Highways Department Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Highways Department Tender

Works
Civil And Construction
Bridge Construction
Road Construction
Eprocure
Opening Date19 Oct 2024
Closing Date20 Nov 2024
Tender Amount₹ 11,83,00,000 
Notes
Download

Costs

Summary

Wdg From Two Lane To Two Lane With Pavedshoulders And Stg Atkm 22/6-28/6 Ofariyalur - Alathur - Chettikulam-senjeri Roadincl Reconst Of Box Culvert

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of Granular Sub-Base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory soil compactor to achieve the desired density, complete as per clause 401 (Grade-V)

3330

1937

6452074.8

... More
Construction of Granular Sub-Base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory soil compactor to achieve the desired density, complete as per clause 401 (Grade-III)

1708

2026

3461313.24

... More
Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam 250mm thick, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory soil compactor to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5

4270

2132

9104365.9

... More
Charges for cutting the B.T surface to 5 to 7 cm depth using Milling machine,conveying the Milled waste materials to at least for 20 km distance including hire and running charges for the machine, conveyance charges, unloading at unobjectionable place, cleaning the milled surface as to avoid slippery including all other incidental and unforeseen item etc. complete as per the direction of the departmental officers s per MORTH No.111,112, 501

2332

101

236861.24

... More
Providing and laying Prime Coat over WBM/ WMM surface using 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 502 of MORTH Rev-5

17077

81

1390409.34

... More
Providing and laying Tack Coat over WBM/ WMM surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5

17077

18

320022.98

... More
Providing and laying Tack Coat over Existing BT surface using 2 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5

42835

26

1156116.65

... More
Providing, laying 80mm consolidated thick Dense Bituminous Macadam using 0.40cum of 37.50-13.20mm, 0.35cum of 13.20-2.36mm and 0.36cum of 2.36mm & below size IRC metal with 71.30kgs of VG30 grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in the required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to site, spreading the mix to uniform thickness of 80mm with mechanical paver to the specified grades and cross sections and consolidated by Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 505 of MORTH rev-5. (Grade-I)

1367

9053

12375847.43

... More
Providing, laying 50mm consolidated thick Bituminous Macadam using 0.20cum of 26.50- 13.20mm, 0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRC metal with 37 Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 504 of MORTH Rev-5 (Grade-II)

2787

8366

23317769.94

... More
Providing and laying Bituminous Concrete to 30mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 (Grade-II)

2397

10595

25397533.35

... More
Box culvert

-

-

-

... More
Dismantling salvaging and removal and disposing of resulting materials and back filling the resulting trenches and pits including all labour, materials, tools, equipment, safe guards, incidental necessary to complete the work as directed by the Engineer for Plain Cement Concrete as per MORTH No.111,112,202

-

-

-

... More
Km 22/8

6.53

283

1848.9

... More
Km 23/6

6.53

283

1848.9

... More
Km 25/4

13.05

283

3694.98

... More
Km 27/2

6.53

283

1848.9

... More
Dismantling the Vibrated Cement Concrete M20(nominal mix)using 40mm ISS size HBG metal including cost and coveyance of all materials to site including cost and labour for form work and centering labour charges for compacting curing and all other incidental charges baling out water etc complete for Foundation and as per MoRTH Specification 1000, 1500, 1700 & 2100.

-

-

-

... More
Km 26/6

29.4

486

14294.28

... More
Earthwork excavation in all classes of soil except Soft Rock / Kankar not requiring blasting, medium rock and hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for FOUNDATION OF BOX CULVERT AND CUT OF WALL as per MORTH No.111,112,304

-

-

-

... More
Km 22/8

233.38

246

57532.84

... More
Km 23/6

233.38

246

57532.84

... More
Km 25/4

383.34

246

94500.98

... More
Km 26/6

223.7

246

55146.52

... More
Km 27/2

233.38

246

57532.84

... More
Vibrated Cement Concrete M15 (Nominal Mix) using 40mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement, centering, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants employed etc., complete as per relevant standard specifications as directed by the Engineer for Foundation as per MORTH No. 111, 112, 900, 1000, 1500, 1700, 2100

-

-

-

... More
Km 22/8

8.36

6037

50469.32

... More
Km 23/6

8.36

6021

50335.56

... More
Km 25/4

12.51

5989

74922.39

... More
Km 26/6

7.52

5973

44916.96

... More
Km 27/2

8.36

5968

49892.48

... More
Supply and fabrication of Fe 500 Steel required for all RCC items of works involved in the schedule including cost of steel and cost of fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills, including over lapping to the required length wherever necessary and providing to the reinforcement placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc. complete as directed by the Engineer as per MORTH No. 111, 112, 900, 1000

-

-

-

... More
Km 22/8

3.83

95610

366186.3

... More
Km 23/6

3.83

95610

366186.3

... More
Km 25/4

5.63

95610

538666.74

... More
Km 26/6

2.28

95610

218182.02

... More
Km 27/2

3.83

95610

366186.3

... More
Vibrated Reinforced Cement Concrete M25 (Design Mix) using ISS graded metal including cost and conveyance of all materials to site including cost of cement, centering, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants employed etc., complete as per relevant standard specifications as directed by the Engineer for Foundation as per MORTH No. 111, 112, 900, 1000, 1500, 1600, 1700, 2200 for Box Culvert

-

-

-

... More
Km 22/8

53.92

12179

656691.68

... More
Km 23/6

53.92

12163

655828.96

... More
Km 25/4

78.04

11356

886222.24

... More
Km 26/6

32.78

10490

343862.2

... More
Km 27/2

53.92

12110

652971.2

... More
Vibrated cement Concrete M30 design mix using ISS size HBG graded metal including cost and conveyance of all materials to worksite and cement at site including all labour charges for ixing concrete, laying, vibrating, hire charges for tools and plants, compacting, curing with all leads for soft water, including all other incidental charges,formwork,cost of premoulded expansion joints and fixing the same in position etc., complete for wearing coat of 75mm uniform thickness over deck slab

-

-

-

... More
Km 22/8

34.06

662

22547.72

... More
Km 23/6

34.06

660

22479.6

... More
Km 25/4

48.47

658

31893.26

... More
Km 26/6

15.5

657

10183.5

... More
Km 27/2

34.06

656

22343.36

... More
Vibrated Cement Concrete M20 (Nominal Mix) using 40mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement, centering, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants employed etc., complete as per relevant standard specifications as directed by the Engineer for as per MORTH No. 111, 112, 900, 1000, 1500, 1700, 2200 Above sill level

-

-

-

... More
Km 22/8

51.44

7683

395213.52

... More
Km 23/6

51.44

7667

394390.48

... More
Km 25/4

53.36

7627

406976.72

... More
Km 26/6

75.28

7047

530498.16

... More
Km 27/2

51.44

7614

391664.16

... More
Supply of NP3 class RCC pipe with flush joint to a size of 1000mm inner diameter with wall thickness 115mm. to a length of 2.5m in RCC M35 with reinforcement as per table 5 of IS :458:2003 to a ultimate load capacity of 71.58 KN/Linearmeter including cost of conveyance of all matrials and steel including moulding charges, all labour charge, hire charges for all T & P including conveyance and supply of pipe to worksite and other incidental charges etc., as per the specification IS : 458:2003 as per MORTH No. 111, 112, 2900, 900

-

-

-

... More
Km 22/8

10

4276

42768

... More
Km 23/6

10

4276

42768

... More
Km 25/4

10

4276

42768

... More
Km 27/2

10

4276

42768

... More
Hoisting and fixing of 1000 mm dia NP3 pipes to proper gradient including labour and all other incidental charges as directed by the Engineer as per MORTH No.2900

-

-

-

... More
Km 22/8

10

266

2662

... More
Km 23/6

10

266

2662

... More
Km 25/4

10

266

2662

... More
Km 27/2

10

266

2662

... More
Providing and laying Carted Earth having minimum CBR of 10 with lead of _10__ km including cost of earth, conveyance, laying, watering and consolidation etc., complete as directed by the Engineer for forming the Embankment as per MORTH No.111, 112, 305, 900

-

-

-

... More
Km 22/8

85.75

237

20406.79

... More
Km 23/6

85.75

265

22752.05

... More
Km 25/4

85.75

237

20406.79

... More
Km 27/2

85.75

210

18061.52

... More
Providing and Laying Granular Sub-Base Grade- V consisting of well graded Material confirming to the grading given in Table No.400-1, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory roller to achieve the desired density, etc., complete as directed by the Engineer. as per MORTH No. 111, 112, 401, 900.

-

-

-

... More
Km 22/8

41.25

1937

79924.35

... More
Km 23/6

41.25

1937

79924.35

... More
Km 25/4

41.25

1937

79924.35

... More
Km 27/2

41.25

1937

79924.35

... More
Gravel Filling Behind the Clean Good Gritty Gravel including cost and conveyance to site including labour charge for filling in layers, watering, tamping under optimum moisture contents to get the maximum density all incidental charges etc., complete

-

-

-

... More
Km 26/6

21.7

324

7041.65

... More
Slab culvert

-

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structures comprising of masonry, cement concrete, wood work, steel work, including T & P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres. (Existing Structure RCC)

-

-

-

... More
Km 28/4

7.91

486

3845.84

... More
Earthwork excavation in all classes of soil except soft disintegrated rock not requiring blasting and hardrock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidential charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for FOUNDATION OF ABUTMENTS, PIERS & RETURN WALL. as per section 300 of MORT&H Specifications (Fifth Revision -2013)

-

-

-

... More
Km 28/4

98.64

387

38173.68

... More
Plain Cement Concrete of grade M15 Nominal Mix using 40mm ISS size HBG graded metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and including all other incidental charges etc; complete as per relevant standard specifications, for LEVELLING COURSE.Under footing as per 2100 of MORT&H Specficaton (Fifth Revision-2013)

-

-

-

... More
Km 28/4

7.9

6018

47542.2

... More
Vibrated Cement Concrete of Grade M-20, Nomional Mix, using 40mm ISS HBG metal including cost and conveyance of all materials to site including cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification, etc, complete as per relevant standard specification for FOOTINGS OF ABUTMENT AND RETURN WALLS. as per Section 1500,1700 & 2100 of MORT&H Specficaton (Fifth Revision-2013)

-

-

-

... More
Km 28/4

62.09

7038

436989.42

... More
Vibrated Cement Concrete of grade M20 Nominal Mix using 40mm ISS size HBG graded metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and including all other incidental charges etc; complete as per relevant standard specifications, for SUBSTRUCTURE OF ABUTMENTS, RETURN WALL AND PIERS ABOVE SILL LEVEL. as per Section 1500,1700 & 2200 of MORT&H Specficaton (Fifth Revision-2013)

-

-

-

... More
Km 28/4

39.18

9264

362963.52

... More
Vibrated Reinforced Cement Concrete of grade M30 design mix using ISS size HBG graded metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants including all other incidental charges etc; complete as per relevant standard specifications, for DIRT WALL CUM BED BLOCK OVER ABUTMENTS AND BED BLOCK OVER PIERS.as per Section 1500,1700 & 2200 of MORT&H Specficaton (Fifth Revision-2013)

-

-

-

... More
Km 28/4

1.86

13150

24459

... More
Providing and fixing KRAFT PAPER for full width of seating of deck slab and including cost and conveyance to worksite, labour for fixing the same in correct position and all other incidental charges etc., complete.

-

-

-

... More
Km 28/4

4.46

110

490.6

... More
Vibrated Reinforced Cement Concrete of grade M30 Design Mix using ISS size HBG graded metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants including all other incidental charges etc; complete as per relevant standard specifications, for DECK SLAB and Safety Kerb. as per Section 1500,1700 & 2300 of MORT&H Specficaton (Fifth Revision-2013)

-

-

-

... More
Km 28/4

9.76

11804

115207.04

... More
Vibrated Reinforced Cement Concrete M-30, Grade, Design Mix, using ISS size hard granite broken graded metal including cost and conveyance of all materials to site including cement at site but excluding cost and fabrication of steel, including labour charges for mixing, transporting, laying, and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges etc.,, complete for RCC CRASH BARRIERS OVER DECK SLAB. as per Section 811,1700 & 2703.3 of MORT&H Specficaton (Fifth Revision-2013)

-

-

-

... More
Km 28/4

3.07

18022

55327.54

... More
Vibrated Cement Concrete M20 grade, Nominal Mix using 20mm ISS size hard granite broken metal including cost and conveyance of all materials to site and cement at site including labour charges for mixing, transporting, laying, and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges,etc.,complete as per standard specification for PCC PARAPETS OVER RETURN WALL. as per Section 1500 & 1700 of MORT&H Specficaton (Fifth Revision-2013)

-

-

-

... More
Km 28/4

5.46

13192

72028.32

... More
Vibrated Cement Concrete M15 grade, Nominal Mix 1:2:4, using 40mm ISS hard granite broken metal including cost and conveyance of all materials to site and cement at site including cost of formwork, lead for soft water, labour charges for mixing , transporting, laying, and curing concrete working in heights and hire charges for tools and plants, and all other incidental charges etc complete as per relevant specification for BASE COURSE BELOW APPROACH SLAB.

-

-

-

... More
Km 28/4

3.84

6716

25789.44

... More
Vibrated Reinforced Cement Concrete M-30, Grade, Design Mix, using ISS size graded HBG metal including cost and conveyance of all materials to site and cement at site but excluding cost and fabrication of steel, including all labour charges for mixing concrete, laying, vibrating, and hire charges for tools and plants, compacting, curing with all leads for soft water, including all other incidental charges, formwork, cost of remolded expansion joints and fixing the same in position etc, complete for APPROACH SLAB. as per Section 1500,1700 & 2704 of MORT&H Specficaton (Fifth Revision-2013)

-

-

-

... More
Km 28/4

9.1

9460

86086

... More
Supply and fabrication of Fe-500 steel required for all RCC items of works involved in the schedule, including cost of steel at site and cost of fabrication labour charges for cleaning the rods straightening,cutting,bending,tying grills, including over laping to the required length wherever necessary and providing to the reinforcement placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges , etc., complete. as per Section 2706 of MORT&H Specficaton (Fifth Revision-2013

-

-

-

... More
Km 28/4

1.95

95610

186439.5

... More
Supply and fabrication of Fe-240 steel required for all RCC items of works involved in the schedule, including cost of steel at site and cost of fabrication labour charges for cleaning the rods straightening,cutting,bending,tying grills, including over laping to the required length wherever necessary and providing to the reinforcement placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges , etc., complete. FOR WEARING COAT as Mesh Reinforcement. as per Section 2706 of MORT&H Specficaton (Fifth Revision-201

-

-

-

... More
Km 28/4

0.4

95610

38244

... More
Vibrated cement Concrete M30 design mix using ISS size HBG graded metal including cost and conveyance of all materials to worksite and cement at site including all labour charges for fixing concrete, laying, vibrating, hire charges for tools and plants, compacting, curing with all leads for soft water, including all other incidental charges formwork cost of remolded expansion joints and fixing the same in position etc., complete for wearing coat of 75mm uniform thickness over deck slab and approach slab. as per Section 2702.2 of MORT&H Specficaton

-

-

-

... More
Km 28/4

49.6

656

32537.6

... More
Supplying and fixing GI DRAINAGE SPOUTS 100mm dia as per GOI drawing SD/205 with grating arrangements at top as shown in the drawing and 100mm dia drainage spout projecting atleast 300mm beyond the bottom of deck slab as shown in the drawing, including cost and conveyance of Galvanised iron pipes and flats and fixing them in position, etc., complete as per cl 2705 of MORT&H specification. (V Revision)

-

-

-

... More
Km 28/4

2

2498

4996.2

... More
Providing FILTER MEDIA behind Abutment and Returns for 600mm thickness using filter material conforming to clause 309.3.2.B of MORT&H-Rev.5 well packed with smaller size towards the soil and bigger size towards the wall including cost and conveyance of all materials to worksite including labour charges and all other incidental charges, etc complete. as per CI.710.1.4 & Appendix 6 of IRC :78-2014

-

-

-

... More
Km 28/4

22.81

1228

28010.68

... More
Supplying and fixing 300mm wide PVC EXPANSION JOINT in the 20mm expansion gap provided in between decks over piers and in between deck and dirt wall over abutment as shown in the drawing including cost and conveyance of expansion joints including shalimar pad and joint sealant etc., complete(In Deck slab)

-

-

-

... More
Km 28/4

3.62

653

2365.31

... More
Filling behind Abutments and return wall with clean gritty gravel including cost and conveyance of gravel to worksite, laying, handling charges and filling in layers, tamping under optimum moisture content to get the maximum density including watering, with all leads for water and all other incidental charges etc., complete. as per CI.710.1.4 & Appendix 6 of IRC :78-2014

-

-

-

... More
Km 28/4

31.93

343

10951.99

... More
Providing and fixing class1 PVC seepage pipes of 100 mm dia of required lengths for retaining walls including costs and conveyance of all materials to work site and labour charges for fixing, including backing aggregate for draining seepage water etc., (Weep hole)

-

-

-

... More
Km 28/4

38.4

192

7392

... More
Painting two coats with Ready mix plastic enamel paint and approved colour including priming coat over the cement surface complete including scrapping clean removal of dirt of parts over cement surface

-

-

-

... More
Km 28/4

56.38

250

14099.51

... More
Pipe culvert

-

-

-

... More
Dismantling salvaging and removal and disposing of resulting materials and back filling the resulting trenches and pits including all labour, materials, tools, equipment, safe guards, incidental necessary to complete the work as directed by the Engineer for PCC as per MORTH No.111,112,202

-

-

-

... More
Km 23/10

1.89

486

918.92

... More
Km 24/2

1.84

486

894.61

... More
Km 26/10

4.13

486

2008.01

... More
Earthwork excavation in all classes of soil such as hard stiff clay, stiff black cotton soil, hard red earth, shales, muram, gravel, stone earth etc., depositing on bank with all leads and lifts as per SS 20 B and all other incidental charges such as baling out water, shoring, strutting, walling, and forming protective bund wherever necessary etc., complete as directed by the Engineer as per MORTH No. 111, 112, 304. for Foundation of Body wall and Pipes

-

-

-

... More
Km 23/10

19.55

246

4819.47

... More
Km 24/2

13.14

246

3239.27

... More
Km 26/10

66

246

16270.32

... More
Vibrated Cement Concrete M15 Mix using 40mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement, centering, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants employed and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for Levelling course below the Body wall

-

-

-

... More
Km 23/10

0.55

6015

3308.45

... More
Km 24/2

0.55

6015

3308.45

... More
Km 26/10

0.99

5967

5907.94

... More
Vibrated Cement Concrete M20 (Nominal Mix) using 40mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement, centering, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants employed and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications as directed by the Engineer for as per MORTH No. 111, 112, 900, 1000, 1500, 1700, 2100 (Below Sill and Above sill Level )

-

-

-

... More
Km 23/10

4.93

9352

46105.95

... More
Km 24/2

4.93

9352

46106

... More
Km 26/10

7.67

8606

66014.92

... More
Supply of NP3 class RCC pipe with flush joint to a size of 1000mm inner diameter with wall thickness 115mm. to a length of 2.5m in RCC M35 with reinforcement as per table 5 of IS :458:2003 to a ultimate load capacity of 71.58 KN/Linearmeter including cost of conveyance of all matrials and steel including moulding charges, all labour charge, hire charges for all T & P including conveyance and supply of pipe to worksite and other incidental charges etc., as per the specification IS : 458:2003 as per MORTH No. 111, 112, 2900, 900

-

-

-

... More
Km 23/10

5

4276

21384

... More
Km 24/2

2.5

4276

10692

... More
Km 26/10

15

4276

64152

... More
Hoisting and fixing of 1000 mm dia NP3 pipes to proper gradient including labour and all other incidental charges as directed by the Engineer as per MORTH No.2900

-

-

-

... More
Km 23/10

5

266

1331

... More
Km 24/2

2.5

266

665.5

... More
Km 26/10

15

266

3993

... More
Filling under the box culvert with stone dust including cost and conveyance of stone dust to worksite, laying, handling charges and filling in layers, tamping under optimum moisture content to get the maximum density including watering, with all leads for water and all other incidental charges etc, complete for filling under the box culvert .

-

-

-

... More
Km 23/10

22.4

256

5740.9

... More
Km 24/2

3.71

256

950.84

... More
Km 26/10

28.67

232

6652.87

... More
RCC Well Protective wall

-

-

-

... More
Blasting and removing the hard rock measured in solid in the foundation and removing the blasted stones and stacking the same for pre-measurement at site including the all other labour and incidental charges including the cost of the blasting materials and all other tools and plants employed etc., complete as per standard specifications for FOUNDATION OF ABUTMENTS, PIERS AND WINGS WALLS

-

-

-

... More
Km 24/2

81

871

70593.93

... More
Benching, Hard rock upto an average of 10cm depth including all albour and incidental charges and hire charges for tools and plants employed etc., complete in the FOUNDATION OF ABUTMENTS AND WING WALLS.

-

-

-

... More
Km 24/2

134

843

113055.8

... More
Providing Fe-550 grade 25mm dowel bars including cost and conveyance of all materials to site drilling 40mm holes in rock and grouting the same with cm 1:2 after placing the 25mm dowel bars etc., complete in the FOUNDATION OF ABUTMENTS AND WING WALLS.

-

-

-

... More
Km 24/2

120

858

102960

... More
Plain Cement Concrete M-15, (Nominal mix ) using 40mm ISS HBG metal including cost and conveyance of all materials to site and cost cement at site including portable water, labour charges for mixing, transporting, laying campacting and curing concrete, Tools and Plants and incidental charges such as bailing out water ,maintaining of protectivebunds,cofferdams,shoring,structting etc, complete as per relevant standard specification for LEVELLING COURSE BELOW RETAININGWALL AS PER SECTION 1100 OF MORT&H Specifications (Fifth Revision).

-

-

-

... More
Km 24/2

13.4

6015

80601

... More
Vibrated Reinforced cement concrete M30 (Design mix) using 20mm ISS graded HBGS metal stone including cost and conveyance of all materials to site including cement at site including cost of formwork using soft water, labour charges for mixing, transporting and placing in position, vibrating and compacting, laying in all heights and curing concrete, hire charges for tools and plants including shoring, shutting etc., complete as per relevant specification, as per MORT&H specifications 1000,1500,1600,1700 & 2300 for retainingwall below sill

-

-

-

... More
Km 24/2

68.7

10428

716403.6

... More
Providing and fixing 110 mm dia PVC seepage pipes of requied length for abutments and wngs including cost and conveyance of all materials to work site, cost and labour semi sperical backfill arrangements with 100mm size graniet stone at the periphery and labour charges for fixing etc., complete to drain the backfil as per standard specification as per MORTH No.2706

-

-

-

... More
Km 24/2

120

203

24372

... More
Vibrated Reinforced cement concrete M30 (Design mix) using 20mm ISS graded HBGS metal stone including cost and conveyance of all materials to site including cement at site including cost of formwork using soft water, labour charges for mixing, transporting and placing in position, vibrating and compacting, laying in all heights and curing concrete, hire charges for tools and plants including shoring, shutting etc., complete as per relevant specification, as per MORT&H specifications 1000,1500,1600,1700 & 2300 for STEM OF RCC RETAINING WALLS.

-

-

-

... More
Km 24/2

87.7

13527

1186317.9

... More
Supply and fabrication of Fe 500 Steel required for all RCC items of works involved in the schedule including cost of steel and cost of fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills, including over lapping to the required length wherever necessary and providing to the reinforcement placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc. complete as directed by the Engineer as per MORTH No. 111, 112, 900, 1000

-

-

-

... More
Km 24/2

7.64

95610

730460.4

... More
Vibrated Cement Concrete of grade M20 (nominal mix 1:1.5:3) using40mm HBG metal including cost and conveyance of all materialsto site and cement at site including cost of formwork, soft water,labour charges for mixing, transporting, laying and curing concrete working at depths, Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, struttingetc., complete as per relevent standard specification for RETAINING WALL PARAPET WALL

-

-

-

... More
Km 24/2

4.05

12535

50766.75

... More
Providing and laying Carted Earth having minimum CBR of 10 with lead of _10__ km including cost of earth, conveyance, laying, watering and consolidation etc., complete as directed by the Engineer for forming the Embankment as per MORTH No.111, 112, 305, 900

-

-

-

... More
Km 24/2

207.7

251

52269.78

... More
PCC Well Protective wall

-

-

-

... More
Earth work excavation in all classes of soils except hard rockrequiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as providing and maintaining necessarycofferdams, sheeting, shoring, bracing and their subsequentremoval, removal of all logs, stumps and other deleterious matterand obstructions, trimming bottom of excavation backfilling, andclearing the site and disposal of all surplus materials etc., complete as per relevent standard specification for FOUNDATION OF WELL PROTECTIVE WALL

-

-

-

... More
Km 28/2

20.63

123

2542.85

... More
Km 28/4

20.63

123

2542.85

... More
Km 28/6 (i),(ii)

41.26

123

5085.71

... More
PLain Cement Concrete of grade M15 (nominal mix 1:2:4) using40mm HBG metal including cost and conveyance of all materialsto site and cement at site including cost of formwork, soft water,labour charges for mixing, transporting, laying and curing concreteworking at depths, Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, struttingetc., complete as per relevent standard specification for LEVELLING COURSE BELOW WELL PROTECTIVE FOUNDATION FOOTINGS (below sill level)

-

-

-

... More
Km 28/2

6.19

5951

36841.02

... More
Km 28/4

6.19

5941

36775.35

... More
Km 28/6 (i),(ii)

12.38

5941

73550.69

... More
Vibrated Cement Concrete of grade M20 (nominal mix 1:1.5:3) using 40mm HBG metal including cost andconveyance of all materials to site and cement at site including cost of formwork, soft water, labour charges for mixing,transporting,laying & curing concrete working at depths,Tools and Plants and incidental charges such as maintaining of protective bunds cofferdams, horing, strutting etc., complete as per relevent standard specification for FOUNDATION OF RETAINING WALLS

-

-

-

... More
Km 28/2

20.63

6140

126686.35

... More
Km 28/4

20.63

6130

126467.47

... More
Km 28/6 (i),(ii)

41.26

6130

252934.94

... More
Vibrated Cement Concrete of grade M20 (nominal mix 1:1.5:3) using 40mm HBG metal including cost andconveyance of all materials to site and cement at site including cost of formwork, soft water, labour chargesfor mixing, transporting, laying and curing concrete working at depths,Tools & Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, struttingetc.,complete as per relevent standardspecification for BODY WALL OF WELL PROTECTIVE (Above sill level)

-

-

-

... More
Km 28/2

38.25

8054

308083.48

... More
Km 28/4

38.25

8043

307677.65

... More
Km 28/6 (i),(ii)

76.5

8043

615355.29

... More
Providing and fixing 110 mm dia PVC seepage pipes of requied length for abutments and wngs including cost and conveyance of all materials to work site, cost and labour semi sperical backfill arrangements with 100mm size graniet stone at the periphery and labour charges for fixing etc., complete to drain the backfil as per standard specification as per MORTH No.2706

-

-

-

... More
Km 28/2

19.6

203

3980.76

... More
Km 28/4

19.6

203

3980.76

... More
Km 28/6 (i),(ii)

39.2

203

7961.52

... More
Refilling with excavated earth complying with standard specification for filling in sides of the retaining wall only labour charges etc,complete

-

-

-

... More
Km 28/2

17.54

42

751.59

... More
Km 28/4

17.54

42

751.59

... More
Km 28/6 (i),(ii)

35.08

42

1503.18

... More
Providing and laying Carted Earth having minimum CBR of 10 with lead of _10__ km including cost of earth, conveyance, laying, watering and consolidation etc., complete as directed by the Engineer for forming the Embankment as per MORTH No.111, 112, 305, 900

-

-

-

... More
Km 28/2

8.34

196

1642.56

... More
Km 28/4

8.34

196

1642.56

... More
Km 28/6 (i),(ii)

16.68

196

3285.13

... More
Calculation of SubTotal, GST and Total Amount carried out by system automatically

-

-

-

... More
Basic cost of value put to tender as per estimate

1

100213733

-

... More
Add GST at 18%

1

18038472

-

... More
Total Value put to Tender

1

118252205

-

... More
Difference in Value

1

-

-

... More
Bidder quoted value

1

-

-

... More
Add GST at 18% of Final quoted Value

1

-

-

... More
Total Value of Contract Including 18% of GST

1

-

-

... More
Basic cost of value put to tender as per Estimate

-

-

100213733

... More
Quoted Rate in Figures (Total Value of Contract Including 18% of GST )

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.