Highways Department Tender

... More
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Highways Department Tender

Works
Civil And Construction
Bridge Construction
Eprocure
Opening Date24 Aug 2024
Closing Date23 Sep 2024
Tender Amount₹ 4,07,00,000 
Notes
Download

Costs

Summary

Mdu No 014 Tn No 07 2024 25 Hdo Dated 17 08 2024

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Granular Sub-base with Graded Material (Table:- 400-1) - Plant Mix Method Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 of MORTH Specification no.111, 112, 401,900 - for grading- V Material

-

-

-

... More
Road A

225

396951

1764.23

... More
Road B

1138.25

2038184

1790.63

... More
Granular Sub-base with Graded Material (Table:- 400-1) - Plant Mix Method Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 of MORTH Specification no.111, 112, 401,900 - for grading- III Material

-

-

-

... More
Road A

150

277965

1853.1

... More
Road B

572.25

1075543

1879.5

... More
Picking the existing BT surface upto 50mm depth as directed by the departmental officers and levelling the surface including all labour charges for pickig and all other tools and plants employed of the work and including all other incidental charges etc., complete as per standard specifications.

-

-

-

... More
Road B

1162.5

25389

21.84

... More
Advance B.T. Patches with bituminous premix chips upto 50mm thick using standard 45mm IRC size HBG metal cum of metal premix with 44Kgs of 80/100 grade bitumen per cum of metal in accordance with the requirement of the specifications to serve as base course and in conformity with the drawing or as directed by the Engineer.

-

-

-

... More
Road B

38.67

142613

3687.96

... More
Providing and Laying 50mm thick Bituminous Macadam using course aggregate and VG30 bitumen which shall consist of construction in a single course base/binder course confirming to the specficationon a previously prepared base. (using Mini Hot Mix Plant and Power Roller) including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,complete as per clause 111,112,504,900 MORTH Rev-5 (Mix-in-place method) (For Patch Works)

-

-

-

... More
Road A

13.38

108254

8090.76

... More
Wet Mix Macadam (Table 400-13) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density, Complete as per clause 406 of MORTH Vth Revision Specification no.111,112,406,900

-

-

-

... More
Road A

375

793950

2117.2

... More
Road B

1879.04

3978303

2117.2

... More
Prime coat Providing and applying primer coat with bitumen emulsion (SS-I type) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per clause 502 of MORTH Specification no.111,112, 501,502,900- over WMM

-

-

-

... More
Road A

1500

122760

81.84

... More
Road B

9887.56

809099

81.83

... More
Tack coat - Providing and applying tack coat with bitumen emulsion(RS-I type) using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 of MORTH Specification no.111,112,501, 503,900- over granular surfaces treated with primer

-

-

-

... More
Road A

1500

28350

18.9

... More
Road B

9887.56

186776

18.89

... More
Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 of MORTH Specification no.111,112,501, 503,900 - over bituminous surfaces

-

-

-

... More
Road A

5500

149160

27.12

... More
Road B

10773.99

292190

27.12

... More
Providing and laying Tack coat over Concrete surface using 3.00 Kg Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of materials, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5 Specification no.111,112,501, 503,900

-

-

-

... More
Road B

94.05

2011

21.39

... More
Bituminous Macadam : Providing and laying bituminous macadam with Hot mix plant using crushed aggregates of specified grading premixed with bituminous binder (Viscosity Grade- 30), transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction, complete as per clause 504 of MORTH Specification no.111,112,501,503,900 - Grading II

-

-

-

... More
Road B

494.27

4196174

8489.64

... More
Providing and laying Dence Bituminous Macadam with Hot Mix Plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade- 40) at percentage specified by Job Mix Formula by weight of total mix of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolled as per clause 501.6 and 501.7 to achieve the desired compaction, as per clause No.505 of MoRTH specification no.111,112,505,900 Grading II 50 mm thick.

-

-

-

... More
Road A

199.38

2033624

10199.74

... More
Providing and laying Dence Bituminous Macadam with Hot Mix Plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade- 40) at percentage specified by Job Mix Formula by weight of total mix of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolled as per clause 501.6 and 501.7 to achieve the desired compaction, as per clause No.505 of MoRTH specification no.111,112,505,900 Grading I 75 mm thick.

-

-

-

... More
Road A

142.5

1343129

9425.47

... More
Bituminous Concrete (Table 500-17) Providing and laying bituminous concrete with hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade 40) at percentage specified by Job Mix Formula of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolled as per clause 501.6 and 501.7 to achieve the desired compaction clause No. 507 as per MORTH specification 111,112,507,900complete in all respects - Grading II

-

-

-

... More
Road A

210

2328003

11085.73

... More
Bituminous Concrete (Table 500-17) Providing and laying bituminous concrete with hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade-30) at percentage specified by Job Mix Formula of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment,rolled as per clause 501.6 and 501.7 to achieve the desired compaction as per clause No. 507 of MORTH Specification no. 111, 112, 507, 900 complete in all respects - Grading II

-

-

-

... More
Road B

622.83

6725243

10797.88

... More
Providing combaction for berms using the box cut earth including all hire and fuel charges for power roller for compaction, water sprinkler, including all labour charges for laying, spreading, watering etc., complete and as directed by the departmental engineers for making up of low berms. (Earth work compaction only)

-

-

-

... More
Road A for Berms

200

5328

26.64

... More
Road B For Berms

555

14785

26.64

... More
Dismantling Dismantling the existing RR masonry with cement mortor / PCC / RCC / Cut Stone Slab salvaging and removal and disposing of resulting materials and back filling the resulting trenches and pits etc,as per MORTH Specification no.111,112,202

-

-

-

-

-

-

... More
Road B Box culvert at Km 0/8

14.55

7074

486.2

... More
Road B Widening Slab culvert at Km 1/2

10.58

5144

486.2

... More
Road B Widening Slab culvert at Km 1/4

10.58

5144

486.2

... More
Road B Box culvert at Km 2/10 (i) & (ii)

31.29

15213

486.2

-

-

-

... More
Road B Box culvert at Km 0/8

3.75

16157

4308.7

... More
Road B Box culvert at Km 2/10 (i) & (ii)

4.5

19389

4308.7

... More
Earth work Excavation in all classes of soils except hard rock not requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges and sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavtion, backfilling, and clearing the site and disposal of all surplus materials etc. complete as per standard specification no 111,112,304

-

-

-

... More
Road A Box culvert at Km 0/8

261.79

64536

246.52

... More
Road B Box culvert at Km 2/10 (i) & (ii)

336.87

83045

246.52

... More
Earthwork excacation in soft distegrade rock not requiring blasting expect hardrock requiring blasting and deposting on bank with all leads and lifts as per SS20B,including cost of al labour, equipments and all incidental charges such as bailing our water,providing and maintaining necessary cofferdams, sheeting, shoring bracing and their sudsequent removal,removal of all logs, stumps, grups and other deleterious matter and obstructions, trimming bottom of excavation backfilling,, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for FOUNDATION OF ABUTMENTS WALLS,AND PIER FOOTINS.

-

-

-

... More
Road B Widening Slab culvert at Km 1/2

95.28

36846

386.72

... More
Road B Widening Slab culvert at Km 1/4

95.28

36846

386.72

... More
Vibrated Cement Concrete M20 using 40mm ISS size HBG graded metal crushed stone including cost and conveyance of all materials to site but excluding cost and fabrication for steel but including cost and labour charges for formwork and centering, labour charges, compacting, finishing and curing, including all incidental charges etc., complete as per MORTH Specification no.111, 112, 1000, 1500, 1700, 2200, 900 For Leveling Course and Foundation and FOOTINGS OF PCC RETAINING WALL Below Sill

-

-

-

... More
Road B Box culvert at Km 0/8

17.47

108748

6224.86

... More
Road B Widening Slab culvert at Km 1/2

62.54

437353

6993.18

... More
Road B Widening Slab culvert at Km 1/4

62.54

437353

6993.18

... More
Road B Box culvert at Km 2/10 (i) & (ii)

29.1

182331

6265.68

... More
Vibrated Cement Concrete M20 using 40mm ISS size HBG graded metal crushed stone including cost and conveyance of all materials to site but excluding cost and fabrication for steel but including cost and labour charges for formwork and centering, labour charges, compacting, finishing and curing, including all incidental charges etc., complete as per MORTH Specification no.111, 112, 1000, 1500, 1700, 2200, 900 For Leveling Course and Foundation and FOOTINGS OF PCC RETAINING WALL Above Sill

-

-

-

... More
Road B Widening Slab culvert at Km 1/2

23.17

179372

7741.6

... More
Road B Widening Slab culvert at Km 1/4

23.62

182193

7713.54

... More
Vibrated cement concrete of grade M20 Nominal mix 1:1.5:3 using 40mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing,transporting, laying and curing cobncrete, working at depths ,tool,s and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specification, for ABUTMENTS, WINGS, RETAINING WALL AND RIVER TRAINING WALL FOR BELOW SILL LEVEL.

-

-

-

... More
Road B Box culvert at Km 0/8

43.59

338813

7772.74

... More
Road B Box culvert at Km 2/10 (i) & (ii)

80.83

639520

7911.92

... More
Vibrated cement concrete of grade M20 Nominal mix 1:1.5:3 using 40mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing,transporting, laying and curing cobncrete, working at depths ,tool,s and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specification, for ABUTMENTS, WINGS, RETAINING WALL AND RIVER TRAINING WALL FOR Above SILL LEVEL.

-

-

-

... More
Road B Box culvert at Km 0/8

58.97

545685

9253.61

... More
Road B Box culvert at Km 2/10 (i) & (ii)

117.49

1087882

9259.36

... More
Vibrated reinforced cement concrete of grade M25 design mix ISS size HBG graded metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing transporting, laying and curing concrete, working at depths, tools and plants including all other incidental charges etc., complete as per relevant standard specifications for BED BLOCK CUM DIRT WALL OVER PIER AND ABUTMENTS.

-

-

-

... More
Road B Widening Slab culvert at Km 1/2

2.1

23028

10966.05

... More
Road B Widening Slab culvert at Km 1/4

2.1

23028

10966.05

... More
Providing and fixing KRAFT PAPER for dull width of seating of deck slab and including cost and conveyence to worksite, labour for fixing ghe same in correct position and all other incidental charges etc., complete - sqm

-

-

-

... More
Road B Widening Slab culvert at Km 1/2

4.2

462

110

... More
Road B Widening Slab culvert at Km 1/4

4.2

462

110

... More
Vibrated reinforced cement concrete of grade M25 design mix ISS size HBG graded metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing transporting, laying and curing concrete, working at depths, tools and plants including all other incidental charges etc., complete as per relevant standard specifications for Deck slab

-

-

-

... More
Road B Widening Slab culvert at Km 1/2

3.44

38976

11330.4

... More
Road B Widening Slab culvert at Km 1/4

4.84

59093

12209.31

... More
Vibrated Reinforced Cement Concrete M25 (Design Mix) using crushed ISS size HBG graded metal of including cost and conveyance of all materials to site but excluding cost and fabrication of steel but including cost and labour charges for formwork and centering, labour charges for formwork and centering, labour charges compacting, finishing and curing including all incidental charges etc., completed as per MORTH Specification no.1000,1500,1600,1700,2300, 900 for BOX CULVERT

-

-

-

... More
Road B Box culvert at Km 0/8

46.47

569927

12264.42

... More
Road B Box culvert at Km 2/10 (i) & (ii)

64.38

784958

12192.59

... More
Supply and fabrication of steel Grade Fe-500 required for all RCC items of works involved in the schedule including cost of steel cost of fabrication labour charges for cleaning the bars straightening cutting bending tying grills hoisting and placing the reinforcement in position as specified in the drawings including cost of binding wire provision of spacer bars, cover blocks and all other incidental charges etc. complete as per MORTH Vth Revision Specification No. 1000, 1500, 1600, 900

-

-

-

... More
Road B Box culvert at Km 0/8

3.34

318856

95609.27

... More
Road B Widening Slab culvert at Km 1/2 (Deck Slab)

0.22

21034

95609.27

... More
Road B Widening Slab culvert at Km 1/2 Bed Block)

0.12

11473

95609.27

... More
Road B Widening Slab culvert at Km 1/4 (Deck Slab)

0.3

28682

95609.27

... More
Road B Widening Slab culvert at Km 1/4 Bed Block)

0.12

11473

95609.27

... More
Road B Box culvert at Km 2/10 (i) & (ii)

4.89

467338

95609.27

... More
Providing and fixing 100mm dia PVC Seepage pipes (working pressure 4Kg/1sq.cm) of required length for abutment and wing, retaining wall including cost and conveyance of all materials to worksite cost and labour for semi-sperical back fill arrangements with 100mm size broken granite stones at the periphery and labour charges for fixing etc., complete to drain the back fill as per standard specifications as per MORTH specification no.2700, 900

-

-

-

... More
Road B Widening Slab culvert at Km 1/2

56

10780

192.5

... More
Road B Widening Slab culvert at Km 1/4

56

10780

192.5

... More
Providing and fixing PVC EXPANSION JOINT 20mm thick confiriming to specification between deck slabs and dirt wall over abutment and in between decks and dirt wall including cost and conveyance of expansion joints to site including cost of testing as per MORT&H specification, including charges for fixing in all respect etc., Complete.

-

-

-

... More
Road B Widening Slab culvert at Km 1/2

8

5227

653.4

... More
Road B Widening Slab culvert at Km 1/4

8

5227

653.4

... More
Gravel filling behind Abutments and Wings with clean good gritty gravel including cost and conveyance to site including labour charges for filling in layers, watering, tamping under OMC to get the maximum density, all incidental charges etc., complete

-

-

-

... More
Road B Widening Slab culvert at Km 1/2

5.78

1819

314.86

... More
Road B Widening Slab culvert at Km 1/4

5.78

1819

314.86

... More
Refilling excavated earth in trench portion including removal and satisfactory disposal of all materials necessary for the construction of road way and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer

-

-

-

... More
Road B Box culvert at Km 0/8

87.3

3740

42.85

... More
Road B Box culvert at Km 2/10 (i) & (ii)

116.2

4979

42.85

... More
Providing filter media behind the abutments and wings for 600mm thickness using filter materials as per appendix - 6 of IRC 78 - 2014 well packed with smaller size towards the soil and bigger size towards the wall including cost and conveyance to worksite including all other incidental charges etc., complete.

-

-

-

... More
Road B Widening Slab culvert at Km 1/2

14.2

18577

1308.27

... More
Road B Widening Slab culvert at Km 1/4

14.2

18577

1308.27

... More
Calculation of SubTotal, GST and Total Amount carried out by system automatically

-

-

-

... More
Basic cost of value put to tender as per estimate

1

-

34490970

... More
Add GST at 18%

1

-

6208375

... More
Total Value put to Tender

1

-

40699345

... More
Excess/Less Percentage

1

-

-

... More
Final Value

1

-

-

... More
Add GST at 18% of Final Value

1

-

-

... More
Total Value of Contract Including 18% of GST

1

-

-

... More
Basic cost of value put to tender as per Estimate

-

34490970

-

... More
Quoted Rate in Figures (Total Value of Contract Including 18% of GST )

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.