Highways Department Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Highways Department Tender

Works
Civil And Construction
Eprocure
Opening Date30 Sep 2024
Closing Date17 Oct 2024
Tender Amount₹ 4,28,70,000 
Notes
Download

Costs

Summary

Uthangarai (h) Candm Sub Division (slm-104)

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
1.Widening from Two Lane to Two Lane with Paved Shoulders and Strengthening at km 2/6 - 5/2 of Pochampalli - Kallavi road including CD works at Km 3/8 (i), 3/8 (ii), 3/10

4590.47

565821

123.26

... More
Construction of granular sub-base by providing close graded Material,mixing in a mechanical mixplant at OMC, carriage of mixed Material to worksite, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory soil compactor to achieve the desired density, complete as per clause 111, 112, 401 & 900 of MORTH Vth Revision etc., complete - for Grading- V Material

-

-

-

... More
1.Widening from Two Lane to Two Lane with Paved Shoulders and Strengthening at km 2/6 - 5/2 of Pochampalli - Kallavi road including CD works at Km 3/8 (i), 3/8 (ii), 3/10

869.81

1691797

1945.02

... More
Construction of granular sub-base by providing close graded Material,mixing in a mechanical mixplant at OMC, carriage of mixed Material to worksite, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory soil compactor to achieve the desired density, complete as per clause 111, 112, 401 & 900 of MORTH Vth Revision etc., complete - for Grading- III Material

-

-

-

... More
1.Widening from Two Lane to Two Lane with Paved Shoulders and Strengthening at km 2/6 - 5/2 of Pochampalli - Kallavi road including CD works at Km 3/8 (i), 3/8 (ii), 3/10

790.74

1608697

2034.42

... More
Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam of 150/ 250mm thickness, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory soil compactor to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 111, 112, 406 & 900 of MORTH Vth Revision

-

-

-

... More
1.Widening from Two Lane to Two Lane with Paved Shoulders and Strengthening at km 2/6 - 5/2 of Pochampalli - Kallavi road including CD works at Km 3/8 (i), 3/8 (ii), 3/10

2867.25

6293671

2195.02

... More
Providing and laying Prime Coat over WMM surface using 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 111, 112, 501, 502 & 900 of MORTH Vth Revision

-

-

-

... More
1.Widening from Two Lane to Two Lane with Paved Shoulders and Strengthening at km 2/6 - 5/2 of Pochampalli - Kallavi road including CD works at Km 3/8 (i), 3/8 (ii), 3/10

13843.4

1117577

80.73

... More
Providing and laying Tack Coat over WMM surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 111, 112, 501, 503 & 900 of MORTH Vth Revision

-

-

-

... More
1.Widening from Two Lane to Two Lane with Paved Shoulders and Strengthening at km 2/6 - 5/2 of Pochampalli - Kallavi road including CD works at Km 3/8 (i), 3/8 (ii), 3/10

13843.4

255826

18.48

... More
Providing and laying Tack Coat over Existing BT surface using 2 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 111, 112, 501, 503 & 900 of MORTH Vth Revision

-

-

-

... More
1.Widening from Two Lane to Two Lane with Paved Shoulders and Strengthening at km 2/6 - 5/2 of Pochampalli - Kallavi road including CD works at Km 3/8 (i), 3/8 (ii), 3/10

12234.6

327764

26.79

... More
Providing and laying Tack Coat over Dry Lean Cement Concrete surface using 3.00 Kg of Bitumen Emulsion (RS1) per10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 111, 112, 501, 503 & 900 of MORTH Vth Revision

-

-

-

... More
1.Widening from Two Lane to Two Lane with Paved Shoulders and Strengthening at km 2/6 - 5/2 of Pochampalli - Kallavi road including CD works at Km 3/8 (i), 3/8 (ii), 3/10

42

877

20.89

... More
Providing, laying 50mm consolidated thick Bituminous Macadam using 0.20cum of 26.50-13.20mm, 0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRC metal with 37Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 504 of MORTH Rev-5 Grading II

-

-

-

... More
1.Widening from Two Lane to Two Lane with Paved Shoulders and Strengthening at km 2/6 - 5/2 of Pochampalli - Kallavi road including CD works at Km 3/8 (i), 3/8 (ii), 3/10

910.63

7498819

8234.76

... More
Providing, laying 75mm consolidated thick Dense Bituminous Macadam using 0.40cum of 37.50-13.20mm, 0.35 cum of 13.20-2.36 mm and 0.36 cum of 2.36 mm & below size IRC metal with 71.30 kgs of VG30 grade bitumen for premixing per 10 sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing the min the required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to site, spreading the mix to uniform thickness of 75mm with mechanical paver to the specified grades and cross section sand consolidated by Vibratory Roller to the required density etc., including labour for attending to paver to site etc.,including hire and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and allother tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per MoRTH specification clause No.111,112,501,505 & 900 - Grading I

-

-

-

... More
1.Widening from Two Lane to Two Lane with Paved Shoulders and Strengthening at km 2/6 - 5/2 of Pochampalli - Kallavi road including CD works at Km 3/8 (i), 3/8 (ii), 3/10

593.06

5270660

8887.23

... More
Providing and laying Bituminous Concrete to 30mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per clause No. 111, 112, 501, 507 & 900 of MORTH vth Revision Grading - II

-

-

-

... More
1.Widening from Two Lane to Two Lane with Paved Shoulders and Strengthening at km 2/6 - 5/2 of Pochampalli - Kallavi road including CD works at Km 3/8 (i), 3/8 (ii), 3/10

783.6

8127773

10372.35

... More
Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with power roller, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification. For making up of low berms as per clause No. 111, 112, 301 to 305 & 900 of MORTH Vth Revision (Labour and Hire charges only)

-

-

-

... More
1.Widening from Two Lane to Two Lane with Paved Shoulders and Strengthening at km 2/6 - 5/2 of Pochampalli - Kallavi road including CD works at Km 3/8 (i), 3/8 (ii), 3/10

406

10815

26.64

... More
Dismantling Culverts, bridges and other structures Dismantling salvaging and removal and disposing of resulting materials and back filling the resulting trenches and pits etc as per clause No. 111, 112, 202 of MORTH vth Revision Dismantling Random Rubble Masonry

-

-

-

... More
1.2.Reconstruction of culvert at Km 3/8(ii), 3/10 of Pochampalli - Kalavi Road

13.2

3737

283.14

... More
Earth Work excavation in all classes of soil except hard rock not requiring blasting and deposting on bank with all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges and sheeting, shoring, bracing and their subsequent removal of all logs, stumps and other deleteriuos matter and obstructions, trimming of bottom of excavation, backfilling and clearing the site and disposal of all surplus materials etc.,complete as per standard specification for Foundation of Box Culvert as per clause 111, 112, 201, 202, 301 to 305 & 900 of MORTH Vth Revision

-

-

-

... More
1.1.Construction of Protective wall at Km 3/8(i) of Pochampalli - Kallavi road

95

11709

123.26

... More
1.2.Reconstruction of culvert at Km 3/8(ii), 3/10 of Pochampalli - Kalavi Road

196.74

24250

123.26

... More
Vibrated Cement Concrete of grade M15 Nominal Mix using 40mm ISS size HBG metal including cost and conveyance of all materials to site complying with required standards and specifications. including cost of formwork, mixing, laying and compacting using vibrator including hire and fuel charges for all Tools and Plants and incidental charges such as maintaining of protective bunds, coffer dams strutting etc., complete as per relevant standard specification for Base Concrete of Culverts as per clause as per clause 1000, 1500, 1700, 2100, 2200 & 2908 of MORTH Vth Revision

-

-

-

... More
1.2.Reconstruction of culvert at Km 3/8(ii), 3/10 of Pochampalli - Kalavi Road

23.27

147149

6323.57

... More
Vibrated Cement Concrete of grade M15 Nominal Mix using 40mm ISS size HBG metal including cost and conveyance of all materials to site complying with required standards and specifications. including cost of formwork, mixing, laying and compacting using vibrator including hire and fuel charges for all Tools and Plants and incidental charges such as maintaining of protective bunds, coffer dams strutting etc., complete as per relevant standard specification for Below sill Level of Protective wall as per clause as per clause 1000, 1500, 1700, 2100, 2200 & 2908 of MORTH Vth Revision

-

-

-

... More
1.1.Construction of Protective wall at Km 3/8(i) of Pochampalli - Kallavi road

28.5

180221

6323.57

... More
Vibrated Reinforced Cement Concrete of grade M25 (Design mix) using ISS HBG graded metal including cost and conveyance of all materials to site and cost of cement excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for tools and plants including all other incidental charges etc., complete for Base Slab, Side Walls, Top Slab of Box Culvert as per clause 900, 1000, 1500, 1600, 1700, 2100, 2200 & 2300 of MORTH Vth Revision

-

-

-

... More
1.2.Reconstruction of culvert at Km 3/8(ii), 3/10 of Pochampalli - Kalavi Road

68.59

867298

12644.68

... More
Vibrated Cement Concrete of grade M20 (Nominal mix) using 40mm ISS size HBG metal including cost and conveyance of all materials to site and cost cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths Tools and Plants and incidental charges etc., complete as per relevent standard specification for Above sill Level of Protective wall as per clause 1000, 1500, 1700, 2100, 2200 & 2908 of MORTH Vth Revision

-

-

-

... More
1.1.Construction of Protective wall at Km 3/8(i) of Pochampalli - Kallavi road

116.5

989391

8492.63

... More
Vibrated Cement Concrete of grade M20 (Nominal mix) using 40mm ISS size HBG metal including cost and conveyance of all materials to site and cost cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths Tools and Plants and incidental charges etc., complete as per relevent standard specification for Wing wall and Parapet as per clause 1000, 1500, 1700, 2100, 2200 & 2908 of MORTH Vth Revision

-

-

-

... More
1.2.Reconstruction of culvert at Km 3/8(ii), 3/10 of Pochampalli - Kalavi Road

88.97

764340

8590.99

... More
Supply and fabrication of STEEL grade Fe500 D for all the reinforced cement concrete items of work involved in the schedule including cost of steel, cost of fabrication, labour charges for cleaning the rods, straightening, cutting, bending, tying grills, hoisting and placing the reinforcement in position as specified in the drawing including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete. as per standard specification as per clause 1000, 1500, 1600, 1700, 2100 & 2300 of MORTH Vth Revision

-

-

-

... More
1.2.Reconstruction of culvert at Km 3/8(ii), 3/10 of Pochampalli - Kalavi Road

5.22

499080

95609.27

... More
Providing and fixing 100mm dia PVC Seepage Pipes of required length for abutment and wing, retaining wall including cost and conveyance of all materials to worksite, cost and labour for semi-spherical backfill arrangements with 100mm size broken granite stones at the periphery and labour charges for fixing etc., complete to Retaining wall the backfill as per clause 2700 of MORTH Vth Revision

-

-

-

... More
1.1.Construction of Protective wall at Km 3/8(i) of Pochampalli - Kallavi road

30

5775

192.5

... More
Filling behind Protevtive wall with clean good gritty gravel in including cost and conveyance to site including labour charges for filling in layers , watering , tamping under optimum moisture content to get the maximum density and all other incidental charges etc., complete as per clause 304 & 2907 of MORTH Vth Revision

-

-

-

... More
1.1.Construction of Protective wall at Km 3/8(i) of Pochampalli - Kallavi road

70

18588

265.55

... More
Filling behind the Box Culvert with excavated earthincluding cost and conveyance to site including labour charges for filling in layers , watering , tamping under optimum moisture content to get the maximum density and all other incidental charges etc., complete as per clause 304 & 2907 of MORTH Vth Revision (Labour Charges only)

-

-

-

... More
1.2.Reconstruction of culvert at Km 3/8(ii), 3/10 of Pochampalli - Kalavi Road

44.4

1902

42.85

... More
Calculation of SubTotal, GST and Total Amount carried out by system automatically

-

-

-

... More
Basic cost of value put to tender as per estimate

1

-

36326762

... More
Add GST at 18%

1

-

6538817

... More
Total Value put to Tender

1

-

42865579

... More
Negotiated Percentage

1

-

-

... More
Final Negotiated Value

1

-

-

... More
Add GST at 18% of Final Negotiated Value

1

-

-

... More
Total Value of Contract Including 18% of GST

1

-

-

... More
Basic cost of value put to tender as per Estimate

-

36326762

-

... More
Quoted Rate in Figures (Total Value of Contract Including 18% of GST )

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.