Highways Department Tender

... More
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Highways Department Tender

Civil And Construction
Bridge Construction
Eprocure
Opening Date18 Apr 2022
Closing Date6 May 2022
Tender Amount₹ 6,28,40,000 
Notes
Download

Costs

Summary

Try-64-trichy H Candm Subdivision

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Earth work Excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges and sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavtion backfilling, and clearing the site and disposal of all surplus materials etc. complete and in accordance with standard specification for foundation of Cut off wall and Retainingwall as per MORTH Vth Rev., 304.

-

-

-

... More
Road-A

10061.46

-

369

... More
Dewatering the river water using 1 No of 7.5HP pumpset including Hire charges of machineries fuel charges, and labour charges including operating person including shifting the pumpset wherever necessary etc.,complete as directed by the Departmental officers. For RCC Retaining wall

-

-

-

... More
Road-A

3000

-

405.8

... More
Vibrated Cement Concrete M 15 grade mix using 40mm ISS size hard broken granite metal including cost and conveyance of all materials from approved quarry to worksite including cost of cement including cost and labour charges for formwork and centering mixing the concrete, transporting, laying, vibrating, compacting, curing with all leads for soft potable water, working in all depths including hire, running and fuel charges for all tools and plants employed and in accordance with standard specification for Levelling course below the footings of Retaining walls as per MORTH Vth Rev., 1000, 1500, 1700, 2100 & 900

-

-

-

... More
Road-A

291.36

-

5759

... More
Vibrated Cement Concrete of grade M20 using 40mm ISS size HBG graded metal including cost and conveyance of all materials to site and cement at site including cost of formwork, soft water,labour charges for mixing, transporting, laying and curing concrete, working at depths,Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification for PCC cutoff wall. 1 Cu.m - Below Sill as per MORTH Vth Rev., 1000, 1500, 1700, 2100 & 900

-

-

-

... More
Road-A

2447.71

-

6925

... More
Vibrated Reinforced Cement Concrete design mix M30 grade using 20mm & 12 mm ISS size HBG graded metal crushed stone with M-Sand including cost and conveyance of all materials to site but excluding cost and fabrication of steel but including cost and labour charges for formwork and centering, labour charges, compacting, finishing and curing including all incidental charges etc., complete - MORTH Vth Rev., 1000, 1500, 1600, 1700, 2200, 2300 & 900 for footings of RCC Retaining walls.

-

-

-

... More
Road-A

792

-

8425

... More
Vibrated Reinforced Cement Concrete design mix M30 grade using 20mm & 12 mm ISS size HBG graded metal crushed stone with M-Sand including cost and conveyance of all materials to site but excluding cost and fabrication of steel but including cost and labour charges for formwork and centering, labour charges, compacting, finishing and curing including all incidental charges etc., complete - MORTH Vth Rev., 1000, 1500, 1600, 1700, 2200, 2300 & 900 for Stem of RCC Retaining walls.

-

-

-

... More
Road-A

995.63

-

11689

... More
Granite rough stone dry packing for the specified thickness for apron using good size granite rough stone, properly wedged with quarry spalls including cost and conveyance of all materials to site labour charges for packing the same in position and all other incidental charges etc, complete for APRON.

-

-

-

... More
Road-A

4756.36

-

481

... More
Supply and fabrication of (HYSD) required for all RCC items of works involved in the schedule of drawings including cost of steel, cost of fabrication, labour charges for cleaning the bars straightening, cutting, bending, tying grills, positioning and placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete as per standard specification. - MORTH Vth Rev., 1000, 1500, 1600 & 900

-

-

-

... More
Road-A

69.6

-

84996

... More
Calculation of SubTotal, GST and Total Amount carried out by system automatically

-

-

-

... More
Basic cost of value put to tender as per estimate

1

-

56097405

... More
Add GST at 12%

1

-

6731689

... More
Total Value put to Tender

1

-

62829094

... More
Quoted Percentage

1

-

-

... More
Quoted Value

1

-

-

... More
Add GST at 12% of Final Quoted Value

1

-

-

... More
Total Value of Contract Including 12% of GST

1

-

-

... More
Basic cost of value put to tender as per Estimate

-

-

-

... More
Quoted Rate in Figures (Total Value of Contract Including 12% of GST )

-

-

-

... More
Quoted Rate in Words

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.