Highways Department Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Highways Department Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date14 Mar 2024
Closing Date8 May 2024
Tender Amount₹ 34,98,45,622 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
95% Compaction

57234.09

21977890

384

... More
Forming the embankment using carted earth having soaked CBR value not less than 8 including cost and conveyance of earth from the approved source to site, spreading the earth uniformly to the entire formation width as directed by the departmental officers, including labour for breaking clods, sectioning, laying in layers not exceeding 250mm in loose thickness and compacting each layer to the required density in accordance with IS 2720 Part IV to 97% proctor density to the specified depth below the sub grade level, keeping the moisture content of the earth at the time of compaction within the range of 1% above and 2% below the optimum moisture content determined in accordance with IS 2720 using 80-100 Kn power roller rolling to achieve the required maximum dry density including labour charges for sectioning, watering with all leads for water, including fuel and hire charges for power roller, water sprinkler and other tools and plants employed, etc. complete as per clause 305 of MORT&H Specifications

-

-

-

... More
97% Compaction

30002.41

11760944

392

... More
Providing and laying Granular Sub-Base Grade- V consisting of well graded Material confirming to the grading given in Table No.400-1, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory roller to achieve the desired density, etc., complete as directed by the Engineer. as per MORTH No. 111, 112, 401, 900.

7119.05

10312584

1448.59

... More
Providing and laying Granular Sub-Base Grade- III consisting of well graded Material confirming to the grading given in Table No.400-1, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory roller to achieve the desired density, etc., complete as directed by the Engineer. as per MORTH No. 111, 112, 401, 900.

3394.82

5237494

1542.79

... More
Provding and laying Wet Mix Macadam consisting of clean crushed aggregates confirming to the grading given in Table No.400-13, including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver on well prepared surface and compacting with vibratory roller to achieve the desired density, etc., complete as directed by the Engineer. as per MORTH No. 111, 112, 406, 900.

8487.05

15015373

1769.21

... More
Providing and applying Prime Coat over granular Base with bitumen emulsion (SS-I type) on prepared surface including preparing the road surface and spraying the primer at the rate of 0.70 kg/sqm using bitumen sprayer as directed by the Engineer - over WMM as per MORTH No. 111, 112, 502.

33948.2

2600092

76.59

... More
Providing and applying Tack Coat over Granular surface treated with primer using Bitumen Emulsion (RS-I type) with mechanical sprayer at the rate of 0.25 kg per sqm as directed by the Engineer as per MORTH No.111,112,503,900.

33948.2

589340

17.36

... More
Providing and laying TackCoatover DryLean Cement Concrete surfaceusing 3.00Kg of Bitumen Emulsion (RS1)per 10 sqm for preparatory to another bituminous construction over it including cost of material, labourcharges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 503 of MORTH Rev-5

1480.8

29349

19.82

... More
Providing, laying 75mm consolidated thick Dense Bituminous Macadam using 0.40 cum of 37.50-13.20mm, 0.35 cum of 13.20-2.36mm and 0.36cum of2.36mm & below size IRC metal with 71.30kgs of VG30 grade bitumen for premixing per 10sqm including costand conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing in required temperature incentralhot mixplant 20-30 toncapacity,conveying the mix bytipper trucks tosite, spreading the mix to uniform thickness of 75mm with mechanical paver to the specified grades and crosssections and consolidated by Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler,tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including allother incidental charges etc.,complete as per specification using CMP as per clause 505 of MORTH No. 111, 112, 505, 900.rev-5.

3394.82

28949123

8527.44

... More
Providing and laying Bituminous Concrete to 30/40mm thick using 0.13cum of19.00-9.50mm, 0.17cum of 9.50-2.36mm and 0.26cum of 2.36 and below with 50.30kgs of VG30 grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMPsite, heating the bitumen and aggregate to required temperature and mixing the min required temperature in central hotmix plant20-30t on capacity, conveying the mix by tipper trucks to paversite, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and crosssections and consolidated by 8-10tonne Vibratory to the required densityetc., including labour for attending to paver to site etc., including hirecharges and fuel charges for 20-30tCMP with bitumen boiler, tippertrucks, PaverFinisher, Vibratory roller and allother tool sand plant required, including fuel and all other incidental charges etc.,complete as per specification using CMP as per clause 507 of MORTH Rev-5

1136.91

11395055

10022.83

... More
Sub Estimate - 1) Construction of Single Cell Box Culvert (2x2) at Km 0/8(i), 0/8(ii), 1/6(i), 1/6(ii), 1/8(i), 1/8(ii), 1/10(i), 1/10(ii), 2/2, 2/4, 2/6(i), 2/6(ii), 3/4, 3/6, 3/8 for a width of 12m (15 Nos)

-

-

-

... More
Earth work Excavation in all classes of soils except hard rock not requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges and sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavtion, backfilling, and clearing the site and disposal of all surplus materials etc. complete as per standard specification for Box Culvert.

1384.1

207615

150

... More
Plain Cement Concrete of grade M15 (Nominal mix) using 40mm ISS hard broken granite metal including cost and conveyance of all materials to site, including cost and labour charges for form work and centering, labour charges for compacting, curing and all incidental charges etc., complete as per standard specification for Leveling Course below Box Culvert, Wing wall & Approach slab

181.95

1089067

5985.53

... More
Vibrated Reinforced Cement Concrete of grade M25 (Design mix) using 20mm ISShard broken granite metal including cost and conveyance of all materials to site and cost of cement excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for tools and plants including all other incidental charges etc., complete for Box culvert.

697.05

7737624

11100.53

... More
Vibrated cement concrete M20 (Nominal mix) using 40mm ISS size hard broken granite metal including cost and conveyance of all materials to site including cost and labour charges for formwork, centering, labour charges for laying, compacting, curing all incidental charges etc., complete for Wing wall and Parapet.

590.55

5477274

9274.87

... More
Supply and fabrication of STEEL grade Fe500 with suitable anticorrsive measure required for all the reinforced cement concrete items of work involved in the shedule including cost of steel, cost of fabrication, labour charges for cleaning the rods, straightening, cutting, bending, tying grills, hoisting and placing the reinforcement in position as specified in the drawing including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete.

47.34

4488068

94805

... More
Providing and fixing PVC seepage pipes of 100 mm dia of required lengths for retaining wall including costs and conveyance of all materials to work site and labour charges for fixing , etc., complete to drain the backfill.

540

102600

190

... More
Sub Estimate - 2) Construction of Single Cell Box Culvert (2x2) at Km 0/8(i), 0/8(ii), 1/6(i), 1/6(ii), 1/8(i), 1/8(ii), 1/10(i), 1/10(ii), 2/2, 2/4, 2/6(i), 2/6(ii), 3/4, 3/6, 3/8 for a width of 12m (15 Nos)

-

-

-

... More
Earth work Excavation in all classes of soils except hard rock not requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges and sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavtion, backfilling, and clearing the site and disposal of all surplus materials etc. complete as per standard specification for Box Culvert.

-

-

-

... More
0 to 2 m

883.4

132510

150

... More
2 to 3 m

252.52

40542

160.55

... More
3 to 4 m

40.18

6874

171.1

... More
Plain Cement Concrete of grade M15 (Nominal mix) using 40mm ISS hard broken granite metal including cost and conveyance of all materials to site, including cost and labour charges for form work and centering, labour charges for compacting, curing and all incidental charges etc., complete as per standard specification for Leveling Course below Box Culvert, Wing wall & Approach slab

66.64

398140

5974.5

... More
Vibrated Reinforced Cement Concrete of grade M25 (Design mix) using 20mm ISShard broken granite metal including cost and conveyance of all materials to site and cost of cement excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for tools and plants including all other incidental charges etc., complete for Box culvert.

338.52

3576971

10566.5

... More
Vibrated cement concrete M20 (Nominal mix) using 40mm ISS size hard broken granite metal including cost and conveyance of all materials to site including cost and labour charges for formwork, centering, labour charges for laying, compacting, curing all incidental charges etc., complete for Wing wall and Parapet.

245.16

2151646

8776.5

... More
Supply and fabrication of STEEL grade Fe500 with suitable anticorrsive measure required for all the reinforced cement concrete items of work involved in the shedule including cost of steel, cost of fabrication, labour charges for cleaning the rods, straightening, cutting, bending, tying grills, hoisting and placing the reinforcement in position as specified in the drawing including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete.

22.75

2157003

94805

... More
Providing and fixing PVC seepage pipes of 100 mm dia of required lengths for retaining wall including costs and conveyance of all materials to work site and labour charges for fixing , etc., complete to drain the backfill.

192

36480

190

... More
Sub Estimate - 3) Construction of Single Cell Box Culvert (5x3) at Km 3/2(i), 3/2(ii), for a width of 12m (2 Nos)

-

-

-

... More
Earth work Excavation in all classes of soils except hard rock not requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges and sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavtion, backfilling, and clearing the site and disposal of all surplus materials etc. complete as per standard specification for Box Culvert.

-

-

-

... More
0 to 2 m

508.84

76326

150

... More
2 to 3 m

100.8

16183

160.55

... More
3 to 4 m

21.16

3620

171.1

... More
Plain Cement Concrete of grade M15 (Nominal mix) using 40mm ISS hard broken granite metal including cost and conveyance of all materials to site, including cost and labour charges for form work and centering, labour charges for compacting, curing and all incidental charges etc., complete as per standard specification for Leveling Course below Box Culvert, Wing wall & Approach slab

41.2

247323

6003

... More
Vibrated Reinforced Cement Concrete of grade M25 (Design mix) using 20mm ISShard broken granite metal including cost and conveyance of all materials to site and cost of cement excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for tools and plants including all other incidental charges etc., complete for Box culvert.

259.5

2616279

10082

... More
Vibrated cement concrete M20 (Nominal mix) using 40mm ISS size hard broken granite metal including cost and conveyance of all materials to site including cost and labour charges for formwork, centering, labour charges for laying, compacting, curing all incidental charges etc., complete for Wing wall and Parapet.

170.54

1466985

8602

... More
Supply and fabrication of STEEL grade Fe500 with suitable anticorrsive measure required for all the reinforced cement concrete items of work involved in the shedule including cost of steel, cost of fabrication, labour charges for cleaning the rods, straightening, cutting, bending, tying grills, hoisting and placing the reinforcement in position as specified in the drawing including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete.

17.14

1624957

94805

... More
Providing and fixing PVC seepage pipes of 100 mm dia of required lengths for retaining wall including costs and conveyance of all materials to work site and labour charges for fixing , etc., complete to drain the backfill.

96

18240

190

... More
Sub Estimate - 4) Construction of Single Cell Box Culvert (6x3) at Km 0/4 for a width of 12m

-

-

-

... More
Earth work Excavation in all classes of soils except hard rock not requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges and sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavtion, backfilling, and clearing the site and disposal of all surplus materials etc. complete as per standard specification for Box Culvert.

-

-

-

... More
0 to 2 m

293.93

44089

150

... More
2 to 3 m

50.9

8172

160.55

... More
Plain Cement Concrete of grade M15 (Nominal mix) using 40mm ISS hard broken granite metal including cost and conveyance of all materials to site, including cost and labour charges for form work and centering, labour charges for compacting, curing and all incidental charges etc., complete as per standard specification for Leveling Course below Box Culvert, Wing wall & Approach slab

22.88

136616

5971

... More
Vibrated Reinforced Cement Concrete of grade M25 (Design mix) using 20mm ISShard broken granite metal including cost and conveyance of all materials to site and cost of cement excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for tools and plants including all other incidental charges etc., complete for Box culvert.

186.72

1805395

9669

... More
Vibrated cement concrete M20 (Nominal mix) using 40mm ISS size hard broken granite metal including cost and conveyance of all materials to site including cost and labour charges for formwork, centering, labour charges for laying, compacting, curing all incidental charges etc., complete for Wing wall and Parapet.

86.72

744664

8587

... More
Supply and fabrication of STEEL grade Fe500 with suitable anticorrsive measure required for all the reinforced cement concrete items of work involved in the shedule including cost of steel, cost of fabrication, labour charges for cleaning the rods, straightening, cutting, bending, tying grills, hoisting and placing the reinforcement in position as specified in the drawing including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete.

10.83

1026643

94805

... More
Providing and fixing PVC seepage pipes of 100 mm dia of required lengths for retaining wall including costs and conveyance of all materials to work site and labour charges for fixing , etc., complete to drain the backfill.

48

9120

190

... More
Sub Estimate - 5) Construction of 5 Cells of Box Culvert of Size 5.48 x 2.81 at Km 0/10 for a length of 30m

-

-

-

... More
Earth work Excavation in all classes of soils except hard rock not requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges and sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavtion, backfilling, and clearing the site and disposal of all surplus materials etc. complete as per standard specification for Box Culvert.

-

-

-

... More
0 to 2 m

661.86

99279

150

... More
2 to 3 m

65.52

10519

160.55

... More
Plain Cement Concrete of grade M15 (Nominal mix) using 40mm ISS hard broken granite metal including cost and conveyance of all materials to site, including cost and labour charges for form work and centering, labour charges for compacting, curing and all incidental charges etc., complete as per standard specification for Leveling Course below Box Culvert, Wing wall & Approach slab

42.06

251140

5971

... More
Vibrated Reinforced Cement Concrete of grade M35 (Design mix) using 20mm ISShard broken granite metal including cost and conveyance of all materials to site and cost of cement excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for tools and plants including all other incidental charges etc., complete for Box culvert.

458.47

4619105

10075

... More
Vibrated Reinforced Cement Concrete M40 (Design mix) using 20mm ISS metal, including cost and conveyance of all materials to site and cost of cement at site but excluding cost and fabrication of steel but including cost of form work, labour charges for mixing transporting, laying, curing concrete, working at heights, soft water, hire charges for Tools and Plants, including all other incidental charges, etc complete for CRASH BARRIER OVER BOX CULVERT PORTION.

18.6

266649

14336

... More
Vibrated cement concrete M20 (Nominal mix) using 40mm ISS size hard broken granite metal including cost and conveyance of all materials to site including cost and labour charges for formwork, centering, labour charges for laying, compacting, curing all incidental charges etc., complete for Wing wall and Parapet.

87.32

740560

8481

... More
Supply and fabrication of STEEL grade Fe500 with suitable anticorrsive measure required for all the reinforced cement concrete items of work involved in the shedule including cost of steel, cost of fabrication, labour charges for cleaning the rods, straightening, cutting, bending, tying grills, hoisting and placing the reinforcement in position as specified in the drawing including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete.

52.48

4975366

94805

... More
Providing and fixing PVC seepage pipes of 100 mm dia of required lengths for retaining wall including costs and conveyance of all materials to work site and labour charges for fixing , etc., complete to drain the backfill.

48

9120

190

... More
Sub Estimate - 6) Construction of 4 Cells of Box Culvert of Size 5.925 x 2.81 at Km 2/10 for a length of 26m

-

-

-

... More
Earth work Excavation in all classes of soils except hard rock not requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges and sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavtion, backfilling, and clearing the site and disposal of all surplus materials etc. complete as per standard specification for Box Culvert.

-

-

-

... More
0 to 2 m

588.17

88225

150

... More
2 to 3 m

65.52

10519

160.55

... More
Plain Cement Concrete of grade M15 (Nominal mix) using 40mm ISS hard broken granite metal including cost and conveyance of all materials to site, including cost and labour charges for form work and centering, labour charges for compacting, curing and all incidental charges etc., complete as per standard specification for Leveling Course below Box Culvert, Wing wall & Approach slab

37.18

222745

5991

... More
Vibrated Reinforced Cement Concrete of grade M35 (Design mix) using 20mm ISShard broken granite metal including cost and conveyance of all materials to site and cost of cement excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for tools and plants including all other incidental charges etc., complete for Box culvert.

398.2

4009037

10068

... More
Vibrated Reinforced Cement Concrete M40 (Design mix) using 20mm ISS metal, including cost and conveyance of all materials to site and cost of cement at site but excluding cost and fabrication of steel but including cost of form work, labour charges for mixing transporting, laying, curing concrete, working at heights, soft water, hire charges for Tools and Plants, including all other incidental charges, etc complete for CRASH BARRIER OVER BOX CULVERT PORTION.

16.12

231547

14364

... More
Vibrated cement concrete M20 (Nominal mix) using 40mm ISS size hard broken granite metal including cost and conveyance of all materials to site including cost and labour charges for formwork, centering, labour charges for laying, compacting, curing all incidental charges etc., complete for Wing wall and Parapet.

87.32

742228

8500

... More
Supply and fabrication of STEEL grade Fe500 with suitable anticorrsive measure required for all the reinforced cement concrete items of work involved in the shedule including cost of steel, cost of fabrication, labour charges for cleaning the rods, straightening, cutting, bending, tying grills, hoisting and placing the reinforcement in position as specified in the drawing including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete.

41.03

3889849

94805

... More
Providing and fixing PVC seepage pipes of 100 mm dia of required lengths for retaining wall including costs and conveyance of all materials to work site and labour charges for fixing , etc., complete to drain the backfill.

48

9120

190

... More
Sub Estimate - 7) Construction of 3 Cells of Box Culvert of Size 5.1 x 3.5 at Km 4/10 for a length of 18m

-

-

-

... More
Earth work Excavation in all classes of soils except hard rock not requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges and sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavtion, backfilling, and clearing the site and disposal of all surplus materials etc. complete as per standard specification for Box Culvert.

-

-

-

... More
0 to 2 m

712.6

106890

150

... More
2 to 3 m

82.99

13324

160.55

... More
Plain Cement Concrete of grade M15 (Nominal mix) using 40mm ISS hard broken granite metal including cost and conveyance of all materials to site, including cost and labour charges for form work and centering, labour charges for compacting, curing and all incidental charges etc., complete as per standard specification for Leveling Course below Box Culvert, Wing wall & Approach slab

45.42

272656

6003

... More
Vibrated Reinforced Cement Concrete of grade M35 (Design mix) using 20mm ISShard broken granite metal including cost and conveyance of all materials to site and cost of cement excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for tools and plants including all other incidental charges etc., complete for Box culvert.

627.33

6190492

9868

... More
Vibrated Reinforced Cement Concrete M40 (Design mix) using 20mm ISS metal, including cost and conveyance of all materials to site and cost of cement at site but excluding cost and fabrication of steel but including cost of form work, labour charges for mixing transporting, laying, curing concrete, working at heights, soft water, hire charges for Tools and Plants, including all other incidental charges, etc complete for CRASH BARRIER OVER BOX CULVERT PORTION.

11.16

160826

14411

... More
Vibrated cement concrete M20 (Nominal mix) using 40mm ISS size hard broken granite metal including cost and conveyance of all materials to site including cost and labour charges for formwork, centering, labour charges for laying, compacting, curing all incidental charges etc., complete for Wing wall and Parapet.

87.32

741783

8495

... More
Supply and fabrication of STEEL grade Fe500 with suitable anticorrsive measure required for all the reinforced cement concrete items of work involved in the shedule including cost of steel, cost of fabrication, labour charges for cleaning the rods, straightening, cutting, bending, tying grills, hoisting and placing the reinforcement in position as specified in the drawing including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete.

59.81

5670287

94805

... More
Providing and fixing PVC seepage pipes of 100 mm dia of required lengths for retaining wall including costs and conveyance of all materials to work site and labour charges for fixing , etc., complete to drain the backfill.

48

9120

190

... More
Sub Estimate - 8) Construction of Retaining wall at Km 4/2

-

-

-

... More
Earth work excavation in all classes of soils such as hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour materials, tools, equipments and all incidental charges and sheeting, shoring and bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification for FOUNDATION RETAINING WALL

2730.68

614403

225

... More
Plain Cement concrete M15 ( Nominal mix ) using 40mm ISS HBG graded metal including cost and conveyance of all materials to site and cost of cement at site including soft water, labour charges for mixing, transporting, laying compacting, curing concrete,Tools and Plants and incidential charges etc., complete as per relevant standard specification, for LEVELLING COURSE BELOW FOUNDATION OF RETAINING WALLS

143.72

863326

6007

... More
Vibrated Reinforced Cement Concrete of grade M 35 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials and cost of cement to site but excluding cost and fabrication of steel but including soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths hire charges for Tools and Plants including all other incidental charges, etc. complete, for FOUNDATION OF RETAINING WALL

568.72

5136679

9032

... More
Vibrated Reinforced Cement Concrete of grade M 35 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials and cost of cement to site but excluding cost and fabrication of steel but including soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths hire charges for Tools and Plants including all other incidental charges, etc. complete, for Stem of RETAINING WALL (below ground level)

267.69

3281879

12260

... More
Vibrated Reinforced Cement Concrete of grade M 35 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials and cost of cement to site but excluding cost and fabrication of steel but including soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths hire charges for Tools and Plants including all other incidental charges, etc. complete, for Stem of RETAINING WALL (above ground level)

494.28

6857146

13873

... More
Providing Filter media inbetween the retaining walls for 600mm thickness using filter materials well packed with smaller sized towards the soil and bigger size towards the wall including cost and conveyance to work site including all labours and other incidental charges including hire charges for tools and plants employed etc. complete.as per CI. 710.1.4 and appendix -6 of IRC : 78-2014

396.46

449585

1134

... More
Providing and fixing PVC seepage pipes of 100 mm dia of required lengths for retaining wall including costs and conveyance of all materials to work site and labour charges for fixing , etc., complete to drain the backfill.

676

128440

190

... More
Supply and fabrication of Fe-500D (HYSD) Steel required for all RCC items of works involved in the schedule, including cost of steel at site and cost of fabrication labour charges for cleaning the rods straightening,cutting,bending,tying grills, including over laping to the required length wherever necessary and providing to the reinforcement placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges , etc., complete

79.56

7542685

94805

... More
Sub Estimate - 9) Provisions for filling exsisting Water Well in KM 0/0 to 4/094

-

-

-

... More
Filling of open well or Borehole with Stone dust up to 1.5m height below natural ground level including cost and conveyance of material to work site and spreading the fill material uniformly shall be placed in the well in layer of 500 mm thick where dumping of materials from trucks and front-end loaders into the abandoned wells not be allowed. Each layers of fill material shall be compacted by flooding with water etc.., for filling of open wells and as directed by the Departmental Officers.

4210

1128280

268

... More
Providing and laying Granular Sub-Base Grade- V consisting of well graded Material confirming to the grading given in Table No.400-1, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory roller to achieve the desired density, etc., complete as directed by the Engineer. as per MORTH No. 111, 112, 401, 900.

512.5

742402

1448.59

... More
Sub Estimate - 10-14)Junction Improvements

-

-

-

... More
Earth work Excavation in all classes of soils including weathered rock not requiring blasting and dopsiting on bank with initial leads and lifts including cost of all labour, equipments and all incidental charges backfilling and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for Preparation of Bed

-

-

-

... More
At Km 4/094

879.75

98575

112.05

... More
Picking the existing B.T surface upto 50mm depth as directed by the departmental officers and collecting the picked up salvaged metal and stacking the same for reuse and deposting the debris excluding cost of materials including all labour charges for picking and all other tools and plants employed of the work and including all other incidental charges etc., complete as per standard specifications.

-

-

-

... More
At Km 1/4 - 600.00 Sq.m At Km 2/6 - 262.50 Sq.m

862.5

17137

19.87

... More
Forming the embankment using carted earth having soaked CBR value not less than 8 including cost and conveyance of earth from the approved source to site, spreading the earth uniformly to the entire formation width as directed by the departmental officers, including labour for breaking clods, sectioning, laying in layers not exceeding 250mm in loose thickness and compacting each layer to the required density in accordance with IS 2720 Part IV to 95% proctor density to the specified depth below the sub grade level, keeping the moisture content of the earth at the time of compaction within the range of 1% above and 2% below the optimum moisture content determined in accordance with IS 2720 using 80-100 Kn power roller rolling to achieve the required maximum dry density including labour charges for sectioning, watering with all leads for water, including fuel and hire charges for power roller, water sprinkler and other tools and plants employed, etc. complete as per clause 305 of MORT&H Specifications 95% Compaction

-

-

-

... More
At Km 0/0 - 9180.25 Cu.m At Km 0/650 - 2685.53 Cu.m At Km 1/4 - 3012.32 Cu.m At Km 2/6 - 3047.10 Cu.m At Km 4/094 - 11021.25 Cu.m

28946.45

11115436

384

... More
Forming the embankment using carted earth having soaked CBR value not less than 8 including cost and conveyance of earth from the approved source to site, spreading the earth uniformly to the entire formation width as directed by the departmental officers, including labour for breaking clods, sectioning, laying in layers not exceeding 250mm in loose thickness and compacting each layer to the required density in accordance with IS 2720 Part IV to 97% proctor density to the specified depth below the sub grade level, keeping the moisture content of the earth at the time of compaction within the range of 1% above and 2% below the optimum moisture content determined in accordance with IS 2720 using 80-100 Kn power roller rolling to achieve the required maximum dry density including labour charges for sectioning, watering with all leads for water, including fuel and hire charges for power roller, water sprinkler and other tools and plants employed, etc. complete as per clause 305 of MORT&H Specifications 97% Compaction

-

-

-

... More
At Km 0/0 - 4695.36 Cu.m At Km 0/650 - 1826.51 Cu.m At Km 1/4 - 5699.29 Cu.m At Km 2/6 - 2620.67 Cu.m At Km 4/094 - 3767.73 Cu.m

18609.56

7294947

392

... More
Providing and laying Granular Sub-Base Grade- V consisting of well graded Material confirming to the grading given in Table No.400-1, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory roller to achieve the desired density, etc., complete as directed by the Engineer. as per MORTH No. 111, 112, 401, 900.

-

-

-

... More
At Km 0/0 - 997.32 Cu.m At Km 0/650 - 430.73 Cu.m At Km 1/4 - 1411.65 Cu.m At Km 2/6 - 618.38 Cu.m At Km 4/094 - 900.72 Cu.m

4358.8

6314114

1448.59

... More
Providing and laying Granular Sub-Base Grade- III consisting of well graded Material confirming to the grading given in Table No.400-1, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory roller to achieve the desired density, etc., complete as directed by the Engineer. as per MORTH No. 111, 112, 401, 900.

-

-

-

... More
At Km 0/0 - 382.50 Cu.m At Km 0/650 - 211.31 Cu.m At Km 1/4 - 751.29 Cu.m At Km 2/6 - 296.34 Cu.m At Km 4/094 - 431.48 Cu.m

2072.92

3198080

1542.79

... More
Provding and laying Wet Mix Macadam consisting of clean crushed aggregates confirming to the grading given in Table No.400-13, including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver on well prepared surface and compacting with vibratory roller to achieve the desired density, etc., complete as directed by the Engineer. as per MORTH No. 111, 112, 406, 900.

-

-

-

... More
At Km 0/0 - 956.25 Cu.m At Km 0/650 - 528.29 Cu.m At Km 1/4 - 1863.00 Cu.m At Km 2/6 - 737.91 Cu.m At Km 4/094 - 1078.69 Cu.m

5164.14

9136448

1769.21

... More
Providing and applying Prime Coat over granular Base with bitumen emulsion (SS-I type) on prepared surface including preparing the road surface and spraying the primer at the rate of 0.70 kg/sqm using bitumen sprayer as directed by the Engineer - over WMM as per MORTH No. 111, 112, 502.

-

-

-

... More
At Km 0/0 - 3589.53 Sq.m At Km 0/650 - 2113.14 Sq.m At Km 1/4 - 7179.22 Sq.m At Km 2/6 - 2938.96 Sq.m At Km 4/094 - 3910.78 Sq.m

19731.63

1511245

76.59

... More
Providing and applying Tack Coat over Granular surface treated with primer using Bitumen Emulsion (RS-I type) with mechanical sprayer at the rate of 0.25 kg per sqm as directed by the Engineer as per MORTH No.111,112,503,900.

-

-

-

... More
At Km 0/0 - 3589.53 Sq.m At Km 0/650 - 2113.14 Sq.m At Km 1/4 - 7179.22 Sq.m At Km 2/6 - 2938.96 Sq.m At Km 4/094 - 3910.78 Sq.m

19731.63

342541

17.36

... More
Providing and applying Tack Coat over Exsisting BT surface using 2 Kg of Bitumen Eulsion (RSI) per 10 Sqm for preparatory to another bituminous construction over it including cost of material,labour charges, rentals for machinary,fuel and aii other incidental charges etc.., complet as per MORTH Rev-5...

-

-

-

... More
At Km 4/094

1775

43753

24.65

... More
Providing, laying 75mm consolidated thick Dense Bituminous Macadam using 0.40 cum of 37.50-13.20mm, 0.35 cum of 13.20-2.36mm and 0.36cum of2.36mm & below size IRC metal with 71.30kgs of VG30 grade bitumen for premixing per 10sqm including costand conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing in required temperature incentralhot mixplant 20-30 toncapacity,conveying the mix bytipper trucks tosite, spreading the mix to uniform thickness of 75mm with mechanical paver to the specified grades and crosssections and consolidated by Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler,tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including allother incidental charges etc.,complete as per specification using CMP as per clause 505 of MORTH No. 111, 112, 505, 900.rev-5.

-

-

-

... More
At Km 0/0 - 358.95 Cu.m At Km 0/650 - 211.31 Cu.m At Km 1/4 - 717.92 Cu.m At Km 2/6 - 293.90 Cu.m At Km 4/094 - 568.58 Cu.m

2150.66

18339624

8527.44

... More
Providing and laying Bituminous Concrete to 30/40mm thick using 0.13cum of19.00-9.50mm, 0.17cum of 9.50-2.36mm and 0.26cum of 2.36 and below with 50.30kgs of VG30 grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMPsite, heating the bitumen and aggregate to required temperature and mixing the min required temperature in central hotmix plant20-30t on capacity, conveying the mix by tipper trucks to paversite, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and crosssections and consolidated by 8-10tonne Vibratory to the required densityetc., including labour for attending to paver to site etc., including hirecharges and fuel charges for 20-30tCMP with bitumen boiler, tippertrucks, PaverFinisher, Vibratory roller and allother tool sand plant required, including fuel and all other incidental charges etc.,complete as per specification using CMP as per clause 507 of MORTH Rev-5

-

-

-

... More
At Km 0/0 - 107.69 Cu.m At Km 0/650 - 63.39 Cu.m At Km 1/4 - 215.38 Cu.m At Km 2/6 - 88.17 Cu.m At Km 4/094 - 170.57 Cu.m

645.2

6466729

10022.83

... More
Providing and laying of cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to the worksite including labour charges for mixing, laying, finishing and curing with soft potable water and all other incidental charges etc., complete as per standard specification.for median covering concrete

-

-

-

... More
At Km 0/0 - 3.68 Cu.m At Km 1/4 - 3.35 Cu.m At Km 4/094 - 11.21 Cu.m

18.24

138113

7572

... More
Manufacturing and fixing of new C.C kerbs of mountable type (as per IRC : 86-1983) in cc 1:2:4 using 20mm ISS HBG metal including cost and conveyance of all materials to work site including moulding charges, labour charges for fixing to the correct lines and grades, and pointing with cm 1:3 to full depth and all other incidental charges etc, complete

-

-

-

... More
At Km 0/0 - 155 Rm At Km 1/4 - 140 Rm At Km 4/094 - 460 Rm

755

250660

332

... More
Earth filling with excavated soil (other than sand) including cost of all labour, equipments and all other incidental charges for filling and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification with in the channelization island

-

-

-

... More
At Km 0/0 - 59.73 Cu.m At Km 1/4 - 50.98 Cu.m At Km 4/094 - 165.90 Cu.m

276.61

10773

38.95

... More
Painting two coats of alternative black and white bands using Synthetic Enamel Paint including cost and conveyance of all materials to worksite including labour charges for applying the two coats of black and white bands etc., and other incidental charges etc., complete

-

-

-

... More
At Km 0/0 - 51.54 Cu.m At Km 1/4 - 46.87 Cu.m At Km 4/094 - 156.94 Cu.m

255.35

72085

282.3

... More
Providing RCC Centre Median of size 0.610m at bottom 0.250m at middle 0.150 at top and to height of 1.10m from the road level including cost and conveyance of all materials to work site including picking the existing B.T surface if necessary and excavating the necessary depth to have a median, and providing form work for shuttering on both sides and chamfered edges at top, including cost of steel reinforcement as per the Bar bending schedule appended here with, fabrication and placing in position of steel grills including cost of binding wire, laying of R.C.C M25 concrete using ISS HBG graded metal including cost and conveyance of all materials to work site from the approved sources including labour charges for mixing laying curing etc middle of the median as directed by the departmental officers, Rendering Smoothness over the CC surface with 10 kg of cement for 10 sqm area and painting two coats over the CC surfaces with best approved quality of synthetic enamel paint including primer etc., including all labour charges, hire and fuel charges for the tools and plants employed and as per the standard specification and as directed by the departmental officers etc., complete.

-

-

-

... More
At Km 1/4 - 208.00 Rm At Km 2/6 - 40.00 Rm

248

2514720

10140

... More
Sub Estimate - 15)Provision for Road furnitures

-

-

-

... More
Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface - Providing and laying of hot applied Thermoplastic compound 2.5 mm thick including reflectorising glass beads@ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform and free from streaks and holes etc complete as per MORT&H specification No.803.

2847.06

2533883

890

... More
Road Markers/Road Stud with Lens Reflector - Providing and fixing reflective road studs of 'category A' Raised pavement markers made out of poly carbonate / methyl methercrylate/ ABS moulded body confirming to ASTM D 788 and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face with retro reflectance and chromaticity values conforming to ASTM D4280. The reflective raised pavement markers shall also confirm to the MORTH circular No RW / NH. 33023/ 10/ 97-DO.III dt 11.06.97. The height, width and length shall not be less than 15 mm, 90 mm and 100 mm and with minimum reflective area of 13 Sq.cm on each side and the slope to the base shall be 35 + /- 5 degree. Each reflector shall have a CIL not less than values specified in Table 2 of said MORTH circular. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 + / - 2mm and height not less than 30+ / - 2 mm) from the body is to be a minimum value of 500 Kgf. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer. The marker shall support a load of 13635 Kg tested in accordance with ASTM D4280 and confirming to IRC 35 - 2015 guidelines and MORT&H specification 804 etc., complete

3593

1724640

480

... More
Rigid Median Marker - Providing fixing of Median marker double sided made of polycarbonate for impact resistance and good weather ability. Polycarbonate used for molding the median marker shall have a minimum Izod impact strength value of 600 J/m at room temperature. The impact strength of the poly carbonate should not decrease to less than 70% of its initial value on being subjected to UV weathering as per ASTM G 155 for 1000 hours or exposure to 2 years of natural weathering. The body of the median marker shall be in the form of an isosceles trapezoidal structure of length 15 cm height and width of 10 x 10 cm. The median marker shall have fluorescent yellow retro - reflective sheeting confirming to Tpe XI specifications as per ASTM D 4956.Area of reflective sheeting should not be less than 70 cm2 .Edge of retro reflective shall be concealed using a grill/ mesh/ similar mechanism to prevent vandalism and sheeting pilferage. The logo of the manufacturer shall be embossed and painted in contrasting colour on both side of median marker for distinct identification.

396

186120

470

... More
Metal Beam Crash Barrier Type - A, "W" Double Guard - Providing and erecting Single sided Double Guard Metal Beam Crash Barrier System 1. 70m high, comprising of 3mm thick wall "W" beams posts and spacer channels shall be made by cold roll forming using HR conform to IS 5986 Fe 410 / 360 and dip galvanized having Zinc Mass of 550gms/ sqm, minimum 950mm above road/ ground level fixed on ISMC series channel vertical post 150x75x5mm spaced 2m center to center 312mm x 83mm flange width X 3mm thick, 4318mm long post directly embedded in the concrete (M15) pit size 350x350x800mm for a depth of 750mm below ground. All fixing bolts and nuts hot dip galvanized conforming to IS: 1367 clause 4.60 all complete as per Technical Specification and as directed by the Engineer-in-charge

988

6422000

6500

... More
Sub Estimate - 16)Provision for other sign boards, informatory boards and Cantilever boards

-

-

-

... More
Retro-Refl.ectorised Traffic Signs (with out definition board) Type - IV - Providing and fixing of retro - Providing and erecting of Retro - Reflectorised Cautionary, Mandatory and Informatory signs (without definition board) made out of High Intensity Prismatic Grade Sheeting confirming to Type-IV standards of IRC-67: 2012 and ASTM D 4956 -09, specification and fixed over 2mm thick Aluminium sheet fixed over a back supporting frame of 25mmx25mmx3mm Mild Steel angle and supported on a mild steel angle post 75X75X6mm with a clear height of not less than 2.10m from the ground level to the bottom of the sign board and 0.60m below ground level. The sign post should be painted as per IRC 67-2012 and firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45cmX45cmX60cm size including cost and conveyance of all materials, equipment, Machinery and labour with all leads and lifts, loading charges necessary for satisfactory completion of the work as directed by the engineer in charge. High intensity Retro - Reflectro sheet shall consist of minimum coefficient of Retro-reflection as per Table 6.6 of IRC 67- 2012. The retro - reflective sheeting shall be covered under 7 year warranty issued for field performance and a certified copy of three years outdoor exposure report shall be obtained as per IRC 67:2012 . (as per MORT&H Specification No.801)

-

-

-

... More
90 cm equilateral triangle (Pedestrian Crossing, other sign boards)

12

61512

5126

... More
60 cm equilateral triangle

12

38736

3228

... More
60 cm circular (No Overtaking, Speed limit)

24

108312

4513

... More
80 cm x 60 cm rectangular (Bus stop village boards)

6

38094

6349

... More
60 cm x 45 cm rectangular (Chevron Sign)

70

302120

4316

... More
60 cm x 60 cm square

5

25920

5184

... More
90 cm high octagon

5

41025

8205

... More
Providing and erecting of Direction and Place Identification Retro-reflectorised Sign made out of High Intensity Prismatic Grade Sheeting confirming to Type-IV standards of IRC-67: 2012 and ASTM D 4956 —09, specification and fixed over 2mm thickAluminium sheet fixed over a back supporting frame of 25mmx25mmx3mm Mild Steel angle and supported on a mild steel angle post 75X75X6mm with a clear height of not less than 2.10m from the ground level to the bottom of the sign board and 0.6Om below ground level. The sign post should be painted as per IRC 67-2012 and firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45cmX45cmX60cm size including cost and conveyance of all materials, equipment, Machinery and labour with all leads and lifts, loading charges necessary for satisfactory completion of the work as directed by the engineer in charge. High intensity Retro Reflectro sheet shall consist of minimum coefficient of Retro-reflection as per Table 6.6 of IRC 67-2012. The retro- reflective sheeting shall be covered under 7 year warranty issued for field performance and a certified copy of three years outdoor exposure report shall be obtained as per IRC 67:2012. (as per MORT&H Specification No.801)

16.2

191241

11805

... More
Road Delineators - Supplying and installation of delineators (road way indicators, hazard markers and object markers), 80-100 cm high above ground level, painted at alternatively black and white in 15 cm wide strips, fitted with 80 x 100 mm rectangular or 75 mm dia circular reflectorised panels at the top, buried or pressed into the ground and conforming to IRC-79 etc., complete (as per MORT&H specification No. 806)

125

300000

2400

... More
Digitally Printed Retro Reflectorized Overhead Cantilever Gantry Informatory Sign Board - Providing and fixing of Retro Reflectorized Overhead Cantilever Informatory sign made of cube corner Micro Prismatic grade sheeting conforming to Type XI standards of IRC67 - 2012 and ASTMD4956 - 09, specification and fixed over 2mm thick aluminum sheet fixed on back supporting frame mild steel L angle of size 50mm x 50mm x 6mm. The Vertical support post for the installation of overhead sign Gantry shall be made of 300NB (Nominal Bore) MS Pipe with 12mm thick with a ground clearance of 6 meters along with 80NB (Nominal Bore) MS Pipe with 4mm thick and 40NB (Nominal Bore) MS Pipe with 3.20mm thick support posts. MS Base plate of size 1200mm x 1200mm x 25mm and MS Top plate of size 900mm x 1650mm x 16mm to be used to hold the sign board at the top and bottom respectively. MS Stiffener plates 8mm thick of sizes 420x420, 682x420, 288x288, 288x927 & 44xl30 are to be used. Anchor bolts of dimension 25mm dia and 1000mm length are to be used as fixtures. The approved direction information should be digitally printed and should have 70% of the co­efficient of Retro-reflection values against the values as mentioned in Table 6. 9 of IRC67 - 2012.The Latex printer used for digital printing should use inks with low VOC emissions and have green guard, eco logo certificates as per UL 2801 standards. The retro-reflective sheeting shall be covered under 10 years warranty issued for field performance and a certified copy of three years Outdoor exposure report shall be obtained as per IRC 67-2012 (As per MoRT&H specification No.801) etc., complete.

10

5404900

540490

... More
Aluminium backed Flexible Prismatic (AFF) Sheeting - Supply and fixing of AFP Sheeting flexible prismatic sheeting shall be of 1ft width and laminated at the back with a 50 micron thick Aluminium (Al) foil with pressure sensitive adhesive and liner ,further this flexible prismatic sheeting shall have screen printed arrow / slant line pattern in black colour on top in continuous roll format. Neither AFP sheeting nor the flexible prismatic sheeting used shall crack when slowly bent in second time around a I/8th inch mandrel after being conditioned for 24 hrs at 0 degrees and tested as per section s2.2.2 of ASTM, D 4956-09. The AFP sheeting with the linear removed shall be applied with a neoprene contact adhesive with polychloroprene as base viscosity of 200-450 cps and solid content of 20-30 % once applied the edges of the product shall be extremely resistant to peel off. A test report from institutes like ARAI/CRR/ conforming to above mentioned flexibility and ASTM D 4956-09 type -vi retro reflectivity performance of the flexible prismatic sheeting used in AFP shall be submitted by the tenderer during pre-qualification and supply of material.2 years Pre-qualification warranty for field performance shall be submitted by the contractor for technical qualification in the tender

50

460000

9200

... More
Supplying of Solar Raised Pavement Markers made of polycarbonate molded body, solar powered, LED self­ illumination in active mode, 360 degree illumination and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face in passive mode. The product shall support a load of 13635 kg tested in accordance to MORTH and ASTM D 4280 Type H. The product should be resistant to water ingress according to IP 65 standards with IS 12063: 1987 Category 2 and should withstand temperatures in the range of -7 C to 70 C. Flashing rate and color of lighting is to be provided as per requirement. There should be minimum current losses of less than 20 micro-amperes in sleep-charging mode to enhance product life and single charge should provide for a minimum autonomy of 50 hours. The height, width and length shall not be less than 10 mm x 100 mm x 100 mm. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epOA'Y resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer. Warranty Certificate and test reports confirming to compressive strength as per MORTH circular shall be obtained from the manufacturer and submitted to the engineer-in-charge. Two Years Warranty Certificate for Solar RPM for the quantity installed and a certified copy of test reports from an independent test laboratory conforming to water ingress shall be obtained from the Manufacturer by the contractor and submitted to the engineer-in-charge.

330

1089000

3300

... More
Providing and fixing of Retro Reflectorized Overhead Cantilever lnformatory sign made of cube corner Micro Prismatic grade sheeting conforming to Type XI standards of IRC67 - 2012 and ASTMD4956 — 09, specification and fixed over 2mm thick aluminum sheet fixed on back supporting frame mild steel L angle of size 50mm x 50mm x 6mm. The Vertical support post for the installation of overhead sign Gantry shall be made of 300NB (Nominal Bore) MS Pipe with 12mm thick with a ground clearance of 6 meters along with 80NB (Nominal Bore) MS Pipe with 4mm thick and 40NB (Nominal Bore) MS Pipe with 3.20mm thick support posts. MS Base plate of size l200mm x l200mm x 25mm and MS Top plate of size 900mm x 1650mm x 16mm to be used to hold the sign board at the top and bottom respectively. MS Stiffener plates 8mm thick of sizes 420x420, 682x420, 288x288, 288x927 & 44x 130 are to be used. Anchor bolts of dimension 25mm dia and l000mm length are to be used as fixtures. The approved direction information should be digitally printed and should have 70% of the co- efficient of Retro-reflection values against the values as mentioned in Table 6.9 of IRC67 — 2012.The Latex printer used for digital printing should use inks with low VOC emissions and have green guard, eco logo certificates as per UL 280 1 standards. The retro-reflective sheeting shall be covered under 10 years warranty issued for field performance and a certified copy of three years Outdoor exposure report shall be obtained as per IRC 67-20 12 (As per MoRT&H specification No.80 l). Cantilever sign shall be installed at the site as per the approved structural and foundation drawing provided in the tender document and including cost and conveyance of all materials, equipment, machineries to worksite, including all labour charges for fixing the gantry in position with all leads and lifts, loading charges and necessary for satisfactory completion of the work as directed by the engineer-in- charge etc., complete. Item No 16 Digitally Printed Retro Reflectorized Overhead Gantry Informatory Sign Board

4

4060640

1015160

... More
Sub Estimate - 17) Providing and fixing of KM Stones, HM Stones,Guide posts & Boundary stone etc.,

-

-

-

... More
Providing R.C.C. grade M15 Precast Km stones of - standard design as per IRC 8 - 1980 and fixing in position including painting and printing etc., complete ( as per MoRT&H Specifications No 804)

10

22680

2268

... More
Providing R.C.C. grade M15 Precast Hm stones of standard design as per IRC 8 - 1980 and fixing in position including painting and printing etc., complete ( as per MoRT&H Specifications No 804)

32

12800

400

... More
Supplying and fixing of R.C.C. grade M15 guide posts of size 1.20x0.20x0.20m with Reflective star stickers with tin M.S sheet with two side packing and top cover of 0.75 inches in RCC 1:2:4 mix using 20mm HBG metal with 1010mm dia bars as vertical with 8mm dia stirrups including 8.25 inches x 4.25 feet mould with star shape of 5 inches and top projection by projection by 0. 75 inches x3 inches including cost and conveyance of materials to work site etc., complete.

205

292945

1429

... More
Providing R.C.C. grade M15 Precast Boundary stones of - standard design as per IRC 25 - 1967 and fixing in position including painting and printing including cost and coveyance of materials to work site etc., complete.

72

50184

697

... More
Calculation of SubTotal, GST and Total Amount carried out by system automatically

-

-

-

... More
Basic cost of value put to tender as per estimate

1

-

296479341

... More
Add GST at 18%

1

53366281

53366281

... More
Total Estimate Value including GST (Value put to tender)

1

-

349845622

... More
Quoted value by the bidder

1

-

-

... More
Final Quoted Value by the bidder (A+D)

1

-

-

... More
Add GST at 18% of Final Quoted Value

1

-

-

... More
Total Value of Contract Including 18% of GST

1

-

-

... More
Total Estimate Value including GST (Value put to tender)

-

349845622

-

... More
Quoted Rate in Figures (Total Value of Contract Including 18% of GST )

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.