Highways Department Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Highways Department Tender
Civil And Construction
Road Construction
Eprocure
Opening Date5 Sep 2024
Closing Date23 Sep 2024
Tender Amount₹ 1,71,50,000
Costs
EMD
₹ 97,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_HWAY_481339_1Tender No
TN NO.10/2024-25/HDO, DATED 23.08.2024Tender Authority
Highways Department ViewPurchaser Address
-Website
http://https://tnhighways.gov.in/index.php/en/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Road A
86.63
198535
2291.76
... More
Prime Coat Over WBM/ WMM Surface Providing and laying Prime Coat over WBM/ WMM surface using 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 502 of MORTH Rev-5 as per MORTH Rev. V Clause No. 111,112,501,502 &900 .
-
-
-
... More
Road A
577.5
47337
81.97
... More
Tack Coat Over Primed Surface Providing and laying Tack Coat over WBM/ WMM surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 503 of MORTH Rev-5 as per MORTH Rev. V Clause No.111, 112,501, 503 & 900.
-
-
-
... More
Road A
577.5
10943
18.95
... More
Tack Coat Over Existing BT Surface Providing and laying Tack Coat over Existing BT surface using 2 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel andall other incidental charges etc., complete as perClause 503 of MORTH Rev-5 as per MORTH Rev. V Clause No.111, 112,501, 503 & 900.
-
-
-
... More
Road A
28847.5
783498
27.16
... More
BM (Grade-II) 50mm Thick Using VG30 (Providing, laying 50mm consolidated thick Bituminous Macadam using 0.20cum of 26.50-13.20mm, 0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRC metal with 37Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the itumen, aggregate and mixing them in required temperatureusing Central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site,spreading the mix to uniform thickness of 50mm with mechanical paver to the specified gradesand cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc.,including labour for attending to paver to site etc., including hire and fuel charges for 20-30tCMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 504 ) of MORTH Rev-5
-
-
-
... More
Road A
368.51
3264372
8858.3
... More
BC 30/40mm Thick (Grade - II) - using VG 30 - Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
-
-
-
... More
Road A
882.75
9964287
11287.78
... More
Earth Work for berms Incl. Compaction Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including costof all labour charges, materials, tools,equipments and all incidental charges, including compacting with power roller, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc.,complete as per standard specification. For making up of low berms with conveyance
-
-
-
... More
Road A
1070
254713
238.05
... More
Calculation of SubTotal, GST and Total Amount carried out by system automatically
-
-
-
... More
Basic cost of value put to tender as per estimate
1
-
14527892
... More
Add GST at 18%
1
-
2615021
... More
Total Value put to Tender
1
-
17142913
... More
Negotiated Percentage
1
-
-
... More
Final Negotiated Value
1
-
-
... More
Add GST at 18% of Final Negotiated Value
1
-
-
... More
Total Value of Contract Including 18% of GST
1
-
-
... More
Basic cost of value put to tender as per Estimate
-
14527892
-
... More
Quoted Rate in Figures (Total Value of Contract Including 18% of GST )
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements