Highways Department Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Highways Department Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date2 Sep 2024
Closing Date23 Sep 2024
Tender Amount₹ 5,39,90,000 
Notes
Download

Costs

Summary

Sendamangalam (h) Candm Sub Division (slm-18)

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Dry Lean Cement Concrete Sub Base - Construction of Dry Lean Cement Concrete Sub Base over a prepared sub grade with coarse and fine aggregates conforming to IS : 383, the size of the aggregate not exceeding 25 mm, aggregate - cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 Kg / cum, concrete strength not to be less than 10 Mpa at 7 Days, mixed at site, compacted using vibrator, finishing and curing etc., complete as per clause 600,601 & 602 of MORTH Vth Revision

1050.23

7273409

6925.54

... More
Advance patch work 50mm thick using 45 mm IRC size HBG metal for making the pot holes and patching using VG 10 grade bitumen including mixing at the rate of 44 Kg / Cum of chips after trimming the pot holes or depression to proper shape and depth side painting with tack coat and compacting the layers as directed by Departmental officers etc., complete as per clause 111, 112, 501, 3004 & 900 of MORTH Vth Revision

22.58

103431

4580.68

... More
Advance patch work 25mm thick using 13.20 mm IRC size HBG metal for making the pot holes and patching using VG 10 grade bitumen including mixing at the rate of 44 Kg / Cum of chips after trimming the pot holes or depression to proper shape and depth side painting with tack coat and compacting the layers as directed by Departmental officers etc., complete as per clause 111, 112, 501, 3004 & 900 of MORTH Vth Revision

16.68

85499

5125.89

... More
Providing and laying Tack Coat over Existing BT surface using 2 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 111, 112, 501, 503 & 900 of MORTH Vth Revision

11616.52

382880

32.96

... More
Providing and laying Tack Coat over Dry Lean Cement Concrete surface using 3.00 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 111, 112, 501, 503 & 900 of MORTH Vth Revision

5365

123019

22.93

... More
Providing, laying 70mm consolidated thick Dense Bituminous Macadam using 0.40cum of 37.50-13.20mm, 0.35 cum of 13.20-2.36 mm and 0.36 cum of 2.36 mm & below size IRC metal with 71.30 kgs of VG30 grade bitumen for premixing per 10 sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing the min the required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to site, spreading the mix to uniform thickness of 70 mm with mechanical paver to the specified grades and cross section sand consolidated by Vibratory Roller to the required density etc., including labour for attending to paver to site etc.,including hire and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and allother tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per MoRTH specification clause No.111,112,501,505 & 900 - Grading I

369.95

3937196

10642.51

... More
Providing and laying Bituminous Concrete to 30mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG 30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per clause No. 111, 112, 501, 507 & 900 of MORTH vth Revision

509.45

6269510

12306.43

... More
Providing compaction for embankment / making up of low berms using the available box cut earth including all hire and fuel charges for power roller for compaction, water sprinkler, including all labour charges for laying, spreading, watering etc., complete and as directed by the departmental engineers. clause No. 111, 112, 301 to 305 & 900 of MORTH vth Revision

302

10011

33.15

... More
Earth Work excavation in all classes of soil except hard rock requiring blasting and deposting on bank with all leads and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges including compacting with vibratory sioil compactor, watering, including all hire and fuel charges for all tools and plants removal of all other deleteriuos matter and obstructions, trimming of bottom of excavation, backfilling, clearing up the site and disposal of all surplus materials etc.,complete as per standard specification for formation of Diversion Road using Site Earth as per MORTH specification clause No. 111, 112, 301 to 305 & 900 of MORTH vth Revision

-

-

-

... More
1.2) Construction of Box Culvert at Km 0/6 (Diversion Road)

82.5

14236

172.56

... More
Dismantling Culverts, Bridges and other Structures Dismantling salvaging and removal and disposing of resulting materials and back filling the resulting trenches and pits etc as per clause No. 111, 112, 202 of MORTH vth Revision Dismantling Plain Cement Concrete

-

-

-

... More
1.1) Wedining of pipe Culvert at Km 0/2, 0/8,0/10, 1/4,1/6, 1/8, 1/10, 3/8,3/10,4/2,4/6(i),4/6(ii),4/8

16.43

7988

486.2

... More
Earth Work excavation in all classes of soil except hard rock not requiring blasting and deposting on bank with all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges and sheeting, shoring, bracing and their subsequent removal of all logs,stumps and other deleteriuos matter and obstructions,trimming of bottom of excavation,backfilling and clearing the site and disposal of all surplus materials etc.,complete as per standard specification for Foundation of Culvert and Retaining Wall as per clause 111, 112, 201, 202, 301 to 305 & 900 of MORTH Vth Revision

-

-

-

... More
1.1) Wedining of pipe Culvert at Km 0/2, 0/8,0/10, 1/4,1/6, 1/8, 1/10, 3/8,3/10,4/2,4/6(i),4/6(ii),4/8

94.63

16329

172.56

... More
1.2) Construction of Box Culvert at Km 0/6

70.68

12196

172.56

... More
1.3) Construction of Retaining wall at Km 0/6

183.96

31744

172.56

... More
1.4) Construction of Retaining wall at Km 0/2,0/8,0/10

200.1

34529

172.56

... More
1.5) Construction of Retaining wall at Km 1/2,1/8

176.4

30439

172.56

... More
1.6) Construction of Retaining wall at Km 3/10

93.6

16151

172.56

... More
1.7) Construction of Retaining wall at Km 4/2,4/6

264.6

45659

172.56

... More
1.8) Construction of Retaining wall at Km 4/4,4/8

124.8

21535

172.56

... More
Vibrated Cement Concrete of grade M15 Nominal Mix using 40mm ISS size HBG metal including cost and conveyance of all materials to site complying with required standards and specifications. including cost of formwork, mixing, laying and compacting using vibrator including hire and fuel charges for all Tools and Plants and incidental charges such as maintaining of protective bunds, coffer dams strutting etc., complete as per relevant standard specification for Base Concrete of Culverts and Retaining Wall as per clause as per clause 1000, 1500, 1700, 2100, 2200 & 2908 of MORTH Vth Revision

-

-

-

... More
1.1) Wedining of pipe Culvert at Km 0/2, 0/8,0/10, 1/4,1/6, 1/8, 1/10, 3/8,3/10,4/2,4/6(i),4/6(ii),4/8

19.03

155685

8181.03

... More
1.2) Construction of Box Culvert at Km 0/6

6.05

49793

8230.41

... More
1.3) Construction of Retaining wall at Km 0/6

61.32

504688

8230.41

... More
1.4) Construction of Retaining wall at Km 0/2,0/8,0/10

100.05

823452

8230.41

... More
1.5) Construction of Retaining wall at Km 1/2,1/8

58.8

482496

8205.72

... More
1.6) Construction of Retaining wall at Km 3/10

46.8

381716

8156.34

... More
1.7) Construction of Retaining wall at Km 4/2,4/6

88.2

717211

8131.65

... More
1.8) Construction of Retaining wall at Km 4/4,4/8

62.4

507414

8131.65

... More
Vibrated Cement Concrete of grade M20 (Nominal mix) using 40mm ISS size HBG metal including cost and conveyance of all materials to site and cost cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths Tools and Plants and incidental charges etc., complete as per relevent standard specification for Body wall of the Culvert as per clause 1000, 1500, 1700, 2100, 2200 & 2908 of MORTH Vth Revision

-

-

-

... More
1.1) Wedining of pipe Culvert at Km 0/2, 0/8,0/10, 1/4,1/6, 1/8, 1/10, 3/8,3/10,4/2,4/6(i),4/6(ii),4/8

155.42

1899296

12220.41

... More
Vibrated Cement Concrete of grade M20 (Nominal mix) using 40mm ISS size HBG metal including cost and conveyance of all materials to site and cost cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths Tools and Plants and incidental charges etc., complete as per relevent standard specification for Stem of the retaining wall as per clause 1000, 1500, 1700, 2100, 2200 & 2908 of MORTH Vth Revision

-

-

-

... More
1.4) Construction of Retaining wall at Km 0/2,0/8,0/10

311.03

3682685

11840.29

... More
1.6) Construction of Retaining wall at Km 3/10

152.37

1774028

11642.9

... More
1.8) Construction of Retaining wall at Km 4/4,4/8

203.16

2365312

11642.61

... More
Vibrated Reinforced Cement Concrete of grade M25 (Design mix) using 20mm and below ISS HBG metal including cost and conveyance of all materials to site and cost of cement excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for tools and plants including all other incidental charges etc., complete for Base Slab, Side Walls, Top Slab, Cover Slab of Box Culvert as per clause 900, 1000, 1500, 1600, 1700, 2100, 2200 & 2300 of MORTH Vth Revision

-

-

-

... More
1.2) Construction of Box Culvert at Km 0/6

24.18

388477

16066.07

... More
Randam Rubble Masonry Retaining Wall in Cement Mortar 1:5 with simultaneous pointing using new good sized Rough Stone and 10% of Bond Stone including cost and conveyance of all materials from approved Quarry to site including cost of cement and all labour charges for mixing mortar,watering with all leads for good water and curing and all other incidental charges etc., complete as per relevant standard specification for Retaining Walls, and Parapets as per clause 1400, 1405,1406,1407 & 2908 of MORTH Vth Revision

-

-

-

... More
1.3) Construction of Retaining wall at Km 0/6

355.28

2900985

8165.35

... More
1.5) Construction of Retaining wall at Km 1/2,1/8

405.99

3305172

8141.02

... More
1.7) Construction of Retaining wall at Km 4/2,4/6

393.68

3176225

8068.04

... More
Dry Stone Masonry Retaining Wall using with 50% new good sized Rough Stone and 50% of Blasted Stone with a head load of 200mts including cost and conveyance of all materials from approved Quarry to site and all labour charges required for breaking.packing the stones in position and all other incidental charges etc., complete as per relevant standard specification for Retaining Walls as per clause 1400, 1405 of MORTH Vth Revision

-

-

-

... More
1.3) Construction of Retaining wall at Km 0/6

216.84

903413

4166.27

... More
1.5) Construction of Retaining wall at Km 1/2,1/8

210.19

871607

4146.76

... More
1.7) Construction of Retaining wall at Km 4/2,4/6

216.82

886407

4088.22

... More
Supply and fabrication of STEEL grade Fe500 D for all the reinforced cement concrete items of work involved in the schedule including cost of steel, cost of fabrication, labour charges for cleaning the rods, straightening, cutting, bending, tying grills, hoisting and placing the reinforcement in position as specified in the drawing including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete. as per standard specification as per clause 1000, 1500, 1600, 1700, 2100 & 2300 of MORTH Vth Revision

-

-

-

... More
1.2) Construction of Box Culvert at Km 0/6

1.73

188134

108937.27

... More
Plastering with Cement Mortar 1:5 (One cement and Five Plastering sand), 20mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.

-

-

-

... More
1.3) Construction of Retaining wall at Km 0/6

25.2

18833

747.36

... More
1.5) Construction of Retaining wall at Km 1/2,1/8

172.8

129072

746.95

... More
1.7) Construction of Retaining wall at Km 4/2,4/6

45

33556

745.7

... More
Vibrated Cement Concrete of grade M20 (Nominal mix) using 40mm ISS size HBG metal including cost and conveyance of all materials to site and cost cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths Tools and Plants and incidental charges etc., complete as per relevent standard specification for Wing wall and Parapets as per clause 1000, 1500, 1700, 2100, 2200 & 2908 of MORTH Vth Revision

-

-

-

... More
1.2) Construction of Box Culvert at Km 0/6

19.91

240630

12085.92

... More
Providing and fixing Class I PVC seepage pipes of 110mm dia of required lengths for abutments and return walls including costs and conveyance of all materials to work site and labour charges for fixing etc., complete to drain from the back fill as per section 2706 of MORTH specification (Rev- V)

-

-

-

... More
1.4) Construction of Retaining wall at Km 0/2,0/8,0/10

150.5

33727

224.1

... More
1.6) Construction of Retaining wall at Km 3/10

78

17479

224.1

... More
1.8) Construction of Retaining wall at Km 4/4,4/8

104

23306

224.1

... More
Filling behind the Box Culvert with Stone Dust including cost and conveyance to site including labour charges for filling in layers , watering , tamping under optimum moisture content to get the maximum density and all other incidental charges etc., complete as per clause 304 & 2907 of MORTH Vth Revision

-

-

-

... More
1.2) Construction of Box Culvert at Km 0/6

17.55

14117

804.44

... More
Refilling in between Retaining wall and Road Culverts with excavated earth including cost and conveyence to site including labour charges for filling in layers , watering , tamping under optimum moisture content to get themaximum density and all other incidental charges etc., complete as per clause 304 & 2907 of MORTH Vth Revision Specifications (labour charges only)

-

-

-

... More
1.1) Wedining of pipe Culvert at Km 0/2, 0/8,0/10, 1/4,1/6, 1/8, 1/10, 3/8,3/10,4/2,4/6(i),4/6(ii),4/8

42.36

2541

59.99

... More
1.3) Construction of Retaining wall at Km 0/6

183.96

11035

59.99

... More
1.4) Construction of Retaining wall at Km 0/2,0/8,0/10

200.1

12004

59.99

... More
1.5) Construction of Retaining wall at Km 1/2,1/8

176.4

10582

59.99

... More
1.6) Construction of Retaining wall at Km 3/10

93.6

5615

59.99

... More
1.7) Construction of Retaining wall at Km 4/2,4/6

264.6

15873

59.99

... More
1.8) Construction of Retaining wall at Km 4/4,4/8

124.8

7486

59.99

... More
Filling behind Abutments and return walls with clean gritty freed raining gravel including cost of gravel having pi value less than 6, conveyance of gravel to worksite. Laying,handling charges and filling in layers tamping under optimum moiture content to get the maximum density, including watering, with all leads and lifts for water and all other incidental charges etc., complete as per clause 304 & 2907 of MORTH Vth Revision

-

-

-

... More
1.3) Construction of Retaining wall at Km 0/6

163.84

46315

282.69

... More
1.4) Construction of Retaining wall at Km 0/2,0/8,0/10

261.86

74025

282.69

... More
1.5) Construction of Retaining wall at Km 1/2,1/8

169.1

47802

282.69

... More
1.6) Construction of Retaining wall at Km 3/10

136.35

38544

282.69

... More
1.7) Construction of Retaining wall at Km 4/2,4/6

180.9

51138

282.69

... More
1.8) Construction of Retaining wall at Km 4/4,4/8

181.8

51393

282.69

... More
Supply of NP3class RCC 1000mm dia hume pipes of 2.50m length confirming to IS458/1989 cost of pipes including all other incidental charges , testing charges, including Loading and Unloading charges, transport and delivery in good condition at work site as directed by the departmental officers etc., complete as per clause 1013,2900 & 2911 of MORTH Vth Revision

-

-

-

... More
1.1) Wedining of pipe Culvert at Km 0/2, 0/8,0/10, 1/4,1/6, 1/8, 1/10, 3/8,3/10,4/2,4/6(i),4/6(ii),4/8

32.5

138996

4276.8

... More
Hoisting and fixing of 1000 mm dia pipes to proper gradient including all labour charges and allother incidental charges etc.,complete as per clause 2905 & 2906 of MORTH Vth Revision

-

-

-

... More
1.1) Wedining of pipe Culvert at Km 0/2, 0/8,0/10, 1/4,1/6, 1/8, 1/10, 3/8,3/10,4/2,4/6(i),4/6(ii),4/8

32.5

8651

266.2

... More
Calculation of SubTotal, GST and Total Amount carried out by system automatically

-

-

-

... More
Basic cost of value put to tender as per estimate

1

-

45743837

... More
Add GST at 18%

1

-

8233891

... More
Total Value put to Tender

1

-

53977728

... More
Negotiated Percentage

1

-

-

... More
Final Negotiated Value

1

-

-

... More
Add GST at 18% of Final Negotiated Value

1

-

-

... More
Total Value of Contract Including 18% of GST

1

-

-

... More
Basic cost of value put to tender as per Estimate

-

45743837

-

... More
Quoted Rate in Figures (Total Value of Contract Including 18% of GST )

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.