Highways Department Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Highways Department Tender
Civil And Construction
Eprocure
Opening Date30 Sep 2024
Closing Date17 Oct 2024
Tender Amount₹ 3,67,70,000
Costs
EMD
₹ 1,95,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Uthangarai (h) Candm Sub Division (slm-106)
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_HWAY_489024_1Bid Award Id
ViewTender No
30 / 2024-2025 / HDO, Dated. 20.09.2024-2Tender Authority
Highways Department ViewPurchaser Address
-Website
http://https://tnhighways.gov.in/index.php/en/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
1. Widening from Two Lane to Two Lane with Paved Shoulders and Strengthening at km 5/2 - 7/6 of Pochampalli - Kallavi road including CD works at Km 6/8
4259.3
525001
123.26
Construction of granular sub-base by providing close graded Material,mixing in a mechanical mixplant at OMC, carriage of mixed Material to worksite, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory soil compactor to achieve the desired density, complete as per clause 111, 112, 401 & 900 of MORTH Vth Revision etc., complete - for Grading- V Material
-
-
-
1. Widening from Two Lane to Two Lane with Paved Shoulders and Strengthening at km 5/2 - 7/6 of Pochampalli - Kallavi road including CD works at Km 6/8
834.18
1600474
1918.62
Construction of granular sub-base by providing close graded Material,mixing in a mechanical mixplant at OMC, carriage of mixed Material to worksite, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory soil compactor to achieve the desired density, complete as per clause 111, 112, 401 & 900 of MORTH Vth Revision etc., complete - for Grading- III Material
-
-
-
1. Widening from Two Lane to Two Lane with Paved Shoulders and Strengthening at km 5/2 - 7/6 of Pochampalli - Kallavi road including CD works at Km 6/8
725.37
1456557
2008.02
Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam of 150/ 250mm thickness, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory soil compactor to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 111, 112, 406 & 900 of MORTH Vth Revision
-
-
-
1. Widening from Two Lane to Two Lane with Paved Shoulders and Strengthening at km 5/2 - 7/6 of Pochampalli - Kallavi road including CD works at Km 6/8
2580.98
5665302
2195.02
Providing and laying Prime Coat over WMM surface using 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 111, 112, 501, 502 & 900 of MORTH Vth Revision
-
-
-
1. Widening from Two Lane to Two Lane with Paved Shoulders and Strengthening at km 5/2 - 7/6 of Pochampalli - Kallavi road including CD works at Km 6/8
12370.7
998810
80.74
Providing and laying Tack Coat over WMM surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 111, 112, 501, 503 & 900 of MORTH Vth Revision
-
-
-
1. Widening from Two Lane to Two Lane with Paved Shoulders and Strengthening at km 5/2 - 7/6 of Pochampalli - Kallavi road including CD works at Km 6/8
12370.7
228610
18.48
Providing and laying Tack Coat over Existing BT surface using 2 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 111, 112, 501, 503 & 900 of MORTH Vth Revision
-
-
-
1. Widening from Two Lane to Two Lane with Paved Shoulders and Strengthening at km 5/2 - 7/6 of Pochampalli - Kallavi road including CD works at Km 6/8
11666.3
312540
26.79
Providing and laying Tack Coat over Dry Lean Cement Concrete surface using 3.00 Kg of Bitumen Emulsion (RS1) per10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 111, 112, 501, 503 & 900 of MORTH Vth Revision
-
-
-
1. Widening from Two Lane to Two Lane with Paved Shoulders and Strengthening at km 5/2 - 7/6 of Pochampalli - Kallavi road including CD works at Km 6/8
21
438
20.89
Providing, laying 50mm consolidated thick Bituminous Macadam using 0.20cum of 26.50-13.20mm, 0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRC metal with 37Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 504 of MORTH Rev-5 Grading II
-
-
-
1. Widening from Two Lane to Two Lane with Paved Shoulders and Strengthening at km 5/2 - 7/6 of Pochampalli - Kallavi road including CD works at Km 6/8
840.32
6919833
8234.76
Providing, laying 75mm consolidated thick Dense Bituminous Macadam using 0.40cum of 37.50-13.20mm, 0.35 cum of 13.20-2.36 mm and 0.36 cum of 2.36 mm & below size IRC metal with 71.30 kgs of VG30 grade bitumen for premixing per 10 sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing the min the required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to site, spreading the mix to uniform thickness of 75mm with mechanical paver to the specified grades and cross section sand consolidated by Vibratory Roller to the required density etc., including labour for attending to paver to site etc.,including hire and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and allother tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per MoRTH specification clause No.111,112,501,505 & 900 - Grading I
-
-
-
1. Widening from Two Lane to Two Lane with Paved Shoulders and Strengthening at km 5/2 - 7/6 of Pochampalli - Kallavi road including CD works at Km 6/8
544.03
4834919
8887.23
Providing and laying Bituminous Concrete to 30mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per clause No. 111, 112, 501, 507 & 900 of MORTH vth Revision Grading - II
-
-
-
1. Widening from Two Lane to Two Lane with Paved Shoulders and Strengthening at km 5/2 - 7/6 of Pochampalli - Kallavi road including CD works at Km 6/8
721.8
7486762
10372.35
Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with power roller, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification. For making up of low berms as per clause No. 111, 112, 301 to 305 & 900 of MORTH Vth Revision (Labour and Hire charges only)
-
-
-
1. Widening from Two Lane to Two Lane with Paved Shoulders and Strengthening at km 5/2 - 7/6 of Pochampalli - Kallavi road including CD works at Km 6/8
424
11295
26.64
Dismantling Culverts, bridges and other structures Dismantling salvaging and removal and disposing of resulting materials and back filling the resulting trenches and pits etc as per clause No. 111, 112, 202 of MORTH vth Revision Dismantling Random Rubble Masonry
-
-
-
1.1.Reconstruction of culvert at Km 6/8 of Pochampalli-Kalavi Road
6.6
1868
283.14
Earth Work excavation in all classes of soil except hard rock not requiring blasting and deposting on bank with all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges and sheeting, shoring, bracing and their subsequent removal of all logs, stumps and other deleteriuos matter and obstructions, trimming of bottom of excavation, backfilling and clearing the site and disposal of all surplus materials etc.,complete as per standard specification for Foundation of Box Culvert as per clause 111, 112, 201, 202, 301 to 305 & 900 of MORTH Vth Revision
-
-
-
1.1.Reconstruction of culvert at Km 6/8 of Pochampalli-Kalavi Road
91.17
11237
123.26
Vibrated Cement Concrete of grade M15 Nominal Mix using 40mm ISS size HBG metal including cost and conveyance of all materials to site complying with required standards and specifications. including cost of formwork, mixing, laying and compacting using vibrator including hire and fuel charges for all Tools and Plants and incidental charges such as maintaining of protective bunds, coffer dams strutting etc., complete as per relevant standard specification for Base Concrete of Culverts as per clause as per clause 1000, 1500, 1700, 2100, 2200 & 2908 of MORTH Vth Revision
-
-
-
1.1.Reconstruction of culvert at Km 6/8 of Pochampalli-Kalavi Road
10.56
67147
6358.69
Vibrated Cement Concrete of grade M20 (Nominal mix) using 40mm ISS size HBG metal including cost and conveyance of all materials to site and cost cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths Tools and Plants and incidental charges etc., complete as per relevent standard specification for Wing wall and Parapet as per clause 1000, 1500, 1700, 2100, 2200 & 2908 of MORTH Vth Revision
-
-
-
1.1.Reconstruction of culvert at Km 6/8 of Pochampalli-Kalavi Road
35.79
310968
8688.7
Vibrated Reinforced Cement Concrete of grade M25 (Design mix) using ISS HBG graded metal including cost and conveyance of all materials to site and cost of cement excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for tools and plants including all other incidental charges etc., complete for Base Slab, Side Walls, Top Slab of Box Culvert as per clause 900, 1000, 1500, 1600, 1700, 2100, 2200 & 2300 of MORTH Vth Revision
-
-
-
1.1.Reconstruction of culvert at Km 6/8 of Pochampalli-Kalavi Road
34.3
434916
12679.79
Supply and fabrication of STEEL grade Fe500 D for all the reinforced cement concrete items of work involved in the schedule including cost of steel, cost of fabrication, labour charges for cleaning the rods, straightening, cutting, bending, tying grills, hoisting and placing the reinforcement in position as specified in the drawing including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete. as per standard specification as per clause 1000, 1500, 1600, 1700, 2100 & 2300 of MORTH Vth Revision
-
-
-
1.1.Reconstruction of culvert at Km 6/8 of Pochampalli-Kalavi Road
2.61
249540
95609.27
Filling behind the Box Culvert with excavated earthincluding cost and conveyance to site including labour charges for filling in layers , watering , tamping under optimum moisture content to get the maximum density and all other incidental charges etc., complete as per clause 304 & 2907 of MORTH Vth Revision (Labour Charges only)
-
-
-
1.1.Reconstruction of culvert at Km 6/8 of Pochampalli-Kalavi Road
22.2
951
42.85
Calculation of SubTotal, GST and Total Amount carried out by system automatically
-
-
-
Basic cost of value put to tender as per estimate
1
-
31154429
Add GST at 18%
1
-
5607797
Total Value put to Tender
1
-
36762226
Negotiated Percentage
1
-
-
Final Negotiated Value
1
-
-
Add GST at 18% of Final Negotiated Value
1
-
-
Total Value of Contract Including 18% of GST
1
-
-
Basic cost of value put to tender as per Estimate
-
31154429
-
Quoted Rate in Figures (Total Value of Contract Including 18% of GST )
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements