Highways Department Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Highways Department Tender

Civil And Construction
Bridge Construction
Eprocure
Opening Date11 Feb 2023
Closing DateCancelled
Tender Amount₹ 15,66,00,000 
Notes
Download

Costs

Summary

Mdu093 Tn 48 2021 22hdo Dated 31 01 2023

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Widening of minor bridge @ MM Lodge (sellur ch: 0/482)

56

-

-

... More
Providing AT-GRADE IMPROVEMENTS at Corporation Road and Palam sataion Road

33.27

-

-

... More
AT-GRADE IMPROVEMENTS AT Goripalayam Thallakulam side

738.98

-

-

... More
AT-GRADE IMPROVEMENTS AT Thamukkam flyover to out post

2420.04

-

-

... More
AT grade Improvements at Bibikulam loop Roads

1763.2

-

-

... More
Junction Improvement at Goripalayam

6120.88

-

-

... More
Junction IMPROVEMENTS AT BB Kulam side

2666.4

-

-

... More
Junction IMPROVEMENTS AT Anna statue side

807

-

-

... More
Junction IMPROVEMENTS AT Gokulae side

3491.4

-

-

... More
Junction IMPROVEMENTS AT Yanaikkal side

1801.86

-

-

... More
Excavation including removal and satisfactory disposal of all materias necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer as per MORTH Specification for Box cutting

-

-

-

... More
Providing AT-GRADE IMPROVEMENTS at Corporation Road and Palam sataion Road

10029

-

-

... More
AT-GRADE IMPROVEMENTS AT Goripalayam Thallakulam side

5308.5

-

-

... More
AT-GRADE IMPROVEMENTS AT Thamukkam flyover to out post

3082

-

-

... More
Earth Work Excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges such as bailing out water, providing and maintaining necessary cofferdams, sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavation, backfilling and clearing the site and disposal of all surplus materials etc. complete as per standard specification No. 304 of MORTH for FOUNDATION OF PILE CAPS UNDER PIERS.

-

-

-

... More
Main Arm

2361

-

-

... More
Sellur Arm

1906

-

-

... More
High Level Bridge

1877

-

-

... More
Widening of minor bridge @ MM Lodge (sellur ch: 0/482)

200.15

-

-

... More
Cement concrete M15 Grade (Nominal Mix) using 40mm ISS size hard broken granite metal including cost and conveyance of all materials to site, including soft water, labour charges for mixing, transporting, laying, compacting, curing, tools and plants and all incidental charges such as bailing out water, maintaning of protective bunds, cofferdams, shoring strutting etc., complete as per relevant standard specification for LEVELLING COURSE BELOW PILE CAP

-

-

-

... More
Main Arm

68

-

-

... More
Sellur Arm

76

-

-

... More
High Level Bridge

72

-

-

... More
Widening of minor bridge @ MM Lodge (sellur ch: 0/482)

10.01

-

-

... More
Box culvert @ meenakshi college CH :589

16.63

-

-

... More
Box culvert @ Anna statue CH:0.090

16.63

-

-

... More
Cement concrete M10 Grade (Nominal Mix) using 40mm ISS size hard broken granite metal including cost and conveyance of all materials to site, including soft water, labour charges for mixing, transporting, laying, compacting, curing, tools and plants and all incidental charges such as bailing out water, maintaning of protective bunds, cofferdams, shoring strutting etc., complete as per relevant standard specification for LEVELLING COURSE for Load bearing drain

-

-

-

... More
LOAD BEARING DRAIN

44.88

-

-

... More
Cost and supply of MS liner including fabrication and driving upto refusal point permanent liner using 6 mm thick M.S.plates confirming to I.S.2062 of 1200mm inner diameter from formed ground level and charges for welding, and construction with consumables, labour and tools and plants required and driving the MS liner 6 mm thick to be left permanently with the pile shaft as per re quiremently with the pile shaft as per specification and placing them in position with all lead and lift etc complete as directed by the departmental officiers as per MORT & H specifications

-

-

-

... More
Main Arm

392

-

-

... More
Sellur Arm

159

-

-

... More
High Level Bridge

73

-

-

... More
Providing reinforced cement concrete cast-int-situ bored PILES of 1200mm diameter in vibrated RCC mix M35 (Design mix) using ISS graded metal by tremie concreting including cost and conveyance of all materials to site and cost of cement at site but excluding cost and fabrication of steel and placing it in position before concreting setting up of piling equipment, shifting the same from one pile location to another pile location, dismantling them and reerceting as necessary including all labour for driving or boring and providing temporary casing where ever required through all soils, leading the excavated earth to a distance of 200m including forming of working platform over the river bed for acomodating piling equipment etc., forming of working platform etc., forming approaches to the working platform, mixing concrete, filling it in position, cutting of pile head to cut off level for casting pile cap including diversion of water course if necessary, forming and maintaining protective bunds and all other incidental charges etc., complete as per standard specifications for PILES.

-

-

-

... More
Main Arm

1850

-

-

... More
Sellur Arm

1181

-

-

... More
High Level Bridge

1690

-

-

... More
Vibrated Reinforced Cement Concrete of grade M35 (Design mix) using ISS graded metal including cost and conveyance of all materials to site excluding cost and conveyance of all materials to site excluding cost of steel, including cost cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths Tools and Plants and incidental charges such as bailing out water, maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevent standard specification for PILE CAPS

-

-

-

... More
Main Arm

1735

-

-

... More
Sellur Arm

1287

-

-

... More
High Level Bridge

1422

-

-

... More
Vibrated Reinforced Cement Concrete of grade M35 (Design Mix) using 20mm ISS graded metal including cost and conveyance of all materials to site excluding cost of steel including cost cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at heights, soft water, hire charges for Tools and Plants and incidental all other incidental charges etc., complete as per relevent standard specification for ABUTMENT AND RETURNS

-

-

-

... More
Main Arm

140

-

-

... More
Sellur Arm

65

-

-

... More
High Level Bridge

419

-

-

... More
Vibrated Reinforced Cement Concrete of grade M35 (Design Mix) using 20mm ISS graded metal including cost and conveyance of all materials to site excluding cost of steel including cost cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at heights, soft water, hire charges for Tools and Plants and incidental all other incidental charges etc., complete as per relevent standard specification for PIERS

-

-

-

... More
Main Arm

524

-

-

... More
Sellur Arm

693

-

-

... More
High Level Bridge

235

-

-

... More
Vibrated Reinforced Cement Concrete of grade M35 (Design Mix) using 20mm ISS graded metal including cost and conveyance of all materials to site excluding cost of steel including cost cement at site including cost of formwork, labour charges for mixing, transporting, laying and curing concrete, working at heights, soft water, hire charges for Tools and Plants and incidental all other incidental charges etc., complete as per relevent standard specification for Capping Beam.

-

-

-

... More
Main Arm

823

-

-

... More
Sellur Arm

639

-

-

... More
High Level Bridge

307

-

-

... More
Vibrated Reinforced Cement Concrete of M35 (Design mix) using 20mm ISS graded HBG metal stone including cost and conveyance of all materials to site and cost of cement at site but excluding cost and fabrication of steel but including using soft water cost of form work and cntering, labour charges for mixing, transporting, laying, curing concrete, working on heights, hire charges for tools and plants including all other incidental charges etc., complete as per standard specifications for BED BLOCK AND DIRT WALL.

-

-

-

... More
Main Arm

29

-

-

... More
Sellur Arm

9

-

-

... More
High Level Bridge

24

-

-

... More
Vibrated Reinforced Cement Concrete of grade M35 (Design Mix) using 20mm ISS graded metal including cost and conveyance of all materials to site excluding cost of steel including cost cement at site including cost of formwork, labour charges for mixing, transporting, laying and curing concrete, working at heights, soft water, hire charges for Tools and Plants and incidental all other incidental charges etc., complete as per relevent standard specification for PEDESTALS

-

-

-

... More
Main Arm

15

-

-

... More
Sellur Arm

12

-

-

... More
High Level Bridge

13

-

-

... More
Supplying, fitting and fixing in position true to line and level elastomeric bearing conforming to IRC: 83 (Part-II) section IX and clause 2005 of MoRTH specifications complete including all accessories as per drawing and Technical Specifications.

-

-

-

... More
Main Arm

2332800

-

-

... More
Sellur Arm

1728000

-

-

... More
High Level Bridge

1440000

-

-

... More
Supplying, fitting and fixing in position true to line and level POT-PTFE Bearing consisting of a metal piston supported by a disc or unreinforced elastomer confined within a metal cylinder, sealing rings, dust seals, PTFE surface sliding against stainless steel mating surface, completely assembly to be of cast steel/fabricated structural steel, metal and elastomer elements to be as per IRC:83 Part I and II respectively and other parts confirming to BS:5400, section 9.1 and 9.2 and clause 2006 of MoSRT&H Specifications complete,, ncluding cost of all materials, labour, with all lead and lift, loading, unloading, transpotring, etc,complete,as per the directions of eng-in-charge of work, and in accordance with MoSRT&H Technical Specification Clause 2000 & 2200

-

-

-

... More
Main Arm

-

-

-

-

-

-

-

-

-

... More
Transverse

-

-

-

... More
Longitudinal

-

-

-

... More
Sellur Arm

-

-

-

2

-

-

2

-

-

... More
Transverse

2

-

-

... More
Longitudinal

2

-

-

... More
Vibrated Reinforced Cement Concrete of grade M35 (Design Mix) using 20mm and below ISS graded metal including cost and conveyance of all materials to site excluding cost of steel including cost cement at site and including cost of formwork, labour charges for mixing, transporting, laying and curing concrete, working at heights, soft water, hire charges for Tools and Plants including all other incidental charges etc., compelete as per MoSRT&H technical specification clause 1500,1600& 1700for RCC T Beam & CROSS BEAMS

-

-

-

... More
Main Arm

2590

-

-

... More
Sellur Arm

1255

-

-

... More
High Level Bridge

1138

-

-

... More
Vibrated Reinforced Cement Concrete of grade M35 (Design Mix) using 20mm and below ISS graded metal including cost and conveyance of all materials to site excluding cost of steel including cost cement at site and including cost of formwork, labour charges for mixing, transporting, laying and curing concrete, working at heights, soft water, hire charges for Tools and Plants including all other incidental charges etc., compelete as per MoSRT&H technical specification clause 1500,1600& 1700 for DECK SLAB.

-

-

-

... More
Main Arm

1860

-

-

... More
Sellur Arm

759

-

-

... More
High Level Bridge

1382

-

-

... More
Vibrated Reinforced cement concrete of design mix M40 (Design mix) using 20mm ISS graded HBGS metal stone including cost and conveyance of all materials to site including cost of cement at site including formwork and centering, using soft water, labour charges for mixing, transporting and placing in position, vibrating and compacting, finishing and curing, working at heights, hire charges for tools and plants including all other incidental charges etc., complete as per standard specifications for Box girder, Super structure.

-

-

-

... More
Main Arm

861

-

-

... More
Sellur Arm

529.4

-

-

... More
Vibrated Reinforced Cement Concrete of grade M40 (Design Mix) using 20mm ISS graded metal including cost and conveyance of all materials to site excluding cost of steel including cost cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at heights, soft water, hire charges for Tools and Plants and incidental all other incidental charges etc., complete as per relevent standard specification for CRASH BARRIER

-

-

-

... More
Main Arm

838

-

-

... More
Sellur Arm

394

-

-

... More
High Level Bridge

178

-

-

... More
Providing and laying of a Strip Seal expansion joint catering to maximum horizontal movement upto 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instructions for installation.

-

-

-

... More
Main Arm

352

-

-

... More
Sellur Arm

216

-

-

... More
High Level Bridge

232

-

-

... More
Providing and laying Tack coat over Dry Lean Cement Concrete surface using 3.0kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinary, fuel and all other incidental charges etc., complete per clause 503 of MORTH Rev-5.

-

-

-

... More
Main Arm

8027

-

-

... More
Sellur Arm

4780

-

-

... More
High Level Bridge

3536

-

-

... More
Providing and laying 25mm thick Mastic Asphalt wearinf Course with paving grade bitumen melting the requirement given in table 500-29, prepared by using mastic cooker and slope after cleaning the surface including anti skid surface with bitumen percolated fine grained hand stone clipping of 10cm center to center in both directions pressed in to surface when the temperature of surface is not less than 10 centigrade protruding 1mm to 4mm over mastic surface all complete as per MORTH Rev-5.

-

-

-

... More
Main Arm

8223

-

-

... More
Sellur Arm

4780

-

-

... More
High Level Bridge

3536

-

-

... More
Vibrated Reinforced Cement Concrete M30 Grade (Design Mix) using 25mm, 12mm and 6mm IRC size hard broken granite metal including cost and conveyance of all materials to site cost of premoulded expansion joints and fixing the same in position including cost and labour charges for formwork, labour charges for laying, compacting, curing including all other incidental charges etc., complete for Wearing coat 75mm uniform thickness over Deck slab and over approach slab.

-

-

-

... More
Widening of minor bridge @ MM Lodge (sellur ch: 0/482)

82

-

-

... More
Box culvert @ meenakshi college CH :589

102.09

-

-

... More
Box culvert @ Anna statue CH:0.090

102.09

-

-

... More
Providing and fixing G.I Drainage spouts of 100mm dia as per GOI drawing No.SD/205 with grating arrangements at top as shown in the drawing and 100mm dia drainage spouts projecting atleast 300mm beyond bottom of deck slab including cost and conveyance of all meterials to site fixing them in position etc., complete.

-

-

-

... More
Main Arm

200

-

-

... More
Sellur Arm

152

-

-

... More
High Level Bridge

120

-

-

... More
Widining of minor bridge @ MM Lodge (sellur ch: 0/482)

3

-

-

... More
Providing and fixing Class I PVC seepage pipes of 110mm dia of required lengths for abutments and return walls including costs and conveyance of all materials to work site and labour charges for fixing etc., complete to drain from the backfill as per section 2706 of MORTH specification (Rev- V)

-

-

-

... More
Main Arm

124

-

-

... More
Sellur Arm

51

-

-

... More
High Level Bridge

304

-

-

... More
Providing FILTER MEDIA behind abutments and return walls for 600mm thickness using filter material conforming to clause 309.3.2.B of MORTH well packed with smaller size towards the soil and bigger size towards the wall including cost and conveyance of all materials to worksite and including labour charges and all other incidental charges etc.,complete.

-

-

-

... More
Main Arm

104

-

-

... More
Sellur Arm

41

-

-

... More
High Level Bridge

208

-

-

... More
Widining of minor bridge @ MM Lodge (sellur ch: 0/482)

22

-

-

... More
Filling behind Abutments and return walls with clean gritty free draining gravel including cost of gravel having pi value less than 6, conveyance of gravel to worksite. Laying, handling charges and filling in layers tamping under optimum moiture content to get the maximum density, including watering, with all leads and lifts for water and all other incidental charges etc., complete.

-

-

-

... More
Main Arm

270

-

-

... More
Sellur Arm

81

-

-

... More
High Level Bridge

461

-

-

... More
Widining of minor bridge @ MM Lodge (sellur ch: 0/482)

52

-

-

... More
Vibrated Reinforced Cement Concrete of grade M15 (Nominal Mix) using 40mm ISS graded metal including cost and conveyance of all materials to site including cost cement at site and including cost of formwork, labour charges for mixing, transporting, laying and curing concrete, working at heights, soft water, hire charges for Tools and Plants incidental all other incidental charges etc., complete as per relevent standard specification for BASE COURSE below approach slab

-

-

-

... More
Main Arm

12

-

-

... More
Sellur Arm

4

-

-

... More
High Level Bridge

13

-

-

... More
Widining of minor bridge @ MM Lodge (sellur ch: 0/482)

12

-

-

... More
Vibrated Reinforced Cement Concrete of grade M35 (Design Mix) using 20mm ISS graded metal including cost and conveyance of all materials to site excluding cost of steel including cost cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at heights, soft water, hire charges for Tools and Plants and incidental all other incidental charges etc., complete as per relevent standard specification for APPROACH SLAB

-

-

-

... More
Main Arm

33

-

-

... More
Sellur Arm

10

-

-

... More
High Level Bridge

35

-

-

... More
Supply and fabrication of STEEL grade Fe500 D with suitable anticorrosive measure required for all the reinforced cement concrete items of work involved in the schedule including cost of steel, cost of fabrication, labour charges for cleaning the rods, straightening, cutting, bending, tying grills, hoisting and placing the reinforcement in position as specified in the drawing including cost of binding wire provision of spacer bars, cover blocks and all other incidental charges etc., complete.

-

-

-

... More
Main Arm

1557

-

-

... More
Sellur Arm

934

-

-

... More
High Level Bridge

837

-

-

... More
RETAINING WALL AT ANNA STATUE (A1-HLB)

38

-

-

... More
RETAINING WALL B/W AV BRIDGE (A2)-PRO.FLYOVER (A1)-LHS

62

-

-

... More
RETAINING WALL BETWEEN AV BRIDGE (A2 HLB) SIDE BHS

35

-

-

... More
RETAINING WALL AV BRIDGE UPRAMP LHS PORTION

60

-

-

... More
RETAINING WALL SELLUR SIDE

114

-

-

... More
RETAINING WALL SELLUR SIDE

64

-

-

... More
PIER PROTECTION

23.8

-

-

... More
LOAD BEARING DRAIN

22.97

-

-

... More
Widening of minor bridge @ MM Lodge (sellur ch: 0/482)

12.04

-

-

... More
Box culvert @ meenakshi college CH :589

13

-

-

... More
Box culvert @ Anna statue CH:0.090

13

-

-

... More
STAIR CASE

9.5

-

-

... More
Retaining wall At Tammukam

57

-

-

... More
Footpathcum Drain Goripalaym to Tamukam

131.96

-

-

... More
Footpathcum Drain Tamukam to outpost

89.99

-

-

... More
Footpathcum Drain Goripalayam to sellur

53.5

-

-

... More
Load Drain Near GH Side

55.4

-

-

... More
Supply and fabrication of STEEL grade Fe 240 with suitable anticorrosive measure required for all the reinforced cement concrete items of work involved in the schedule including cost of steel, cost of fabrication, labour charges for cleaning the rods, straightening, cutting, bending, tying grills, hoisting and placing the reinforcement in position as specified in the drawing including cost of binding wire provision of spacer bars, cover blocks and all other incidental charges etc., complete.

-

-

-

... More
Main Arm

3

-

-

... More
Sellur Arm

2

-

-

... More
High Level Bridge

2

-

-

... More
Widening of minor bridge @ MM Lodge (sellur ch: 0/482)

0.5

-

-

... More
Vibrated Reinforced cement concrete of grade M30 (Design mix) using 20mm ISS hard broken granite metal including cost and conveyance of all materials to site and cost of cement excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for tools and plants including all other incidental charges etc., complete for Hand Rails and Posts.

-

-

-

... More
High Level Bridge

315

-

-

... More
Vibrated cement concrete M15 (Nominal mix) using 40mm ISS size hard broken granite metal including cost and conveyance of all materials to site including cost and labour charges for formwork, centering, labour charges for laying, compacting, curing all incidental charges etc., complete for Parapet.

-

-

-

... More
High Level Bridge

8

-

-

... More
Widining of minor bridge @ MM Lodge (sellur ch: 0/482)

4

-

-

... More
Box culvert @ meenakshi college CH :589

2.72

-

-

... More
Box culvert @ Anna statue CH:0.090

2.72

-

-

... More
Earth work excavation in all classes of soils except hard rock requiring blasting and depositing on bank with initial leads of 10m and initial lifts of 2m as per SS20B, including cost of all labour, equipments and all other incidential charges such as bailing out water, sheeting, shoring, bracing and their subsequent removal of all logs, stumps and other deleterious matter and obstructions trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus earth with all leads etc., complete as per standard specifications .

-

-

-

... More
RETAINING WALL AT ANNA STATUE (A1-HLB)

1094

-

-

... More
RETAINING WALL B/W AV BRIDGE (A2)-PRO.FLYOVER (A1)-LHS

2114

-

-

... More
RETAINING WALL BETWEEN AV BRIDGE (A2 HLB) SIDE BHS

1024

-

-

... More
RETAINING WALL AV BRIDGE UPRAMP LHS PORTION

1966

-

-

... More
RETAINING WALL SELLUR SIDE

3473

-

-

... More
PIER PROTECTION

329.25

-

-

... More
Retaining wall At Tammukam

1673

-

-

... More
Cement Concrete M15 Nominal mix(1:2:4), using 40mm ISS HBG metal including cost and conveyance of all materials to site and cement at site including form work and centering, using soft water, labour charges for mixing, transporting and placing in position, compacting, finishing and curing, working at depths, hire charges for tools and plants and incidental charges, etc., complete, as per standard specifications for LEVELLING COURSE BELOW RETAINING WALLS, PROTECTION WALL

-

-

-

... More
RETAINING WALL AT ANNA STATUE (A1-HLB)

47

-

-

... More
RETAINING WALL B/W AV BRIDGE (A2)-PRO.FLYOVER (A1)-LHS

79

-

-

... More
RETAINING WALL BETWEEN AV BRIDGE (A2 HLB) SIDE BHS

47

-

-

... More
RETAINING WALL AV BRIDGE UPRAMP LHS PORTION

81

-

-

... More
RETAINING WALL SELLUR SIDE

136

-

-

... More
Coffer dam

1340

-

-

... More
PIER PROTECTION

109.75

-

-

... More
Retaining wall At Tammukam

78

-

-

... More
PCC M20 in Foundation (Plain cement concrete 1:1.5:3 nominal mix in foundation with crushed stone aggregate 20 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.) Curtain wall complete as per drawing and Technical specification

-

-

-

... More
Coffer dam

1340

-

-

... More
Reinforced Cement Concrete M25 using 20mm ISS HBG jelly including cost and conveyance of all materials to site and cost of cement at site including soft water, labour charges for mixing, transporting, laying, curing concrete, cost of formwork, soft water, working on depths, hire charges for tools and plants including all other incidental charges etc., complete as per relevant standard specification for PROTECTION WALLS.

-

-

-

... More
PIER PROTECTION

791

-

-

... More
Construction of Median and Island with Soil Taken from Roadway Cutting (Construction of median and Island above road level with approved material deposited at site from Road cutting and excavation for drain and foundation of other structures, spread, sloped and compacted as per clause 407)

-

-

-

... More
PIER PROTECTION

8426

-

-

... More
Construction of Coffer dam earthern embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2.

-

-

-

... More
Coffer dam

3750

-

-

... More
Reinforced Cement concrete M30 using 20mm ISS HBG jelly including cost and conveyance of all materials to site and cost of cement at site including soft water, labour charges for mixing, transporting, laying, curing concrete, cost of formwork, soft water, working on depths, hire charges for tools and plants includding all other incidental charges etc., complete as per relevant standard specification for FOUNDATION OF RETAINING WALLS.

-

-

-

... More
RETAINING WALL AT ANNA STATUE (A1-HLB)

494

-

-

... More
RETAINING WALL B/W AV BRIDGE (A2)-PRO.FLYOVER (A1)-LHS

761

-

-

... More
RETAINING WALL BETWEEN AV BRIDGE (A2 HLB) SIDE BHS

350

-

-

... More
RETAINING WALL AV BRIDGE UPRAMP LHS PORTION

760

-

-

... More
RETAINING WALL SELLUR SIDE

1655

-

-

... More
Retaining wall At Tammukam

673

-

-

... More
Reinforced Cement concrete M30 using 20MM ISS graded HBG metal stone including cost and conveyance of all materials to site including cost of cement site including formwork and centering using soft water. Labour charges for mixing, transporting and placing in position, vibrating and compacting. finishing and curing, working at depth, hire charges for tools and plants including all other incidential charges for tools and palnts including all other incidental charges etc., complete as per standard specifications for STEM OF RETAINING WALLS .

-

-

-

... More
RETAINING WALL AT ANNA STATUE (A1-HLB)

238

-

-

... More
RETAINING WALL B/W AV BRIDGE (A2)-PRO.FLYOVER (A1)-LHS

533

-

-

... More
RETAINING WALL BETWEEN AV BRIDGE (A2 HLB) SIDE BHS

176

-

-

... More
RETAINING WALL AV BRIDGE UPRAMP LHS PORTION

520

-

-

... More
RETAINING WALL SELLUR SIDE

952

-

-

... More
Retaining wall At Tammukam

288

-

-

... More
Providing and fixing PVC seepage pipes of 100mm dia of required lengths for abutments wings and Retaining walls including cost and conveyance of all materials to worksite and labour charges for fixing,etc,complete to drain the backfill as per standard specifications.

-

-

-

... More
RETAINING WALL AT ANNA STATUE (A1-HLB)

265

-

-

... More
RETAINING WALL B/W AV BRIDGE (A2)-PRO.FLYOVER (A1)-LHS

508

-

-

... More
RETAINING WALL BETWEEN AV BRIDGE (A2 HLB) SIDE BHS

432

-

-

... More
RETAINING WALL AV BRIDGE UPRAMP LHS PORTION

543

-

-

... More
RETAINING WALL SELLUR SIDE

936

-

-

... More
Widining of minor bridge @ MM Lodge (sellur ch: 0/482)

24

-

-

... More
Retaining wall At Tammukam

474

-

-

... More
Footpathcum Drain Goripalaym to Tamukam

403

-

-

... More
Footpathcum Drain Tamukam to outpost

230

-

-

... More
Footpathcum Drain Goripalayam to sellur

153

-

-

... More
Load Drain Near GH Side

165

-

-

... More
Vibrated Reinforced Cement Concrete of M30 design mix using 20mm ISS HBG graded metal including cost and conveyance of all materials to site and using cement at site, but excluding cost and fabrication of steel but including labour charges for mixing, laying, vibrating, curing concrete, hire charges for tools and plants including all other incidental charges etc., complete, as per relevant specification for Bracket

-

-

-

... More
RETAINING WALL AT ANNA STATUE (A1-HLB)

18

-

-

... More
RETAINING WALL B/W AV BRIDGE (A2)-PRO.FLYOVER (A1)-LHS

35

-

-

... More
RETAINING WALL BETWEEN AV BRIDGE (A2 HLB) SIDE BHS

34

-

-

... More
RETAINING WALL AV BRIDGE UPRAMP LHS PORTION

37

-

-

... More
RETAINING WALL SELLUR SIDE

75

-

-

... More
Retaining wall At Tammukam

43

-

-

... More
Vibrated Reinforced cement concrete M40 (Design Mix) using 20mm ISS graded HBG graded metal including cost"and conveyance of all materials to site including cement at site including cost of formwork using soft water, labour charges for mixing, transporting and placing in position, vibrating and compacting, laying and curing concrete, hire charges for tools and plants including shoring, shuttering etc., complete as per relevant specification for CRASH BARRIER

-

-

-

... More
RETAINING WALL AT ANNA STATUE (A1-HLB)

22

-

-

... More
RETAINING WALL B/W AV BRIDGE (A2)-PRO.FLYOVER (A1)-LHS

42

-

-

... More
RETAINING WALL BETWEEN AV BRIDGE (A2 HLB) SIDE BHS

41

-

-

... More
RETAINING WALL AV BRIDGE UPRAMP LHS PORTION

45

-

-

... More
RETAINING WALL SELLUR SIDE

91

-

-

... More
Retaining wall At Tammukam

52

-

-

... More
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2.

-

-

-

... More
APPROACH ROAD At Anna Statue

5538.44

-

-

... More
APPROACH ROAD AV BRIDGE (A2-HLB) SIDE

17171.9

-

-

... More
APPROACH ROAD At corporation side

5041.08

-

-

... More
APPROACH ROAD At Sellur arm

2990.7

-

-

... More
APPROACH ROAD At Thamukkam side

716.73

-

-

... More
Construction of Sub Grade with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2

-

-

-

... More
APPROACH ROAD At Anna Statue

479.69

-

-

... More
APPROACH ROAD AV BRIDGE (A2-HLB) SIDE

2482.75

-

-

... More
APPROACH ROAD At corporation side

998.85

-

-

... More
APPROACH ROAD At Sellur arm

517.5

-

-

... More
APPROACH ROAD At Thamukkam side

430.1

-

-

... More
Granular Sub-base with Graded Material (Table:- 400-1) - Plant Mix Method Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 of MORTH Vth Revision Specification No. 111, 112, 401, 900 - for Grading- III Material

-

-

-

... More
APPROACH ROAD At Anna Statue

95.94

-

-

... More
APPROACH ROAD AV BRIDGE (A2-HLB) SIDE

496.55

-

-

... More
APPROACH ROAD At corporation side

199.77

-

-

... More
APPROACH ROAD At Sellur arm

103.5

-

-

... More
APPROACH ROAD At Thamukkam side

86.02

-

-

... More
Providing AT-GRADE IMPROVEMENTS at Corporation Road and Palam sataion Road

1509

-

-

... More
AT-GRADE IMPROVEMENTS AT Goripalayam Thallakulam side

792.3

-

-

... More
AT-GRADE IMPROVEMENTS AT Thamukkam flyover to out post

460

-

-

... More
AT grade Improvements at Bibikulam loop Roads

162

-

-

... More
Junction Improvement at Goripalayam

874.17

-

-

... More
Junction IMPROVEMENTS AT Anna statue side

375.9

-

-

... More
Junction IMPROVEMENTS AT Gokulae side

529

-

-

... More
Junction IMPROVEMENTS AT Yanaikkal side

270.95

-

-

... More
Granular Sub-base with Graded Material (Table:- 400-1) - Plant Mix Method Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 of MORTH Vth Revision Specification No. 111, 112, 401, 900 - for Grading- V Material

-

-

-

... More
APPROACH ROAD At Anna Statue

153.5

-

-

... More
APPROACH ROAD AV BRIDGE (A2-HLB) SIDE

794.48

-

-

... More
APPROACH ROAD At corporation side

319.63

-

-

... More
APPROACH ROAD At Sellur arm

186.3

-

-

... More
APPROACH ROAD At Thamukkam side

137.63

-

-

... More
Providing AT-GRADE IMPROVEMENTS at Corporation Road and Palam sataion Road

2715

-

-

... More
AT-GRADE IMPROVEMENTS AT Goripalayam Thallakulam side

1267.7

-

-

... More
AT-GRADE IMPROVEMENTS AT Thamukkam flyover to out post

736

-

-

... More
AT grade Improvements at Bibikulam loop Roads

367.2

-

-

... More
Junction Improvement at Goripalayam

1398.66

-

-

... More
Junction Improvement at BB Kulam

1010

-

-

... More
Junction IMPROVEMENTS AT Anna statue side

601.44

-

-

... More
Junction IMPROVEMENTS AT Gokulae side

846.4

-

-

... More
Junction IMPROVEMENTS AT Yanaikkal side

487.73

-

-

... More
Wet Mix Macadam (Table 400-13) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density, Complete as per clause 406 of MORTH Vth Revision Specification No. 111, 112, 406, 900

-

-

-

... More
APPROACH ROAD At Anna Statue

239.84

-

-

... More
APPROACH ROAD AV BRIDGE (A2-HLB) SIDE

1241.38

-

-

... More
APPROACH ROAD At corporation side

499.42

-

-

... More
APPROACH ROAD At Sellur arm

258.75

-

-

... More
APPROACH ROAD At Thamukkam side

215.05

-

-

... More
Providing AT-GRADE IMPROVEMENTS at Corporation Road and Palam sataion Road

3771

-

-

... More
AT-GRADE IMPROVEMENTS AT Goripalayam Thallakulam side

1980.8

-

-

... More
AT-GRADE IMPROVEMENTS AT Thamukkam flyover to out post

1150

-

-

... More
AT grade Improvements at Bibikulam loop Roads

755

-

-

... More
Junction Improvement at Goripalayam

1985.41

-

-

... More
Junction Improvement at BB Kulam

1010

-

-

... More
Junction IMPROVEMENTS AT Anna statue side

939.75

-

-

... More
Junction IMPROVEMENTS AT Gokulae side

1322.5

-

-

... More
Junction IMPROVEMENTS AT Yanaikkal side

677.4

-

-

... More
Prime coat Providing and applying primer coat with bitumen emulsion (SS-I type) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per clause 502 of MORTH Specification no.111,112, 501,502,900- over WMM

-

-

-

... More
APPROACH ROAD At Anna Statue

959.38

-

-

... More
APPROACH ROAD AV BRIDGE (A2-HLB) SIDE

4965.5

-

-

... More
APPROACH ROAD At corporation side

1997.69

-

-

... More
APPROACH ROAD At Sellur arm

1035

-

-

... More
APPROACH ROAD At Thamukkam side

860.2

-

-

... More
Providing AT-GRADE IMPROVEMENTS at Corporation Road and Palam sataion Road

15081

-

-

... More
AT-GRADE IMPROVEMENTS AT Goripalayam Thallakulam side

6524.4

-

-

... More
AT-GRADE IMPROVEMENTS AT Thamukkam flyover to out post

4600

-

-

... More
AT grade Improvements at Bibikulam loop Roads

3020

-

-

... More
Junction Improvement at Goripalayam

7941.61

-

-

... More
Junction Improvement at BB Kulam

4040

-

-

... More
Junction IMPROVEMENTS AT Anna statue side

3759

-

-

... More
Junction IMPROVEMENTS AT Gokulae side

5290

-

-

... More
Junction IMPROVEMENTS AT Yanaikkal side

2709.57

-

-

... More
Tack coat - Providing and applying tack coat with bitumen emulsion(RS-I type) using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 of MORTH Specification no.111,112,501,503,900- over granular surfaces treated with primer

-

-

-

... More
APPROACH ROAD At Anna Statue

959.38

-

-

... More
APPROACH ROAD AV BRIDGE (A2-HLB) SIDE

4965.5

-

-

... More
APPROACH ROAD At corporation side

1997.69

-

-

... More
APPROACH ROAD At Sellur arm

1035

-

-

... More
APPROACH ROAD At Thamukkam side

860.2

-

-

... More
Providing AT-GRADE IMPROVEMENTS at Corporation Road and Palam sataion Road

12920

-

-

... More
AT-GRADE IMPROVEMENTS AT Goripalayam Thallakulam side

6524.4

-

-

... More
AT-GRADE IMPROVEMENTS AT Thamukkam flyover to out post

4600

-

-

... More
AT grade Improvements at Bibikulam loop Roads

3020

-

-

... More
Junction Improvement at Goripalayam

7941.61

-

-

... More
Junction Improvement at BB Kulam

4040

-

-

... More
Junction IMPROVEMENTS AT Anna statue side

3759

-

-

... More
Junction IMPROVEMENTS AT Gokulae side

5290

-

-

... More
Junction IMPROVEMENTS AT Yanaikkal side

2709.57

-

-

... More
Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 of MORTH Specification no.111,112,501, 503,900 - over bituminous surfaces

-

-

-

... More
Providing AT-GRADE IMPROVEMENTS at Corporation Road and Palam sataion Road

2161

-

-

... More
AT-GRADE IMPROVEMENTS AT Thamukkam flyover to out post

4100

-

-

... More
Junction Improvement at Goripalayam

3960

-

-

... More
Junction Improvement at Gokhale

5710

-

-

... More
AT grade Improvements at Bibikulam loop Roads

11980

-

-

... More
Dense Graded Bituminous Macadam (Table - 500-10) Providing and laying dense bituminous macadam with Hot Mix Plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade- 30/40) at percentage specified by Job Mix Formula by weight of total mix of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolled as per clause 501.6 and 501.7 to achieve the desired compaction as per MORTH Vth Revision Specification clause No. 111, 112, 505, 503, 900 Grading I USING 9M PAVER

-

-

-

... More
APPROACH ROAD At Anna Statue

115.13

-

-

... More
APPROACH ROAD AV BRIDGE (A2-HLB) SIDE

595.86

-

-

... More
APPROACH ROAD At corporation side

239.72

-

-

... More
APPROACH ROAD At Sellur arm

98.33

-

-

... More
APPROACH ROAD At Thamukkam side

103.22

-

-

... More
Providing AT-GRADE IMPROVEMENTS at Corporation Road and Palam sataion Road

1433

-

-

... More
AT-GRADE IMPROVEMENTS AT Goripalayam Thallakulam side

1060.8

-

-

... More
AT-GRADE IMPROVEMENTS AT Thamukkam flyover to out post

1140

-

-

... More
AT grade Improvements at Bibikulam loop Roads

1103.52

-

-

... More
Junction Improvement at Goripalayam

1428.19

-

-

... More
Junction Improvement at BB Kulam

774.4

-

-

... More
Junction IMPROVEMENTS AT Anna statue side

451.08

-

-

... More
Junction IMPROVEMENTS AT Gokulae side

1137.4

-

-

... More
Junction IMPROVEMENTS AT Yanaikkal side

257.43

-

-

... More
Dense Graded Bituminous Macadam (Table - 500-10) Providing and laying dense bituminous macadam with Hot Mix Plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade- 30/40) at percentage specified by Job Mix Formula by weight of total mix of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolled as per clause 501.6 and 501.7 to achieve the desired compaction as per MORTH Vth Revision Specification clause No. 111, 112, 505, 503, 900

-

-

-

... More
AT grade Improvements at Bibikulam loop Roads

420.42

-

-

... More
Bituminous Concrete (Table 500-17) Providing and laying bituminous concrete with hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade-30/40) at percentage specified by Job Mix Formula of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment,rolled as per clause 501.6 and 501.7 to achieve the desired compaction as per clause No. 507 of MORTH Specificationno.111,112, 507, 900 complete in all respects - Grading II USING 9M PAVER

-

-

-

... More
Main Arm

329

-

-

... More
Sellur Arm

192

-

-

... More
High Level Bridge

142

-

-

... More
APPROACH ROAD At Anna Statue

38.38

-

-

... More
APPROACH ROAD AV BRIDGE (A2-HLB) SIDE

198.62

-

-

... More
APPROACH ROAD At corporation side

79.91

-

-

... More
APPROACH ROAD At Sellur arm

41.4

-

-

... More
APPROACH ROAD At Thamukkam side

34.41

-

-

... More
Providing AT-GRADE IMPROVEMENTS at Corporation Road and Palam sataion Road

496

-

-

... More
AT-GRADE IMPROVEMENTS AT Goripalayam Thallakulam side

956.5

-

-

... More
AT-GRADE IMPROVEMENTS AT Thamukkam flyover to out post

380

-

-

... More
AT grade Improvements at Bibikulam loop Roads

600

-

-

... More
Junction Improvement at Goripalayam

476.07

-

-

... More
Junction Improvement at BB Kulam

320

-

-

... More
Junction IMPROVEMENTS AT Anna statue side

107.6

-

-

... More
Junction IMPROVEMENTS AT Gokulae side

440

-

-

... More
Junction IMPROVEMENTS AT Yanaikkal side

108.38

-

-

... More
Construction of cement concrete kerb with top and bottom width 150 and 150mm respecively, 275 mm high in M 20 grade PCC on M 10 grade foundation 125 mm thick, foundation having 50 mm projection beyond kerb stone, kerb stone laid with kerb laying machine, foundation concrete laid manually, all complete as per clause 408.

-

-

-

... More
Junction Improvement at Goripalayam

1087.22

-

-

... More
Junction IMPROVEMENTS AT Anna statue side

378

-

-

... More
Junction IMPROVEMENTS AT Yanaikkal side

225.12

-

-

... More
AT grade Improvements at Bibikulam loop Roads

400

-

-

... More
Construction of Median and Island with Soil Taken from Roadway Cutting (Construction of median and Island above road level with approved material deposited at site from Road cutting and excavation for drain and foundation of other structures, spread, sloped and compacted as per clause 407)

-

-

-

... More
Junction Improvement at Goripalayam

1394.64

-

-

... More
Junction IMPROVEMENTS AT Anna statue side

531

-

-

... More
Junction IMPROVEMENTS AT Yanaikkal side

503.15

-

-

... More
AT grade Improvements at Bibikulam loop Roads

52.2

-

-

... More
Manufacturing, Supplying and Fixing of Stainless Steel Hand rails for staircase using 50mm dia 304L Grade Stainless Steel pipe of 1.60mm thick at required locations to a height of 900mm from finished floor level welded to 38mm dia Stainless Steel pipe post of 1.00mm thick as vertical at900mm centre with 2 Nos. of 25mm dia intermediate horizontal stainless steel pipe of 1.60mm thick in between.The vertical pipe has to be welded to the 100 X 100 X 6mm MS base plate encased in the base concrete. The rate is inclusive of the charges for cutting, bending, welding, grinding, polishing, conveyance, electrical charges, etc. complete

-

-

-

... More
Junction Improvement at Goripalayam

360

-

-

... More
Footpathcum Drain Goripalaym to Tamukam

1815.3

-

-

... More
Footpathcum Drain Footpathcum Drain Tamukam to outpost

1035.9

-

-

... More
Load Drain Near GH Side

855

-

-

... More
Earth work excavation in Soft disintegrated rock not requiring blasting and hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all other incidental charges such as bailing out water, sheeting, shoring, bracing and their subsequent removal of all logs, stumps and other deleterious matter and obstructions trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus earth with all leads etc., complete as per MORT & H specifications 900,301,305 for foundation Abutment, Wing Wall and Piers

-

-

-

... More
Widining of minor bridge @ MM Lodge (sellur ch: 0/482)

127

-

-

... More
Vibrated Cement Concrete of Grade M20 Nominal mix, using 40mm ISS HBG graded metal stone including form work and centering using soft water cost and conveyance of all materials to site including cost of cement at site form work and centering using soft water labour charges for mixing, transporting, laying, vibrating, curing, concrete working at depth, hire charges for tools and plants including all other incidental charges etc., complete as per standard specifications for Footing Under Abutment & Returns & Pier Below Sill Level.

-

-

-

... More
Widining of minor bridge @ MM Lodge (sellur ch: 0/482)

238.24

-

-

... More
Vibrated Cement Concrete of Grade M20 Nominal mix, using 40mm ISS HBG graded metal stone including form work and centering using soft water cost and conveyance of all materials to site including cost of cement at site form work and centering using soft water labour charges for mixing, transporting, laying, vibrating, curing, concrete working at depth, hire charges for tools and plants including all other incidental charges etc., complete as per standard specifications for Sub structure of Abutments, Wings & Piers Above Sill Level.

-

-

-

... More
Widining of minor bridge @ MM Lodge (sellur ch: 0/482)

69

-

-

... More
Vibrated Reinforced Cement Concrete M30 (Design mix), using 20mm ISS graded HBG graded metal including cost of cement at site, including formwork and centering, using soft water, labour charges for mixing, transporting and placing in position, vibrating and compacting, finishing and curing concrete, working at heights, hire charges for tools and plants including all other incidental charges etc., complete, as per standard specifications for BED BLOCK CUM DIRT WALL OVER ABUTMENTS & PIERS as per MORT & H specifications 1000,1500,1600,1700 & 2200

-

-

-

... More
Widining of minor bridge @ MM Lodge (sellur ch: 0/482)

5.5

-

-

... More
Providing and fixing KRAFT PAPER for full width of seating of deck slab and including cost and conveyance to worksite, labour for fixing the same in correct position and all other identical charges etc.,complete.

-

-

-

... More
Widining of minor bridge @ MM Lodge (sellur ch: 0/482)

15

-

-

... More
Vibrated Reinforced cement concrete of design mix M30 (Design mix) using 20mm ISS graded HBGS metal stone including cost and conveyance of all materials to site including cost of cement at site including formwork and centering, using soft water, labour charges for mixing, transporting and placing in position, vibrating and compacting, finishing and curing, working at heights, hire charges for tools and plants including all other incidental charges etc., complete as per standard specifications for Deck Slab.

-

-

-

... More
Widining of minor bridge @ MM Lodge (sellur ch: 0/482)

71.9

-

-

... More
Providing and fixing PVC EXPANSION JOINT in between Deck Slabs over abutment and pier as shown in the drawing including cost and conveyance of expansion joints including Shalimar pad and joint sealent etc., complete.

-

-

-

... More
Widining of minor bridge @ MM Lodge (sellur ch: 0/482)

26.72

-

-

... More
Vibrated Reinforced cement concrete of M30 (design mix) using 20mm ISS graded metal including cost and conveyance of all materials to site and using cement at site but excluding cost and fabrication of steel but including labour charges for mixing, laying, vibrating, curing concrete, hire charges for tools and plants including all other incidental charges etc., complete as per relevant specification for Approach Slab.

-

-

-

... More
Widining of minor bridge @ MM Lodge (sellur ch: 0/482)

7.1

-

-

... More
Vibrated Reinforced Cement Concrete M-25, Grade, Design Mix, using ISS size hard granite broken graded metal including cost and conveyance of all materials to site including cement at site but excluding cost and fabrication of steel, including labour charges for mixing, transporting, laying, and curing concrete,working at heights,hire charges for tools and plants,including all other incidental charges,etc, complete for RCC HAND RAILS AND POSTS OVER DECK SLAB.

-

-

-

... More
Widining of minor bridge @ MM Lodge (sellur ch: 0/482)

21

-

-

... More
Providing and fixing PVC Duct pipes of 100 mm dia for required lengths for providing inside the footpath for service utility purpose including cost and conveyance of all materials to worksite,cost and labour charges for fixing etc., complete to provide utility ducts - 1 No.

-

-

-

... More
Widining of minor bridge @ MM Lodge (sellur ch: 0/482)

55

-

-

... More
Earthwork excavation in all classes of soils except soft rock not requiring, blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour materials, tools, equipments and all incidental charges and sheeting, shoring and bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, Trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials, etc, complete as per MORTH specification No. 111, 112, 304 for Foundation

-

-

-

... More
LOAD BEARING DRAIN

964.92

-

-

... More
Earth work Excavation in all classes of soils except hard rock not requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges and sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavtion, backfilling, and clearing the site and disposal of all surplus materials etc. complete as per standard specification for Foundation of Abutments and Piers.

-

-

-

... More
Box culvert @ meenakshi college CH :589

440.08

-

-

... More
Box culvert @ Anna statue CH:0.090

440.08

-

-

... More
Vibrated Reinforced Cement Concrete of grade M30 (Design mix) using 20mm ISShard broken granite metal including cost and conveyance of all materials to site and cost of cement excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for tools and plants including all other incidental charges etc., complete for Box culvert.

-

-

-

... More
Box culvert @ meenakshi college CH :589

196.69

-

-

... More
Box culvert @ Anna statue CH:0.090

196.69

-

-

... More
Vibrated Reinforced Cement Concrete M25 (Design Mix) using crushed ISS size HBG graded metal of including cost and conveyance of all materials to site but excluding cost and fabrication of steel but including cost and labour charges for formwork and centering, labour charges for formwork and centering, labour charges compacting, finishing and curing including all incidental charges etc., completed for BASE SLAB, STEM AND TOP SLAB FOR DRAIN

-

-

-

... More
LOAD BEARING DRAIN

349.8

-

-

... More
Hire charges for barricade of minimum 3mheight , around the site permisses of 94kg/mn using ISMC 100 as trasom &vertical and 3 mm tk MS sheets withbottom suppourt of ISMC 200 including nailing to the floor, cost of fabricationFitting and placing in position usinggranes,painting reflective stickers,provision for contionus lighting arrangement incentre In straight rows or as required atthe site without hinderance to the traffic(The barricade to the same location on till1completion of the work. All the barricadingmaterial shall be disposed and taken awayfrom the site by the contractor.Noadditional payment shall be made forextended period of contract)

-

-

-

... More
Barricading

1704

-

-

... More
Earthwork excavation in all classes of soil except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specifications.

-

-

-

... More
Upto 2.00m depth STAIR CASE

30.09

-

-

... More
Above 2.00m depth STAIR CASE

13.55

-

-

... More
STAIRCASE

-

-

-

... More
Plain Cement Concrete M15 Nominal Mix using 40mm ISS size HBG metal including cost and conveyance of all materials to site and cement at site including formwork and centering, using soft water, labour charges for mixing, trabsporting and placing in position, compacting, finishing and curing, working at depths, hire charges for tools and plants and incidental charges etc., complete as per standard specifications for FOOTINGS, PLINTH BEAM.

-

-

-

... More
STAIRCASE

2.4

-

-

... More
Vibrated Reinforced Cement Concrete M25 (Design mix) using maximum nominal size of coarse aggregate as 20mm ISS HBG metal as per clause 1704.2 & 1706 of MORT&H IV Revision 2001 admixed with 2% suitable water proofing compound including cost and conceyance of all charges etc., complete as per standard specifications for FOOTINGS.

-

-

-

... More
STAIRCASE

8.38

-

-

... More
Vibrated Reinforced Cement Concrete M25 (Design mix) using maximum nominal size of coarse aggregate as 20mm ISS HBG metal as per clause 1704.2 & 1706 of MORT&H IV Revision 2001 admixed with 2% suitable water proofing compound including cost and conceyance of all charges etc., complete as per standard specifications for COLUMN.

-

-

-

... More
STAIRCASE

1.64

-

-

... More
Vibrated Reinforced Cement Concrete M25 (Design mix) using maximum nominal size of coarse aggregate as 20mm ISS HBG metal as per clause 1704.2 & 1706 of MORT&H IV Revision 2001 admixed with 2% suitable water proofing compound including cost and conceyance of all charges etc., complete as per standard specifications for plinth BEAM.

-

-

-

... More
STAIRCASE

2.7

-

-

... More
Vibrated Reinforced Cement Concrete M25 (Design mix) using maximum nominal size of coarse aggregate as 20mm ISS HBG metal as per clause 1704.2 & 1706 of MORT&H IV Revision 2001 admixed with 2% suitable water proofing compound including cost and conceyance of all charges etc., complete as per standard specifications for TIE BEAM.

-

-

-

... More
STAIRCASE

0.72

-

-

... More
Vibrated Reinforced Cement Concrete M25 (Design mix) using maximum nominal size of coarse aggregate as 20mm ISS HBG metal as per clause 1704.2 & 1706 of MORT&H IV Revision 2001 admixed with 2% suitable water proofing compound including cost and conceyance of all charges etc., complete as per standard specifications for STRINGER BEAM.

-

-

-

... More
STAIRCASE

2.51

-

-

... More
Vibrated Reinforced Cement Concrete M25 (Design mix) using maximum nominal size of coarse aggregate as 20mm ISS HBG metal as per clause 1704.2 & 1706 of MORT&H IV Revision 2001 admixed with 2% suitable water proofing compound including cost and conceyance of all charges etc., complete as per standard specifications for WAIST SLAB.

-

-

-

... More
STAIRCASE

6.5

-

-

... More
Vibrated Reinforced Cement Concrete M25 (Design mix) using maximum nominal size of coarse aggregate as 20mm ISS HBG metal as per clause 1704.2 & 1706 of MORT&H IV Revision 2001 admixed with 2% suitable water proofing compound including cost and conceyance of all charges etc., complete as per standard specifications for STEPS.

-

-

-

... More
STAIRCASE

1.77

-

-

... More
Brick work in CM 1:4 using second class brick including cost and conveyance of all materials including charges for bailing out of water and labour charges for mixing of cement mortar and curing with all leads for soft water and including all other incidental charges etc., complete for brick work in CM 1:4 below ground level for handrails as per relevant clauses of SSRB and MDSS and MOST specifications.

-

-

-

... More
STAIRCASE

18.56

-

-

... More
Plastering with cement mortar 1:3, 12mm thick over a plinth beam, column, tie beam surface including cost and conveyance of all materials to site, soft water, labour charges for curing etc., complete for CLOUMN.

-

-

-

... More
STAIRCASE

31.31

-

-

... More
Plastering with cement mortar 1:3, 12mm thick over a plinth beam, column, tie beam surface including cost and conveyance of all materials to site, soft water, labour charges for curing etc., complete.

-

-

-

... More
STAIRCASE

100.32

-

-

... More
Supplying and fixing in position Cement based hydruali-cally pressed Anti-Skid tiles (pattern design) 20 mmthick in cement mortar 1:3 - 20 mm thick & pointed with same colour of cement etc., complete.as per standard specification

-

-

-

... More
STAIRCASE

63.91

-

-

... More
Providing colour wash two coats using cement paint of approved make and colour over the stucco plastering area including cost and conveyance of all materials to site, all labour for cleaning the surface, painting and all other incidental charges etc., complete as per item no. 11 & 12 of the estimate.

-

-

-

... More
STAIRCASE

131.63

-

-

... More
Earth work Excavation in all classes of soils except hard rock not requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges and sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavtion, backfilling, and clearing the site and disposal of all surplus materials etc. complete as per standard specification for Foundation For SVUP

-

-

-

127.55

-

-

... More
Vibrated Plain Cement Concrete of Grade M15 (Nominal Mix 1:2:4), using 40mm size ISS HBGmetal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specificationgraded metal including cost and conveyance of all materials to site and cement at site including formwork and centering, using soft water, labour charges for mixing, transporting and placing in position, compacting, finishing and curing, working at depths, hire charges for tools and plants and incidental charges, etc., complete, as per standard specifications for LEVELLING COURSE BELOW SVUP

-

-

-

27.33

-

-

... More
Vibrated Reinforced cement concete of grade M35 (Design mix) using 20mm ISS Graded HBGS Jelly including cost and conveyance of all materials to site and cost of cement at site but excluding cost and fabrication of steel but including cost of form work, soft water, labour charges for mixing, transporting, laying and curing concrete, working art depths, Tools and plants and incidential charges etc., complete as per relevant standard specifications for Box. as per MORT & H specifications.

-

-

-

293.71

-

-

... More
Providing and fixing PVC seepage pipes of 100mm dia, of required lengths for abutments wings and Retaining walls including cost and conveyance of all materials to worksite and labour charges for fixing , etc, complete to drain the backfill as per standard specifications.

-

-

-

66

-

-

... More
Providing FILTER MEDIA 600mm thick behind abutments and returns using filter material with 53mm to 5.6mm metal confirming to Standard Specification well packed with smaller size towards the soil and bigger size towards the wall including cost of conveyance to works site inclding all other incidental charges etc., complete.

-

-

-

49.82

-

-

... More
Vibrated Reinforced Cement Concrete of grade M15 (Nominal Mix) using 40mm ISS graded metal including cost and conveyance of all materials to site including cost cement at site and including cost of formwork, labour charges for mixing, transporting, laying and curing concrete, working at heights, soft water, hire charges for Tools and Plants incidental all other incidental charges etc., complete as per relevent standard specification for BASE COURSE below approach slab

-

-

-

11.06

-

-

... More
Vibrated Reinforced Cement Concrete of grade M35 (Design Mix) using 20mm ISS graded metal including cost and conveyance of all materials to site excluding cost of steel including cost cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at heights, soft water, hire charges for Tools and Plants and incidental all other incidental charges etc., complete as per relevent standard specification for APPROACH SLAB

-

-

-

23.1

-

-

... More
Vibrated Reinforced Cement Concrete of grade M40 (Design Mix) using 20mm ISS graded metal including cost and conveyance of all materials to site excluding cost of steel including cost cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at heights, soft water, hire charges for Tools and Plants and incidental all other incidental charges etc., complete as per relevent standard specification for CRASH BARRIER

-

-

-

6.99

-

-

... More
Providing and laying of a Strip Seal expansion joint catering to maximum horizontal movement upto 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instructions for installation.

-

-

-

22

-

-

... More
Providing and laying 25mm thick Mastic Asphalt wearinf Course with paving grade bitumen melting the requirement given in table 500-29, prepared by using mastic cooker and slope after cleaning the surface including anti skid surface with bitumen percolated fine grained hand stone clipping of 10cm center to center in both directions pressed in to surface when the temperature of surface is not less than 10 centigrade protruding 1mm to 4mm over mastic surface all complete as per MORTH Rev-5.

-

-

-

224.4

-

-

... More
Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00-9.50mm, 0.17 cum of 9.50-2.36mm and 0.26cum of 2.36 & below IRC HBG metal with 50.30 kgs of VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP clause 507 of MORTH.

-

-

-

11.22

-

-

... More
SVUP RCC kerb for Cross road footpath

24

-

-

... More
Manufacturing, Supplying and Fixing of Stainless Steel Hand rails for staircase using 50mm dia 304L Grade Stainless Steel pipe of 1.60mm thick at required locations to a height of 900mm from finished floor level welded to 38mm dia Stainless Steel pipe post of 1.00mm thick as vertical at900mm centre with 2 Nos. of 25mm dia intermediate horizontal stainless steel pipe of 1.60mm thick in between.The vertical pipe has to be welded to the 100 X 100 X 6mm MS base plate encased in the base concrete. The rate is inclusive of the charges for cutting, bending, welding, grinding, polishing, conveyance, electrical charges, etc. complete

-

-

-

24

-

-

... More
Supply and fabrication of STEEL grade Fe500 D with suitable anticorrsive measure required for all the reinforced cement concrete items of work involved in the shedule including cost of steel, cost of fabrication, labour charges for cleaning the rods, straightening, cutting, bending, tying grills, hoisting and placing the reinforcement in position as specified in the drawing including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete.

-

-

-

29.87

-

-

... More
Earth work Excavation in all classes of soils except hard rock not requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges and sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavtion, backfilling, and clearing the site and disposal of all surplus materials etc. complete as per standard specification for Drain.

-

-

-

... More
Footpathcum Drain Goripalayam to Tamukam

5614.29

-

-

... More
Footpathcum Drain Tamukam to out post

3684.98

-

-

... More
Footpathcum Drain Goripalayam to sellur

2242.18

-

-

... More
Load Drain Near GH Side

2382.13

-

-

... More
Filling with Quarry fines including cost and conveyance of material to work site including labour charges for filling, laying, compacting by manual labour under optimum moisture content to get the maximum density flooding with water as layers or built-up to the bottom level inclusive all other incidental charges etc., complete below levelling course.

-

-

-

... More
Footpathcum Drain Goripalayam to Tamukam

559.5

-

-

... More
Footpathcum Drain Thamukkam to out post

358.29

-

-

... More
Footpathcum Drain Goripalayam to sellur

221.35

-

-

... More
Load Drain Near GH Side

242.25

-

-

... More
Plain Cement Concrete of grade M10 (Nominal mix) using 40mm ISS hard broken granite metal including cost and conveyance of all materials to site, including cost and labour charges for form work and centering, labour charges for compacting, curing and all incidental charges etc., complete as per standard specification for Levelling course below Drain.

-

-

-

... More
Footpathcum Drain Goripalayam to Tamukam

372.98

-

-

... More
Footpathcum Drain Tamukam to out post

1444.87

-

-

... More
Footpathcum Drain Goripalayam to sellur

147.56

-

-

... More
Load Drain Near GH Side

161.5

-

-

... More
Vibrated Reinforced cement concrete of grade M20 (Design mix) using 20mm and below ISS hard broken granite metal including cost and conveyance of all materials to site and cost of cement excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for tools and plants including all other incidental charges etc., complete for Drain.

-

-

-

... More
Footpathcum Drain Goripalayam to Tamukam

2163.22

-

-

... More
Footpathcum Drain Tamukam to out post

2163.22

-

-

... More
Footpathcum Drain Goripalayam to sellur

913.74

-

-

... More
Load Drain Near GH Side

907.15

-

-

... More
Supplying and fixing of Reinforced Cement Concrete Man hole cover 750 mm x 750 mm with frames as directed by the Departmental officers including labour charges for fixing at every intervals along the drain including all other incidental charges etc., complete

-

-

-

... More
Footpathcum Drain Goripalayam to Tamukam

403

-

-

... More
Footpathcum Drain Tamukam to out post

230

-

-

... More
Footpathcum Drain Goripalayam to sellur

222

-

-

... More
Load Drain Near GH Side

165

-

-

... More
Supplying and fixing in position Cement based hydruali-cally pressed Anti-Skid tiles (pattern design) 20 mmthick in cement mortar 1:3 - 20 mm thick & pointed with same colour of cement etc., complete.as per standard specification

-

-

-

... More
Footpathcum Drain Goripalayam to Tamukam

3025.5

-

-

... More
Footpathcum Drain Tamukam to out post

1726.5

-

-

... More
Footpathcum Drain Goripalayam to sellur

1147.5

-

-

... More
Load Drain Near GH Side

1425

-

-

... More
Calculation of SubTotal, GST and Total Amount carried out by system automatically

-

-

-

... More
Basic cost of value put to tender as per estimate

1

-

-

... More
Add GST at 18%

1

-

-

... More
Total value with GST

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.