Highways Department Tender

... More
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Highways Department Tender

Civil And Construction
Eprocure
Opening Date13 Sep 2019
Closing Date14 Oct 2019
Tender Amount₹ 6,14,80,000 
Notes
Download

Costs

Summary

Package-53, Nagapattinam Division Cridp 2019-20

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Road E

200

-

12.99

... More
Road F

2125

-

12.99

... More
Road G

1500

-

12.99

... More
Road H

3250

-

12.99

... More
Excavation including removal and satisfactory disposal of all materials necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer as per MORTH Vth Rev., 111, 112 & 201 a) box cutting for widening portion

-

-

-

... More
Road B

583.2

-

73.1

... More
Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density and complete as per clause 401 in accordance with standard specifications for grading-V as per MORTH Vth Rev., 111, 112, 401 & 900.

-

-

-

... More
Road B

328.2

-

2258.41

... More
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density, complete as per clause 406 and in accordance with standard specifications as per MORTH Vth Rev., 111, 112, 406 & 900

-

-

-

... More
Road B

270

-

2536.84

... More
Road C

1237.5

-

2536.84

... More
Road D

1125

-

2536.84

... More
Road E

90

-

2536.84

... More
Road F

956.25

-

2536.84

... More
Road G

675

-

2536.84

... More
Road H

1462.5

-

2536.84

... More
Providing and applying primer coat with bitumen emulsion (SS-I type) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per clause 502 and in accordance with standard specifications as per MORTH Vth Rev., 111, 112, 501, 502 & 900

-

-

-

... More
Road B

1080

-

60.53

... More
Road C

8250

-

60.53

... More
Road D

7500

-

60.54

... More
Road E

600

-

60.53

... More
Road F

6375

-

60.53

... More
Road G

4500

-

60.53

... More
Road H

9750

-

60.53

... More
Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous / granular surface cleaned with mechanical broom as per clause 503 and in accordance with standard specifications as per MORTH Vth Rev., 111, 112, 501, 503 & 900

-

-

-

... More
Road B

1080

-

11.74

... More
Road C

8250

-

11.74

... More
Road D

7500

-

11.75

... More
Road E

600

-

11.74

... More
Road F

6375

-

11.74

... More
Road G

4500

-

11.74

... More
Road H

9750

-

11.74

... More
Providing and laying 50mm thick Bituminous Macadam using course aggregate and VG30 Bitumen which shall consist of construcion in a single course base/binder course confirming to the specifiction on a previously prepared base(using Mini hot mix plant and power roller) including cost of material, labour charges , rental for machinery, fuel and all other incidental charges etc., complete as per clause 504 MORTH revision V (Mix in place method) for Patch works. MORTH Vth Rev., 111, 112, 501, 504 & 900

-

-

-

... More
Road A

17.73

-

6852.75

... More
Advance BT patch work to an average thickness of 45mm using IRC size HBG metals with 44kg of (VG10) 80/100 grade bulk bitumen per 1 cum metals including premixing, laying over the existing BT surface and compaction including all labour and other incidental charges etc., completed as per clause 3004-2 and in accordance with standard specifications as per MORTH Vth Rev., 111, 112, 501 & 900.

-

-

-

... More
Road E

22.65

-

3638.75

... More
Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 and in accordance with standard specifications as per MORTH Vth Rev., 111, 112, 501, 503 & 900

-

-

-

... More
Road A

7000

-

16.64

... More
Road E

5400

-

16.64

... More
Providing and laying Dense Bituminous Macadam with hot mix plant using crushed aggregates of specified grading premixed with bituminous binder (Viscosity Grade-30), transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction, complete as per clause 504 and in accordance with standard specifications for Grading II as per MORTH Vth Rev. 111, 112, 504 & 900

-

-

-

... More
Road B

54

-

8326.66

... More
Providing and laying Bituminous Macadam with hot mix plant using crushed aggregates of specified grading premixed with bituminous binder (Viscosity Grade-30), transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction, complete as per clause 504 and in accordance with standard specifications for Grading II as per MORTH Vth Rev. 111, 112, 504 & 900

-

-

-

... More
Road A

70

-

7170.44

... More
Road C

412.5

-

7170.44

... More
Road D

375

-

7170.44

... More
Road E

60

-

7170.44

... More
Road F

318.75

-

7170.44

... More
Road G

225

-

7170.44

... More
Road H

487.5

-

7170.44

... More
Providing and laying Bituminous Concrete with hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (VG30) at percentage specified by job mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandam rollers to achieve the desired compaction as per MORTH specification clause No. 501-6, 501-7 & 507 and complete in all respects and in accordance with standard specifications MORTH Vth Rev. 111, 112, 507 & 900 Grading -II

-

-

-

... More
Road A

280

-

8882.13

... More
Road B

32.4

-

8882.13

... More
Road C

247.5

-

8882.13

... More
Road D

225

-

8882.13

... More
Road E

180

-

8882.13

... More
Road F

191.25

-

8882.13

... More
Road G

135

-

8882.13

... More
Road H

292.5

-

8882.13

... More
Collection and supply of Gravel including cost and conveyance to worksite and stacking them on road side for taking premeasurements and spreading the same in the low berms as directed by the Engineer with initial lift including all labour charges and consolidation with power roller including all tools and plants and all other incidental charges etc., complete for low berms in accordance with standard specifications as per MORTH Vth Rev., 111, 112, 408 & 900

-

-

-

... More
Road A

300

-

684.97

... More
Road C

376

-

842.97

... More
Road D

600

-

761.11

... More
Road E

160

-

860.18

... More
Road F

495

-

768.48

... More
Road G

195

-

724.22

... More
Road H

660

-

724.22

... More
Upkeeping Component

-

-

-

... More
Collection and supply of Gravel including cost and conveyance to worksite and stacking them on road side for taking premeasurements and spreading the same in the low berms as directed by the Engineer with initial lift including all labour charges and consolidation with power roller including all tools and plants and all other incidental charges etc., complete for low berms in accordance with standard specifications as per MORTH Vth Rev., 111, 112, 408 & 900 filling the berms.

-

-

-

... More
Second Year

-

-

-

... More
Road A

120

-

684.97

... More
Road C

140

-

842.97

... More
Road D

145

-

761.11

... More
Road E

95

-

860.18

... More
Road F

130

-

768.48

... More
Road G

154

-

724.22

... More
Road H

144

-

724.22

... More
Third Year

-

-

-

... More
Road A

120

-

684.97

... More
Road C

140

-

842.97

... More
Road D

145

-

761.11

... More
Road E

95

-

860.18

... More
Road F

130

-

768.48

... More
Road G

154

-

724.22

... More
Road H

144

-

724.22

... More
Fourth Year

-

-

-

... More
Road A

120

-

684.97

... More
Road C

140

-

842.97

... More
Road D

145

-

761.11

... More
Road E

95

-

860.18

... More
Road F

130

-

768.48

... More
Road G

154

-

724.22

... More
Road H

144

-

724.22

... More
Fifth Year

-

-

-

... More
Road A

120

-

684.97

... More
Road C

140

-

842.97

... More
Road D

145

-

761.11

... More
Road E

95

-

860.18

... More
Road F

130

-

768.48

... More
Road G

154

-

724.22

... More
Road H

144

-

724.22

... More
Clearing the Light jungles including weeding out shrubs bushes, vegetables, growth etc,as per spcifications and directions of Engineer in charge

-

-

-

... More
First Year

-

-

-

... More
Road A

2400

-

3.9

... More
Road C

3360

-

3.9

... More
Road D

3480

-

3.9

... More
Road E

2280

-

3.9

... More
Road F

3120

-

3.9

... More
Road G

2640

-

3.9

... More
Road H

2160

-

3.9

... More
Second Year

-

-

-

... More
Road A

2400

-

3.9

... More
Road C

3360

-

3.9

... More
Road D

3480

-

3.9

... More
Road E

2280

-

3.9

... More
Road F

3120

-

3.9

... More
Road G

2640

-

3.9

... More
Road H

2160

-

3.9

... More
Third Year

-

-

-

... More
Road A

2400

-

3.9

... More
Road C

3360

-

3.9

... More
Road D

3480

-

3.9

... More
Road E

2280

-

3.9

... More
Road F

3120

-

3.9

... More
Road G

2640

-

3.9

... More
Road H

2160

-

3.9

... More
Fourth Year

-

-

-

... More
Road A

2400

-

3.9

... More
Road C

3360

-

3.9

... More
Road D

3480

-

3.9

... More
Road E

2280

-

3.9

... More
Road F

3120

-

3.9

... More
Road G

2640

-

3.9

... More
Road H

2160

-

3.9

... More
Fifth Year

-

-

-

... More
Road A

2400

-

3.9

... More
Road C

3360

-

3.9

... More
Road D

3480

-

3.9

... More
Road E

2280

-

3.9

... More
Road F

3120

-

3.9

... More
Road G

2640

-

3.9

... More
Road H

2160

-

3.9

... More
Provision for engaging JCB for Clearing the vent way of CD works, and minor Bridges, clearing storm water drains and removing debris along roadside during urgent periods.

-

-

-

... More
First Year

-

-

-

... More
Road A

8

-

700

... More
Road C

2

-

700

... More
Road D

14

-

700

... More
Road E

4

-

700

... More
Road F

16

-

700

... More
Road G

8

-

700

... More
Road H

26

-

700

... More
Second Year

-

-

-

... More
Road A

8

-

700

... More
Road C

2

-

700

... More
Road D

14

-

700

... More
Road E

4

-

700

... More
Road F

16

-

700

... More
Road G

8

-

700

... More
Road H

26

-

700

... More
Third Year

-

-

-

... More
Road A

8

-

700

... More
Road C

2

-

700

... More
Road D

14

-

700

... More
Road E

4

-

700

... More
Road F

16

-

700

... More
Road G

8

-

700

... More
Road H

26

-

700

... More
Fourth Year

-

-

-

... More
Road A

8

-

700

... More
Road C

2

-

700

... More
Road D

14

-

700

... More
Road E

4

-

700

... More
Road F

16

-

700

... More
Road G

8

-

700

... More
Road H

26

-

700

... More
Fifth Year

-

-

-

... More
Road A

8

-

700

... More
Road C

2

-

700

... More
Road D

14

-

700

... More
Road E

4

-

700

... More
Road F

16

-

700

... More
Road G

8

-

700

... More
Road H

26

-

700

... More
Painting with Plastic Enamel paint over the existing boundary stones, Guide stones, Parapets of Culverts, Tree number back ground, cautionary board and Sign board etc., including cost of paint and labour charges, etc., including all other incidental charges as directed by departmental officers.

-

-

-

... More
First Year

-

-

-

... More
Road A

9

-

158.09

... More
Road C

5.09

-

158.09

... More
Road D

9.14

-

158.09

... More
Road E

5.54

-

158.09

... More
Road F

9.41

-

158.09

... More
Road G

6.08

-

158.09

... More
Road H

14.81

-

158.09

... More
Second Year

-

-

-

... More
Road A

11.88

-

158.09

... More
Road C

10.5

-

158.09

... More
Road D

14.19

-

158.09

... More
Road E

10.23

-

158.09

... More
Road F

14.1

-

158.09

... More
Road G

10.05

-

158.09

... More
Road H

22.39

-

158.09

... More
Third Year

-

-

-

... More
Road A

11.88

-

158.09

... More
Road C

10.5

-

158.09

... More
Road D

14.19

-

158.09

... More
Road E

10.23

-

158.09

... More
Road F

14.1

-

158.09

... More
Road G

10.05

-

158.09

... More
Road H

22.39

-

158.09

... More
Fourth Year

-

-

-

... More
Road A

11.88

-

158.09

... More
Road C

10.5

-

158.09

... More
Road D

14.19

-

158.09

... More
Road E

10.23

-

158.09

... More
Road F

14.1

-

158.09

... More
Road G

10.05

-

158.09

... More
Road H

22.39

-

158.09

... More
Fifth Year

-

-

-

... More
Road A

11.88

-

158.09

... More
Road C

10.5

-

158.09

... More
Road D

14.19

-

158.09

... More
Road E

10.23

-

158.09

... More
Road F

14.1

-

158.09

... More
Road G

10.05

-

158.09

... More
Road H

22.39

-

158.09

... More
White washing with White cem with over the Centre medians, culvert parapet wall, Tree banding etc., including cost of all materials and labour charges, etc., including all other incidental charges as directed by departmental officers.

-

-

-

... More
First Year

-

-

-

... More
Road A

425.85

-

22.78

... More
Road C

259.53

-

22.78

... More
Road D

409.59

-

22.78

... More
Road E

269.44

-

22.78

... More
Road F

411.02

-

22.78

... More
Road G

276.8

-

22.78

... More
Road H

647.22

-

22.78

... More
Second Year

-

-

-

... More
Road A

425.85

-

22.78

... More
Road C

259.53

-

22.78

... More
Road D

409.59

-

22.78

... More
Road E

269.44

-

22.78

... More
Road F

411.02

-

22.78

... More
Road G

276.8

-

22.78

... More
Road H

647.22

-

22.78

... More
Third Year

-

-

-

... More
Road A

425.85

-

22.78

... More
Road C

259.53

-

22.78

... More
Road D

409.59

-

22.78

... More
Road E

269.44

-

22.78

... More
Road F

411.02

-

22.78

... More
Road G

276.8

-

22.78

... More
Road H

647.22

-

22.78

... More
Fourth Year

-

-

-

... More
Road A

425.85

-

22.78

... More
Road C

259.53

-

22.78

... More
Road D

409.59

-

22.78

... More
Road E

269.44

-

22.78

... More
Road F

411.02

-

22.78

... More
Road G

276.8

-

22.78

... More
Road H

647.22

-

22.78

... More
Fifth Year

-

-

-

... More
Road A

425.85

-

22.78

... More
Road C

259.53

-

22.78

... More
Road D

409.59

-

22.78

... More
Road E

269.44

-

22.78

... More
Road F

411.02

-

22.78

... More
Road G

276.8

-

22.78

... More
Road H

647.22

-

22.78

... More
Black Banding with japan black with over the Centre medians, Tree banding, etc., including cost of all materials and labour charges, etc., including all other incidental charges as directed by departmental officers. Black banding

-

-

-

... More
First Year

-

-

-

... More
Road A

158.67

-

135

... More
Road C

116.2

-

135

... More
Road D

109.84

-

135

... More
Road E

107.59

-

135

... More
Road F

96.99

-

135

... More
Road G

84.14

-

135

... More
Road H

147.27

-

135

... More
Second Year

-

-

-

... More
Road A

158.67

-

135

... More
Road C

116.2

-

135

... More
Road D

109.84

-

135

... More
Road E

107.59

-

135

... More
Road F

96.99

-

135

... More
Road G

84.14

-

135

... More
Road H

147.27

-

135

... More
Third Year

-

-

-

... More
Road A

158.67

-

135

... More
Road C

116.2

-

135

... More
Road D

109.84

-

135

... More
Road E

107.59

-

135

... More
Road F

96.99

-

135

... More
Road G

84.14

-

135

... More
Road H

147.27

-

135

... More
Fourth Year

-

-

-

... More
Road A

158.67

-

135

... More
Road C

116.2

-

135

... More
Road D

109.84

-

135

... More
Road E

107.59

-

135

... More
Road F

96.99

-

135

... More
Road G

84.14

-

135

... More
Road H

147.27

-

135

... More
Fifth Year

-

-

-

... More
Road A

158.67

-

135

... More
Road C

116.2

-

135

... More
Road D

109.84

-

135

... More
Road E

107.59

-

135

... More
Road F

96.99

-

135

... More
Road G

84.14

-

135

... More
Road H

147.27

-

135

... More
Letterings in Culvert parapets / Bridges and tree numbers including cost of Paint and labour charges and all other incidental charges, etc., complete as directed by departmental Engineer. Lettering 5 to 10cm

-

-

-

... More
First Year

-

-

-

... More
Road A

608

-

6.1

... More
Road C

278

-

6.1

... More
Road D

770

-

6.1

... More
Road E

350

-

6.1

... More
Road F

834

-

6.1

... More
Road G

478

-

6.1

... More
Road H

1334

-

6.1

... More
Second Year

-

-

-

... More
Road A

658

-

6.1

... More
Road C

374

-

6.1

... More
Road D

862

-

6.1

... More
Road E

438

-

6.1

... More
Road F

922

-

6.1

... More
Road G

558

-

6.1

... More
Road H

1472

-

6.1

... More
Third Year

-

-

-

... More
Road A

658

-

6.1

... More
Road C

374

-

6.1

... More
Road D

862

-

6.1

... More
Road E

438

-

6.1

... More
Road F

922

-

6.1

... More
Road G

558

-

6.1

... More
Road H

1472

-

6.1

... More
Fourth Year

-

-

-

... More
Road A

658

-

6.1

... More
Road C

374

-

6.1

... More
Road D

862

-

6.1

... More
Road E

438

-

6.1

... More
Road F

922

-

6.1

... More
Road G

558

-

6.1

... More
Road H

1472

-

6.1

... More
Fifth Year

-

-

-

... More
Road A

658

-

6.1

... More
Road C

374

-

6.1

... More
Road D

862

-

6.1

... More
Road E

438

-

6.1

... More
Road F

922

-

6.1

... More
Road G

558

-

6.1

... More
Road H

1472

-

6.1

... More
Letterings in Culvert parapets / Bridges and tree numbers including cost of Paint and labour charges and all other incidental charges, etc., complete as directed by departmental Engineer. Lettering 10 to 15 cm

-

-

-

... More
First Year

-

-

-

... More
Road A

32

-

9.15

... More
Road C

8

-

9.15

... More
Road D

56

-

9.15

... More
Road E

16

-

9.15

... More
Road F

64

-

9.15

... More
Road G

32

-

9.15

... More
Road H

104

-

9.15

... More
Second Year

-

-

-

... More
Road A

48

-

9.15

... More
Road C

38

-

9.15

... More
Road D

84

-

9.15

... More
Road E

42

-

9.15

... More
Road F

90

-

9.15

... More
Road G

54

-

9.15

... More
Road H

146

-

9.15

... More
Third Year

-

-

-

... More
Road A

48

-

9.15

... More
Road C

38

-

9.15

... More
Road D

84

-

9.15

... More
Road E

42

-

9.15

... More
Road F

90

-

9.15

... More
Road G

54

-

9.15

... More
Road H

146

-

9.15

... More
Fourth Year

-

-

-

... More
Road A

48

-

9.15

... More
Road C

38

-

9.15

... More
Road D

84

-

9.15

... More
Road E

42

-

9.15

... More
Road F

90

-

9.15

... More
Road G

54

-

9.15

... More
Road H

146

-

9.15

... More
Fivth Year

-

-

-

... More
Road A

48

-

9.15

... More
Road C

38

-

9.15

... More
Road D

84

-

9.15

... More
Road E

42

-

9.15

... More
Road F

90

-

9.15

... More
Road G

54

-

9.15

... More
Road H

146

-

9.15

... More
Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 - over bituminous surfaces

-

-

-

... More
Fourth Year

-

-

-

... More
Road A

210

-

16.64

... More
Road C

157.5

-

16.64

... More
Road D

163.13

-

16.64

... More
Road E

135

-

16.64

... More
Road F

146.25

-

16.64

... More
Road G

123.75

-

16.64

... More
Road H

101.25

-

16.64

... More
Fifth Year

-

-

-

... More
Road A

350

-

16.64

... More
Road C

375

-

16.64

... More
Road D

271.88

-

16.64

... More
Road E

225

-

16.64

... More
Road F

243.75

-

16.64

... More
Road G

206.25

-

16.64

... More
Road H

168.75

-

16.64

... More
Bituminous Concrete (Table 500-17) (Providing and laying bituminous concrete with hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade) at percentage specified by JMF of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects) - Grading II

-

-

-

... More
Fourth Year

-

-

-

... More
Road A

6.3

-

8882.13

... More
Road C

6.75

-

8882.13

... More
Road D

4.89

-

8882.13

... More
Road E

4.05

-

8882.13

... More
Road F

4.39

-

8882.13

... More
Road G

3.71

-

8882.13

... More
Road H

3.04

-

8882.13

... More
Fifth Year

-

-

-

... More
Road A

10.5

-

8882.13

... More
Road C

11.25

-

8882.13

... More
Road D

8.16

-

8882.13

... More
Road E

6.75

-

8882.13

... More
Road F

7.31

-

8882.13

... More
Road G

6.19

-

8882.13

... More
Road H

5.06

-

8882.13

... More
Calculation of SubTotal, GST and Total Amount carried out by system automatically

-

-

-

... More
Basic cost of value put to tender as per estimate

1

-

-

... More
Add GST at 12%

1

-

-

... More
Total Value put to Tender

1

-

-

... More
Negotiated Percentage

1

-

-

... More
Final Negotiated Value

1

-

-

... More
Add GST at 12% of Final Negotiated Value

1

-

-

... More
Total Value of Contract Including 12% of GST

1

-

-

... More
Basic cost of value put to tender as per Estimate

-

-

-

... More
Quoted Rate in Figures (Total Value of Contract Including 12% of GST )

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.