Highways Department Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Highways Department Tender
Civil And Construction
Bridge Construction
Eprocure
Opening Date10 Feb 2024
Closing Date26 Feb 2024
Tender Amount₹ 45,00,000
Costs
EMD
₹ 33,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Tn No 36 2023 2024 Sdo Dated 06 02 2024
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_HWAY_422367_1Bid Award Id
ViewTender No
TN No 36 2023 2024 SDO Dated 06 02 2024Tender Authority
Highways Department ViewPurchaser Address
-Website
http://tntenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Reconstruction of Slab culvert at km 8/4 of Punnam - Pugalur road
14.56
80909
5557
... More
Vibrated Cement Concrete M20 Grade using 40mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for formwork and centering, labour charges, compacting, curing, and all incidental charges etc., complete for SUBSTRUCTURE OF ABUTMENTS, WINGS BELOW SILL LEVEL
1
-
-
... More
Reconstruction of Slab culvert at km 8/4 of Punnam - Pugalur road
119.44
792126
6632
... More
Vibrated Cement Concrete M20 Grade using 40mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for formwork and centering, labour charges, compacting, curing, and all incidental charges etc., complete for SUBSTRUCTURE OF ABUTMENTS, WINGS ABOVE SILL LEVEL
1
-
-
... More
Reconstruction of Slab culvert at km 8/4 of Punnam - Pugalur road
49.92
400458
8022
... More
Vibrated Reinforced Cement Concrete of grade M25 (Design mix) using 20mm and below ISS HBG metal including cost and conveyance of all materials to site and cost of cement excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for tools and plants including all other incidental charges etc., complete for Bed block cum Dirtwall.
1
-
-
... More
Reconstruction of Slab culvert at km 8/4 of Punnam - Pugalur road
9.31
112688
12104
... More
Vibrated Reinforced Cement Concrete of grade M30 (Design mix) using 20mm and below ISS hard broken granite metal including cost and conveyance of all materials to site and cost of cement excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for tools and plants including all other incidental charges etc., complete for Deck slab.
1
-
-
... More
Reconstruction of Slab culvert at km 8/4 of Punnam - Pugalur road
25.03
244092
9752
... More
Vibrated cement concrete M30 Grade (Design mix) using 25mm, 12mm and 6mm IRC size hard broken granite metal including cost and conveyance of all materials to site cost of premoulded expansion joints and fixing the same in position including cost and labour charges for formwork, labour charges for laying, compacting, curing including all other incidental charges etc.,complete for WEARING COAT 75mm UNIFORM THICKNESS OVER DECK SLAB AND OVER APPROACH SLAB.
1
-
-
... More
Reconstruction of Slab culvert at km 8/4 of Punnam - Pugalur road
62.04
36312
585.3
... More
Supply and fixing of KRAFT paper for full width of seating of deckslab and including cost and conveyance to worksite, labour for fixing the same in correct position and all other incidental charges etc., complete.
1
-
-
... More
Reconstruction of Slab culvert at km 8/4 of Punnam - Pugalur road
12.6
1260
100
... More
Supply and fabrication of STEEL grade Fe500 D with suitable anticorrsive measure required for all the reinforced cement concrete items of work involved in the shedule including cost of steel, cost of fabrication, labour charges for cleaning the rods, straightening, cutting, bending, tying grills, hoisting and placing the reinforcement in position as specified in the drawing including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete.
1
-
-
... More
Reconstruction of Slab culvert at km 8/4 of Punnam - Pugalur road
2.09
198142
94805
... More
Supplying and fixing of PVC expansion joint in between deck slabs over abutment and pier as shown in the drawing including cost and conveyance of expansion joints including shalimar pad and joint sealent etc., complete as per section 2600 of MORTH specifications (Rev - V)
1
-
-
... More
Reconstruction of Slab culvert at km 8/4 of Punnam - Pugalur road
1
594
594
... More
Providing and fixing Class I PVC seepage pipes of 100mm dia of required lengths for abutments and return walls including costs and conveyance of all materials to work site and labour charges for fixing etc., complete to drain from the backfill as per section 2706 of MORTH specification (Rev- V)
1
-
-
... More
Reconstruction of Slab culvert at km 8/4 of Punnam - Pugalur road
38
7717
203.1
... More
Filling behind Abutments and return walls with clean gritty free draining gravel including cost of gravel having pi value less than 6, conveyance of gravel to worksite. Laying, handling charges and filling in layers tamping under optimum moiture content to get the maximum density, including watering, with all leads and lifts for water and all other incidental charges etc., complete.
1
-
-
... More
Reconstruction of Slab culvert at km 8/4 of Punnam - Pugalur road
42.79
11296
264
... More
Dismantling of RR Masonry walls, clearing away and carfully stacking useful materials for reuse etc., complete.
1
-
-
... More
Reconstruction of Slab culvert at km 8/4 of Punnam - Pugalur road
82.5
21235
257.4
... More
Excavation for Roadway and drainage Excavation including removal and satisfactory disposal of all materials necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer, as per MORTH Specification. Box cutting for widening portion.
1
-
-
... More
Reconstruction of Slab culvert at km 8/4 of Punnam - Pugalur road
536.58
60123
112.05
... More
Granular Sub-base with Graded Material (Table:- 400-1) - Plant Mix Method Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 of MORTH Specification- for grading- V Material. (Bottom Layer)
1
-
-
... More
Reconstruction of Slab culvert at km 8/4 of Punnam - Pugalur road
216.8
313525
1446.15
... More
Wet Mix Macadam (Table 400-13) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density, Complete as per clause 406 of MORTH Specification.
1
-
-
... More
Reconstruction of Slab culvert at km 8/4 of Punnam - Pugalur road
271
499171
1841.96
... More
Prime coat Providing and applying primer coat with bitumen emulsion (SS-I type) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per clause 502 of MORTH Specification over WMM.
1
-
-
... More
Reconstruction of Slab culvert at km 8/4 of Punnam - Pugalur road
1084
81625
75.3
... More
Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 of MORTH Specification- over granular surfaces treated with primer.
1
-
-
... More
Reconstruction of Slab culvert at km 8/4 of Punnam - Pugalur road
1084
18297
16.88
... More
Dense Graded Bituminous Macadam (Table - 500-10) Providing and laying dense bituminous macadam with Hot Mix Plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade- 40) at percentage specified by Job Mix Formula by weight of total mix of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolled as per clause 501.6 and 501.7 to achieve the desired compaction, as per clause No.505 of MoRTH specification Grading II.
1
-
-
... More
Reconstruction of Slab culvert at km 8/4 of Punnam - Pugalur road
54.2
508205
9376.48
... More
Bituminous Concrete (Table 500-17) Providing and laying bituminous concrete with Hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade-40) at percentage specified by Job Mix Formula of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolled as per clause 501.6 and 501.7 to achieve the desired compaction as per clause No. 507 of MORTH Specification complete in all respects - Grading II
1
-
-
... More
Reconstruction of Slab culvert at km 8/4 of Punnam - Pugalur road
32.52
331085
10180.98
... More
Calculation of SubTotal, GST and Total Amount carried out by system automatically
-
-
-
... More
Basic cost of value put to tender as per estimate
1
-
3776247
... More
Add GST at 18%
1
-
679724
... More
Total Value put to Tender
1
-
4455971
... More
Differnce Amount (Excess/Less)
1
-
-
... More
Quoted Amount (Basic Rate Only)
1
-
-
... More
Add GST at 18% of of Quoted Amount
1
-
-
... More
Total Value of Quoted Amount Including 18% of GST
1
-
-
... More
Basic cost of value put to tender as per Estimate
-
3776247
-
... More
Quoted Rate in Figures (Total Value of Contract Including 18% of GST )
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements