Highways Department Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Highways Department Tender

Works
Civil And Construction
Eprocure
Opening Date30 Sep 2024
Closing Date22 Oct 2024
Tender Amount₹ 2,67,60,000 
Notes
Download

Costs

Summary

Try71 Mannargudi H C And M Sub Division

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Granular Sub-base with Graded Material (Table:- 400-1) - Plant Mix Method (Construction of granular sub-base by providing close graded Material, (Table : 401) mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory soil compactor to achieve the desired density, complete as per clause 401) - for Grading III Material. as per MORT&H Rev.V specifications No.111,112,401,900

384.63

1107869

2880.35

... More
Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam 250mm thick, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory soil compactor to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5

961.59

2973101

3091.86

... More
Advance patch work to an average thickness of 50mm using premixed 45mm IRC metal over the existing BT surface using 44Kg of bitumen of grade 80/100 per cum of chips for premix and consolidation well including cost and conveyance of chips to work site and including cost of bitumen which shall be procured by the contractor himself and all labour charges etc., complete.

17.91

75103

4193.4

... More
Providing and laying Prime Coat over WMM surface using pressure distributor 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5

3869.47

312730

80.82

... More
Providing and laying Tack Coat over WMM surface (treated with primer) using pressure distributor 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5

3869.47

71623

18.51

... More
Providing and laying Tack Coat over Existing BT surface using pressure distributor 2 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 503 of MORTH Rev-5

7755.97

207937

26.81

... More
Providing and laying Tack Coat over Cement Concrete surface using pressure distributor 3.00Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 503 of MORTH Rev-5

91.49

1914

20.93

... More
BM (Grade-II) 50mm Thick using VG30 Providing, laying 50mm consolidated thick Bituminous Macadam using 0.20cum of 26.50-13.20mm, 0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRC metal with 37 Kgs of VG30 Grade bitumen for premixing per 10sqm of 50mm thick including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc.,including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 504 of MORTH Rev-5

674.29

6216009

9218.6

... More
BC (Grade-II) 30mm Thick using VG30 Providing and laying Bituminous Concrete to 30mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm of 40mm thick including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc.,complete as per specification using CMP as per clause 507 of MORTH Rev-5

348.78

3960477

11355.23

... More
BC (Grade-I) 50mm Thick using VG30 Providing and laying Bituminous Concrete to 50mm thick using 0.22 cum of 26.5- 13.20mm, 0.24 cum of 13.20-2.36mm and 0.26 cum of 2.36 and below IRC HBG metal with 62.40kgs of VG30 bitumen for premixing per 10sqm of 50mm thick including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc.,complete as per specification using CMP as per clause 507 of MORTH Rev-5

4.57

49762

10888.92

... More
Providing spreeding / making up of low berms using the available box cut earth including all hire and fuel charges for power roller for compaction, water sprinkler, including all labour charges for laying, spreading, watering etc.,complete and as directed by the departmental engineers.

393.35

10486

26.66

... More
Box Culvert

-

-

-

... More
Dismantling Culverts,bridges and other structures Dismantling salvaging and removal and disposing of resulting materials and back filling the resulting trenches and pits etc. a)Dismantling brick masonry in cement mortar MORTH 111,112,202

-

-

-

... More
At km 0/2,0/8

15.02

4252

283.14

... More
At km 1/2

7.87

2228

283.14

... More
At km 1/8

67.98

19247

283.14

... More
Dismantling Culverts,bridges and other structures Dismantling salvaging and removal and disposing of resulting materials and back filling the resulting trenches and pits etc. b)Removal of cut stone slab/ by using deploying macineries MORTH 111,112,202

-

-

-

... More
At km 1/8

9.6

4924

512.93

... More
Earth work excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges and sheeting, shoring and bracing and their subsequent removal, removal of all logs, stumps and other deletrious matter and obstructions, trimming bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification -MORTH Vth Rev., 304 for foundation.

-

-

-

... More
At km 0/2,0/8

167.42

48446

289.37

... More
At km 1/2

144.18

41721

289.37

... More
At km 1/8

218.13

63120

289.37

... More
Plain Cement Concrete of grade M15 (Nominal Mix) using 40mm ISS size HBG graded metal using with M.Sand including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labor charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for LEVELLING COURSE as per MORTH Vth Rev., 1000, 1500, 1700, 2100 & 900

-

-

-

... More
At km 0/2,0/8

9.94

68931

6934.78

... More
At km 1/2

7.29

50554

6934.78

... More
At km 1/8

6.08

42219

6943.98

... More
Vibrated Cement Concrete M20 grade nominal mix using 40mm ISS size hard broken granite metal using with M.Sand including cost and conveyance of all materials from approved quarry to worksite including cost of cement including cost and labour charges for formwork and centering mixing the concrete, transporting, laying, vibrating, compacting, curing with all leads for soft potable water, working in all depths including hire, running and fuel charges for all tools and plants employed and in accordance with standard specification for as per MORTH Vth Rev., 1000, 1500, 1700, 2100 & 900 - for base course in foundation of wing wall

-

-

-

... More
At km 0/2,0/8

1.34

9443

7047.18

... More
At km 1/2

1.8

12684

7047.18

... More
At km 1/8

7.39

52146

7056.38

... More
Vibrated reinforced cement concrete design mix M25 grade using 20mm & 12 mm ISS size HBG graded metal crushed stone with M.Sand including cost and conveyance of all materials to site but excluding cost and fabrication of steel but including cost and labour charges for formwork and centering, labour charges, compacting, finishing and curing including all incidental charges etc., complete - MORTH Vth Rev., 1000, 1500, 1600, 1700, 2200, 2300 & 900 for Box culvert

-

-

-

... More
At km 0/2,0/8

62.4

816771

13089.28

... More
At km 1/2

45.12

589677

13069.09

... More
At km 1/8

39.42

517222

13120.81

... More
Vibrated Cement Concrete M20 grade nominal mix using 40mm ISS size hard broken granite metal and using M.sand including cost and conveyance of all materials from approved quarry to worksite including cost of cement including cost and labour charges for formwork and centering mixing the concrete, transporting, laying, vibrating, compacting, curing with all leads for soft potable water, working in all depths including hire, running and fuel charges for all tools and plants employed and in accordance with standard specification for - Wing wall and Parapet as per MORTH Vth Rev., 1000, 1500, 1700, 2100 & 900

-

-

-

... More
At km 0/2,0/8

22.26

229122

10293

... More
At km 1/2

24.06

229319

9531.15

... More
At km 1/8

100.35

889804

8867.01

... More
Supply and fabrication of (HYSD) Steel Grade 500 as per Steel Schedule required for all RCC items of works involved in the schedule of drawings including cost of steel, cost of fabrication, labour charges for cleaning the bars straightening, cutting, bending, tying grills, positioning and placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete as per standard specification. - MORTH Vth Rev., 1000, 1500, 1600 & 900

-

-

-

... More
At km 0/2,0/8

4.49

429285

95609.27

... More
At km 1/2

3.26

311781

95609.27

... More
At km 1/8

2.67

255659

95609.27

... More
Stone dust filling including cost and conveyance of Stone dust to work site including labour charges for filling in layers as specified by the departmental officers including watering with all leads for water including labour charges for compacting,tamping,ramming under optimum moisture content to obtain the maximum density and all other incidental charges etc. complete as per standard specification.

-

-

-

... More
At km 0/2,0/8

16.54

11451

692.34

... More
At km 1/2

13.42

9291

692.34

... More
At km 1/8

15.66

10915

697.03

... More
Granular Sub-base with Graded Material (Table:- 400-1) - Plant Mix Method (Construction of granular sub-base by providing close graded Material, (Table : 401) mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory soil compactor to achieve the desired density, complete as per clause 401) - for Grading V Material. as per MORT&H Rev.V specifications No.111,112,401,900. for Culvert Portion (Approach)

-

-

-

... More
At km 0/2,0/8

3.75

10443

2784.91

... More
At km 1/2

2.98

8299

2784.91

... More
At km 1/8

2.38

6628

2784.91

... More
Granular Sub-base with Graded Material (Table:- 400-1) - Plant Mix Method (Construction of granular sub-base by providing close graded Material, (Table : 401) mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory soil compactor to achieve the desired density, complete as per clause 401) - for Grading III Material. as per MORT&H Rev.V specifications No.111,112,401,900. for Culvert Portion (Approach)

-

-

-

... More
At km 0/2,0/8

1.73

4983

2880.35

... More
At km 1/2

1.37

3946

2880.35

... More
At km 1/8

1.1

3168

2880.35

... More
Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam 150mm thick, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory soil compactor to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5. for Approach

-

-

-

... More
At km 0/2,0/8

4.4

13604

3091.86

... More
At km 1/2

3.45

10666

3091.86

... More
At km 1/8

2.79

8626

3091.86

... More
Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with average lead of 10 km and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with power roller, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, clearing up the site and disposal of all surplus materials etc., complete as per standard specification. For Carted Earth with compaction for diversion road with conveyance of 10 Kms Lead.

-

-

-

... More
At km 0/2,0/8

115.75

35466

306.41

... More
At km 1/2

55.56

17024

306.41

... More
At km 1/8

64.82

19861

306.41

... More
Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam required thick, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory soil compactor to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5. for Diversion Road

-

-

-

... More
At km 0/2,0/8

28.13

86974

3091.86

... More
At km 1/2

13.5

41740

3091.86

... More
At km 1/8

15.75

48696

3091.86

... More
Calculation of SubTotal, GST and Total Amount carried out by system automatically

-

-

-

... More
Basic cost of value put to tender as per estimate

1

-

22674621

... More
Add GST at 18%

1

-

4081432

... More
Total Value put to Tender

1

-

26756053

... More
Quoted Percentage

1

-

-

... More
Quoted Value

1

-

-

... More
Add GST at 18% of Final Quoted Value

1

-

-

... More
Total Value of Contract Including 18% of GST

1

-

-

... More
Basic cost of value put to tender as per Estimate

-

22674621

-

... More
Quoted Rate in Figures (Total Value of Contract Including 18% of GST )

-

-

-

... More
Quoted Rate in Words

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.