reconstruction of Culvert at km. 51/2 of Thiruvannamlai - Arur (via) Thanipadi road.

55.8

-

221.9

... More
1.3 Reconstruction of Culvert at km. 52/2 of Thiruvannamlai - Arur (via) Thanipadi road.

55.8

-

221.9

... More
1.4 Reconstruction of Culvert at km. 52/4 of Thiruvannamlai - Arur (via) Thanipadi road.

55.8

-

221.9

... More
1.5 Reconstruction of Culvert at km. 52/10 of Thiruvannamlai - Arur (via) Thanipadi road.

55.8

-

221.9

... More
1.6 Reconstruction of Culvert at km. 53/2 of Thiruvannamlai - Arur (via) Thanipadi road.

55.8

-

221.9

... More
1.7 Reconstruction of Culvert at km. 53/4(i) of Thiruvannamlai - Arur (via) Thanipadi road.

55.8

-

221.9

... More
1.8 Reconstruction of Culvert at km. 53/4(ii) of Thiruvannamlai - Arur (via) Thanipadi road.

55.8

-

221.9

... More
1.9 Reconstruction of Culvert at km. 54/6 of Thiruvannamlai - Arur (via) Thanipadi road.

55.8

-

221.9

... More
1.10 Reconstruction of Culvert at km. 54/8 of Thiruvannamlai - Arur (via) Thanipadi road.

91.8

-

221.9

... More
1.11 Reconstruction of Culvert at km. 55/2 of Thiruvannamlai - Arur (via) Thanipadi road.

55.8

-

221.9

... More
1.12 Reconstruction of Culvert at km. 55/8 of Thiruvannamlai - Arur (via) Thanipadi road.

55.8

-

221.9

... More
1.13 Reconstruction of Culvert at km. 56/2 of Thiruvannamlai - Arur (via) Thanipadi road.

55.8

-

221.9

... More
1.14 Reconstruction of Culvert at km. 56/6 of Thiruvannamlai - Arur (via) Thanipadi road.

55.8

-

221.9

... More
1.15 Reconstruction of Culvert at km. 58/2 of Thiruvannamlai - Arur (via) Thanipadi road.

55.8

-

221.9

... More
1.16 Reconstruction of Culvert at km. 59/2 of Thiruvannamlai - Arur (via) Thanipadi road.

55.8

-

221.9

... More
1.17 Reconstruction of Culvert at km. 59/10 of Thiruvannamlai - Arur (via) Thanipadi road.

55.8

-

221.9

... More
Earth Work excavation in all classes of soil except hard rock not requiring blasting and deposting on bank as per SS20B with all leads and lifts and all other icidental charges such as baling out water shoring shrutting walling and forming protective bunds wherever necessary etc.,comlete as per relavant specification.For Foundation of culverts with a disposal of foundation earth.

-

-

-

... More
1.1 Reconstruction of Culvert at km. 50/6 of Thiruvannamlai - Arur (via) Thanipadi road.

129.09

-

118.86

... More
1.2 Reconstruction of Culvert at km. 51/2 of Thiruvannamlai - Arur (via) Thanipadi road.

216.58

-

118.86

... More
1.3 Reconstruction of Culvert at km. 52/2 of Thiruvannamlai - Arur (via) Thanipadi road.

594.66

-

118.86

... More
1.4 Reconstruction of Culvert at km. 52/4 of Thiruvannamlai - Arur (via) Thanipadi road.

669.59

-

118.86

... More
1.5 Reconstruction of Culvert at km. 52/10 of Thiruvannamlai - Arur (via) Thanipadi road.

310.08

-

118.86

... More
1.6 Reconstruction of Culvert at km. 53/2 of Thiruvannamlai - Arur (via) Thanipadi road.

268.37

-

118.86

... More
1.7 Reconstruction of Culvert at km. 53/4(i) of Thiruvannamlai - Arur (via) Thanipadi road.

259.76

-

118.86

... More
1.8 Reconstruction of Culvert at km. 53/4(ii) of Thiruvannamlai - Arur (via) Thanipadi road.

201.41

-

118.86

... More
1.9 Reconstruction of Culvert at km. 54/6 of Thiruvannamlai - Arur (via) Thanipadi road.

229.39

-

118.86

... More
1.10 Reconstruction of Culvert at km. 54/8 of Thiruvannamlai - Arur (via) Thanipadi road.

417.59

-

118.86

... More
1.11 Reconstruction of Culvert at km. 55/2 of Thiruvannamlai - Arur (via) Thanipadi road.

263.99

-

118.86

... More
1.12 Reconstruction of Culvert at km. 55/8 of Thiruvannamlai - Arur (via) Thanipadi road.

309.94

-

118.86

... More
1.13 Reconstruction of Culvert at km. 56/2 of Thiruvannamlai - Arur (via) Thanipadi road.

235.77

-

118.86

... More
1.14 Reconstruction of Culvert at km. 56/6 of Thiruvannamlai - Arur (via) Thanipadi road.

451.02

-

118.86

... More
1.15 Reconstruction of Culvert at km. 58/2 of Thiruvannamlai - Arur (via) Thanipadi road.

662.21

-

118.86

... More
1.16 Reconstruction of Culvert at km. 59/2 of Thiruvannamlai - Arur (via) Thanipadi road.

233.07

-

118.86

... More
1.17 Reconstruction of Culvert at km. 59/10 of Thiruvannamlai - Arur (via) Thanipadi road.

162.98

-

118.86

... More
1.18 Construction of Cattle pass at km. 51/4 of Thiruvannamlai - Arur (via) Thanipadi road.

992.67

-

118.86

... More
1.19 Construction of Cattle pass at km. 53/4of Thiruvannamlai - Arur (via) Thanipadi road.

259.76

-

118.86

... More
1.20 Construction of Retaining wall at km. 54/10, 55/4, 55/10 of Thiruvannamlai - Arur (via) Thanipadi road.

656.19

-

96.6

... More
Plain Cement Concrete of grade M15 Nominal Mix using 40mm ISS size HBG metal including cost and conveyance of all materials to site complying with required standards and specifications. including cost of formwork, mixing, laying and compacting using vibrator including hire and fuel charges for all Tools and Plants and incidental charges such as maintaining of protective bunds, coffer dams strutting etc., complete as per relevant standard specification for Levelling course below Base slab as per clause 1000, 1500, 1700, 2100, 2200 & 2908 of MORTH Vth Revision

-

-

-

... More
1.1 Reconstruction of Culvert at km. 50/6 of Thiruvannamlai - Arur (via) Thanipadi road.

14.66

-

5520.73

... More
1.2 Reconstruction of Culvert at km. 51/2 of Thiruvannamlai - Arur (via) Thanipadi road.

17.84

-

5517.04

... More
1.3 Reconstruction of Culvert at km. 52/2 of Thiruvannamlai - Arur (via) Thanipadi road.

35.83

-

5504.78

... More
1.4 Reconstruction of Culvert at km. 52/4 of Thiruvannamlai - Arur (via) Thanipadi road.

39.41

-

5496.21

... More
1.5 Reconstruction of Culvert at km. 52/10 of Thiruvannamlai - Arur (via) Thanipadi road.

22.29

-

5492.52

... More
1.6 Reconstruction of Culvert at km. 53/2 of Thiruvannamlai - Arur (via) Thanipadi road.

20.3

-

5492.52

... More
1.7 Reconstruction of Culvert at km. 53/4(i) of Thiruvannamlai - Arur (via) Thanipadi road.

22.31

-

5423.76

... More
1.8 Reconstruction of Culvert at km. 53/4(ii) of Thiruvannamlai - Arur (via) Thanipadi road.

17.11

-

5483.96

... More
1.9 Reconstruction of Culvert at km. 54/6 of Thiruvannamlai - Arur (via) Thanipadi road.

18.45

-

5469.66

... More
1.10 Reconstruction of Culvert at km. 54/8 of Thiruvannamlai - Arur (via) Thanipadi road.

32.27

-

5409.46

... More
1.11 Reconstruction of Culvert at km. 55/2 of Thiruvannamlai - Arur (via) Thanipadi road.

20.09

-

5465.37

... More
1.12 Reconstruction of Culvert at km. 55/8 of Thiruvannamlai - Arur (via) Thanipadi road.

22.28

-

5395.15

... More
1.13 Reconstruction of Culvert at km. 56/2 of Thiruvannamlai - Arur (via) Thanipadi road.

20.4

-

5390.87

... More
1.14 Reconstruction of Culvert at km. 56/6 of Thiruvannamlai - Arur (via) Thanipadi road.

28.99

-

5380.85

... More
1.15 Reconstruction of Culvert at km. 58/2 of Thiruvannamlai - Arur (via) Thanipadi road.

39.46

-

5362.27

... More
1.16 Reconstruction of Culvert at km. 59/2 of Thiruvannamlai - Arur (via) Thanipadi road.

18.62

-

5347.96

... More
1.17 Reconstruction of Culvert at km. 59/10 of Thiruvannamlai - Arur (via) Thanipadi road.

15.79

-

5393.87

... More
1.18 Construction of Cattle pass at km. 51/4 of Thiruvannamlai - Arur (via) Thanipadi road.

59.15

-

5508.47

... More
1.19 Construction of Cattle pass at km. 53/4of Thiruvannamlai - Arur (via) Thanipadi road.

22.31

-

5423.76

... More
1.20 Construction of Retaining wall at km. 54/10, 55/4, 55/10 of Thiruvannamlai - Arur (via) Thanipadi road.

41.01

-

5455.35

... More
Vibrated Cement Concrete of grade M20 Nominal Mix using 20mm ISS size HBG metal including cost and conveyance of all materials to site complying with required standards and specifications. including cost of formwork, mixing, laying and compacting using vibrator including hire and fuel charges for all Tools and Plants and incidental charges such as maintaining of protective bunds, coffer dams strutting etc., complete as per relevant standard specification for Kerb Median as per clause 1000, 1500, 1700, 2100, 2200 & 2908 of MORTH Vth Revision

-

-

-

... More
1.22 Providing Kerb Median at km.50/8-60/0 of Thiruvannamlai - Arur (via) Thanipadi road.

887.12

-

10406.57

... More
Vibrated reinforced cement concrete M-25 Grade, Design mix, using ISS size hard granite broken graded metal including cost and conveyance of all materials to site complying with required standards and specifications. but excluding cost and fabrication of steel, including cost of formwork, mixing, laying and compacting using vibrator including hire and fuel charges for all Tools and Plants and incidental charges such as maintaining of protective bunds, coffer dams strutting etc., complete as per relevant standard specification as per clause 1000, 1500, 1700, 2100, 2200 & 2908 of MORTH Vth Revision for Base Slab, Side wall, Retaining wall

-

-

-

... More
1.1 Reconstruction of Culvert at km. 50/6 of Thiruvannamlai - Arur (via) Thanipadi road.

107.43

-

10214.9

... More
1.2 Reconstruction of Culvert at km. 51/2 of Thiruvannamlai - Arur (via) Thanipadi road.

144.68

-

9936.54

... More
1.3 Reconstruction of Culvert at km. 52/2 of Thiruvannamlai - Arur (via) Thanipadi road.

466.29

-

8994.87

... More
1.4 Reconstruction of Culvert at km. 52/4 of Thiruvannamlai - Arur (via) Thanipadi road.

551.57

-

8907.44

... More
1.5 Reconstruction of Culvert at km. 52/10 of Thiruvannamlai - Arur (via) Thanipadi road.

211.48

-

9555.86

... More
1.6 Reconstruction of Culvert at km. 53/2 of Thiruvannamlai - Arur (via) Thanipadi road.

179.6

-

9713.57

... More
1.7 Reconstruction of Culvert at km. 53/4(i) of Thiruvannamlai - Arur (via) Thanipadi road.

210.45

-

9777.65

... More
1.8 Reconstruction of Culvert at km. 53/4(ii) of Thiruvannamlai - Arur (via) Thanipadi road.

135.4

-

9998.27

... More
1.9 Reconstruction of Culvert at km. 54/6 of Thiruvannamlai - Arur (via) Thanipadi road.

153.5

-

9833.34

... More
1.10 Reconstruction of Culvert at km. 54/8 of Thiruvannamlai - Arur (via) Thanipadi road.

289.72

-

9356.67

... More
1.11 Reconstruction of Culvert at km. 55/2 of Thiruvannamlai - Arur (via) Thanipadi road.

176.54

-

9689.06

... More
1.12 Reconstruction of Culvert at km. 55/8 of Thiruvannamlai - Arur (via) Thanipadi road.

208.24

-

9539.07

... More
1.13 Reconstruction of Culvert at km. 56/2 of Thiruvannamlai - Arur (via) Thanipadi road.

164.21

-

9906.9

... More
1.14 Reconstruction of Culvert at km. 56/6 of Thiruvannamlai - Arur (via) Thanipadi road.

328.41

-

9162.39

... More
1.15 Reconstruction of Culvert at km. 58/2 of Thiruvannamlai - Arur (via) Thanipadi road.

536.77

-

8851.41

... More
1.16 Reconstruction of Culvert at km. 59/2 of Thiruvannamlai - Arur (via) Thanipadi road.

156.17

-

9760.34

... More
1.17 Reconstruction of Culvert at km. 59/10 of Thiruvannamlai - Arur (via) Thanipadi road.

119.96

-

9997.66

... More
1.18 Construction of Cattle pass at km. 51/4 of Thiruvannamlai - Arur (via) Thanipadi road.

589.09

-

9716.23

... More
1.19 Construction of Cattle pass at km. 53/4of Thiruvannamlai - Arur (via) Thanipadi road.

210.45

-

9777.65

... More
1.20 Construction of Retaining wall at km. 54/10, 55/4, 55/10 of Thiruvannamlai - Arur (via) Thanipadi road.

314.26

-

10923.9

... More
Vibrated Reinforced cement concrete M40 (Design mix) using 20MM ISS graded HBGS metal stone including cost and conveyance of all materials to site including cement at site but excluding cost and fabrication of steel, including cost of formwork using soft water, labour charges for mixing, transporting and placing in position, vibrating and compacting, laying in all heights and curing concrete, hire charges for tools and plants including shoring, shutting etc., complete as per relevant specification, as per MORT&H specifications 1000,1500,1600,1700 & 2300 for Crash Barrier

-

-

-

... More
1.1 Reconstruction of Culvert at km. 50/6 of Thiruvannamlai - Arur (via) Thanipadi road.

1.59

-

12159.34

... More
1.2 Reconstruction of Culvert at km. 51/2 of Thiruvannamlai - Arur (via) Thanipadi road.

1.59

-

12155.65

... More
1.3 Reconstruction of Culvert at km. 52/2 of Thiruvannamlai - Arur (via) Thanipadi road.

1.59

-

12143.4

... More
1.4 Reconstruction of Culvert at km. 52/4 of Thiruvannamlai - Arur (via) Thanipadi road.

1.59

-

12134.83

... More
1.5 Reconstruction of Culvert at km. 52/10 of Thiruvannamlai - Arur (via) Thanipadi road.

1.59

-

12131.14

... More
1.6 Reconstruction of Culvert at km. 53/2 of Thiruvannamlai - Arur (via) Thanipadi road.

1.59

-

12131.14

... More
1.7 Reconstruction of Culvert at km. 53/4(i) of Thiruvannamlai - Arur (via) Thanipadi road.

2.34

-

11971.59

... More
1.8 Reconstruction of Culvert at km. 53/4(ii) of Thiruvannamlai - Arur (via) Thanipadi road.

1.59

-

12122.57

... More
1.9 Reconstruction of Culvert at km. 54/6 of Thiruvannamlai - Arur (via) Thanipadi road.

1.59

-

12108.27

... More
1.10 Reconstruction of Culvert at km. 54/8 of Thiruvannamlai - Arur (via) Thanipadi road.

2.9

-

11883.28

... More
1.11 Reconstruction of Culvert at km. 55/2 of Thiruvannamlai - Arur (via) Thanipadi road.

1.59

-

12103.98

... More
1.12 Reconstruction of Culvert at km. 55/8 of Thiruvannamlai - Arur (via) Thanipadi road.

1.59

-

12093.97

... More
1.13 Reconstruction of Culvert at km. 56/2 of Thiruvannamlai - Arur (via) Thanipadi road.

1.59

-

12089.68

... More
1.14 Reconstruction of Culvert at km. 56/6 of Thiruvannamlai - Arur (via) Thanipadi road.

1.59

-

12079.67

... More
1.15 Reconstruction of Culvert at km. 58/2 of Thiruvannamlai - Arur (via) Thanipadi road.

1.59

-

12061.08

... More
1.16 Reconstruction of Culvert at km. 59/2 of Thiruvannamlai - Arur (via) Thanipadi road.

1.59

-

12046.78

... More
1.17 Reconstruction of Culvert at km. 59/10 of Thiruvannamlai - Arur (via) Thanipadi road.

1.59

-

12032.48

... More
1.18 Construction of Cattle pass at km. 51/4 of Thiruvannamlai - Arur (via) Thanipadi road.

2.38

-

11931.72

... More
1.19 Construction of Cattle pass at km. 53/4of Thiruvannamlai - Arur (via) Thanipadi road.

2.34

-

11971.59

... More
Vibrated cement Concrete M30 design mix using ISS size HBG graded metal including cost and conveyance of all materials to worksite and cement at site including all labour charges for fixing concrete, laying, vibrating, hire charges for tools and plants, compacting, curing with all leads for soft water, including all other incidental charges,formwork,cost of premoulded expansion joints and fixing the same in position etc., complete for wearing coat of 75mm uniform thickness over deck slab

-

-

-

... More
1.1 Reconstruction of Culvert at km. 50/6 of Thiruvannamlai - Arur (via) Thanipadi road.

47.58

-

559.36

... More
1.2 Reconstruction of Culvert at km. 51/2 of Thiruvannamlai - Arur (via) Thanipadi road.

47.58

-

559.08

... More
1.3 Reconstruction of Culvert at km. 52/2 of Thiruvannamlai - Arur (via) Thanipadi road.

47.58

-

558.14

... More
1.4 Reconstruction of Culvert at km. 52/4 of Thiruvannamlai - Arur (via) Thanipadi road.

47.58

-

557.48

... More
1.5 Reconstruction of Culvert at km. 52/10 of Thiruvannamlai - Arur (via) Thanipadi road.

47.58

-

557.21

... More
1.6 Reconstruction of Culvert at km. 53/2 of Thiruvannamlai - Arur (via) Thanipadi road.

47.58

-

557.21

... More
1.7 Reconstruction of Culvert at km. 53/4(i) of Thiruvannamlai - Arur (via) Thanipadi road.

70.27

-

556.55

... More
1.8 Reconstruction of Culvert at km. 53/4(ii) of Thiruvannamlai - Arur (via) Thanipadi road.

47.58

-

556.55

... More
1.9 Reconstruction of Culvert at km. 54/6 of Thiruvannamlai - Arur (via) Thanipadi road.

47.58

-

555.46

... More
1.10 Reconstruction of Culvert at km. 54/8 of Thiruvannamlai - Arur (via) Thanipadi road.

86.93

-

555.46

... More
1.11 Reconstruction of Culvert at km. 55/2 of Thiruvannamlai - Arur (via) Thanipadi road.

47.58

-

555.13

... More
1.12 Reconstruction of Culvert at km. 55/8 of Thiruvannamlai - Arur (via) Thanipadi road.

47.58

-

554.37

... More
1.13 Reconstruction of Culvert at km. 56/2 of Thiruvannamlai - Arur (via) Thanipadi road.

58.37

-

554.04

... More
1.14 Reconstruction of Culvert at km. 56/6 of Thiruvannamlai - Arur (via) Thanipadi road.

47.58

-

553.27

... More
1.15 Reconstruction of Culvert at km. 58/2 of Thiruvannamlai - Arur (via) Thanipadi road.

50.18

-

551.86

... More
1.16 Reconstruction of Culvert at km. 59/2 of Thiruvannamlai - Arur (via) Thanipadi road.

47.58

-

550.77

... More
1.17 Reconstruction of Culvert at km. 59/10 of Thiruvannamlai - Arur (via) Thanipadi road.

47.58

-

549.67

... More
1.19 Construction of Cattle pass at km. 53/4of Thiruvannamlai - Arur (via) Thanipadi road.

70.27

-

556.55

... More
Supply and fabrication of Steel Grade Fe 500D required for all RCC items of works involved in the schedule including cost of steel, cost of fabrication, labour charges for cleaning the bars straightening, cutting, bending, tying grills, hoisting and placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete as per standard specification as per clause 900, 1000, 1500, 1600, 1700, 2100 & 2300 of MORTH Vth Revision

-

-

-

... More
1.1 Reconstruction of Culvert at km. 50/6 of Thiruvannamlai - Arur (via) Thanipadi road.

8.1

-

83688.7

... More
1.2 Reconstruction of Culvert at km. 51/2 of Thiruvannamlai - Arur (via) Thanipadi road.

8.04

-

83688.7

... More
1.3 Reconstruction of Culvert at km. 52/2 of Thiruvannamlai - Arur (via) Thanipadi road.

41.55

-

83688.7

... More
1.4 Reconstruction of Culvert at km. 52/4 of Thiruvannamlai - Arur (via) Thanipadi road.

47.72

-

83688.7

... More
1.5 Reconstruction of Culvert at km. 52/10 of Thiruvannamlai - Arur (via) Thanipadi road.

16.24

-

83688.7

... More
1.6 Reconstruction of Culvert at km. 53/2 of Thiruvannamlai - Arur (via) Thanipadi road.

12.85

-

83688.7

... More
1.7 Reconstruction of Culvert at km. 53/4(i) of Thiruvannamlai - Arur (via) Thanipadi road.

11.73

-

83688.7

... More
1.8 Reconstruction of Culvert at km. 53/4(ii) of Thiruvannamlai - Arur (via) Thanipadi road.

9.81

-

83688.7

... More
1.9 Reconstruction of Culvert at km. 54/6 of Thiruvannamlai - Arur (via) Thanipadi road.

11.13

-

83688.7

... More
1.10 Reconstruction of Culvert at km. 54/8 of Thiruvannamlai - Arur (via) Thanipadi road.

22.24

-

83688.7

... More
1.11 Reconstruction of Culvert at km. 55/2 of Thiruvannamlai - Arur (via) Thanipadi road.

14.11

-

83688.7

... More
1.12 Reconstruction of Culvert at km. 55/8 of Thiruvannamlai - Arur (via) Thanipadi road.

17.34

-

83688.7

... More
1.13 Reconstruction of Culvert at km. 56/2 of Thiruvannamlai - Arur (via) Thanipadi road.

11.2

-

83688.7

... More
1.14 Reconstruction of Culvert at km. 56/6 of Thiruvannamlai - Arur (via) Thanipadi road.

26.91

-

83688.7

... More
1.15 Reconstruction of Culvert at km. 58/2 of Thiruvannamlai - Arur (via) Thanipadi road.

46.99

-

83688.7

... More
1.16 Reconstruction of Culvert at km. 59/2 of Thiruvannamlai - Arur (via) Thanipadi road.

11.27

-

83688.7

... More
1.17 Reconstruction of Culvert at km. 59/10 of Thiruvannamlai - Arur (via) Thanipadi road.

8.88

-

83688.7

... More
1.18 Construction of Cattle pass at km. 51/4 of Thiruvannamlai - Arur (via) Thanipadi road.

29.51

-

83688.7

... More
1.19 Construction of Cattle pass at km. 53/4of Thiruvannamlai - Arur (via) Thanipadi road.

14.54

-

83688.7

... More
1.20 Construction of Retaining wall at km. 54/10, 55/4, 55/10 of Thiruvannamlai - Arur (via) Thanipadi road.

25.14

-

83688.7

... More
Providing and laying filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRT&H Specifications to The thickness of filter is generally of the order of 200 mm to 300 mm. Where filter is provided in two layers, thickness of each layer shall be 150 mm. The smaller size towards the soil and bigger size towards the wall and provided over the entire surface behaind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specifications

-

-

-

... More
1.1 Reconstruction of Culvert at km. 50/6 of Thiruvannamlai - Arur (via) Thanipadi road.

63.48

-

1155.71

... More
1.2 Reconstruction of Culvert at km. 51/2 of Thiruvannamlai - Arur (via) Thanipadi road.

77.05

-

1155.71

... More
1.3 Reconstruction of Culvert at km. 52/2 of Thiruvannamlai - Arur (via) Thanipadi road.

205.72

-

1146.19

... More
1.4 Reconstruction of Culvert at km. 52/4 of Thiruvannamlai - Arur (via) Thanipadi road.

236.62

-

1136.67

... More
1.5 Reconstruction of Culvert at km. 52/10 of Thiruvannamlai - Arur (via) Thanipadi road.

108.54

-

1136.67

... More
1.6 Reconstruction of Culvert at km. 53/2 of Thiruvannamlai - Arur (via) Thanipadi road.

94.98

-

1136.67

... More
1.7 Reconstruction of Culvert at km. 53/4(i) of Thiruvannamlai - Arur (via) Thanipadi road.

108.02

-

1127.15

... More
1.8 Reconstruction of Culvert at km. 53/4(ii) of Thiruvannamlai - Arur (via) Thanipadi road.

74.54

-

1127.15

... More
1.9 Reconstruction of Culvert at km. 54/6 of Thiruvannamlai - Arur (via) Thanipadi road.

81.99

-

1116.02

... More
1.10 Reconstruction of Culvert at km. 54/8 of Thiruvannamlai - Arur (via) Thanipadi road.

133.38

-

1116.02

... More
1.11 Reconstruction of Culvert at km. 55/2 of Thiruvannamlai - Arur (via) Thanipadi road.

92.94

-

1116.02

... More
1.12 Reconstruction of Culvert at km. 55/8 of Thiruvannamlai - Arur (via) Thanipadi road.

108.69

-

1104.89

... More
1.13 Reconstruction of Culvert at km. 56/2 of Thiruvannamlai - Arur (via) Thanipadi road.

90.44

-

1104.89

... More
1.14 Reconstruction of Culvert at km. 56/6 of Thiruvannamlai - Arur (via) Thanipadi road.

156.87

-

1093.76

... More
1.15 Reconstruction of Culvert at km. 58/2 of Thiruvannamlai - Arur (via) Thanipadi road.

232.41

-

1082.63

... More
1.16 Reconstruction of Culvert at km. 59/2 of Thiruvannamlai - Arur (via) Thanipadi road.

83.83

-

1071.5

... More
1.17 Reconstruction of Culvert at km. 59/10 of Thiruvannamlai - Arur (via) Thanipadi road.

68.1

-

1060.37

... More
1.18 Construction of Cattle pass at km. 51/4 of Thiruvannamlai - Arur (via) Thanipadi road.

283.17

-

1146.19

... More
1.19 Construction of Cattle pass at km. 53/4of Thiruvannamlai - Arur (via) Thanipadi road.

108.02

-

1127.15

... More
1.20 Construction of Retaining wall at km. 54/10, 55/4, 55/10 of Thiruvannamlai - Arur (via) Thanipadi road.

194.4

-

1104.89

... More
Gravel Filling behind Abutments and wings with clean good gritty gravel incl;uding cost and conveyance to site including labour charges for filling in layers, watering, tamping under optimum moisture content to get the maximum density and all other incidental charges etc., complete-For Culvert and Retaining wall portion as per clause 304 & 2907 of MORTH Vth revision.

-

-

-

... More
1.1 Reconstruction of Culvert at km. 50/6 of Thiruvannamlai - Arur (via) Thanipadi road.

214.03

-

249.9

... More
1.2 Reconstruction of Culvert at km. 51/2 of Thiruvannamlai - Arur (via) Thanipadi road.

285.7

-

249.9

... More
1.3 Reconstruction of Culvert at km. 52/2 of Thiruvannamlai - Arur (via) Thanipadi road.

665.69

-

249.9

... More
1.4 Reconstruction of Culvert at km. 52/4 of Thiruvannamlai - Arur (via) Thanipadi road.

730.9

-

249.9

... More
1.5 Reconstruction of Culvert at km. 52/10 of Thiruvannamlai - Arur (via) Thanipadi road.

408.04

-

249.9

... More
1.6 Reconstruction of Culvert at km. 53/2 of Thiruvannamlai - Arur (via) Thanipadi road.

360.72

-

249.9

... More
1.7 Reconstruction of Culvert at km. 53/4(i) of Thiruvannamlai - Arur (via) Thanipadi road.

495.64

-

249.9

... More
1.8 Reconstruction of Culvert at km. 53/4(ii) of Thiruvannamlai - Arur (via) Thanipadi road.

273.78

-

249.9

... More
1.9 Reconstruction of Culvert at km. 54/6 of Thiruvannamlai - Arur (via) Thanipadi road.

305.68

-

249.9

... More
1.10 Reconstruction of Culvert at km. 54/8 of Thiruvannamlai - Arur (via) Thanipadi road.

471.62

-

249.9

... More
1.11 Reconstruction of Culvert at km. 55/2 of Thiruvannamlai - Arur (via) Thanipadi road.

351.25

-

249.9

... More
1.12 Reconstruction of Culvert at km. 55/8 of Thiruvannamlai - Arur (via) Thanipadi road.

410.49

-

249.9

... More
1.13 Reconstruction of Culvert at km. 56/2 of Thiruvannamlai - Arur (via) Thanipadi road.

373.33

-

249.9

... More
1.14 Reconstruction of Culvert at km. 56/6 of Thiruvannamlai - Arur (via) Thanipadi road.

551.42

-

249.9

... More
1.15 Reconstruction of Culvert at km. 58/2 of Thiruvannamlai - Arur (via) Thanipadi road.

759.54

-

249.9

... More
1.16 Reconstruction of Culvert at km. 59/2 of Thiruvannamlai - Arur (via) Thanipadi road.

313.39

-

249.9

... More
1.17 Reconstruction of Culvert at km. 59/10 of Thiruvannamlai - Arur (via) Thanipadi road.

239.77

-

249.9

... More
1.18 Construction of Cattle pass at km. 51/4 of Thiruvannamlai - Arur (via) Thanipadi road.

2603.58

-

249.9

... More
1.19 Construction of Cattle pass at km. 53/4of Thiruvannamlai - Arur (via) Thanipadi road.

495.64

-

249.9

... More
Providing and fixing 100mm dia PVC Seepage Pipes of required length for abutment and wing, retaining wall including cost and conveyance of all materials to worksite, cost and labour for semi-spherical backfill arrangements with 100mm size broken granite stones at the periphery and labour charges for fixing etc., complete to Abutment and wings as per clause 2700 of MORTH Vth Revision

-

-

-

... More
1.1 Reconstruction of Culvert at km. 50/6 of Thiruvannamlai - Arur (via) Thanipadi road.

35.4

-

169.1

... More
1.2 Reconstruction of Culvert at km. 51/2 of Thiruvannamlai - Arur (via) Thanipadi road.

48

-

169.1

... More
1.3 Reconstruction of Culvert at km. 52/2 of Thiruvannamlai - Arur (via) Thanipadi road.

144.3

-

169.1

... More
1.4 Reconstruction of Culvert at km. 52/4 of Thiruvannamlai - Arur (via) Thanipadi road.

168.6

-

169.1

... More
1.5 Reconstruction of Culvert at km. 52/10 of Thiruvannamlai - Arur (via) Thanipadi road.

71.4

-

169.1

... More
1.6 Reconstruction of Culvert at km. 53/2 of Thiruvannamlai - Arur (via) Thanipadi road.

61.5

-

169.1

... More
1.7 Reconstruction of Culvert at km. 53/4(i) of Thiruvannamlai - Arur (via) Thanipadi road.

63.6

-

169.1

... More
1.8 Reconstruction of Culvert at km. 53/4(ii) of Thiruvannamlai - Arur (via) Thanipadi road.

47.1

-

169.1

... More
1.9 Reconstruction of Culvert at km. 54/6 of Thiruvannamlai - Arur (via) Thanipadi road.

51.6

-

169.1

... More
1.10 Reconstruction of Culvert at km. 54/8 of Thiruvannamlai - Arur (via) Thanipadi road.

87.7

-

169.1

... More
1.11 Reconstruction of Culvert at km. 55/2 of Thiruvannamlai - Arur (via) Thanipadi road.

59.7

-

169.1

... More
1.12 Reconstruction of Culvert at km. 55/8 of Thiruvannamlai - Arur (via) Thanipadi road.

71.4

-

169.1

... More
1.13 Reconstruction of Culvert at km. 56/2 of Thiruvannamlai - Arur (via) Thanipadi road.

55.5

-

169.1

... More
1.14 Reconstruction of Culvert at km. 56/6 of Thiruvannamlai - Arur (via) Thanipadi road.

108.3

-

169.1

... More
1.15 Reconstruction of Culvert at km. 58/2 of Thiruvannamlai - Arur (via) Thanipadi road.

164.4

-

169.1

... More
1.16 Reconstruction of Culvert at km. 59/2 of Thiruvannamlai - Arur (via) Thanipadi road.

53.4

-

169.1

... More
1.17 Reconstruction of Culvert at km. 59/10 of Thiruvannamlai - Arur (via) Thanipadi road.

39.9

-

169.1

... More
1.18 Construction of Cattle pass at km. 51/4 of Thiruvannamlai - Arur (via) Thanipadi road.

156.84

-

169.1

... More
1.19 Construction of Cattle pass at km. 53/4of Thiruvannamlai - Arur (via) Thanipadi road.

77.88

-

169.1

... More
1.20 Construction of Retaining wall at km. 54/10, 55/4, 55/10 of Thiruvannamlai - Arur (via) Thanipadi road.

148

-

169.1

... More
Painting two coat with ready mixed synthatic enamel paint of first class quality paint and of approved colour over a priming coat, including through scrapping, clean removal of dirt,etc, complete and including necessary plaster of paint, putty where ever required as per standard specifications for centre median.

-

-

-

... More
1.22 Providing Kerb Median at km.50/8-60/0 of Thiruvannamlai - Arur (via) Thanipadi road.

6662.94

-

114.3

... More
Filling carted Earth including cost and conveyance to site including labour charges and all other incidental charges etc., complete as per clause 304 & 2907 of MORTH Vth Revision for Center median portion.

-

-

-

... More
1.22 Providing Kerb Median at km.50/8-60/0 of Thiruvannamlai - Arur (via) Thanipadi road.

1640.7

-

185.55

... More
Removal and satisfactory disposal of cut earth with a laed of 5km including conveyance charges and all other incidental charges etc., complete

-

-

-

... More
1.21 Junction Improvements at km.55/4, 56/2, 56/8, 57/8 of Thiruvannamalai - Arur (Via) Thanipadi road

223

-

55.65

... More
Calculation of SubTotal, GST and Total Amount carried out by system automatically

-

-

-

... More
Basic cost of value put to tender as per estimate

1

-

456223916

... More
Add GST at 12%

1

-

54746870

... More
Total Value put to Tender

1

-

510970786

... More
Negotiated Percentage

1

-

-

... More
Final Negotiated Value

1

-

-

... More
Add GST at 12% of Final Negotiated Value

1

-

-

... More
Total Value of Contract Including 12% of GST

1

-

-

... More
Basic cost of value put to tender as per Estimate

-

-

-

... More
Quoted Rate in Figures (Total Value of Contract Including 12% of GST )

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.