Highways Department Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Highways Department Tender

Civil And Construction
Bridge Construction
Eprocure
Opening Date19 Dec 2022
Closing DateCancelled
Tender AmountRefer Documents 
Notes
Download

Costs

Summary

Construction Of Road Over Bridge In Lieu Of Level Crossing No. 16 At Km 16/8 Of Mayiladuthurai - Thiruvarur - Thiruthuraipoondi Road (sh23) In Between Railway Km 15/100-15/200 At Peralam Railway Station Yard Of Mayiladuthurai - Thiruvarur Section.

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Plain Cement Concrete M15 Nominal mix using 40mm ISS HBG METAL including cost and conveyance of all materials to site including cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and all other incidental charges etc., complete For LEVELLING COURSE BELOW FOUNDATION OF RETAINING WALL.as per MORT& H specifications 1100,1500, 1700&2100

159

-

-

... More
Vibrated Reinforced Cement Concrete of grade M 35 (Design mix) using 20 mm & below ISS metal including cost and conveyance of all materials to site and cement at site excluding cost of steel but including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and Plants and all other incidental charges etc.,complete for PILECAPS UNDER ABUTMENT AND PIERs as per cl. 1100,1500, 1700&2200 of MoRT&H specification (V Revision)

1064

-

-

... More
Vibrated Reinforced Cement Concrete of grade M 35 (Design mix) using 20 mm & below ISS metal including cost and conveyance of all materials to site and cement at site excluding cost of steel but including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and Plants and all other incidental charges etc.,complete,for FOUNDATION OF RETAINING WALL. as per cl. 1100,1500, 1700 of MoRT&H specification (V Revision)

824

-

-

... More
Vibrated Reinforced Cement Concrete of grade M 35 (Design mix) using 20 mm & below ISS HBG graded metal including cost and conveyance of all materials to site including cost of cement at site excluding cost of steel ,but including cost of form work soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and Plants and all other incidental charges etc. complete.,for Abutments, Returns and Piers (below Ground Level) as per Cl 1500,1700 & 2100 of MORTH Specifications (V Revision)

51

-

-

... More
Vibrated Reinforced Cement Concrete of grade M 35 (Design mix) using 20 mm & below ISS HBG graded metal including cost and conveyance of all materials to site including cost of cement at site excluding cost of steel ,but including cost of form work soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and Plants and all other incidental charges etc. complete. for Abutments, Returns and Piers (above Ground Level) as per Cl 1500,1700 & 2100 of MORTH Specifications (V Revision)

214

-

-

... More
Vibrated Reinforced Cement Concrete M 35 grade Design Mix using 20mm &below ISS metal, including cost and conveyance of all materials to site and cement at site, to site including cost of cement at site excluding cost of steel ,but including cost of form work soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and Plants and all other incidental charges etc. complete.for RETAINING WALL(below Ground Level). as per Cl 1500,1700 & 2100 of MORTH Specifications (V Revision)

281

-

-

... More
Vibrated Reinforced Cement Concrete M 35 grade Design Mix using 20mm &below ISS metal, including cost and conveyance of all materials to site to site including cost of cement at site excluding cost of steel ,but including cost of form work soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and Plants and all other incidental charges etc. complete. for RETAINING WALL(Above Ground Level). as per Cl 1500,1700,2100 & 2200 of MORTH Specifications (V Revision)

387

-

-

... More
Vibrated Reinforced Cement Concrete M 35 grade Design Mix using 20mm &below ISS metal, including cost and conveyance of all materials to site to site including cost of cement at site excluding cost of steel ,but including cost of form work soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and Plants and all other incidental charges etc. complete. for Bed block cum Dirt wall over Abutment as per cl.1500,1700 & 2200 of MORTH Specifications (V Revision)

26

-

-

... More
Vibrated Reinforced Cement Concrete M 35 grade Design Mix using 20mm &below ISS metal, including cost and conveyance of all materials to site including cost of cement at site excluding cost of steel ,but including cost of form work soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and Plants and all other incidental charges etc. complete. for Capping beam over piers as per cl.1500,1700 & 2200 of MORTH Specifications V - Revision

314

-

-

... More
Vibrated Reinforced Cement Concrete M 35 grade Design Mix using 20mm &below ISS metal, including cost and conveyance of all materials to site including cost of cement at site excluding cost of steel ,but including cost of form work soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and Plants and all other incidental charges etc. complete. for PEDESTALS over piers and Abutments as per cl.1500,1700 & 2200 of MORTH Specifications V - Revision

13

-

-

... More
Vibrated Reinforced Cement Concrete M 35 grade Design Mix using 20mm &below ISS metal, including cost and conveyance of all materials to site including cost of cement at site excluding cost of steel ,but including cost of form work soft water, labour charges for mixing, transporting, laying and curing concrete, working at height, Tools and Plants and all incidental charges etc. complete.for T Beams & Cross beams as per cl.1500,1700 & 2200 of MORTH Specifications V - Revision

2122

-

-

... More
Vibrated Reinforced Cement Concrete M 35 grade Design Mix using 20mm &below ISS metal, including cost and conveyance of all materials to site including cost of cement at site excluding cost of steel ,but including cost of form work soft water, labour charges for mixing, transporting, laying and curing concrete, working at height, Tools and Plants and all other incidental charges etc. complete. for DECK SLAB as per section 1500 , 1700 & 2300 of MoRT&H specification (V Revision)

1398

-

-

... More
Supply and fixing of Elastomeric bearing550*400*96mm sizes as shown in the drawing including cost and conveyance to work site, labour for fixing the same in correct position and all other incidental charges, etc. complete as per section 2005 of MORTH Specifications V Revision and IRC;83-2015 Part-III

1689600

-

-

... More
Supplying and installation of STRIP SEAL EXPANSION joint system conforming to specifications for Road and Bridge Works_Published by Ministry of Roads Transport and Highways in the 40mm wide expansion gap provided in between decks over piers and in between deck and dirt wall over abutment with fatigue tested structural steel section at the nosing and anchorage assembly, including cost and conveyance of all materials, cost of testing as per the MOST specifications, including labour, equipment and incidental charges for fixing the joints complete in all respects, as per cl. 2600 of MORT&H specifications (V Revision).

276

-

-

... More
Providing and fixing of G.I drainage spouts 100mm dia as per GOI drawing SD/205 with grating arrangements at top as shown in the drawing and 100mm dia drainage spout projecting atleast 300mm beyond the bottom of deck slab as shown in the drawing including cost and conveyance of GI pipes and flats and fixing them in position, etc,complete. as per cl. 2705 of MORTH Specifications -V Revision

190

-

-

... More
Vibrated Reinforced Cement Concrete M40 grade Design Mix using 20mm &below ISS metal, including cost and conveyance of all materials to site and cement at site, excluding cost of steel, but including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, ,Tools and Plants and incidental charges etc., complete, for CRASH BARRIER as per Cl 811,1700&2703.3 of MORT&H specifications (V revision)

443

-

-

... More
Vibrated Reinforced Cement Concrete M30 grade Design Mix using ISS graded hard granite broken metal, including cost and conveyance of all materials to site and cement at site, but excluding cost and fabrication of steel, but including formwork and centering, including labour charges for mixing, laying, curing concrete, working at heights, hire charges for Tools and Plants, including all other incidental charges, etc.complete. for WEARING COAT OVER DECK SLAB AND APPROACH SLAB. as per cl 2702.2 of MoRT&H specification (V Revision).

5606

-

-

... More
Vibrated Cement Concrete M15 grade Nominal Mix 1:2:4 using 40mm ISS hard granite broken metal, including cost and conveyance of all materials to site and cement at site, including cost of formwork, lead for soft water, labour charges for mixing, transporting, laying and curing concrete, working in heights and hire charges for Tools and Plants and all other incidental charges, etc. complete for BASE COURSE BELOW APPROACH SLAB as per section 1500 , &1700 of MoRT&H specification (V Revision)

11

-

-

... More
Vibrated Reinforced Cement Concrete M35grade Design Mix using ISS graded hard granite broken metal, including cost and conveyance of all materials to site and cement at site, but excluding cost and fabrication of steel, but including formwork and centering, including labour charges for mixing, laying, curing concrete, working at heights, hire charges for Tools and Plants, including all other incidental charges, etc.complete.- for APPROACH SLABS. as per Cl 1000,1500,1700 & 2704 of MORT&H specifications (V revision)

29

-

-

... More
Filling behind Abutments and Returns and Retaining walls as per Appendix 6 of IRC: 78 -2014 with clean gritty free draining material including cost and draining material having Phi value more than 35° conveyance of material to worksite , laying, handling charges and filling in layers tamping under optimum moisture content to get the maximum density, including watering, with all leads for water and all other incidental charges, etc., complete as per cl 710.1.4 & Appendix 6 of IRC 78- 2014.

188

-

-

... More
Providing filter media behind the Abutments and Returns with clean III graded material 53mm to 5.6mm, to 600mm thick and well compacted in layers with smaller size towards the soil and bigger size towards the wall including cost and conveyance to worksite including all labour and other incidental charges, including hire charges for Tools and Plants employed, etc. for filter media as per MOST (Roads Wing) specifications for Roads and Bridges " Fifth Revision Cl. 309-3-2-13 and 305 -4-4, etc. complete.as per Cl.710.1.4 and Appendix - 6 of IRC.78-2014

65

-

-

... More
Providing and fixing seepage pipes of 100mm dia. PVC pipes of requied lengths for Abutments and Returns including cost and conveyance of all materials to work site, cost and labour for 900mm dia. semi-spherical back fill arrangements with 100mm size broken granite chips at the periphery and labour charges for fixing, etc.- to drain off the backfill as per section 2706 of MORTH Specifications V Revision.

748

-

-

... More
Supply and Fabrication of High Yield Strength Deformed bar approved type of steel Fe-500 , conforming to IS:1786-1985, required for all RCC items of works involved in the schedule, including cost of steel at site and cost of fabrication labour charges for cleaning the rods straightening,cutting,bending,tying grills, including over laping to the required length wherever necessary and providing to the reinforcement placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges , etc., complete as per cl.1600 of MORT&H Specifications (V Revision).

969

-

-

... More
Supply and Fabrication of High Yield Strength Deformed bar approved type of steel Fe-240, conforming to IS:1786-1985, required for all RCC items of works involved in the schedule, including cost of steel at site and cost of fabrication labour charges for cleaning the rods straightening,cutting,bending,tying grills, including over laping to the required length wherever necessary and providing to the reinforcement placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges , etc., complete as per cl.1600 of MORT&H Specifications (V Revision).

34

-

-

... More
Sub Estimate-formation of Approach road

-

-

-

... More
Earthwork Excavation with Box cutting including removal and satisfactory disposal of all materials necessary for the construction of road way and side drains in accordance with specifications and the lines , grades and cross sections shown in the drawings or as indicated by the Engineer for Approach road as per Clause 305 of MORTH Rev-5

426

-

-

... More
Filling with soil having CBR not less than 8 for forming embankment including conveyance of earth to site, spreading the earth uniformly to the entire embankment formation in layers of not exceeding 250 mm thick as directed by the department officers including compacting each layer to the required density in accordance with IS 2720 part VII at 95% Proctor density upto sub grade level and shoulders keeping the moisture content of earth at the time of compaction within the range of 1% above and 2% below the OMC determined and plasticity index value of not more than 20 and liquid limit not greater than 40 in accordance with IS 2720 using required capacity rollers to achieve the required density in each layer including watering with all leads for water and finishing the surface to the lines and grades ,sections as directed by the departmental officers and including hire charges and running charges for the roller and all other tools and plants employed for the work and all labour charges widening of embankment including compacting the original ground with power roller etc., complete 95% compaction - Carted Earth for filling as per cl. 300 of MORT&H Specifications (V Revision).

2700

-

-

... More
Filling with soil having CBR not less than 8 for forming embankment including conveyance of earth to site, spreading the earth uniformly to the entire embankment formation in layers of not exceeding 250 mm thick as directed by the department officers including compacting each layer to the required density in accordance with IS 2720 part VII at 97% Proctor density upto sub grade level and shoulders keeping the moisture content of earth at the time of compaction within the range of 1% above and 2% below the OMC determined and plasticity index value of not more than 20 and liquid limit not greater than 40 in accordance with IS 2720 using required capacity rollers to achieve the required density in each layer including watering with all leads for water and finishing the surface to the lines and grades ,sections as directed by the departmental officers and including hire charges and running charges for the roller and all other tools and plants employed for the work and all labour charges widening of embankment including compacting the original ground with power roller etc., complete 97% Compaction- Carted Earth for filling as per cl. 305 of MORT&H Specifications (V Revision).

2857

-

-

... More
Construction of granular sub-base by providing course graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading inuniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 - for grading- V Material

731

-

-

... More
Construction of granular sub-base by providing course graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading inuniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 - for grading- III Material

487

-

-

... More
Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam 250mm thick, including premixing the materials with water at OMC in mechnanical mix plant,conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in SubBase/ Base course on well prepared surface and compacting with vibratory roller to acheive thedesired density including cost of material, labour charges, rentals for machinery, fuel and allother incidental charges etc., complete as per clause 406 of MORTH Rev-5

1218

-

-

... More
Providing and laying Prime Coat over WMM surface using 7 Kg of Emulsion Bitumen(SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,complete as perClause 502 of MORTH Rev-5

4870

-

-

... More
Providing and laying Tack Coat over WMM surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminousconstruction over it including cost of material, labour charges, rentals for machinery,fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5

4870

-

-

... More
Providing, laying 85 mm consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50-13.20mm, 0.25cum of 13.20-2.36mm and 0.23cum of 2.36mm & below and with 53.20Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site,heating the bitumen, aggregate and mixing them in the required temperature in Central Hot Mix Plant 20-30 ton capacity, conveying the mix by tipper trucks to work site, spreading the mix to uniform thickness of 85mm using paver to the specified grades and cross sections and compacted by Vibratory /Pneumatic Roller to the required density etc., including labour for attending to paver at site etc., including hire and fuel charges for 20-30ton CMP with bitumen boiler, tipper trucks, Paver Finisher,Vibratory rollers and all other tools and plant required, including all other incidental charges etc.,complete as per specification using CMP as per clause 505 MORTH Rev-5 DBM (Grade-I) 85 mm Thick Using VG30

414

-

-

... More
Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00-9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site,heating the bitumen and aggregate to required temperature and mixing them in requiredtemperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks topaver site, spreading the mix to uniform thickness of 40mm with mechanical paver to thespecified grades and cross sections and consolidated by 8-10 tonne Vibratory to the requireddensity etc., including labour for attending to paver to site etc., including hire charges and fuelcharges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc.,complete as per specification using CMP as per clause 507 of MORTH Rev-5 BC 30/40mm Thick (Grade-II) Using VG30 Bitumen

147

-

-

... More
Sub Estimate- Formation of Service Road in Thiruvarur side

-

-

-

... More
Filling with soil having CBR not less than 8 for forming embankment including conveyance of earth to site, spreading the earth uniformly to the entire embankment formation in layers of not exceeding 250 mm thick as directed by the department officers including compacting each layer to the required density in accordance with IS 2720 part VII at 95% Proctor density upto sub grade level and shoulders keeping the moisture content of earth at the time of compaction within the range of 1% above and 2% below the OMC determined and plasticity index value of not more than 20 and liquid limit not greater than 40 in accordance with IS 2720 using required capacity rollers to achieve the required density in each layer including watering with all leads for water and finishing the surface to the lines and grades ,sections as directed by the departmental officers and including hire charges and running charges for the roller and all other tools and plants employed for the work and all labour charges widening of embankment including compacting the original ground with power roller etc., complete 95% compaction - Carted Earth for filling as per cl. 300 of MORT&H Specifications (V Revision).

2602

-

-

... More
Filling with soil having CBR not less than 8 for forming embankment including conveyance of earth to site, spreading the earth uniformly to the entire embankment formation in layers of not exceeding 250 mm thick as directed by the department officers including compacting each layer to the required density in accordance with IS 2720 part VII at 97% Proctor density upto sub grade level and shoulders keeping the moisture content of earth at the time of compaction within the range of 1% above and 2% below the OMC determined and plasticity index value of not more than 20 and liquid limit not greater than 40 in accordance with IS 2720 using required capacity rollers to achieve the required density in each layer including watering with all leads for water and finishing the surface to the lines and grades ,sections as directed by the departmental officers and including hire charges and running charges for the roller and all other tools and plants employed for the work and all labour charges widening of embankment including compacting the original ground with power roller etc., complete 97% Compaction- Carted Earth for filling as per cl. 300 of MORT&H Specifications (V Revision).

3538

-

-

... More
Construction of granular sub-base by providing course graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading inuniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 - for grading- V Material

533

-

-

... More
Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam 250mm thick, including premixing the materials with water at OMC in mechnanical mix plant,conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in SubBase/ Base course on well prepared surface and compacting with vibratory roller to acheive thedesired density including cost of material, labour charges, rentals for machinery, fuel and allother incidental charges etc., complete as per clause 406 of MORTH Rev-5

888

-

-

... More
Providing and laying Prime Coat over WMM surface using 7 Kg of Emulsion Bitumen(SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,complete as perClause 502 of MORTH Rev-5

3549

-

-

... More
Providing and laying Tack Coat over WMM surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminousconstruction over it including cost of material, labour charges, rentals for machinery,fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5

3549

-

-

... More
Providing, laying 50 mm consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50-13.20mm, 0.25cum of 13.20-2.36mm and 0.23cum of 2.36mm & below and with 53.20Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site,heating the bitumen, aggregate and mixing them in the required temperature in Central Hot Mix Plant 20-30 ton capacity, conveying the mix by tipper trucks to work site, spreading the mix to uniform thickness of 50mm using paver to the specified grades and cross sections and compacted by Vibratory /Pneumatic Roller to the required density etc., including labour for attending to paver at site etc., including hire and fuel charges for 20-30ton CMP with bitumen boiler, tipper trucks, Paver Finisher,Vibratory rollers and all other tools and plant required, including all other incidental charges etc.,complete as per specification using CMP as per clause 505 MORTH Rev-5 DBM (Grade-II) 50 mm Thick Using VG30

178

-

-

... More
Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00-9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site,heating the bitumen and aggregate to required temperature and mixing them in requiredtemperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks topaver site, spreading the mix to uniform thickness of 40mm with mechanical paver to thespecified grades and cross sections and consolidated by 8-10 tonne Vibratory to the requireddensity etc., including labour for attending to paver to site etc., including hire charges and fuelcharges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc.,complete as per specification using CMP as per clause 507 of MORTH Rev-5 BC 30/40mm Thick (Grade-II) Using VG30 Bitumen

107

-

-

... More
Sub Estimate- Junction Improvements on Mayiladuthurai side for the ROB at LC 16

-

-

-

... More
Earthwork excavation of road as per drawing and technical specification, including setting out, construction of shoring and bracing,dewatering, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material as per MORT & H No:304 - 12.1

840

-

-

... More
Picking the existing BT surface upto 50mm depth as directed by the departmental officers and collecting the picked up salvaged metal and stacking the same and depositing the debris excluding the cost of materals out including labour charges for picking and all other tools and plants employed and including all other incidental charges etc., complete as per standard specification.

1400

-

-

... More
Filling with soil having CBR not less than 8 for forming embankment including conveyance of earth to site, spreading the earth uniformly to the entire embankment formation in layers of not exceeding 250 mm thick as directed by the department officers including compacting each layer to the required density in accordance with IS 2720 part VII at 97% Proctor density upto sub grade level and shoulders keeping the moisture content of earth at the time of compaction within the range of 1% above and 2% below the OMC determined and plasticity index value of not more than 20 and liquid limit not greater than 40 in accordance with IS 2720 using required capacity rollers to achieve the required density in each layer including watering with all leads for water and finishing the surface to the lines and grades ,sections as directed by the departmental officers and including hire charges and running charges for the roller and all other tools and plants employed for the work and all labour charges widening of embankment including compacting the original ground with power roller etc., complete 97% Compaction- Carted Earth for filling as per cl. 300 of MORT&H Specifications (V Revision).

1054

-

-

... More
Construction of granular sub-base by providing course graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading inuniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 - for grading- V Material

260

-

-

... More
Construction of granular sub-base by providing course graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading inuniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 - for grading- III Material

174

-

-

... More
Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam 250mm thick, including premixing the materials with water at OMC in mechnanical mix plant,conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in SubBase/ Base course on well prepared surface and compacting with vibratory roller to acheive thedesired density including cost of material, labour charges, rentals for machinery, fuel and allother incidental charges etc., complete as per clause 406 of MORTH Rev-5

784

-

-

... More
Providing and laying Prime Coat over WMM surface using 7 Kg of Emulsion Bitumen(SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,complete as perClause 502 of MORTH Rev-5

3133

-

-

... More
Providing and laying Tack Coat over WMM surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminousconstruction over it including cost of material, labour charges, rentals for machinery,fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5

3133

-

-

... More
Providing, laying 85 mm consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50-13.20mm, 0.25cum of 13.20-2.36mm and 0.23cum of 2.36mm & below and with 53.20Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site,heating the bitumen, aggregate and mixing them in the required temperature in Central Hot Mix Plant 20-30 ton capacity, conveying the mix by tipper trucks to work site, spreading the mix to uniform thickness of 85mm using paver to the specified grades and cross sections and compacted by Vibratory /Pneumatic Roller to the required density etc., including labour for attending to paver at site etc., including hire and fuel charges for 20-30ton CMP with bitumen boiler, tipper trucks, Paver Finisher,Vibratory rollers and all other tools and plant required, including all other incidental charges etc.,complete as per specification using CMP as per clause 505 MORTH Rev-5 DBM (Grade-I) 85 mm Thick Using VG30

267

-

-

... More
Providing and laying Bituminous Concrete to 30/40 mm thick using 0.13 cum of 19.00-9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site,heating the bitumen and aggregate to required temperature and mixing them in requiredtemperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks topaver site, spreading the mix to uniform thickness of 40mm with mechanical paver to thespecified grades and cross sections and consolidated by 8-10 tonne Vibratory to the requireddensity etc., including labour for attending to paver to site etc., including hire charges and fuelcharges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc.,complete as per specification using CMP as per clause 507 of MORTH Rev-5 BC 30/40mm Thick (Grade-II) Using VG30 Bitumen

94

-

-

... More
Vibrated Reinforced Cement Concrete of grade M 35 (Design mix) using 20 mm & below ISS metal including cost and conveyance of all materials to site and cement at site excluding cost of steel but including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and Plants and all other incidental charges etc.,complete, as per relevant standard specification,for Kerb wall .

95

-

-

... More
Painitng two coats with ready mix plastic emulsion paint with approved colour including priming coat over the cement surface complete including scrapping clean removal of dirt of parts including cost and conveyance of all materials to site, all labour for cleaning the surface,painting including form work for working in heights and all other incidental charges etc.,complete.for Traffic Island

319

-

-

... More
Painitng two coats with ready mix plastic emulsion paint with approved colour including priming coat over the cement surface complete including scrapping clean removal of dirt of parts including cost and conveyance of all materials to site, all labour for cleaning the surface,painting including form work for working in heights and all other incidental charges etc.,complete.for ZEBRA PAINTING

319

-

-

... More
Supply and fixing of Aluminum Flexible Prismatic Sheeting shall be of 1ft width and laminated at the back with a 50-micron thick Aluminum (Al) foil with pressure sensitive adhesive and liner, further this flexible prismatic sheeting shall have screen printed arrow /slant line pattern in black colour on top in continuous roll format. Neither AFP sheeting nor the flexible prismatic sheeting used shall crack when slowly bent in second time around a 1/8th inch mandrel after being conditioned for 24 hrs at 0 degrees and tested as per section s2.2.2 of ASTM, D 4956-09. The AFP sheeting with the linear removed shall be applied with a neoprene contact adhesive with polychloroprene as base viscosity of 200-450 cps and solid content of 20-30 % once applied the edges of the product shall be extremely resistant to peel off . A test report from institutes like ARAI/CRR/ conforming to above mentioned flexibility and ASTM D 4956-09 type -vi retro reflectivity performance of the flexible prismatic sheeting used in AFP shall be submitted by the tenderer during pre-qualification and supply of material. 2 years Pre-qualification warranty for field performance shall be submitted by the contractor for technical qualification in the tender

41

-

-

... More
Providing and laying of hot applied thermoplastic compound 2.5mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness 2.5mm exclusive of surface applied glass beads as per IRC 35. The finished surface to be level, uniform and free from streaks and holes complete as per MORTH & H specification.

90

-

-

... More
Sub Estimate- Junction Improvements on Thiruvarur side for the ROB at LC 16

-

-

-

... More
Earth work excavation in all classes of soils except hard rock requiring blasting and depositing on bank with initial leads of 10m and initial lifts of 2m as per SS20B, including cost of all labour, equipments and all other incidential charges such as bailing out water, sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus earth with all leads etc., complete as per standard specifications

2520

-

-

... More
Picking the existing BT surface upto 50mm depth as directed by the departmental officers and collecting the picked up salvaged metal and stacking the same and depositing the debris excluding the cost of materals out including labour charges for picking and all other tools and plants employed and including all other incidental charges etc., complete as per standard specification.

980

-

-

... More
Filling with soil having CBR not less than 8 for forming embankment including conveyance of earth to site, spreading the earth uniformly to the entire embankment formation in layers of not exceeding 250 mm thick as directed by the department officers including compacting each layer to the required density in accordance with IS 2720 part VII at 97% Proctor density upto sub grade level and shoulders keeping the moisture content of earth at the time of compaction within the range of 1% above and 2% below the OMC determined and plasticity index value of not more than 20 and liquid limit not greater than 40 in accordance with IS 2720 using required capacity rollers to achieve the required density in each layer including watering with all leads for water and finishing the surface to the lines and grades ,sections as directed by the departmental officers and including hire charges and running charges for the roller and all other tools and plants employed for the work and all labour charges widening of embankment including compacting the original ground with power roller etc., complete 97% Compaction- Carted Earth for filling as per cl. 300 of MORT&H Specifications (V Revision).

1125

-

-

... More
Construction of granular sub-base by providing course graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading inuniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 - for grading- V Material

338

-

-

... More
Construction of granular sub-base by providing course graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading inuniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 - for grading- III Material

225

-

-

... More
Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam 250mm thick, including premixing the materials with water at OMC in mechnanical mix plant,conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in SubBase/ Base course on well prepared surface and compacting with vibratory roller to acheive thedesired density including cost of material, labour charges, rentals for machinery, fuel and allother incidental charges etc., complete as per clause 406 of MORTH Rev-5

808

-

-

... More
Providing and laying Prime Coat over WMM surface using 7 Kg of Emulsion Bitumen(SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,complete as perClause 502 of MORTH Rev-5

3230

-

-

... More
Providing and laying Tack Coat over WMM surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminousconstruction over it including cost of material, labour charges, rentals for machinery,fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5

3230

-

-

... More
Providing, laying 85 mm consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50-13.20mm, 0.25cum of 13.20-2.36mm and 0.23cum of 2.36mm & below and with 53.20Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site,heating the bitumen, aggregate and mixing them in the required temperature in Central Hot Mix Plant 20-30 ton capacity, conveying the mix by tipper trucks to work site, spreading the mix to uniform thickness of 85mm using paver to the specified grades and cross sections and compacted by Vibratory /Pneumatic Roller to the required density etc., including labour for attending to paver at site etc., including hire and fuel charges for 20-30ton CMP with bitumen boiler, tipper trucks, Paver Finisher,Vibratory rollers and all other tools and plant required, including all other incidental charges etc.,complete as per specification using CMP as per clause 505 MORTH Rev-5 DBM (Grade-I) 85 mm Thick Using VG30

275

-

-

... More
Providing and laying Bituminous Concrete to 30/40 mm thick using 0.13 cum of 19.00-9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site,heating the bitumen and aggregate to required temperature and mixing them in requiredtemperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to thespecified grades and cross sections and consolidated by 8-10 tonne Vibratory to the requireddensity etc., including labour for attending to paver to site etc., including hire charges and fuelcharges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc.,complete as per specification using CMP as per clause 507 of MORTH Rev-5 BC 30/40mm Thick (Grade-II) Using VG30 Bitumen

97

-

-

... More
Vibrated Reinforced Cement Concrete M 35 grade Design Mix using 20mm &below ISS metal, including cost and conveyance of all materials to site and cement at site, excluding cost of steel, but including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths,Tools and Plants and incidental charges such as bailing out water, maintaining of protective bunds, cofferdams, shoring, strutting etc., complete, as per relevant standard specifications for Kerb Wall as per cl.1500,1700 & 2200 of MORTH Specifications V - Revision

110

-

-

... More
Painitng two coats with ready mix plastic emulsion paint with approved colour including priming coat over the cement surface complete including scrapping clean removal of dirt of parts including cost and conveyance of all materials to site, all labour for cleaning the surface,painting including form work for working in heights and all other incidental charges etc.,complete.for Traffic Island

368

-

-

... More
Painitng two coats with ready mix plastic emulsion paint with approved colour including priming coat over the cement surface complete including scrapping clean removal of dirt of parts including cost and conveyance of all materials to site, all labour for cleaning the surface,painting including form work for working in heights and all other incidental charges etc.,complete.for ZEBRA PAINTING

368

-

-

... More
Supply and fixing of Aluminum Flexible Prismatic Sheeting shall be of 1ft width and laminated at the back with a 50-micron thick Aluminum (Al) foil with pressure sensitive adhesive and liner, further this flexible prismatic sheeting shall have screen printed arrow /slant line pattern in black colour on top in continuous roll format. Neither AFP sheeting nor the flexible prismatic sheeting used shall crack when slowly bent in second time around a 1/8th inch mandrel after being conditioned for 24 hrs at 0 degrees and tested as per section s2.2.2 of ASTM, D 4956-09. The AFP sheeting with the linear removed shall be applied with a neoprene contact adhesive with polychloroprene as base viscosity of 200-450 cps and solid content of 20-30 % once applied the edges of the product shall be extremely resistant to peel off . A test report from institutes like ARAI/CRR/ conforming to above mentioned flexibility and ASTM D 4956-09 type -vi retro reflectivity performance of the flexible prismatic sheeting used in AFP shall be submitted by the tenderer during pre-qualification and supply of material. 2 years Pre-qualification warranty for field performance shall be submitted by the contractor for technical qualification in the tender

47

-

-

... More
Providing and laying of hot applied thermoplastic compound 2.5mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness 2.5mm exclusive of surface applied glass beads as per IRC 35. The finished surface to be level, uniform and free from streaks and holes complete as per MORTH & H specification.

271

-

-

... More
Sub Estimate- Provision for Box Culvert at CH: 650 & 1025 on Service Road

-

-

-

... More
Earth work excavation in all classes of soils except hard rock requiring blasting and depositing on bank with initial leads of 10m and initial lifts of 2m as per SS20B, including cost of all labour, equipments and all other incidential charges such as bailing out water, sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus earth with all leads etc., complete as per standard specifications for FOUNDATION OF BOX CULVERT AND CUTOFF WALLS.

258

-

-

... More
Cement Concrete M15 grade Nominal Mix 1:2:4 using 40 mm ISS hard granite broken metal, including cost and conveyance of all materials to site and cement at site, including cost of formwork, lead for soft water, labour charges for mixing, transporting, laying and curing concrete,working in depths and hire charges for Tools and Plants and all other incidental charges, etc. complete for Base course below box portion and cut-off walls.

39

-

-

... More
Vibrated reinforced cement concrete M25 (Design mix) using ISS Graded metal including cost and conveyance of all materials and cost of cement to site but excluding cost and fabrication of steel but including soft water, labour charges for mixing, transporting, laying, curing concrete, working at depths, hire charges for tools and plants, including all other incidental charges, etc., complete for Base slab stem & Top Slab of Box Culvert

184

-

-

... More
Vibrated reinforced cement concrete M25 (Design mix) using ISS Graded metal including cost and conveyance of all materials and cost of cement to site but excluding cost and fabrication of steel but including soft water, labour charges for mixing, transporting, laying, curing concrete, working at depths, hire charges for tools and plants, including all other incidental charges, etc., complete for Parapet over Box & Wing wall

110

-

-

... More
Supply and Fabrication of High Yield Strength Deformed bar approved type of steel Fe-500 , conforming to IS:1786-1985, required for all RCC items of works involved in the schedule, including cost of steel at site and cost of fabrication labour charges for cleaning the rods straightening,cutting,bending,tying grills, including over laping to the required length wherever necessary and providing to the reinforcement placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges , etc., complete as per cl.1600 of MORT&H Specifications (V Revision).

13

-

-

... More
Providing and fixing of weep holes in reinforced concrete abutment return wall with 100mm dia PVC pipes extending through the full width of the Strcture with slope of IV :20H towards drawing force complete as per drawing force complete as per drawing technical Specification no 2200& 2706.

16

-

-

... More
Filling behind the Box culverts and wings with Stone dust including cost and conveyance of gravel to work site laying handling charges and filling in layers tamping under optimum moisture content to get the maximum density including watering with all leads for water and all other incidental charges etc complete as per drawing and techinical specifications as per MORTH specification No710.1.4 of IRC :78 & 2200

274

-

-

... More
Sub Estimate- Provision for Painting of Road Over Bridge

-

-

-

... More
Supply and Painting the walls with two coats of plastic emulsion paint over one coat of primer as instructed by the departmental officiers including preparation of surface curing etc., complete in all floors complying with standard specifications (The Colour and Shade of the paint shall be got approved by the Executive Engineer before use of work)

21915

-

-

... More
Sub Estimate- Providing Open Drain with Parapet wall

-

-

-

... More
Earth work excavation in all classes of soils except hard rock requiring blasting and depositing on bank with initial leads of 10m and initial lifts of 2m as per SS20B, including cost of all labour, equipments and all other incidential charges such as bailing out water, sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus earth with all leads etc., complete as per standard specifications for Foundation of Drain.

457

-

-

... More
Cement Concrete M 15 1:2:4 Mix using 40mm ISS HBG metal for 10 cm thick including cast ands conveyance of all materials to site including cement and handling charges for the same at both ends, including form work and centering, labour charges for mixing, transporting and placing in position, compacting finishing and curing, working at depth, tools and plants and including all incidental charges such as bailing out water etc. complete for Base course of below drain .

82

-

-

... More
Vibrated reinforced cement concrete M25 (Design mix) using ISS Graded metal including cost and conveyance of all materials and cost of cement to site but excluding cost and fabrication of steel but including soft water, labour charges for mixing, transporting, laying, curing concrete, working at depths, hire charges for tools and plants, including all other incidental charges, etc., complete for Base slab and Stem of drain.

497

-

-

... More
Vibrated reinforced cement concrete M25 (Design mix) using ISS Graded metal including cost and conveyance of all materials and cost of cement to site but excluding cost and fabrication of steel but including soft water, labour charges for mixing, transporting, laying, curing concrete, working at depths, hire charges for tools and plants, including all other incidental charges, etc., complete for Parapets along Drain.

28

-

-

... More
Supply and Fabrication of High Yield Strength Deformed bar approved type of steel Fe-500 , conforming to IS:1786-1985, required for all RCC items of works involved in the schedule, including cost of steel at site and cost of fabrication labour charges for cleaning the rods straightening,cutting,bending,tying grills, including over laping to the required length wherever necessary and providing to the reinforcement placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges , etc., complete as per cl.1600 of MORT&H Specifications (V Revision).

38

-

-

... More
Provision for Road furnitures

-

-

-

... More
Providing and laying of hot applied thermoplastic compound 2.5mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness 2.5mm exclusive of surface applied glass beads as per IRC 35. The finished surface to be level, uniform and free from streaks and holes complete as per MORTH & H specification.

450

-

-

... More
Providing and fixing reflective road studs of category B raised pavement markers made out of polycarbonate/ABS moulded body and reflective panels (bi-convex reflectors) with micro prismatic lens capable of providing total internal reflection of the light entering the lens face with retro-reflectance and chromaticity values conforming to ASTM D4280. The reflective raised pavement markers shall also confirm to the MORTH circular No RW/NH.33023/10/97-DO.III dt.11.06.97 and the length, height and width of the body shall not be less than 100 mm, 15 mm and 90 mm and base of marker shall be flat within 1.3 mm. The marker shall support a load of 13635 kg tested in accordance with ASTM D4280. Lenses shall be moulded of polycarbonate or methyl methecrylate conforming to ASTM D788. The area of each retro-reflectory surface shall not be lesss than 13.0 sq.cm. The slope of retro-reflectory surface shall be 35+5 degree to base. Each reflector shall have a CIL not less than values specified in table 2 of said MORTH circular and two cylindrical Polymer shanks of not less than 20 mm diameter and not less than 30 mm length shall be provided for better anchorage 3.5m spacing.

585

-

-

... More
Providing and Fixing of Retro Reflectorised Cautionary, mandatory and Informatory signs made of High Intensity Prismatic Grade Sheeting conforming to IRC 67-2012 and ASTM D 4956-09, type IV Specification and fixed over 1.5mm thick Aluminium sheet fixed on back supporting frame of 25mm x 25mm x 3mm Mild steel angle and supported on a mild steel angle iron post 75mm x 75mm x6mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45cm x 45cm x 60cm, 60cm below Ground level etc complete including 7 year warranty for the Retro Reflective Sheeting as per clause 6.9 of IRC 67:2012 Specification (As per MORT & H specification No.801)

-

-

-

... More
90cm equilateral triangle

10

-

-

... More
60cm circular board

8

-

-

... More
60cm x 45cm rectangular board

6

-

-

... More
Providing and erecting direction and place identification retro reflectorised sign as per IRC:67-2012 made of High intensity grade sheeting vide clause 801.3 fixed over aluminium sheeting, 1.5mm thick fixed on back supporting frame and supported on a mild steel single angle iron post 75mm x 75mm x 6mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45cm x 45cm x 60cm, 60cm below ground level as per approved drawing etc., complete (As per MORT&H specification No.801) (for area More than 0.9 sqm).

4.32

-

-

... More
Providing and fixing in correct position over the top of crash barrier on road in both side Median marker of retro reflectorised cautionary sign of good quality reflected on two sides as per IRC 67-2001 made of high intensity grade etc., complete as per standard MORT&H specifications No.801 as instructed by the departmental officers etc., complete.

64

-

-

... More
Sub Estimate- Providing Pier Protection with safety kerb

-

-

-

... More
Earth work excavation in all classes of soils except hard rock requiring blasting and depositing on bank with initial leads of 10m and initial lifts of 2m as per SS20B, including cost of all labour, equipments and all other incidential charges such as bailing out water, sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus earth with all leads etc., complete as per standard specifications for safety kerb as per Clause 300 of MORTH Rev-5

69

-

-

... More
Cement Concrete M 15 1:2:4 Mix using 40mm ISS HBG metal including cast ands conveyance of all materials to site including cement and handling charges for the same at both ends, including form work and centering, labour charges for mixing, transporting and placing in position, compacting finishing and curing, working at depth, tools and plants and including charges such as bailing out water etc. complete for footing of Kerb.

26

-

-

... More
Vibrated cement concrete M20 (1:1.5:3) using 20mm ISS hard granite broken metal, including cost and conveyance of all materials to site and cement at site, including cost of formwork, lead for soft water, labour charges for mixing, transporting, laying and curing concrete, working in depths and hire charges for Tools and Plants and all other incidental charges, etc. complete as per standard specifications for Safety Kerb.

73

-

-

... More
Brick work in cement mortar 1:4 (one of cement and four of sand) using Country bricks of Standard size, curing and finishing neatly as per standard specification etc. complete.)

24

-

-

... More
Plastering with cement mortar 1:4 (one of cement and Four of sand) 12mm thick using fine river sand including curing and neat finishing etc complete. for Walls and Floor.

327

-

-

... More
Providing steel Grill fencing arrangement below the trestle portion of ROB which includes the cost of steel, labour charges for fabrication,fixing the steel grill in position by welding,concreting,cost of primer and two coats of enamal paint and all other incidental charges etc..complete.

471

-

-

... More
Painting black & whiteEmulsion paint on kerbs are complete as directed by the Engineer as per drawing and technical clause 803.

725

-

-

... More
Sub Estimate- PROVIDING RAIN WATER HARVESTING FOR THE ROB AND DECK DRAINAGE ARRANGEMENT.

-

-

-

... More
Earth work excavation in all classes of soils except hard rock requiring blasting and depositing on bank with initial leads of 10m and initial lifts of 2m as per SS20B, including cost of all labour, equipments and all other incidential charges such as bailing out water, sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus earth with all leads etc., complete as per standard specifications for foundation of Rain water Harvesting well.

95

-

-

... More
Filling with river sand including cost and conveyance of all materials and stacking at site departments, labour charges for laying, handling and filling pre measurements, labour charges for laying, handling and filling in layers not more than 15cm thick including watering with all leads for good soft water and all other incidental charges, tamping, compacting under optimum moisture content to get the maximum density for Rain water Harvesting well.

24

-

-

... More
Filling with pebbles of 3 to 6mm size complying with standard specification including cost and conveyance of all materials and including labour charges for laying handling and filling in layers of not more than 500mm thick complete for Rain water Harvesting well.

18

-

-

... More
Brick work in C.M. 1:4 for using best quality chamber bricks including cost & conveyance of materials to the site, labour charges and all other incidental charges etc., complete and as directed by the engineer incharge for rain water harvesting.

31

-

-

... More
Vibrated reinforced cement concrete M25 (Design mix) using ISS Graded metal including cost and conveyance of all materials and cost of cement to site but excluding cost and fabrication of steel but including soft water, labour charges for mixing, transporting, laying, curing concrete, working at depths, hire charges for tools and plants, including all other incidental charges, etc., complete for Rain water Harvesting well Cover slab.

9

-

-

... More
Plastering with cement mortar 1:5 admixed with suitable water proofing compound 12mm thick over the water proofing coating including cost and conveyance of all materials to site including cost of cement water proofing compound, soft water, labour charges for curing etc; complete as per relevant std.specification.

120

-

-

... More
Filling with 40mm size ISS metal complying with standard specification inculding cost and conveyance of all and inculding labour charges for laying, handing and filling in layers of not more than 500mm thick complete for rain water harvesting well.

18

-

-

... More
Supply and Fabrication of High Yield Strength Deformed bar approved type of steel Fe-500 , conforming to IS:1786-1985, required for all RCC items of works involved in the schedule, including cost of steel at site and cost of fabrication labour charges for cleaning the rods straightening,cutting,bending,tying grills, including over laping to the required length wherever necessary and providing to the reinforcement placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges , etc., complete as per cl.1600 of MORT&H Specifications (V Revision).

0.61

-

-

... More
Supply and Fixing of best quality PVC pipes of 110mm dia inculding necessary specials such as elbow, Tee, etc., including cutting, jointing, including cost of pipe specials, labour charges for fixing in position vertically and horizontally in trestle portion and all other incidental charges, etc., complete for connecting drainage spout with Rain Water Harvesting Well.

1345

-

-

... More
Sub Estimate- Providing Disposal of Surplus cut Earth

-

-

-

... More
Conveyance of excavated earth excluding the refilling quantity and Dismantled Quantity of existing retaining wall with a lead of 5 km by tipper carries along with the process of earthwork excavation for foundation of ROB and Retaining wall, for the disposal of surplus earth at the place specified by the engineer and in the specified lines by the departmental officers and stacking the same at specified locations for premeasurements for making payment and including all incidental charges etc., complete.

9053

-

-

... More
Calculation of SubTotal, GST and Total carried out by system automatically

-

-

-

... More
Sub Total Amount for above all items

1

-

-

... More
GST 18% for the above SubTotal Amount

1

-

-

... More
Total in Figures (SubTotal + GST)

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.