Highways Department Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Highways Department Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date26 Aug 2024
Closing Date23 Sep 2024
Tender Amount₹ 5,72,50,000 
Notes
Download

Costs

Summary

Edappady (h) Candm Sub Division (slm-2)

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
2) Improvements to riding quality at Km.9/6-10/2 & 12/6-13/2 of Sankari Mecheri road (via) Edappady

6948.8

735252

105.81

... More
Earth Work excavation in all classes of soil except hard rock not requiring blasting and deposting on bank with all leads and lifts as per SS20B including cost of all labour,materials,tools,equipments and all incidental charges and sheeting, shoring,bracing and their subsequent removal of all logs,stumps and other deleteriuos matter and obstructions,trimming of bottom of excavation,backfilling and clearing the site and disposal of all surplus materials etc.,complete as per standard specification for Boxing as per clause 111, 112, 201, 202, 301 to 305 & 900 of MORTH Vth Revision

-

-

-

... More
1) Widening from Single Lane to Intermediate Lane and Strengthening at Km.0/0-2/0 of Sowripalayam - Vembaneri - Pudupalayaam road including Reconstruction of culvert at Km.0/2, 0/4, 0/6, 0/8(i),(ii), 0/10, 1/2 and Construction of Retaining wall at Km.0/4, 0/6, 0/8, 0/10, 1/2, 1/4, 1/6

1315.86

162192

123.26

... More
Construction of granular sub-base by providing close graded Material,mixing in a mechanical mixplant at OMC, carriage of mixed Material to worksite, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory soil compactor to achieve the desired density, complete as per clause 111, 112, 401 & 900 of MORTH Vth Revision etc., complete - for Grading- V Material

-

-

-

... More
1) Widening from Single Lane to Intermediate Lane and Strengthening at Km.0/0-2/0 of Sowripalayam - Vembaneri - Pudupalayaam road including Reconstruction of culvert at Km.0/2, 0/4, 0/6, 0/8(i),(ii), 0/10, 1/2 and Construction of Retaining wall at Km.0/4, 0/6, 0/8, 0/10, 1/2, 1/4, 1/6

737.82

1471368

1994.21

... More
Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam of specified thickness, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory soil compactor to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 111, 112, 406 & 900 of MORTH Vth Revision

-

-

-

... More
1) Widening from Single Lane to Intermediate Lane and Strengthening at Km.0/0-2/0 of Sowripalayam - Vembaneri - Pudupalayaam road including Reconstruction of culvert at Km.0/2, 0/4, 0/6, 0/8(i),(ii), 0/10, 1/2 and Construction of Retaining wall at Km.0/4, 0/6, 0/8, 0/10, 1/2, 1/4, 1/6

2185.31

5148065

2355.76

... More
Providing and laying 50 mm thick Bituminous Macadam using course aggregate and VG-30 Bitumen which shall consist of construction in a single course base/binder course confirming to the specification on a previously prepared base (using Mini Mix Plant and Power Roller) including cost of material,labour charges,rentals for machinary,fuel and all other incidental charges etc.,complete as per clause 111,112,504 & 900 of MORTH Rev-5 (For Patch Works)

-

-

-

... More
2) Improvements to riding quality at Km.9/6-10/2 & 12/6-13/2 of Sankari Mecheri road (via) Edappady

25.61

216566

8456.32

... More
Providing and laying Prime Coat over WMM surface using 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 111, 112, 501, 502 & 900 of MORTH Vth Revision

-

-

-

... More
1) Widening from Single Lane to Intermediate Lane and Strengthening at Km.0/0-2/0 of Sowripalayam - Vembaneri - Pudupalayaam road including Reconstruction of culvert at Km.0/2, 0/4, 0/6, 0/8(i),(ii), 0/10, 1/2 and Construction of Retaining wall at Km.0/4, 0/6, 0/8, 0/10, 1/2, 1/4, 1/6

11757.91

960973

81.73

... More
Providing and laying Tack Coat over WBM/ WMM surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 111, 112, 501, 503 & 900 of MORTH Vth Revision

-

-

-

... More
1) Widening from Single Lane to Intermediate Lane and Strengthening at Km.0/0-2/0 of Sowripalayam - Vembaneri - Pudupalayaam road including Reconstruction of culvert at Km.0/2, 0/4, 0/6, 0/8(i),(ii), 0/10, 1/2 and Construction of Retaining wall at Km.0/4, 0/6, 0/8, 0/10, 1/2, 1/4, 1/6

11757.91

221754

18.86

... More
Providing and laying Tack Coat over Existing BT surface using 2.00 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 111, 112, 501, 503 & 900 of MORTH Vth Revision

-

-

-

... More
2) Improvements to riding quality at Km.9/6-10/2 & 12/6-13/2 of Sankari Mecheri road (via) Edappady

13299.8

360291

27.09

... More
Providing and laying Tack Coat over Dry Lean Cement Concrete using 3.00 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 111, 112, 501, 503 & 900 of MORTH Vth Revision

-

-

-

... More
1) Widening from Single Lane to Intermediate Lane and Strengthening at Km.0/0-2/0 of Sowripalayam - Vembaneri - Pudupalayaam road including Reconstruction of culvert at Km.0/2, 0/4, 0/6, 0/8(i),(ii), 0/10, 1/2 and Construction of Retaining wall at Km.0/4, 0/6, 0/8, 0/10, 1/2, 1/4, 1/6

133.77

2854

21.34

... More
Providing, laying 50mm consolidated thick Dense Bituminous Macadam using 0.24 cum of 26.50-13.20 mm, 0.25 cumof 13.20-2.36 mm and 0.23 cum of 2.36 mm & below and with 53.20 Kgs of VG-30 Grade bitumen for premixing per 10sqm including cost and conveyance of allmaterials to CMP site, heating the bitumen, aggregate and mixing the min the required temperature in Central Hot Mix Plant 20-30 ton capacity, conveying the mix by tipper trucks to worksite, spread ing the mix to uniform thickness of 50 mm using paver to the specified grade sand crosssection sand compacted by Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver at site etc., including hire and fuel charges for 20-30ton CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller sand all other tools and plant required, including all other incidental charges etc.,complete as per specification using CMP as per clause 505 MORTH Rev-5 as per clause No.111,112,501,505 & 900 - of MORTH rev-5.-Grading II

-

-

-

... More
1) Widening from Single Lane to Intermediate Lane and Strengthening at Km.0/0-2/0 of Sowripalayam - Vembaneri - Pudupalayaam road including Reconstruction of culvert at Km.0/2, 0/4, 0/6, 0/8(i),(ii), 0/10, 1/2 and Construction of Retaining wall at Km.0/4, 0/6, 0/8, 0/10, 1/2, 1/4, 1/6

764.28

7770006

10166.44

... More
Providing, laying 50mm consolidated thick Bituminous Macadam using 0.20cum of 26.50-13.20mm, 0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRC metal with 37 Kgs of VG-30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 111, 112, 501, 504 & 900 of MORTH Vth Revision- Grading II (Table 500-7)

-

-

-

... More
2) Improvements to riding quality at Km.9/6-10/2 & 12/6-13/2 of Sankari Mecheri road (via) Edappady

50.88

443267

8712.02

... More
Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG-30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per clause No. 111, 112, 501, 507 & 900 of MORTH Vth Revision

-

-

-

... More
1) Widening from Single Lane to Intermediate Lane and Strengthening at Km.0/0-2/0 of Sowripalayam - Vembaneri - Pudupalayaam road including Reconstruction of culvert at Km.0/2, 0/4, 0/6, 0/8(i),(ii), 0/10, 1/2 and Construction of Retaining wall at Km.0/4, 0/6, 0/8, 0/10, 1/2, 1/4, 1/6

356.76

3921309

10991.45

... More
2) Improvements to riding quality at Km.9/6-10/2 & 12/6-13/2 of Sankari Mecheri road (via) Edappady

531.99

5847341

10991.45

... More
Providing compaction for embankment/making up of low berms using the available box cut earth including all hire and fuel charges for power roller for compaction, water sprinkler, including all labour charges for laying, spreading, watering etc., completeandasdirected by the departmental engineers. as per clause No. 111, 112, 301 to 305 & 900 of MORTH vth Revision For making up of low berms. (Labour and Hire charges only)

-

-

-

... More
1) Widening from Single Lane to Intermediate Lane and Strengthening at Km.0/0-2/0 of Sowripalayam - Vembaneri - Pudupalayaam road including Reconstruction of culvert at Km.0/2, 0/4, 0/6, 0/8(i),(ii), 0/10, 1/2 and Construction of Retaining wall at Km.0/4, 0/6, 0/8, 0/10, 1/2, 1/4, 1/6

1069.65

28527

26.67

... More
Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with power roller, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification. For making up of low berms with conveyance (Average Lead of 2 Kms) as per clause No. 111, 112, 301 to 305 & 900 of MORTH Vth Revision

-

-

-

... More
2) Improvements to riding quality at Km.9/6-10/2 & 12/6-13/2 of Sankari Mecheri road (via) Edappady

495

97515

197

... More
Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with power roller, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification. For formation of Diversion Road using Carted Earth with a lead of 3 Kms. as per MORTH specification clause No. 111, 112, 301 to 305 & 900 of MORTH Vth Revision

-

-

-

... More
1-1.1 Reconstruction of Culvert at Km.0/2, 0/4, 0/6, 0/8(i),(ii) & 0/10 of Sowripalayam - Vembaneri - Pudupalayaam road

562.5

104231

185.3

... More
1-1.2 Reconstruction of Culvert at Km.1/2 of Sowripalayam - Vembaneri - Pudupalayaam road

93.75

17371

185.3

... More
Providing and laying of Gravel including cost and conveyance of the same to work site from approved quarry including stacking the same to departemental gauge for premeasurement including all labour charges for laying, spreading, including all hire and fuel charges for power roller for compaction, etc., complete for formation of Diversion Road as per clause 111,112, 401 & 900 of MORTH Vth Revision.

-

-

-

... More
1-1.1 Reconstruction of Culvert at Km.0/2, 0/4, 0/6, 0/8(i),(ii) & 0/10 of Sowripalayam - Vembaneri - Pudupalayaam road

148.5

37031

249.37

... More
1-1.2 Reconstruction of Culvert at Km.1/2 of Sowripalayam - Vembaneri - Pudupalayaam road

24.75

6171

249.37

... More
Dismantling Culverts, bridges and other structures Dismantling salvaging and removal and disposing of resulting materials and back filling the resulting trenches and pits etc as per clause No. 111, 112, 202 of MORTH Vth Revision Dismantling RR masonry

-

-

-

... More
1-1.1 Reconstruction of Culvert at Km.0/2, 0/4, 0/6, 0/8(i),(ii) & 0/10 of Sowripalayam - Vembaneri - Pudupalayaam road

66

18687

283.14

... More
1-1.2 Reconstruction of Culvert at Km.1/2 of Sowripalayam - Vembaneri - Pudupalayaam road

11.41

3230

283.14

... More
Earth Work excavation in all classes of soil except hard rock not requiring blasting and deposting on bank with all leads and lifts as per SS20B including cost of all labour,materials,tools,equipments and all incidental charges and sheeting,shoring,bracing and their subsequent removal of all logs,stumps and other deleteriuos matter and obstructions,trimming of bottom of excavation, back filling and clearing the site and disposal of all surplus materials etc.,complete as per standard specification for Foundation of Box Culvert, Wing Wall and Retaining Wall as per clause 111, 112, 201, 202, 301 to 305 & 900 of MORTH Vth Revision

-

-

-

... More
1-1.1 Reconstruction of Culvert at Km.0/2, 0/4, 0/6, 0/8(i),(ii) & 0/10 of Sowripalayam - Vembaneri - Pudupalayaam road

455.52

56147

123.26

... More
1-1.2 Reconstruction of Culvert at Km.1/2 of Sowripalayam - Vembaneri - Pudupalayaam road

75.92

9357

123.26

... More
1-1.3 Construction of Retaining Wall at Km.0/4, 0/6, 0/8 & 0/10 of Sowripalayam - Vembaneri - Pudupalayaam road

528

65081

123.26

... More
1-1.4 Construction of Retaining Wall at Km.1/2, 1/4 & 1/6 of Sowripalayam - Vembaneri - Pudupalayaam road

459

56576

123.26

... More
Plain Cement Concrete of grade M15 (Nominal Mix) using 40mm ISS size HBG metal including cost and conveyance of all materials from approved quarry to worksite including cost of cement including cost and labour charges for mixing the concrete, transporting, laying, vibrating, compacting, curing with all leads for soft potable water, working in all depths including hire, running and fuel charges for all tools and plants employed as per standard specification for Base concrete of Box Culvert and Wing Wall as per clause 1000, 1500, 1700, 2100, 2200 & 2908 of MORTH Vth Revision

-

-

-

... More
1-1.1 Reconstruction of Culvert at Km.0/2, 0/4, 0/6, 0/8(i),(ii) & 0/10 of Sowripalayam - Vembaneri - Pudupalayaam road

39

246515

6320.92

... More
1-1.2 Reconstruction of Culvert at Km.1/2 of Sowripalayam - Vembaneri - Pudupalayaam road

6.5

41111

6324.82

... More
Vibrated Cement Concrete of grade M20 (Nominal Mix) using 40mm ISS size HBG metal including cost and conveyance of all materials from approved quarry to worksite including cost of cement including cost and labour charges for formwork and centering mixing the concrete, transporting, laying, vibrating, compacting, curing with all leads for soft potable water, working in all depths including hire, running and fuel charges for all tools and plants employed as per standard specification for Base Course of Retaining Wall as per clause 1000, 1500, 1700, 2100, 2200 & 2908 of MORTH Vth Revision

-

-

-

... More
1-1.3 Construction of Retaining Wall at Km.0/4, 0/6, 0/8 & 0/10 of Sowripalayam - Vembaneri - Pudupalayaam road

211.2

1375336

6512.01

... More
1-1.4 Construction of Retaining Wall at Km.1/2, 1/4 & 1/6 of Sowripalayam - Vembaneri - Pudupalayaam road

183.6

1196434

6516.53

... More
Supply and fabrication of STEEL grade Fe500D for all the reinforced cement concrete items of work involved in the schedule including cost of steel, cost of fabrication, labour charges for cleaning the rods, straightening, cutting, bending, tying grills, hoisting and placing the reinforcement in position as specified in the drawing including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete. as per standard specification as per clause 1000, 1500, 1600, 1700, 2100 & 2300 of MORTH Vth Revision

-

-

-

... More
1-1.1 Reconstruction of Culvert at Km.0/2, 0/4, 0/6, 0/8(i),(ii) & 0/10 of Sowripalayam - Vembaneri - Pudupalayaam road

12.36

1181730

95609.27

... More
1-1.2 Reconstruction of Culvert at Km.1/2 of Sowripalayam - Vembaneri - Pudupalayaam road

2.06

196955

95609.27

... More
Vibrated Reinforced Cement Concrete of grade M25 (Design Mix) using 20mm and below ISS HBG metal including cost and conveyance of all materials to site and cost of cement excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for tools and plants including all other incidental charges etc., complete for Base Slab, Side Walls and Top Slab of Box Culvert as per clause 900, 1000, 1500, 1600, 1700, 2100, 2200 & 2300 of MORTH Vth Revision

-

-

-

... More
1-1.1 Reconstruction of Culvert at Km.0/2, 0/4, 0/6, 0/8(i),(ii) & 0/10 of Sowripalayam - Vembaneri - Pudupalayaam road

166.92

2107057

12623.16

... More
1-1.2 Reconstruction of Culvert at Km.1/2 of Sowripalayam - Vembaneri - Pudupalayaam road

27.82

351284

12627.06

... More
Vibrated Cement Concrete of grade M20 (Nominal Mix) using 40mm ISS size HBG metal including cost and conveyance of all materials from approved quarry to worksite including cost of cement including cost and labour charges for formwork and centering mixing the concrete, transporting, laying, vibrating, compacting, curing with all leads for soft potable water, working in all depths including hire, running and fuel charges for all tools and plants employed as per standard specification for Stem of Retaining Wall as per clause 1000, 1500, 1700, 2100, 2200 & 2908 of MORTH Vth Revision

-

-

-

... More
1-1.3 Construction of Retaining Wall at Km.0/4, 0/6, 0/8 & 0/10 of Sowripalayam - Vembaneri - Pudupalayaam road

791.9

6715921

8480.77

... More
1-1.4 Construction of Retaining Wall at Km.1/2, 1/4 & 1/6 of Sowripalayam - Vembaneri - Pudupalayaam road

688.5

5837578

8478.69

... More
Providing and fixing Class I PVC seepage pipes of 100mm dia of required lengths for abutments and return walls including costs and conveyance of all materials to work site and labour charges for fixing etc., complete to drain from the back fill as per section 2706 of MORTH specification (Rev-V)

-

-

-

... More
1-1.3 Construction of Retaining Wall at Km.0/4, 0/6, 0/8 & 0/10 of Sowripalayam - Vembaneri - Pudupalayaam road

391

75267

192.5

... More
1-1.4 Construction of Retaining Wall at Km.1/2, 1/4 & 1/6 of Sowripalayam - Vembaneri - Pudupalayaam road

340

65450

192.5

... More
Filling behind the Box Culvert with Stone Dust including cost and conveyance to site including labour charges for filling in layers , watering , tamping under optimum moisture content to get the maximum density and all other incidental charges etc., complete as per clause 304 & 2907 of MORTH Vth Revision

-

-

-

... More
1-1.1 Reconstruction of Culvert at Km.0/2, 0/4, 0/6, 0/8(i),(ii) & 0/10 of Sowripalayam - Vembaneri - Pudupalayaam road

85.2

34291

402.48

... More
1-1.2 Reconstruction of Culvert at Km.1/2 of Sowripalayam - Vembaneri - Pudupalayaam road

14.2

5743

404.47

... More
Filling behind Abutments and return walls with clean gritty freed raining gravel including cost of gravel having pi value less than 6, conveyance of gravel to worksite. Laying,handling charges and filling in layers tamping under optimum moiture content to get the maximum density, including watering, with all leads and lifts for water and all other incidental charges etc., complete as per clause 304 & 2907 of MORTH Vth Revision

-

-

-

... More
1-1.3 Construction of Retaining Wall at Km.0/4, 0/6, 0/8 & 0/10 of Sowripalayam - Vembaneri - Pudupalayaam road

17.6

4673

265.55

... More
1-1.4 Construction of Retaining Wall at Km.1/2, 1/4 & 1/6 of Sowripalayam - Vembaneri - Pudupalayaam road

15.3

4062

265.55

... More
Refilling in between Retaining wall and Road with excavated earth including cost and conveyence to site including labour charges for filling in layers , watering , tamping under optimum moisture content to get themaximum density and all other incidental charges etc., complete as per clause 304 & 2907 of MORTH Vth Revision Specifications (labour charges only)

-

-

-

... More
1-1.3 Construction of Retaining Wall at Km.0/4, 0/6, 0/8 & 0/10 of Sowripalayam - Vembaneri - Pudupalayaam road

528

22624

42.85

... More
1-1.4 Construction of Retaining Wall at Km.1/2, 1/4 & 1/6 of Sowripalayam - Vembaneri - Pudupalayaam road

459

19668

42.85

... More
Vibrated Cement Concrete of grade M20 (Nominal Mix) using 40mm ISS size HBG metal including cost and conveyance of all materials from approved quarry to worksite including cost of cement including cost and labour charges for formwork and centering mixing the concrete, transporting, laying, vibrating, compacting, curing with all leads for soft potable water, working in all depths including hire, running and fuel charges for all tools and plants employed as per standard specification for Wing wall and Parapet as per clause 1000, 1500, 1700, 2100, 2200 & 2908 of MORTH Vth Revision

-

-

-

... More
1-1.1 Reconstruction of Culvert at Km.0/2, 0/4, 0/6, 0/8(i),(ii) & 0/10 of Sowripalayam - Vembaneri - Pudupalayaam road

111.96

1041228

9300

... More
1-1.2 Reconstruction of Culvert at Km.1/2 of Sowripalayam - Vembaneri - Pudupalayaam road

18.66

173610

9303.9

... More
Calculation of SubTotal, GST and Total Amount carried out by system automatically

-

-

-

... More
Basic cost of value put to tender as per estimate

1

-

48513583

... More
Add GST at 18%

1

-

8732445

... More
Total Value put to Tender

1

-

57246028

... More
Negotiated Percentage

1

-

-

... More
Final Negotiated Value

1

-

-

... More
Add GST at 18% of Final Negotiated Value

1

-

-

... More
Total Value of Contract Including 18% of GST

1

-

-

... More
Basic cost of value put to tender as per Estimate

-

48513583

-

... More
Quoted Rate in Figures (Total Value of Contract Including 18% of GST )

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.