Highways Department Tender

... More
The Highways Department has issued a formal invitation for competitive bids for Improvements Cd Works Interlocking Paver Block Pavment For Watter Logging Area Cc Drain Retaining Wall And Up Keeping For A Period Of 60 Months To Government Highways Roads In Udhagai H Cm Sub Division Jurisdiction Package No 16 in Nilgiris, Tamil Nadu, with an estimated contract value of Rs. 5,97,82,527. The bid opening date for this tender is 29-05-2020 and the last date for bid submission is 01-07-2020. Interested bidders for Highways Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

Highways Department Tender

Eprocure
Opening Date29 May 2020
Closing Date1 Jul 2020
Tender Amount₹ 5,97,82,527 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
I st Year (10-15 cm)

4

-

12.13

... More
ROAD C

61.56

-

1967.86

... More
Supplying and laying of Rubber Moulded Hydraulic Pressed Paverblock 83mm thick including cost and conveyance charges and laying charges etc., complete as directed by the department officers etc., complete

1

-

-

... More
ROAD A

63.75

-

7257.19

... More
Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous / granular surface cleaned with mechanical broom as per clause 503 of MORTH Specification - over bituminous surfaces (Morth No. 111, 112, 501, 502, 900)

1

-

-

... More
I st Year

6.89

-

157.2

... More
I st Year

274.03

-

25

... More
Painting,Lettering of KM/HM Stones- Once a Year. Painting One coats with best of approved quality enamel paint including the cost of Paint, brushes, high scaffolding arrangements, neat finishes, etc., complete complying with standard specification and as directed by the departmental officers.

1

-

-

... More
ROAD C

21

-

2268.52

... More
ROAD E

275

-

2720.55

... More
II nd Year

104

-

90

... More
ROAD E

2042.02

-

117.6

... More
IV th Year

2.38

-

141.27

... More
Providing, laying, spreading and compacting wet mix macadam with clean, crushed, graded aggregates and granular material and finished in accordance with the requirements of the specifications and thickness as per approved plans or as directed by the Engineer

1

-

-

... More
IV th Year (5-10 cm)

32

-

7.28

... More
II nd Year

142.03

-

25

... More
Refilling with earth other than sand in between body walls complying with standard specification including all labour charges and all others incidental charges etc., complete for Retanng walls (Box Cut Earth Labour Charges only) (Morth No. 304, 900)

1

-

-

... More
Basic cost of value put to tender as per estimate

1

-

53377256

... More
Tree Banding Once a Year.Painting One coats with best of approved quality enamel paint including the cost of Paint, brushes, high scaffolding arrangements, neat finishes, etc., complete complying with standard specification and as directed by the departmental officers.

1

-

-

... More
V th Year (10-15 cm)

4

-

12.13

... More
II nd Year

2.38

-

141.27

... More
ROAD E

1100

-

1007

... More
Vith Year

8.17

-

8748.62

... More
III rd Year (5-10 cm)

32

-

7.28

... More
III rd Year

1491.3

-

6.16

... More
II nd Year

3.65

-

157.2

... More
III rd Year (5-10 cm)

59

-

7.28

... More
I st Year

30

-

700

... More
Bituminous Concrete (Table 500-17) Providing and laying bituminous concrete with mini hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade-30) at percentage specified by Job Mix Formula of mix and filler, transporting the hot mix to work site, laying with manual labour to the required grade, level and alignment,rolled as per clause 501.6 and 501.7 to achieve the desired compaction as per clause No. 507 of MORTH Specification complete in all respects - Grading II (Morth No. 111, 112, 501, 507,900)

1

-

-

... More
Clearing of Light jungle as directed by the departmental officers etc Complete.

1

-

-

... More
SUB ESTIMATE

1

-

-

... More
ROAD B

65

-

172.8

... More
Cement Concrete M20 grade using 40 mm ISS HBG metal including cost and conveyance of all materials to site, Complying to the required standard and specifications including labour for formwork, laying watering, curing and compacting and all other incidental charges etc., complete For Protective Works & Base Concretes (Morth No. 111, 112, 1000, 1500, 1700, 2200, 900)

1

-

-

... More
Cement Concrete M20 grade using 40 mm ISS HBG metal including cost and conveyance of all materials to site, Complying to the required standard and specifications including labour for formwork, laying watering, curing and compacting and all other incidental charges etc., complete For Protective Works (Morth No. 111, 112, 1000, 1500, 1700, 2200, 900)

1

-

-

... More
IV th Year

104

-

90

... More
I st Year (5-10 cm)

32

-

7.28

... More
ROAD D

306.24

-

235.2

... More
II nd Year

30

-

700

... More
IV th Year

1157.4

-

6.16

... More
ROAD C

30.78

-

6975.26

... More
Cement Concrete M20 using 20mm and 12mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications.For Drain

1

-

-

... More
Major Bridges/Culvert vent clearance Thrice a year -Hiring JCB for uprooting heavy jungle, clearing the dumped earth, cutting the high berms, making side drains, clearing the earth slips and removing wind fallen trees etc., and as directed by the departmental officers.

1

-

-

... More
Vth Year

292.08

-

21.16

... More
ROAD A

65

-

172.8

... More
Cement Concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site, complying to the required standard and specifications including labour for formwork, laying watering curing and compacting vibrator charges and all other incidental charges etc., for KERB WALL

1

-

-

... More
M-Sand filling using M-sand including cost and conveyance including labour charges for filling inlayers, watering tamping under opumum moisture content to get the maximum density all incidental charges etc., complete

1

-

-

... More
II nd Year

4.93

-

141.27

... More
ROAD A

175.25

-

8075.08

... More
Refilling with earth other than sand in between body walls complying with standard specification including all labour charges and all others incidental charges etc., complete for Retanng walls (Box Cut Earth Labour Charges only) (Morth No. 304, 900)

1

-

-

... More
III rd Year

30

-

700

... More
Providing and fixing seepage pipes of 110mm dia. PVC pipes of requied lengths for abutments and wngs including cost and conveyance of all materials to work site, cost and labour for semi-spherical back fill arangements with 100mm size broken ganite stone at the periphery and labour charges for fixing, etc.,complete to drain of the BACKFILL IN The Retainng wall

1

-

-

... More
ROAD C

539.95

-

117.6

... More
V th Year

3.65

-

157.2

... More
II nd Year (5-10 cm)

32

-

7.28

... More
Cement Concrete M20 grade using 40 mm ISS HBG metal including cost and conveyance of all materials to site, Complying to the required standard and specifications including labour for formwork, laying watering, curing and compacting vibrator charges and all other incidental charges etc., complete For Protective Works (Morth No. 111, 112, 1000, 1500, 1700, 2200, 900)

1

-

-

... More
ROAD F

4231.01

-

117.6

... More
ROAD C

74.1

-

172.8

... More
Up keeping component of Making up of Low berms using side earth including cost of compaction by power roller and all other incidental charges etc complete

1

-

-

... More
ROAD F

146.9

-

172.8

... More
I st Year

1491.3

-

6.16

... More
ROAD B

47.4

-

6753.67

... More
Quoted Rate in Figures (Total Value of Quoted Amount Including 12% of GST )

-

-

-

... More
ROAD G

52.8

-

6917.03

... More
IV th Year

30

-

700

... More
V th Year

88.4

-

90

... More
IV th Year

142.03

-

25

... More
Providing filter media behind the abutments and wings with clean III graded material 53mm to 5.6mm to 600mm thick and well compacted in layers with smaller sized towards the soil and bigger size towards the wall including cost and conveyance to work site including all labours and other incidental charges including hire charges for tools and plants employed etc., for filter media as per MOST's (Roads Wing) specifications for Roads and Bridges " Fifth Revision Cl 305 - 4.4, 309-3.2 and Cl. 2504 etc., complete"

1

-

-

... More
I st Year

2.38

-

141.27

... More
III rd Year

165.03

-

25

... More
ROAD B

21.44

-

6994.36

... More
Calculation of SubTotal, GST and Total Amount carried out by system automatically

-

-

-

... More
III rd Year

52

-

90

... More
ROAD A

33

-

6819.96

... More
II nd Year

1157.4

-

6.16

... More
IV th Year

2043

-

6.16

... More
II nd Year

1491.3

-

6.16

... More
II nd Year (10-15 cm)

4

-

12.13

... More
ROAD D

42

-

7419.09

... More
I st Year

3.65

-

157.2

... More
IV th Year

52

-

90

... More
I st Year (10-15 cm)

2

-

12.13

... More
Up Keeping component for ROAD A

1

-

-

... More
ROAD A

82.5

-

6637.19

... More
ROAD A

5841.5

-

21.16

... More
III rd Year (10-15 cm)

4

-

12.13

... More
ROAD B

1227.18

-

117.6

... More
V th Year

9.45

-

141.27

... More
ROAD E

62

-

7509.56

... More
IV th Year

165.03

-

25

... More
III rd Year

30

-

700

... More
V th Year (5-10 cm)

59

-

7.28

... More
ROAD F

298.32

-

235.2

... More
I st Year

104

-

90

... More
ROAD G

211.2

-

235.2

... More
Providing, laying, spreading and compacting wet mix macadam with clean, crushed, graded aggregates and granular material and finished in accordance with the requirements of the specifications and thickness as per approved plans or as directed by the Engineer

1

-

-

... More
ROAD G

54.75

-

7354.26

... More
ROAD A

132

-

235.2

... More
ROAD B

426.25

-

41.02

... More
IV th Year (10-15 cm)

2

-

12.13

... More
White washing parapets of Culvert/Bridge,Protective walls , Kerb wall etc - Once a Year. White washing One coat using best freshly burnt shell lime including cost of lime and other materials complying with standard specification and as directed by the departmental officers.

1

-

-

... More
I st Year (5-10 cm)

32

-

7.28

... More
Lettering the existing KM Stones as per IRC standard including the cost of labour charges and materials etc., complete (10 cm HM/Km stones and 15 cm HM/KM stones)

1

-

-

... More
IV th Year

88.4

-

90

... More
Total Value put to Tender

1

-

59782527

... More
V th Year

52

-

90

... More
V th Year

30

-

700

... More
I st Year

142.03

-

25

... More
Cement Concrete M20 grade using 40 mm ISS HBG metal including cost and conveyance of all materials to site, Complying to the required standard and specifications including labour for formwork, laying watering, curing and compacting and all other incidental charges etc., complete For Protective Works & Base Concretes (Morth No. 111, 112, 1000, 1500, 1700, 2200, 900)

1

-

-

... More
V th Year

165.03

-

25

... More
Vth Year

13.62

-

8748.62

... More
White washing parapets of Culvert/Bridge,Protective walls , Kerb wall etc - Once a Year. White washing One coat using best freshly burnt shell lime including cost of lime and other materials complying with standard specification and as directed by the departmental officers.

1

-

-

... More
Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 of MORTH Specification - over bituminous surfaces (Morth No. 111, 112, 501, 502, 900)

1

-

-

... More
IV th Year

9.45

-

141.27

... More
II nd Year

2043

-

6.16

... More
Cement Concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site, complying to the required standard and specifications including labour for formwork, laying watering curing and compacting vibrator charges and all other incidental charges etc., for KERB WALL

1

-

-

... More
ROAD B

176.55

-

8075.08

... More
ROAD D

600.7

-

8714.52

... More
IV th Year

30

-

700

... More
Excavation including removal and satisfactory disposal of all materials necessary for the construction of roadway and side Drains in accordance with the specifications and lines , grades and cross sections shown in the drawings or as directed by the Engineer For high berms cutting (Morth No 111, 112, 301, 305, 900)

1

-

-

... More
ROAD B

5885

-

21.17

... More
II nd Year

274.03

-

25

... More
II nd Year

6.89

-

157.2

... More
III rd Year (10-15 cm)

2

-

12.13

... More
ROAD B

132

-

235.2

... More
Clearing of Light jungle as directed by the departmental officers etc Complete.

1

-

-

... More
Up Keeping component for ROAD C

1

-

-

... More
I st Year (5-10 cm)

59

-

7.28

... More
V th Year (5-10 cm)

32

-

7.28

... More
II nd Year (5-10 cm)

59

-

7.28

... More
I st Year

1157.4

-

6.16

... More
V th Year

30

-

700

... More
IV th Year (5-10 cm)

59

-

7.28

... More
IV th Year (10-15 cm)

2

-

12.13

... More
ROAD C

44.35

-

7049.64

... More
Vith Year

5.3

-

8700.65

... More
I st Year

2043

-

6.16

... More
Up keeping component of Making up of Low berms using side earth including cost of compaction by power roller and all other incidental charges etc complete

1

-

-

... More
Bituminous Concrete (Table 500-17) Providing and laying bituminous concrete with mini hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade-30) at percentage specified by Job Mix Formula of mix and filler, transporting the hot mix to work site, laying with manual labour to the required grade, level and alignment,rolled as per clause 501.6 and 501.7 to achieve the desired compaction as per clause No. 507 of MORTH Specification complete in all respects - Grading II (Morth No. 111, 112, 501, 507,900)

1

-

-

... More
ROAD G

4565.65

-

117.6

... More
Vth Year

294.23

-

21.17

... More
ROAD B

33

-

6822.12

... More
Earth Work excavation in all classes of soil such as hard rock requiring and depositing on bank with all leads and lifts as per SS208, including cost of all labour, equipment and all other incidental charges such as bailing out water providing and maintaining necessary cofferdams, sheeting,shoring, bracing, and their subsequent removal, removal of all logs, stumps and other deleterious matter and construction, trimming bottom of excavation backfilling, and clearing the sits and disposal of all surplus materials etc, complete as per relevant standard specification for FOUNDATION of Protective walls. (Morth No. 111, 112, 304)

1

-

-

... More
ROAD A

27.68

-

6870.96

... More
Bituminous Concrete (Table 500-17) Providing and laying bituminous concrete with mini hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade-30) at percentage specified by Job Mix Formula of mix and filler, transporting the hot mix to work site, laying with manual labour to the required grade, level and alignment,rolled as per clause 501.6 and 501.7 to achieve the desired compaction as per clause No. 507 of MORTH Specification complete in all respects - Grading II (Morth No. 111, 112, 501, 507,900)

1

-

-

... More
ROAD A

69.75

-

1852.82

... More
ROAD C

454

-

6677.64

... More
III rd Year

4.93

-

141.27

... More
ROAD C

9080

-

21.17

... More
V th Year

3.65

-

157.2

... More
Vith Year

5.26

-

8577.43

... More
ROAD C

700

-

1007

... More
ROAD F

29.85

-

7420.79

... More
III rd Year

30

-

700

... More
Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 of MORTH Specification - over bituminous surfaces (Morth No. 111, 112, 501, 502, 900)

1

-

-

... More
Vth Year

8.76

-

8577.43

... More
ROAD C

175

-

2720.55

... More
II nd Year

30

-

700

... More
III rd Year

9.45

-

141.27

... More
Excavation including removal and satisfactory disposal of all materials necessary for the construction of roadway and side Drains in accordance with the specifications and lines , grades and cross sections shown in the drawings or as directed by the Engineer For high berms cutting (Morth No. 111, 112, 304)

1

-

-

... More
III rd Year

2.38

-

141.27

... More
ROAD F

157.64

-

1974.1

... More
I st Year

88.4

-

90

... More
I st Year (10-15 cm)

2

-

12.13

... More
ROAD D

76.56

-

6981.62

... More
Vith Year

272.4

-

21.17

... More
Major Bridges/Culvert vent clearance Thrice a year -Hiring JCB for uprooting heavy jungle, clearing the dumped earth, cutting the high berms, making side drains, clearing the earth slips and removing wind fallen trees etc., and as directed by the departmental officers.

1

-

-

... More
I st Year

3.65

-

157.2

... More
ROAD E

84

-

6889.56

... More
Up keeping component of Making up of Low berms using side earth including cost of compaction by power roller and all other incidental charges etc complete

1

-

-

... More
Vith Year

176.54

-

21.17

... More
V th Year

142.03

-

25

... More
Vth Year

8.83

-

8700.65

... More
V th Year

2043

-

6.16

... More
IV th Year (10-15 cm)

4

-

12.13

... More
ROAD D

84

-

6822.66

... More
I st Year

30

-

700

... More
ROAD B

258.1

-

8537.12

... More
Cement Concrete M20 using 20mm and 12mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications.For Drain

1

-

-

... More
Bituminous Macadam Providing and laying bituminous macadam with Mini Hot mix plant using crushed aggregates of specified grading premixed with bituminous binder (Viscosity Grade 30), transported to site, laid over a previously prepared surface using manual labour to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction, complete as per clause 504 of MORTH Specification - Grading II (Table 500-7) for patch work. (Morth No. 111, 112, 501, 504, 900, 3004)

1

-

-

... More
White washing parapets of Culvert/Bridge,Protective walls , Kerb wall etc - Once a Year. White washing One coat using best freshly burnt shell lime including cost of lime and other materials complying with standard specification and as directed by the departmental officers.

1

-

-

... More
II nd Year

3.65

-

157.2

... More
ROAD G

104

-

172.8

... More
Cement Concrete 1:2:4 mix using 40mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for Drain Base

1

-

-

... More
ROAD C

272.4

-

8075.08

... More
ROAD D

1789.73

-

117.6

... More
V th Year (10-15 cm)

2

-

12.13

... More
V th Year (5-10 cm)

32

-

7.28

... More
Cement Concrete 1:2:4 mix using 40mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for Drain Base

1

-

-

... More
ROAD C

92.34

-

235.2

... More
II nd Year

88.4

-

90

... More
ROAD C

179.55

-

8851.36

... More
V th Year

2.38

-

141.27

... More
V th Year

104

-

90

... More
V th Year

30

-

700

... More
ROAD C

27

-

7322.5

... More
Bituminous Concrete (Table 500-17) Providing and laying bituminous concrete with hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade-30) at percentage specified by Job Mix Formula of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment,rolled as per clause 501.6 and 501.7 to achieve the desired compaction as per clause No. 507 of MORTH Specification complete in all respects -Grading II (Morth No. 111, 112, 501, 507, 900)

1

-

-

... More
III rd Year

3.65

-

157.2

... More
Lettering the existing KM Stones as per IRC standard including the cost of labour charges and materials etc., complete (10 cm HM/Km stones and 15 cm HM/KM stones)

1

-

-

... More
Clearing of Light jungle as directed by the departmental officers etc Complete.

1

-

-

... More
Supplying and laying Rubber moulded Hydraulic pressure paver Block 83mm thickness in quantity cost and conveyancess charges and laying charges are complete as directed by The Department officer.etc complete.

1

-

-

... More
IV th Year

274.03

-

25

... More
IV th Year

6.89

-

157.2

... More
I st Year

9.45

-

141.27

... More
III rd Year (10-15 cm)

2

-

12.13

... More
Vth Year

454

-

21.17

... More
I st Year

4.93

-

141.27

... More
ROAD G

109.5

-

6734.25

... More
Tree Banding Once a Year.Painting One coats with best of approved quality enamel paint including the cost of Paint, brushes, high scaffolding arrangements, neat finishes, etc., complete complying with standard specification and as directed by the departmental officers.

1

-

-

... More
Basic cost of value put to tender as per Estimate

-

-

-

... More
IV th Year (5-10 cm)

32

-

7.28

... More
ROAD D

161.82

-

1972.57

... More
III rd Year

88.4

-

90

... More
II nd Year (5-10 cm)

32

-

7.28

... More
Vith Year

175.25

-

21.16

... More
III rd Year

2043

-

6.16

... More
IV th Year

30

-

700

... More
Earth Work excavation in all classes of soil such as hard rock requiring and depositing on bank with all leads and lifts as per SS208, including cost of all labour, equipment and all other incidental charges such as bailing out water providing and maintaining necessary cofferdams, sheeting,shoring, bracing, and their subsequent removal, removal of all logs, stumps and other deleterious matter and construction, trimming bottom of excavation backfilling, and clearing the sits and disposal of all surplus materials etc, complete as per relevant standard specification for FOUNDATION of Protective walls. (Morth No. 111, 112, 304)

1

-

-

... More
Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 of MORTH Specification - over bituminous surfaces (Morth No. 111, 112, 501, 502, 900)

1

-

-

... More
ROAD A

1258.91

-

117.6

... More
ROAD B

294.25

-

6677.64

... More
V th Year

1157.4

-

6.16

... More
II nd Year

9.45

-

141.27

... More
ROAD F

585.25

-

8736.45

... More
ROAD A

292.08

-

6677.64

... More
ROAD G

111.6

-

1924.72

... More
ROAD E

33

-

2326.04

... More
III rd Year

142.03

-

25

... More
ROAD C

1532.73

-

117.6

... More
Painting,Lettering of KM/HM Stones- Once a Year. Painting One coats with best of approved quality enamel paint including the cost of Paint, brushes, high scaffolding arrangements, neat finishes, etc., complete complying with standard specification and as directed by the departmental officers.

1

-

-

... More
V th Year

6.89

-

157.2

... More
Differnce Amount (Excess/less)

1

-

-

... More
Quoted Amount (Basic Rate Only)

1

-

-

... More
V th Year

274.03

-

25

... More
Bituminous Macadam Providing and laying bituminous macadam with Hot mix plant using crushed aggregates of specified grading premixed with bituminous binder (Viscosity Grade 30), transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction, complete as per clause 504 of MORTH Specification - Grading II (Table 500-7). (Morth No. 111, 112, 501, 504, 900)

1

-

-

... More
V th Year

1491.3

-

6.16

... More
III rd Year

104

-

90

... More
ROAD A

317.75

-

41.02

... More
ROAD F

74.58

-

6983.68

... More
ROAD C

324

-

6799.68

... More
IV th Year

3.65

-

157.2

... More
Add GST at 12% of Quoted Amount

1

-

-

... More
II nd Year (10-15 cm)

2

-

12.13

... More
Painting,Lettering of KM/HM Stones- Once a Year. Painting One coats with best of approved quality enamel paint including the cost of Paint, brushes, high scaffolding arrangements, neat finishes, etc., complete complying with standard specification and as directed by the departmental officers.

1

-

-

... More
III rd Year

3.65

-

157.2

... More
V th Year

4.93

-

141.27

... More
ROAD C

223.95

-

7418.48

... More
ROAD D

150.8

-

172.8

... More
ROAD F

760.59

-

41.02

... More
Providing and fixing seepage pipes of 110mm dia. PVC pipes of requied lengths for abutments and wngs including cost and conveyance of all materials to work site, cost and labour for 900mm dia. semi-spherical back fill arangements with 100mm size broken ganite chips at the periphery and labour charges for fixing, etc.,to drain of the Backfill IN WALLS

1

-

-

... More
Major Bridges/Culvert vent clearance Thrice a year -Hiring JCB for uprooting heavy jungle, clearing the dumped earth, cutting the high berms, making side drains, clearing the earth slips and removing wind fallen trees etc., and as directed by the departmental officers.

1

-

-

... More
Tree Banding Once a Year.Painting One coats with best of approved quality enamel paint including the cost of Paint, brushes, high scaffolding arrangements, neat finishes, etc., complete complying with standard specification and as directed by the departmental officers.

1

-

-

... More
IV th Year

1491.3

-

6.16

... More
M-Sand filling using M-sand including cost and conveyance including labour charges for filling inlayers, watering tamping under opumum moisture content to get the maximum density all incidental charges etc., complete

1

-

-

... More
Providing filter media behind the abutments and wings with clean III graded material 53mm to 5.6mm to 600mm thick and well compacted in layers with smaller sized towards the soil and bigger size towards the wall including cost and conveyance to work site including all labours and other incidental charges including hire charges for tools and plants employed etc., for filter media as per MOST's (Roads Wing) specifications for Roads and Bridges " Fifth Revision Cl. 309-3-2-13 and 305 -4-4 etc., complete- 1Cum.

1

-

-

... More
I st Year

165.03

-

25

... More
III rd Year

1157.4

-

6.16

... More
II nd Year

30

-

700

... More
ROAD A

259

-

8543.91

... More
ROAD B

69.75

-

1939.1

... More
IV th Year

3.65

-

157.2

... More
I st Year

52

-

90

... More
ROAD D

777.17

-

41.02

... More
III rd Year

274.03

-

25

... More
III rd Year

6.89

-

157.2

... More
Up Keeping component for ROAD B

1

-

-

... More
Lettering the existing KM Stones as per IRC standard including the cost of labour charges and materials etc., complete (10 cm HM/Km stones and 15 cm HM/KM stones)

1

-

-

... More
Add GST at 12%

1

-

6405271

... More
ROAD G

414.4

-

8649.93

... More
Excavation including removal and satisfactory disposal of all materials necessary for the construction of roadway and side Drains in accordance with the specifications and lines , grades and cross sections shown in the drawings or as directed by the Engineer For high berms cutting, For Paver Block (Morth No. 111, 112, 304)

1

-

-

... More
V th Year (10-15 cm)

2

-

12.13

... More
II nd Year

52

-

90

... More
II nd Year

165.03

-

25

... More
ROAD E

54

-

7400.15

... More
I st Year

30

-

700

... More
Total Value of Quoted Amount including 12% of GST

1

-

-

... More
III rd Year (5-10 cm)

32

-

7.28

... More
IV th Year

4.93

-

141.27

... More
ROAD F

59.7

-

6800.79



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.