Highways Department Tender

... More
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Highways Department Tender

Civil And Construction
Civil Works Others
Eprocure
Opening Date8 Jun 2020
Closing Date9 Jul 2020
Tender Amount₹ 5,67,35,715 
Notes
Download

Costs

Summary

Vbd Package No. 88 Cridp 2020-2021

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Bill Of Quantities (Schedule A)
Pre Qualification Volume I
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Earthwork excavation including removal and satisfactory disposal of all materials necessary for the construction of road way and side drain in accordance with specification(SS20A) and the lines grades and cross section shown in drawing or as indicated by the engineer for all other incidental charges etc., complete for Berms

-

-

-

... More
Letterings in KM & HM Stones, Culvert parapets / Bridges and tree numbers including cost of Paint and labour charges and all other incidental charges, etc., complete as directed by departmental Engineer.

-

-

-

... More
Road C

2333.33

-

15.31

... More
Road A

6.09

-

116.6

... More
Painting with synthetic Enamel paint over the existing iron surfaces, etc., including cost of paint and labour charges, etc., including all other incidental charges as directed by departmental officers.

-

-

-

... More
Road C

44.1

-

26.33

... More
Road C

13.95

-

116.6

... More
Road C

24

-

133.9

... More
Bituminous Macadam (Table - 500-10) - (Providing and laying Bituminous Macadam with Hot Mix Plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade 30) at percentage specified by JMF by weight of total mix of mix and filler, transporting the hot mix to work site, laying with a hydrostatic Paver Finisher to the required grade, level and alignment, rolling with smooth wheeled vibratory and tandem rollers to achieve the desired compaction as per Clause 505 MORT&H Rev-V) - Grading II.

-

-

-

... More
Road B

12.35

-

131.56

... More
Road C

7.62

-

133.9

... More
Road B

24

-

133.9

... More
Road B

7.47

-

133.9

... More
White washing with white cem over the Trees etc., including cost of white cem and labour charges, etc., including all other incidental charges as directed by departmental officers.

-

-

-

... More
Calculation of SubTotal, GST and Total Amount carried out by system automatically

-

-

-

... More
Road A

22.05

-

131.56

... More
Road A

2

-

700

... More
Road B

924

-

4.4

... More
Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.25 kg per sqm on the granular surface treated with primer as per clause 503 - over granular surfaces treated with primer

-

-

-

... More
White washing with white cem over the Culvert parapets, etc., including cost of white cem and labour charges, etc., including all other incidental charges as directed by departmental officers.

-

-

-

... More
Road A

15.75

-

56.1

... More
Road C

84.6

-

103.21

... More
Road B

7.47

-

133.9

... More
Road A

44.1

-

26.33

... More
Road C

62

-

14.68

... More
Picking the Existing BT surface including cost and conveyance of all materials and all other incidetal charges etc., complete.

-

-

-

... More
Road B

80

-

5.33

... More
Road A

20

-

1122.21

... More
Road B

24.7

-

26.33

... More
White washing with white cem over the Culvert parapets, etc., including cost of white cem and labour charges, etc., including all other incidental charges as directed by departmental officers.

-

-

-

... More
Road A

1920

-

4.4

... More
Road B

24.7

-

26.33

... More
Painting with synthetic Enamel paint over the existing KM, HM Stones, Parapets of Culverts etc., including cost of paint and labour charges, etc., including all other incidental charges as directed by departmental officers.

-

-

-

... More
Total Value put to Tender

1

-

56735715

... More
Provision for hire charges including pay and allowances of Crews for JCB for clearing the ventway of culverts and clearing on either sides, etc., complete as directed by departmental officers.

-

-

-

... More
Bituminous Concrete (Table 500-17) Providing and laying bituminous concrete with hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade - 30) at percentage specified by JMF of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects) - Grading II

-

-

-

... More
White banding with Japan Black over the Centre medians, Tree banding, etc., including cost of Japan Black and labour charges, etc., including all other incidental charges as directed by departmental officers.

-

-

-

... More
Road B

23.47

-

6443.2

... More
Road A

62

-

14.68

... More
Road B

24.7

-

26.33

... More
Bituminous Concrete (Table 500-17) Providing and laying bituminous concrete with hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade - 30) at percentage specified by JMF of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects) - Grading II

-

-

-

... More
Road C

21

-

6443.2

... More
Road A

72

-

103.21

... More
Upkeeping of Roads for 3rd Year Excavation including removal and satisfactory disposal of all materias necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer for Formation of Earthern Drain.

-

-

-

... More
Road A (Lettering in 5 to 10 cm)

163

-

5.33

... More
Road A

52.5

-

84

... More
White washing with white cem over the Trees etc., including cost of white cem and labour charges, etc., including all other incidental charges as directed by departmental officers.

-

-

-

... More
Road A

22.05

-

131.56

... More
Granular Sub-base with Graded Material (Table:- 400-1) - Plant Mix Method (Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 ) - for grading- V Material

-

-

-

... More
Road B

329

-

1462.66

... More
Road A

12

-

133.9

... More
Road C

95

-

5.33

... More
Black banding with Japan Black over the Centre medians, Tree banding, etc., including cost of Japan Black and labour charges, etc., including all other incidental charges as directed by departmental officers.

-

-

-

... More
Road B

2193.33

-

15.31

... More
Road D

1540

-

1667.54

... More
Road B

9870

-

49.8

... More
Road A

10.12

-

133.9

... More
Providing RCC M15 grade precast HM Stone of standard design as per IRC: 26 - 1976 and fixing in position including all incidental charges, etc., complete as per MORT&H specification No. 804 and as directed by the Engineer.

-

-

-

... More
Bituminous Concrete (Table 500-17) Providing and laying bituminous concrete with hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade - 30) at percentage specified by JMF of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects) - Grading II

-

-

-

... More
Basic cost of value put to tender as per estimate

1

-

50656888

... More
Road A

22.05

-

131.56

... More
Road A

1662.5

-

1667.54

... More
Road A

2566.67

-

15.31

... More
Earthwork excavation including removal and satisfactory disposal of all materials necessary for the construction of road way and side drain in accordance with specification(SS20A) and the lines grades and cross section shown in drawing or as indicated by the engineer for all other incidental charges etc., complete for Berms

-

-

-

... More
Road A

2

-

700

... More
Road C

84.6

-

103.21

... More
Road C

13.95

-

116.6

... More
Painting with synthetic Enamel paint over the existing KM, HM Stones, Parapets of Culverts etc., including cost of paint and labour charges, etc., including all other incidental charges as directed by departmental officers.

-

-

-

... More
Road C

24

-

133.9

... More
Road C

282

-

103.21

... More
Road B

1848

-

4.4

... More
White washing with white cem over the Culvert parapets, etc., including cost of white cem and labour charges, etc., including all other incidental charges as directed by departmental officers.

-

-

-

... More
Black banding with Japan Black over the Centre medians, Tree banding, etc., including cost of Japan Black and labour charges, etc., including all other incidental charges as directed by departmental officers.

-

-

-

... More
Provision for hire charges including pay and allowances of Crews for JCB for clearing the ventway of culverts and clearing on either sides, etc., complete as directed by departmental officers.

-

-

-

... More
Earthwork excavation including removal and satisfactory disposal of all materials necessary for the construction of road way and side drain in accordance with specification(SS20A) and the lines grades and cross section shown in drawing or as indicated by the engineer for all other incidental charges etc., complete for Berms

-

-

-

... More
Road C

22.05

-

131.56

... More
Painting with synthetic Enamel paint over the existing boundary stones, Guide stones, etc., including cost of paint and labour charges, etc., including all other incidental charges as directed by departmental officers.

-

-

-

... More
Road C

62

-

14.68

... More
Road A

6.09

-

116.6

... More
Road A

72

-

103.21

... More
Painting with synthetic Enamel paint over the existing boundary stones, Guide stones, etc., including cost of paint and labour charges, etc., including all other incidental charges as directed by departmental officers.

-

-

-

... More
Clearing the light jungle with uprooting including labour charges and all other incidental charges, etc., complete as per standard specification.

-

-

-

... More
Road A

2178

-

84

... More
Road B

69.3

-

103.21

... More
Road A

12

-

133.9

... More
Clearing the light jungle with uprooting including labour charges and all other incidental charges, etc., complete as per standard specification.

-

-

-

... More
Road B

2

-

1808.29

... More
Road D

2264

-

84

... More
Prime coat Providing and applying primer coat with bitumen emulsion (SS-I type) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per clause 502) - over WMM/ WBM

-

-

-

... More
Road A

10.12

-

133.9

... More
Road A (Lettering in 5 to 10 cm)

163

-

5.33

... More
Painting with synthetic Enamel paint over the existing iron surfaces, etc., including cost of paint and labour charges, etc., including all other incidental charges as directed by departmental officers.

-

-

-

... More
Road B

1616.8

-

84

... More
Road A

346.5

-

16.93

... More
Letterings in KM & HM Stones, Culvert parapets / Bridges and tree numbers including cost of Paint and labour charges and all other incidental charges, etc., complete as directed by departmental Engineer.

-

-

-

... More
Road B

469.4

-

6664.73

... More
Road B

14.08

-

6443.2

... More
Total Value of Contract Including 12% of GST

1

-

-

... More
Road C

525

-

16.93

... More
Providing RCC M15 grade precast KM Stone of standard design as per IRC: 8 - 1980 and fixing in position including all incidental charges, etc., complete as per MORT&H specification No. 804 and as directed by the Engineer.

-

-

-

... More
Black banding with Japan Black over the Centre medians, Tree banding, etc., including cost of Japan Black and labour charges, etc., including all other incidental charges as directed by departmental officers.

-

-

-

... More
Clearing the light jungle with uprooting including labour charges and all other incidental charges, etc., complete as per standard specification.

-

-

-

... More
Road C

44.1

-

26.33

... More
Road A

2

-

700

... More
Road C

44.1

-

26.33

... More
Upkeeping of Roads for 4th Year Excavation including removal and satisfactory disposal of all materias necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer for Formation of Earthern Drain.

-

-

-

... More
Road C

7.62

-

133.9

... More
Road B

1848

-

4.4

... More
Road A

15.75

-

56.1

... More
Add GST at 12%

1

-

6078827

... More
Road A

44.1

-

26.33

... More
Painting with synthetic Enamel paint over the existing KM, HM Stones, boundary stones, Guide stones, Parapets of Culverts, Tree number back ground, etc., including cost of paint and labour charges, etc., including all other incidental charges as directed by departmental officers.

-

-

-

... More
Road C

647.5

-

1435.46

... More
Provision for hire charges including pay and allowances of Crews for JCB for clearing the ventway of culverts and clearing on either sides, etc., complete as directed by departmental officers.

-

-

-

... More
Road B

3.45

-

116.6

... More
Black banding with Japan Black over the Centre medians, Tree banding, etc., including cost of Japan Black and labour charges, etc., including all other incidental charges as directed by departmental officers.

-

-

-

... More
Letterings in KM & HM Stones, Culvert parapets / Bridges and tree numbers including cost of Paint and labour charges and all other incidental charges, etc., complete as directed by departmental Engineer.

-

-

-

... More
Painting with synthetic Enamel paint over the existing KM, HM Stones, Parapets of Culverts etc., including cost of paint and labour charges, etc., including all other incidental charges as directed by departmental officers.

-

-

-

... More
Road C

13.95

-

116.6

... More
Road A

12

-

133.9

... More
Road A

62

-

14.68

... More
Road A

22.05

-

131.56

... More
Road B

29

-

14.68

... More
Road A

72

-

103.21

... More
Road B

231

-

103.21

... More
Road D

244.8

-

287.72

... More
Road A

10.12

-

133.9

... More
Earthwork excavation including removal and satisfactory disposal of all materials necessary for the construction of road way and side drain in accordance with specification(SS20A) and the lines grades and cross section shown in drawing or as indicated by the engineer for all other incidental charges etc., complete for Berms

-

-

-

... More
Road A

20.61

-

26.33

... More
Road B

12.35

-

131.56

... More
Road B

80

-

5.33

... More
Road A

15.75

-

56.1

... More
Road C

7.62

-

133.9

... More
Road A

20.61

-

26.33

... More
Road A

62

-

14.68

... More
Road A

1920

-

4.4

... More
Painting with synthetic Enamel paint over the existing boundary stones, Guide stones, etc., including cost of paint and labour charges, etc., including all other incidental charges as directed by departmental officers.

-

-

-

... More
Road C

44.1

-

26.33

... More
Road A

10.12

-

133.9

... More
Road B

1865

-

16.93

... More
Road A

20.61

-

26.33

... More
Road C

10500

-

49.82

... More
Painting with synthetic Enamel paint over the existing iron surfaces, etc., including cost of paint and labour charges, etc., including all other incidental charges as directed by departmental officers.

-

-

-

... More
Road C

22.05

-

131.56

... More
Road B

69.3

-

103.21

... More
Road B

80

-

5.33

... More
White washing with white cem over the Trees etc., including cost of white cem and labour charges, etc., including all other incidental charges as directed by departmental officers.

-

-

-

... More
Vibrate Cement Concrete M15 (Nominal mix 1:2:4) using 20mm ISS size HBG metal including cost and conveyance of all materials to worksite and cost of cement at site including cost of soft water, labour charges for mixing, transporting, laying, curing working at depths, tools and plants etc. complete as per standard specifications for Stem portion as per MORTH No 1000, 1500, 1700, 2200

-

-

-

... More
Road B

1848

-

4.4

... More
Road D

280

-

1519.86

... More
Road A

2

-

700

... More
Road C

787.5

-

5761.04

... More
Letterings in KM & HM Stones, Culvert parapets / Bridges and tree numbers including cost of Paint and labour charges and all other incidental charges, etc., complete as directed by departmental Engineer.

-

-

-

... More
Black banding with Japan Black over the Centre medians, Tree banding, etc., including cost of Japan Black and labour charges, etc., including all other incidental charges as directed by departmental officers.

-

-

-

... More
Road B

24

-

133.9

... More
Road C

2256

-

4.4

... More
Road C

95

-

5.33

... More
Provision for hire charges including pay and allowances of Crews for JCB for clearing the ventway of culverts and clearing on either sides, etc., complete as directed by departmental officers.

-

-

-

... More
Road C

2256

-

4.4

... More
Clearing the light jungle with uprooting including labour charges and all other incidental charges, etc., complete as per standard specification.

-

-

-

... More
Clearing the light jungle with uprooting including labour charges and all other incidental charges, etc., complete as per standard specification.

-

-

-

... More
Chiseling the tree for tree numbering of size 0.20 x 0.20 m including cost of tools, labour charges

-

-

-

... More
Road C

95

-

5.33

... More
Road C

2256

-

4.4

... More
Road B

31.47

-

183.3

... More
Road B

1848

-

4.4

... More
Dense graded Bituminous Macadam (Table - 500 - 10) (providing and laying dense bituminous macadam with Hot Mix Plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade - 30) at percentage specified by JMF by weight of total mix of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction Grading II as per MORTH Rev. V Specification Nos.111,112,505,900

-

-

-

... More
Road C

62

-

14.68

... More
Road C

13.95

-

116.6

... More
Road C

22.05

-

131.56

... More
Road B

80

-

5.33

... More
Final Quoted Value

1

-

-

... More
Road A

240

-

103.21

... More
Road B

69.3

-

103.21

... More
Road A

2

-

700

... More
Road C

40

-

1136.16

... More
Road B

7.47

-

133.9

... More
Painting with synthetic Enamel paint over the existing iron surfaces, etc., including cost of paint and labour charges, etc., including all other incidental charges as directed by departmental officers.

-

-

-

... More
Painting with synthetic Enamel paint over the existing boundary stones, Guide stones, etc., including cost of paint and labour charges, etc., including all other incidental charges as directed by departmental officers.

-

-

-

... More
Road C

95

-

5.33

... More
Road C

24

-

133.9

... More
Road D

8160

-

781

... More
White washing with white cem over the Culvert parapets, etc., including cost of white cem and labour charges, etc., including all other incidental charges as directed by departmental officers.

-

-

-

... More
Road B

12.35

-

131.56

... More
Road A

44.1

-

26.33

... More
Road C

95

-

5.33

... More
Road C

22.05

-

131.56

... More
Earthwork excavation including removal and satisfactory disposal of all materials necessary for the construction of road way and side drain in accordance with specification(SS20A) and the lines grades and cross section shown in drawing or as indicated by the engineer for all other incidental charges etc., complete for Berms

-

-

-

... More
Road B

352

-

16.93

... More
Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the bituminous surface cleaned with mechanical broom and high pressure air jet,or other means as directed by the Engineer.As per clause 503 - over bituminous surfaces

-

-

-

... More
Road B

69.3

-

103.21

... More
Road A

577.5

-

16.93

... More
Road B

7.47

-

133.9

... More
Road C

12.6

-

6443.2

... More
Road B

9870

-

10.71

... More
Road C

2256

-

4.4

... More
Road A

22.05

-

131.56

... More
Painting with synthetic Enamel paint over the existing KM, HM Stones, Parapets of Culverts etc., including cost of paint and labour charges, etc., including all other incidental charges as directed by departmental officers.

-

-

-

... More
Road B

24

-

133.9

... More
Road A

866.25

-

5761.04

... More
Road C

22.05

-

131.56

... More
Road B

69.3

-

103.21

... More
Road B

12.35

-

131.56

... More
Upkeeping of Roads for 5th Year Excavation including removal and satisfactory disposal of all materias necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer for Formation of Earthern Drain.

-

-

-

... More
Road C

5

-

311.85

... More
Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the bituminous surface cleaned with mechanical broom and high pressure air jet,or other means as directed by the Engineer.As per clause 503 - over bituminous surfaces

-

-

-

... More
Road A

72

-

103.21

... More
Road B

3.45

-

116.6

... More
Quoted value

1

-

-

... More
Road A

462

-

6664.73

... More
Road A

960

-

4.4

... More
Road A

20.61

-

26.33

... More
Road A

12

-

133.9

... More
Upkeeping of Roads for 2nd Year Excavation including removal and satisfactory disposal of all materias necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer for Formation of Earthern Drain.

-

-

-

... More
Road A

6.09

-

116.6

... More
Road B

24.7

-

26.33

... More
White washing with white cem over the Culvert parapets, etc., including cost of white cem and labour charges, etc., including all other incidental charges as directed by departmental officers.

-

-

-

... More
Road A

1920

-

4.4

... More
Letterings in KM & HM Stones, Culvert parapets / Bridges and tree numbers including cost of Paint and labour charges and all other incidental charges, etc., complete as directed by departmental Engineer.

-

-

-

... More
Road C

44.1

-

26.33

... More
Road C

1880

-

84

... More
White washing with white cem over the Trees etc., including cost of white cem and labour charges, etc., including all other incidental charges as directed by departmental officers.

-

-

-

... More
Road C

22.05

-

131.56

... More
Road B

592.2

-

1373.86

... More
Road A

44.1

-

26.33

... More
Road A

11550

-

10.71

... More
Road A

15.75

-

56.1

... More
Road D

420

-

1431.06

... More
Road A

558.25

-

1493.46

... More
Road B

80

-

5.33

... More
Road A

6.09

-

116.6

... More
Painting with synthetic Enamel paint over the existing boundary stones, Guide stones, etc., including cost of paint and labour charges, etc., including all other incidental charges as directed by departmental officers.

-

-

-

... More
Road C

7.62

-

133.9

... More
Upkeeping of Roads for 1st Year Excavation including removal and satisfactory disposal of all materias necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer for Formation of Earthern Drain.

-

-

-

... More
Road C

84.6

-

103.21

... More
Road A

44.1

-

26.33

... More
Road B

3.45

-

116.6

... More
Road A (Lettering in 5 to 10 cm)

163

-

5.33

... More
Road C

31.62

-

183.3

... More
Road B

24.7

-

26.33

... More
Road C

420

-

6664.73

... More
Chiseling the tree for tree numbering of size 0.20 x 0.20 m including cost of tools, labour charges

-

-

-

... More
Road A

20.61

-

26.33

... More
Painting with synthetic Enamel paint over the existing KM, HM Stones, Parapets of Culverts etc., including cost of paint and labour charges, etc., including all other incidental charges as directed by departmental officers.

-

-

-

... More
Road C

13.95

-

116.6

... More
Road C

10500

-

10.71

... More
Painting with synthetic Enamel paint over the existing iron surfaces, etc., including cost of paint and labour charges, etc., including all other incidental charges as directed by departmental officers.

-

-

-

... More
Road B

1592.5

-

1667.54

... More
Road A

72

-

103.21

... More
Road D

24

-

6392.81

... More
Wet Mix Macadam (Table 400-13) (Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at Optimum Moisture Content in accordance with IS 2720 (part 8) in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density, Complete as per clause 406)

-

-

-

... More
Road B

586.75

-

16.93

... More
Chiseling the tree for tree numbering of size 0.20 x 0.20 m including cost of tools, labour charges

-

-

-

... More
Road A

22.05

-

131.56

... More
Road B

7.47

-

133.9

... More
Road C

1575

-

1667.54

... More
Road C

84.6

-

103.21

... More
Black banding with Japan Black over the Centre medians, Tree banding, etc., including cost of Japan Black and labour charges, etc., including all other incidental charges as directed by departmental officers.

-

-

-

... More
Road B

29

-

14.68

... More
Road B

1848

-

4.4

... More
Road A (Lettering in 5 to 10 cm)

163

-

5.33

... More
Road A

6.09

-

116.6

... More
Road B

3.45

-

116.6

... More
Quoted Rate in Figures (Total Value of Contract Including 12% of GST )

-

-

-

... More
Road A

770

-

1404.66

... More
Road A

1920

-

4.4

... More
Road B

880.13

-

5761.04

... More
Road A

11550

-

49.81

... More
Supply and fixing of RCC Guide post of size 0.20 x 0.20 x 1.20m using vibrated RCC 1:2:4 mix using 20mm ISS HBG metal and fixing 0.50m below GL and side packing CC 1:3:6 using 40mm HBG metal including cost and conveyance of all materials to site, including moulding and fixing charges and all other incidental charges, etc., complete.

-

-

-

... More
Supplying and laying vibro compacted M 40 grade heavy duty road paver interlocking blocks with super embeded and skid texture design the international standard with zig lay design for higher interlocking capacity rate illusive of cost of materials transporation to the side from the factor including all labour charges for laying shifting compacting with power libratory and all taxed etc., complete as per standard specification.

-

-

-

... More
Road A (Lettering in 5 to 10 cm)

163

-

5.33

... More
Road A

12

-

133.9

... More
Road B

3.45

-

116.6

... More
Road A (Lettering in 5 to 10 cm)

163

-

5.33

... More
Road C

95

-

5.33

... More
Road B

3.45

-

116.6

... More
Sand for filling with good River sand from approved Quarry including cost and conveyance at work site to departmental officers etc., complete, complete as per standard specification.

-

-

-

... More
Road C

1128

-

4.4

... More
Excavation for Roadway and drainage Excavation including removal and Satisfactory disposal of all materials necessary for the construction of roadway and side drains in accordance with the specification and the lines, grades and cross sections shown in the Drawings or as indicated by the Engineer a)Box cutting for Widening portion

-

-

-

... More
Road B

5

-

304.25

... More
Road A

13.86

-

6443.2

... More
Road B

12.35

-

131.56

... More
Road C

44.1

-

26.33

... More
Road B

24

-

133.9

... More
Road B

40

-

1107.07

... More
Road A

22.12

-

183.3

... More
Road B

24

-

133.9

... More
Road A

20.61

-

26.33

... More
Road C

2256

-

4.4

... More
Basic cost of value put to tender as per Estimate

-

-

-

... More
Road A

15.75

-

56.1

... More
Road A

44.1

-

26.33

... More
Excavation including removal and satisfactory disposal of all materias necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer for Formation of Earthern Drain.

-

-

-

... More
Road C

13.95

-

116.6

... More
Road A

6.09

-

116.6

... More
Road A

2

-

700

... More
Granular Sub-base with Graded Material (Table:- 400-1) - Plant Mix Method (Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 ) - for grading-III Material

-

-

-

... More
Clearing the light jungle with uprooting including labour charges and all other incidental charges, etc., complete as per standard specification.

-

-

-

... More
Road B

29

-

14.68

... More
Road B

80

-

5.33

... More
Road B

12.35

-

131.56

... More
Road A

23.1

-

6443.2

... More
Road B

24.7

-

26.33

... More
Road A

7

-

308.2

... More
Add GST at 12% of Final Quoted Value

1

-

-

... More
Road C

24

-

133.9

... More
Road A

1920

-

4.4

... More
White washing with white cem over the Culvert parapets, etc., including cost of white cem and labour charges, etc., including all other incidental charges as directed by departmental officers.

-

-

-

... More
White washing with white cem over the Trees etc., including cost of white cem and labour charges, etc., including all other incidental charges as directed by departmental officers.

-

-

-

... More
Road C

24

-

133.9

... More
Provision for hire charges including pay and allowances of Crews for JCB for clearing the ventway of culverts and clearing on either sides, etc., complete as directed by departmental officers.

-

-

-

... More
Road C

7.62

-

133.9

... More
Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the bituminous surface cleaned with mechanical broom and high pressure air jet,or other means as directed by the Engineer.As per clause 503 - over bituminous surfaces

-

-

-

... More
Road C

84.6

-

103.21

... More
Road C

315

-

16.93

... More
Earthwork excavation including removal and satisfactory disposal of all materials necessary for the construction of road way and side drain in accordance with specification(SS20A) and the lines grades and cross section shown in drawing or as indicated by the engineer for all other incidental charges etc., complete for Berms

-

-

-

... More
Painting with synthetic Enamel paint over the existing iron surfaces, etc., including cost of paint and labour charges, etc., including all other incidental charges as directed by departmental officers.

-

-

-

... More
Road C

1

-

1854.33

... More
Provision for hire charges including pay and allowances of Crews for JCB for clearing the ventway of culverts and clearing on either sides, etc., complete as directed by departmental officers.

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.