Highways Department Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Highways Department Tender

Works
Civil And Construction
Eprocure
Opening Date30 Sep 2024
Closing Date17 Oct 2024
Tender Amount₹ 3,27,80,000 
Notes
Download

Costs

Summary

Pappireddipatti (h) Candm Sub Division (slm-110)

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Earth Work excavation in all classes of soil except hard rock not requiring blasting and deposting on bank with all leads and lifts as per SS20B including cost of all labour,materials,tools,equipments and all incidental charges and sheeting, shoring,bracing and their subsequent removal of all logs,stumps and other deleteriuos matter and obstructions,trimming of bottom of excavation,backfilling and clearing the site and disposal of all surplus materials etc.,complete as per standard specification for Boxing as per clause 111, 112, 201, 202, 301 to 305 & 900 of MORTH Vth Revision

-

-

-

... More
1. Widening from Intermediate Lane to Two Lane and Strengthening at km 10/0 - 12/4, 13/0 - 13/8 of Mallapuram - Gopinathampatti road including Construction of Retaining wall at KM 11/6, 11/8

3125.03

385191

123.26

... More
Construction of granular sub-base by providing close graded Material,mixing in a mechanical mixplant at OMC, carriage of mixed Material to worksite, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory soil compactor to achieve the desired density, complete as per clause 111, 112, 401 & 900 of MORTH Vth Revision etc., complete - for Grading- V Material

-

-

-

... More
1. Widening from Intermediate Lane to Two Lane and Strengthening at km 10/0 - 12/4, 13/0 - 13/8 of Mallapuram - Gopinathampatti road including Construction of Retaining wall at KM 11/6, 11/8

524.34

935936

1784.98

... More
Construction of granular sub-base by providing close graded Material,mixing in a mechanical mixplant at OMC, carriage of mixed Material to worksite, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory soil compactor to achieve the desired density, complete as per clause 111, 112, 401 & 900 of MORTH Vth Revision etc., complete - for Grading- III Material

-

-

-

... More
1. Widening from Intermediate Lane to Two Lane and Strengthening at km 10/0 - 12/4, 13/0 - 13/8 of Mallapuram - Gopinathampatti road including Construction of Retaining wall at KM 11/6, 11/8

499.37

935954

1874.27

... More
Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam of 250mm thickness, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory soil compactor to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 111, 112, 406 & 900 of MORTH Vth Revision

-

-

-

... More
1. Widening from Intermediate Lane to Two Lane and Strengthening at km 10/0 - 12/4, 13/0 - 13/8 of Mallapuram - Gopinathampatti road including Construction of Retaining wall at KM 11/6, 11/8

1372.19

2992197

2180.6

... More
Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam of 150mm thickness, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory soil compactor to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 111, 112, 406 & 900 of MORTH Vth Revision

-

-

-

... More
2. Improvements to Riding Quality at km 0/0 - 4/5 of Sitheri road

28.13

61340

2180.6

... More
Providing and laying Prime Coat over WMM surface using 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 111, 112, 501, 502 & 900 of MORTH Vth Revision

-

-

-

... More
1. Widening from Intermediate Lane to Two Lane and Strengthening at km 10/0 - 12/4, 13/0 - 13/8 of Mallapuram - Gopinathampatti road including Construction of Retaining wall at KM 11/6, 11/8

5818.7

470034

80.78

... More
2. Improvements to Riding Quality at km 0/0 - 4/5 of Sitheri road

187.5

15144

80.77

... More
Providing and laying Tack Coat over WMM surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 111, 112, 501, 503 & 900 of MORTH Vth Revision

-

-

-

... More
1. Widening from Intermediate Lane to Two Lane and Strengthening at km 10/0 - 12/4, 13/0 - 13/8 of Mallapuram - Gopinathampatti road including Construction of Retaining wall at KM 11/6, 11/8

5818.7

107645

18.5

... More
2. Improvements to Riding Quality at km 0/0 - 4/5 of Sitheri road

187.5

3466

18.49

... More
Advance patch work 50mm thick using 45 mm IRC size HBG metal for making the pot holes and patching using VG 10 grade bitumen including mixing at the rate of 44 Kg / Cum of chips after trimming the pot holes or depression to proper shape and depth side painting with tack coat and compacting the layers as directed by Departmental officers etc., complete as per clause 111, 112, 501, 3004 & 900 of MORTH Vth Revision

-

-

-

... More
2. Improvements to Riding Quality at km 0/0 - 4/5 of Sitheri road

16.51

59240

3588.13

... More
Providing and laying 50 mm thick Bituminous Macadam using course aggregate and VG-30 Bitumen which shall consist of construction in a single course base/binder course confirming to the specification on a previously prepared base (using Mini Mix Plant and Power Roller) including cost of material,labour charges, rentals for machinary,fuel and all other incidental charges etc.,complete as per clause 111,112,504 & 900 of MORTH Rev-5 (For Patch Works)

-

-

-

... More
1. Widening from Intermediate Lane to Two Lane and Strengthening at km 10/0 - 12/4, 13/0 - 13/8 of Mallapuram - Gopinathampatti road including Construction of Retaining wall at KM 11/6, 11/8

13.93

108054

7756.95

... More
Providing and laying Tack Coat over Existing BT surface using 2 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 111, 112, 501, 503 & 900 of MORTH Vth Revision

-

-

-

... More
1. Widening from Intermediate Lane to Two Lane and Strengthening at km 10/0 - 12/4, 13/0 - 13/8 of Mallapuram - Gopinathampatti road including Construction of Retaining wall at KM 11/6, 11/8

16751.9

448950

26.8

... More
2. Improvements to Riding Quality at km 0/0 - 4/5 of Sitheri road

17285.16

463242

26.8

... More
Providing and laying Tack Coat over Dry Lean Cement Concrete surface using 3.00 Kg of Bitumen Emulsion (RS1) per10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 111, 112, 501, 503 & 900 of MORTH Vth Revision

-

-

-

... More
1. Widening from Intermediate Lane to Two Lane and Strengthening at km 10/0 - 12/4, 13/0 - 13/8 of Mallapuram - Gopinathampatti road including Construction of Retaining wall at KM 11/6, 11/8

46.2

966

20.91

... More
2. Improvements to Riding Quality at km 0/0 - 4/5 of Sitheri road

265.5

5551

20.91

... More
Providing, laying 50mm consolidated thick Bituminous Macadam using 0.20cum of 26.50-13.20mm, 0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRC metal with 37Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 504 of MORTH Rev-5 Grading II

-

-

-

... More
2. Improvements to Riding Quality at km 0/0 - 4/5 of Sitheri road

41.13

338749

8236.08

... More
Providing, laying 50mm/70mm consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50-13.20mm, 0.25cum of 13.20-2.36mm and 0.23cum of 2.36mm & below and with 53.20Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in the required temperature in Central Hot Mix Plant 20-30 ton capacity, conveying the mix by tipper trucks to work site, spreading the mix to uniform thickness of 50mm/70mm using paver to the specified grades and cross sections and compacted by Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver at site etc., including hire and fuel charges for 20-30ton CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory rollers and all other tools and plant required, including all other incidental charges etc.,complete as per specification using CMP MORTH Rev-5 as per MoRTH specification clause No.111, 112, 501, 505 & 900 - Grading II for centre portion and widening portion

-

-

-

... More
1. Widening from Intermediate Lane to Two Lane and Strengthening at km 10/0 - 12/4, 13/0 - 13/8 of Mallapuram - Gopinathampatti road including Construction of Retaining wall at KM 11/6, 11/8

390.82

3753114

9603.18

... More
Providing and laying Bituminous Concrete to 30mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per clause No. 111, 112, 501, 507 & 900 of MORTH vth Revision Grading - II

-

-

-

... More
1. Widening from Intermediate Lane to Two Lane and Strengthening at km 10/0 - 12/4, 13/0 - 13/8 of Mallapuram - Gopinathampatti road including Construction of Retaining wall at KM 11/6, 11/8

678.51

7045444

10383.7

... More
2. Improvements to Riding Quality at km 0/0 - 4/5 of Sitheri road

533.44

5539080

10383.7

... More
Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with power roller, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification. For making up of low berms using cut earth as per clause No. 111, 112, 301 to 305 & 900 of MORTH Vth Revision (Labour and Hire charges only)

-

-

-

... More
1. Widening from Intermediate Lane to Two Lane and Strengthening at km 10/0 - 12/4, 13/0 - 13/8 of Mallapuram - Gopinathampatti road including Construction of Retaining wall at KM 11/6, 11/8

1281.56

34192

26.68

... More
Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with power roller, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification. For making up of low berms

-

-

-

... More
2. Improvements to Riding Quality at km 0/0 - 4/5 of Sitheri road

766.4

94466

123.26

... More
Earth Work excavation in all classes of soil except hard rock not requiring blasting and deposting on bank with all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges and sheeting, shoring, bracing and their subsequent removal of all logs, stumps and other deleteriuos matter and obstructions, trimming of bottom of excavation, backfilling and clearing the site and disposal of all surplus materials etc.,complete as per standard specification for Foundation of Retaining wall as per clause 111, 112, 201, 202, 301 to 305 & 900 of MORTH Vth Revision

-

-

-

... More
1.1.Construction of Retaining wall at km 11/6 & 11/8 of Mallapuram - Gopinathampatti Road

275

33896

123.26

... More
Vibrated Cement Concrete of grade M15 Nominal Mix using 40mm ISS size HBG metal including cost and conveyance of all materials to site complying with required standards and specifications. including cost of formwork, mixing, laying and compacting using vibrator including hire and fuel charges for all Tools and Plants and incidental charges such as maintaining of protective bunds, coffer dams strutting etc., complete as per relevant standard specification for Below sill Level of Retaining wall as per clause as per clause 1000, 1500, 1700, 2100, 2200 & 2908 of MORTH Vth Revision

-

-

-

... More
1.1.Construction of Retaining wall at km 11/6 & 11/8 of Mallapuram - Gopinathampatti Road

82.5

501413

6077.74

... More
Vibrated Cement Concrete of grade M20 (Nominal mix) using 40mm ISS size HBG metal including cost and conveyance of all materials to site and cost cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths Tools and Plants and incidental charges etc., complete as per relevent standard specification for Above sill Level of Retaining wall as per clause 1000, 1500, 1700, 2100, 2200 & 2908 of MORTH Vth Revision

-

-

-

... More
1.1.Construction of Retaining wall at km 11/6 & 11/8 of Mallapuram - Gopinathampatti Road

429.8

3344626

7781.82

... More
Providing and fixing 100mm dia PVC Seepage Pipes of required length for abutment and wing, retaining wall including cost and conveyance of all materials to worksite, cost and labour for semi-spherical backfill arrangements with 100mm size broken granite stones at the periphery and labour charges for fixing etc., complete to Retaining wall the backfill as per clause 2700 of MORTH Vth Revision

-

-

-

... More
1.1.Construction of Retaining wall at km 11/6 & 11/8 of Mallapuram - Gopinathampatti Road

66

12705

192.5

... More
Filling behind Retaining wall with clean good gritty gravel in including cost and conveyance to site including labour charges for filling in layers , watering , tamping under optimum moisture content to get the maximum density and all other incidental charges etc., complete as per clause 304 & 2907 of MORTH Vth Revision

-

-

-

... More
1.1.Construction of Retaining wall at km 11/6 & 11/8 of Mallapuram - Gopinathampatti Road

297

78868

265.55

... More
Calculation of SubTotal, GST and Total Amount carried out by system automatically

-

-

-

... More
Basic cost of value put to tender as per estimate

1

-

27776846

... More
Add GST at 18%

1

-

4999832

... More
Total Value put to Tender

1

-

32776678

... More
Negotiated Percentage

1

-

-

... More
Final Negotiated Value

1

-

-

... More
Add GST at 18% of Final Negotiated Value

1

-

-

... More
Total Value of Contract Including 18% of GST

1

-

-

... More
Basic cost of value put to tender as per Estimate

-

27776846

-

... More
Quoted Rate in Figures (Total Value of Contract Including 18% of GST )

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.