Highways Department Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Highways Department Tender
Civil And Construction
Road Construction
Eprocure
Opening Date6 Dec 2024
Closing Date16 Dec 2024
Tender Amount₹ 2,51,40,000
Costs
EMD
₹ 1,36,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Try-90 Nannilam H C And M Subdivision
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_HWAY_508136_3Bid Award Id
ViewTender No
TN.NO.52/2024-25Tender Authority
Highways Department ViewPurchaser Address
-Website
http://https://tnhighways.gov.in/index.php/en/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing and laying Prime Coat over WMM surface using pressure distributor 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 502 of MORTH Rev-5
5834.5
80
471427.6
... More
Providing and laying Tack Coat over WMM surface (treated with primer) using pressure distributor 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5
5834.5
18
107938.25
... More
Providing and laying Tack Coat over existing BT surface using 2.00Kg of Bitumen Emusion (RS1) per 10 sqm for Pressure distributor at preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 503 of MORTH Rev-5
13989
26
374905.2
... More
Providing and Laying 50mm thick Bituminous Macadam using course aggregate and VG30 bitumen which shall consist of construction in a single course base/ binder course confirming to the specfication on a previously prepared base. (using Mini Hot Mix Plant and Power Roller ) including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 504 MORTH Rev-5 (Mix-in-place method) (For Patch Works)
33.81
9168
309978.87
... More
BM (Grade-II) 50mm Thick using VG30 Providing and laying 50mm consolidated thick bituminous macadam using 0.20 cum fo 26.50-13.20mm, 0.43 cum of 13.20-2.36mm and 0.08 cum of 2.36mm & below size IRC metal with 37 Kgs of VG30 Grade bitumen for premixing per 10sqm of 50mm thick including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory / Pneumatic Roller to the required densityetc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher / 9m paver finisher, Vibratory / Pneumaticroller and all other tools and plant required, including fuel and all other incidental charges etc.,complete as per specification using CMP as per clause 504 of MORTH Rev-5
693.33
9345
6479432.32
... More
DBM (Grade-II) 60mm Thick using VG30 Providing, laying 60mm consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50-13.20mm, 0.25cum of 13.20-2.36mm and 0.23cum of 2.36mm & below and with 53.20Kgs of VG30 Grade bitumen for premixing per 10sqm of 50mm thick including cost and conveyance of all materials to CMP site,heating the bitumen, aggregate and mixing them in the required temperature in Central Hot Mix Plant 20-30 ton capacity, conveying the mix by tipper trucks to work site, spreading the mix to uniform thickness of 60mm using paver to the specified grades and cross sections and compacted by Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver at site etc.,including hire and fuel charges for 20-30ton CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory rollers and all other tools and plant required, including all other incidental charges etc.,complete as per specification using CMP as per clause 505 MORTH Rev-5
350.07
10726
3754892.83
... More
BC (Grade-II) 30mm Thick using VG30 Providing and laying Bituminous Concrete to 30mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm of 40mm thick including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc.,complete as per specification using CMP as per clause 507 of MORTH Rev-5
594.72
11473
6823775.65
... More
Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with an average lead of 10km and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with power roller, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, clearing up the site and disposal of all surplus materials etc., complete as per standard specification. For Carted Earth with compaction for making up of low berms
378.45
306
115960.86
... More
Calculation of SubTotal, GST and Total Amount carried out by system automatically
-
-
-
... More
Basic cost of value put to tender as per estimate
1
21297020
-
... More
Add GST at 18%
1
3833464
-
... More
Total Value put to Tender
1
25130484
-
... More
Quoted Percentage
1
-
-
... More
Quoted Value
1
-
-
... More
Add GST at 18% of Final Quoted Value
1
-
-
... More
Total Value of Contract Including 18% of GST
1
-
-
... More
Basic cost of value put to tender as per Estimate
-
-
21297020
... More
Quoted Rate in Figures (Total Value of Contract Including 18% of GST )
-
-
-
... More
Quoted Rate in Words
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements