Highways Department Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Highways Department Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date22 Dec 2023
Closing Date23 Jan 2024
Tender Amount₹ 20,08,60,000 
Notes
Download

Costs

Summary

Try-120 Nagapattinam H, Candm Subdivision

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing and laying embankment with suitable Earth having CBR not less than 5 from the available source at the risk of contractor including all required charges for materials at site including spreading the earth in layers not exceeding the limit as specified in the MORT&H Vth revision specification No.305 and as directed by the Engineer in charge & the work including watering consolidation by power / Vibratory roller etc., complete required compaction for formation embankment. MORT&H Vth Rev. 111, 112, 201, 304, 305, 900

-

-

-

... More
Main work

34143.37

11890087

348.24

... More
Providing and laying sub grade with suitable Earth having CBR not less than 5 from the available source at the risk of contractor including all required charges for materials at site including spreading the earth in layers not exceeding the limit as specified in the MORT&H Vth revision specification No.305 and as directed by the Engineer in charge & the work including watering consolidation by power / Vibratory roller etc., complete required compaction for formation embankment. MORT&H Vth Rev. 111, 112, 201, 304, 305, 900

-

-

-

... More
Main work

22615.07

7875471

348.24

... More
Granular Sub-base with Graded Material (Table:- 400-1) - Plant Mix Method (Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 ) - for Grading V Material. as per MORT&H Rev. V specifications No.111,112,401,900.

-

-

-

... More
Main work

7158.66

20239751

2827.31

... More
Granular Sub-base with Graded Material (Table:- 400-1) - Plant Mix Method (Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 ) - for Grading III Material. as per MORT&H Rev. V specifications No.111,112,401,900.

-

-

-

... More
Main work

4234.77

12412110

2931

... More
Providing and laying spreading and compacting graded stone aggregates to Wet Mix Macadam 250mm thick specification including premixing the materials with water at OMC in mechanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in Sub base / Base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5

-

-

-

... More
Main work

8275.96

26662660

3221.7

... More
Providing and laying Prime coat over WMM surface using 7 Kg of Emulsion Bitumen (SS-1) per 10sqm for preparatory to another bituminous construction over it, including cost of material, labour charges , rentals for machinery, fuel and all other incidental charges etc., complete as per clause 502 of MORTH Rev-5

-

-

-

... More
Main work

32743.78

2501297

76.39

... More
Providing and laying Tack coat over WMM surface (treated with primer) using 2.50 Kg of Emulsion Bitumen (RS-1) per 10sqm for preparatory to another bituminous construction over it, including cost of material, labour charges , rentals for machinery, fuel and all other incidental charges etc., complete as per clause 503 of MORTH Rev-5

-

-

-

... More
Main work

32743.78

566794

17.31

... More
Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.30 kg per sqm on the prepared Concrete surface cleaned with mechanical broom as per clause 503 and in accordance with standard specifications as per MORTH Vth Rev., 111, 112, 503 & 900

-

-

-

... More
Main work Km

713.04

14082

19.75

... More
Providing and laying Dense Bituminous Macadam which work shall consist of construction, using crushed aggregates, (Table 500-10) premixed with VG 30 Grade Bitumen at the rate of minimum 4.50% by weight of the total mix confirming to the aggregates and binder as per the job mix formula in the hot mix plant, transporting the mix to the worksite, laying with 9m paver finisher and compaction with smooth wheeld and vibratory roller in accordance with the requirements of the specification and in confirmity with the drawing as directed by the Engineer for DBM (Grade-II) as per MORTH No. 111, 112, 501, 505 & 900

-

-

-

... More
Main work

2128.35

24693074

11601.98

... More
Providing and laying Bituminous Concrete with hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (VG 30) at percentage specified by job mix and filler, transporting the hot mix to work site, laying with a 9m paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandam rollers to achieve the desired compaction as per MORTH specification clause No. 501-6, 501-7 & 507 and complete in all respects and in accordance with standard specifications MORTH Vth Rev. 111, 112, 507 & 900 Grading -II

-

-

-

... More
Main work

982.32

12214687

12434.53

... More
Providing and laying Bituminous Concrete with hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (VG 30) at percentage specified by job mix and filler, transporting the hot mix to work site, laying with a 9m paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandam rollers to achieve the desired compaction as per MORTH specification clause No. 501-6, 501-7 & 507 and complete in all respects and in accordance with standard specifications MORTH Vth Rev. 111, 112, 507 & 900 Grading -I

-

-

-

... More
Main work

35.66

424433

11902.22

... More
Providing Conveyed Earth for making up of low berms using the suitable Earth having CBR not less than 8 from the available source at the risk of contractor including all required charges for materials and as directed by the Engineer in charge & the work including watering consolidation by power / Vibratory roller etc., complete required compaction as per MORTH Vth Rev., 111, 112 & 201 for berms

-

-

-

... More
Main work

2624.96

2956544

1126.32

... More
Construction of Cement concrete Kerb made of M 20 concrete of size 165 mm to 150 mm width in top 100 mm height and uniform width of 165 mm for the bottom 225 mm height and embeded in Ground as shown in drawing and including rendering the road side face and painting two coats with quality paint complying with standard specification as directed by the Engineer as per MoRTH 408.

-

-

-

... More
Main work

600

298902

498.17

... More
Filling in between kerb using Carted Earth in layers, not exceeding limits including watering consolidation including all labour charges and incidental charges etc., complete as directed by the Engineer as per MORTH Vth Rev.111, 112, 301, 304, 305, 2907.

-

-

-

... More
Main work

52.2

16563

317.3

... More
JUNCTION IMPROVEMENTS

-

-

-

... More
Excavation including removal and satisfactory disposal of all materials necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer as per MORTH Vth Rev., 111, 112 & 201 a) box cutting & Embankment

-

-

-

... More
At junction Km 0/0 - 0/100

324.09

36314

112.05

... More
At junction Km 2/450 - 2/500

436.73

48935

112.05

... More
Providing and laying embankment with suitable Earth having CBR not less than 5 from the available source at the risk of contractor including all required charges for materials at site including spreading the earth in layers not exceeding the limit as specified in the MORT&H Vth revision specification No.305 and as directed by the Engineer in charge & the work including watering consolidation by power / Vibratory roller etc., complete required compaction for formation embankment. MORT&H Vth Rev. 111, 112, 201, 304, 305, 900

-

-

-

... More
At junction Km 0/0 - 0/100

104.41

33946

325.13

... More
At junction Km 2/450 - 2/500

344.67

120027

348.24

... More
Providing and laying sub grade with suitable Earth having CBR not less than 5 from the available source at the risk of contractor including all required charges for materials at site including spreading the earth in layers not exceeding the limit as specified in the MORT&H Vth revision specification No.305 and as directed by the Engineer in charge & the work including watering consolidation by power / Vibratory roller etc., complete required compaction for formation embankment. MORT&H Vth Rev. 111, 112, 201, 304, 305, 900

-

-

-

... More
At junction Km 0/0 - 0/100

407.07

132350

325.13

... More
At junction Km 2/450 - 2/500

327.7

114118

348.24

... More
Granular Sub-base with Graded Material (Table:- 400-1) - Plant Mix Method (Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 ) - for Grading V Material. as per MORT&H Rev. V specifications No.111,112,401,900.

-

-

-

... More
At junction Km 0/0 - 0/100

326.14

919228

2818.51

... More
At junction Km 2/450 - 2/500

108.14

305745

2827.31

... More
Granular Sub-base with Graded Material (Table:- 400-1) - Plant Mix Method (Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 ) - for Grading III Material. as per MORT&H Rev. V specifications No.111,112,401,900.

-

-

-

... More
At junction Km 0/0 - 0/100

197.68

577660

2922.2

... More
At junction Km 2/450 - 2/500

65.54

192097

2931

... More
Providing and laying spreading and compacting graded stone aggregates to Wet Mix Macadam 250mm thick specification including premixing the materials with water at OMC in mechanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in Sub base / Base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5

-

-

-

... More
At junction Km 0/0 - 0/100

494.17

1592067

3221.7

... More
At junction Km 2/450 - 2/500

163.86

527907

3221.7

... More
Providing and laying Prime coat over WMM surface using 7 Kg of Emulsion Bitumen (SS-1) per 10sqm for preparatory to another bituminous construction over it, including cost of material, labour charges , rentals for machinery, fuel and all other incidental charges etc., complete as per clause 502 of MORTH Rev-5

-

-

-

... More
At junction Km 0/0 - 0/100

1976.61

150993

76.39

... More
At junction Km 2/450 - 2/500

655.38

50071

76.4

... More
Providing and laying Tack coat over WMM surface (treated with primer) using 2.50 Kg of Emulsion Bitumen (RS-1) per 10sqm for preparatory to another bituminous construction over it, including cost of material, labour charges , rentals for machinery, fuel and all other incidental charges etc., complete as per clause 503 of MORTH Rev-5

-

-

-

... More
At junction Km 0/0 - 0/100

1976.61

34215

17.31

... More
At junction Km 2/450 - 2/500

655.38

11344

17.31

... More
Providing and laying Dense Bituminous Macadam which work shall consist of construction, using crushed aggregates, (Table 500-10) premixed with VG 30 Grade Bitumen at the rate of minimum 4.50% by weight of the total mix confirming to the aggregates and binder as per the job mix formula in the hot mix plant, transporting the mix to the worksite, laying with 9m paver finisher and compaction with smooth wheeld and vibratory roller in accordance with the requirements of the specification and in confirmity with the drawing as directed by the Engineer for DBM (Grade-II) as per MORTH No. 111, 112, 501, 505 & 900

-

-

-

... More
At junction Km 0/0 - 0/100

128.48

1490622

11601.98

... More
At junction Km 2/450 - 2/500

42.6

494244

11601.98

... More
Providing and laying Bituminous Concrete with hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (VG 30) at percentage specified by job mix and filler, transporting the hot mix to work site, laying with a 9m paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandam rollers to achieve the desired compaction as per MORTH specification clause No. 501-6, 501-7 & 507 and complete in all respects and in accordance with standard specifications MORTH Vth Rev. 111, 112, 507 & 900 Grading -II

-

-

-

... More
At junction Km 0/0 - 0/100

59.3

737367

12434.53

... More
At junction Km 2/450 - 2/500

19.67

244587

12434.53

... More
Providing Conveyed Earth for making up of low berms using suitable Earth having CBR not less than 8 from the available source at the risk of contractor including all required charges for materials and as directed by the Engineer in charge & the work including watering consolidation by power / Vibratory roller etc., complete required compaction for as per MORTH Vth Rev., 111, 112 & 201 for berms

-

-

-

... More
At junction Km 0/0 - 0/100

205.22

227933

1110.68

... More
At junction Km 2/450 - 2/500

66.5

75420

1134.14

... More
Construction of Cement concrete Kerb made of M 20 concrete of size 165 mm to 150 mm width in top 100 mm height and uniform width of 165 mm for the bottom 225 mm height and embeded in Ground as shown in drawing and including rendering the road side face and painting two coats with quality paint complying with standard specification as directed by the Engineer as per MoRTH 408.

-

-

-

... More
At junction Km 0/0 - 0/100

138

68570

496.89

... More
Filling in between kerb using Carted Earth in layers, not exceeding limits including watering consolidation including all labour charges and incidental charges etc., complete as directed by the Engineer as per MORTH Vth Rev.111, 112, 301, 304, 305, 2907.

-

-

-

... More
At junction Km 0/0 - 0/100

23.61

7021

297.38

... More
CULVERTS

-

-

-

... More
Dismantling Culverts,bridges and other structures Dismantling clearing away and carefully stacking material useful for re-use including salvaging and removal and disposing of resulting unusable materials and back filling the resulting trenches and pits etc.including all labour and incidental charges complying with MORTH 111, 112, 202 a)Dismantling brick masonry in cement mortar

-

-

-

... More
Pappakoil - Karunganni Road Km 0/6 (i)

6.17

1588

257.4

... More
Pappakoil - Karunganni Road Km 0/6 (ii)

8.05

2072

257.4

... More
Pappakoil - Karunganni Road Km 0/8 (ii)

8.05

2072

257.4

... More
Pappakoil - Karunganni Road Km 0/10

8.05

2072

257.4

... More
Pappakoil - Karunganni Road Km 1/4 (i)

6.58

1693

257.4

... More
Pappakoil - Karunganni Road Km 1/4 (ii)

6.58

1693

257.4

... More
Medical College Link Road Km 1/2 (i)

8.05

2072

257.4

... More
Medical College Link Road Km 1/2 (ii)

8.05

2072

257.4

... More
Dismantling Culverts,bridges and other structures Dismantling clearing away and carefully stacking material useful for re-use including salvaging and removal and disposing of resulting unusable materials and back filling the resulting trenches and pits etc.including all labour and incidental charges complying with MORTH 111, 112, 202 b)Dismantling Plain cement concrete

-

-

-

... More
Pappakoil - Karunganni Road Km 0/6 (i)

5.55

2453

442

... More
Pappakoil - Karunganni Road Km 0/6 (ii)

2.93

1295

442

... More
Pappakoil - Karunganni Road Km 0/8 (ii)

3.15

1392

442

... More
Pappakoil - Karunganni Road Km 0/10

3.04

1343

442

... More
Pappakoil - Karunganni Road Km 1/2

37.06

16380

442

... More
Pappakoil - Karunganni Road Km 1/4 (i)

2.71

1197

442

... More
Pappakoil - Karunganni Road Km 1/4 (ii)

2.71

1197

442

... More
Medical College Link Road Km 1/2 (i)

3.04

1343

442

... More
Medical College Link Road Km 1/2 (ii)

3.04

1343

442

... More
Dismantling Culverts,bridges and other structures Dismantling clearing away and carefully stacking material useful for re-use including salvaging and removal and disposing of resulting unusable materials and back filling the resulting trenches and pits etc.including all labour and incidental charges complying with MORTH 111, 112, 202 c)Dismantling Reinforecement concrete work

-

-

-

... More
Pappakoil - Karunganni Road Km 1/2

24.25

94987

3917

... More
Earth work Excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges and sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavtion backfilling, and clearing the site and disposal of all surplus materials etc. complete and in accordance with standard specification for Narrow foundation of Body wall , box culvert as per MORTH Vth Rev., 304.

-

-

-

... More
Pappakoil - Karunganni Road Km 0/2

277

72864

263.05

... More
Pappakoil - Karunganni Road Km 0/4

277

72864

263.05

... More
Pappakoil - Karunganni Road Km 0/6 (i)

361.45

95079

263.05

... More
Pappakoil - Karunganni Road Km 0/6 (ii)

172.49

45373

263.05

... More
Pappakoil - Karunganni Road Km 0/8 (i)

277

72864

263.05

... More
Pappakoil - Karunganni Road Km 0/8 (ii)

177.7

46743

263.05

... More
Pappakoil - Karunganni Road Km 0/10

175.1

46060

263.05

... More
Pappakoil - Karunganni Road Km 1/2

252.75

66485

263.05

... More
Pappakoil - Karunganni Road Km 1/4 (i)

172.49

45373

263.05

... More
Pappakoil - Karunganni Road Km 1/4 (ii)

200.54

52752

263.05

... More
Pappakoil - Karunganni Road Km 1/6

277

72864

263.05

... More
Medical College Link Road Km 0/2

277

72864

263.05

... More
Medical College Link Road Km 0/4

277

72864

263.05

... More
Medical College Link Road Km 0/6 (i)

277

72864

263.05

... More
Medical College Link Road Km 0/6 (ii)

277

72864

263.05

... More
Medical College Link Road Km 0/8 (i)

277

72864

263.05

... More
Medical College Link Road Km 0/8 (ii)

277

72864

263.05

... More
Medical College Link Road Km 0/10

277

72864

263.05

... More
Medical College Link Road Km 1/2 (i)

175.1

46060

263.05

... More
Medical College Link Road Km 1/2 (ii)

175.1

46060

263.05

... More
Plain Cement Concrete of grade M15 using 40mm ISS size HBG graded metal using with M Sand including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labor charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for LEVELLING COURSE BELOW Box Culvert and Wing wall as per MORTH Vth Rev., 1000, 1500, 1700, 2100 & 900.

-

-

-

... More
Pappakoil - Karunganni Road Km 0/2

13.21

94414

7147.19

... More
Pappakoil - Karunganni Road Km 0/4

13.21

94414

7147.19

... More
Pappakoil - Karunganni Road Km 0/6 (i)

20.16

144087

7147.19

... More
Pappakoil - Karunganni Road Km 0/6 (ii)

13.21

94414

7147.19

... More
Pappakoil - Karunganni Road Km 0/8 (i)

13.21

94454

7150.22

... More
Pappakoil - Karunganni Road Km 0/8 (ii)

13.21

94454

7150.22

... More
Pappakoil - Karunganni Road Km 0/10

13.21

94454

7150.22

... More
Pappakoil - Karunganni Road Km 1/2

13.21

94534

7156.29

... More
Pappakoil - Karunganni Road Km 1/4 (i)

13.21

94534

7156.29

... More
Pappakoil - Karunganni Road Km 1/4 (ii)

16.63

119009

7156.29

... More
Pappakoil - Karunganni Road Km 1/6

13.21

94534

7156.29

... More
Medical College Link Road Km 0/2

13.21

94574

7159.32

... More
Medical College Link Road Km 0/4

13.21

94574

7159.32

... More
Medical College Link Road Km 0/6 (i)

13.21

94654

7165.39

... More
Medical College Link Road Km 0/6 (ii)

13.21

94654

7165.39

... More
Medical College Link Road Km 0/8 (i)

13.21

94654

7165.39

... More
Medical College Link Road Km 0/8 (ii)

13.21

94654

7165.39

... More
Medical College Link Road Km 0/10

13.21

94654

7165.39

... More
Medical College Link Road Km 1/2 (i)

13.21

94694

7168.42

... More
Medical College Link Road Km 1/2 (ii)

13.21

94694

7168.42

... More
Vibrated Cement Concrete M 20 grade mix using 40mm ISS size hard broken granite metal including cost and conveyance of all materials from approved quarry to worksite using M sand including cost of cement including cost and labour charges for formwork and centering mixing the concrete, transporting, laying, vibrating, compacting, curing with all leads for soft potable water, working in all depths including hire, running and fuel charges for all tools and plants employed and in accordance with standard specification for - Wing wall and Parapet wall as per MORTH Vth Rev., 1000, 1500, 1700, 2100 & 900

-

-

-

... More
Pappakoil - Karunganni Road Km 0/2

66.94

586308

8758.71

... More
Pappakoil - Karunganni Road Km 0/4

66.94

586308

8758.71

... More
Pappakoil - Karunganni Road Km 0/6 (i)

138.49

1176299

8493.75

... More
Pappakoil - Karunganni Road Km 0/6 (ii)

66.94

586308

8758.71

... More
Pappakoil - Karunganni Road Km 0/8 (i)

66.94

586511

8761.75

... More
Pappakoil - Karunganni Road Km 0/8 (ii)

66.94

586511

8761.75

... More
Pappakoil - Karunganni Road Km 0/10

66.94

586511

8761.75

... More
Pappakoil - Karunganni Road Km 1/2

66.94

586917

8767.81

... More
Pappakoil - Karunganni Road Km 1/4 (i)

66.94

586917

8767.81

... More
Pappakoil - Karunganni Road Km 1/4 (ii)

66.94

586917

8767.81

... More
Pappakoil - Karunganni Road Km 1/6

66.94

586917

8767.81

... More
Medical College Link Road Km 0/2

66.94

587120

8770.84

... More
Medical College Link Road Km 0/4

66.94

587120

8770.84

... More
Medical College Link Road Km 0/6 (i)

66.94

587526

8776.91

... More
Medical College Link Road Km 0/6 (ii)

66.94

587526

8776.91

... More
Medical College Link Road Km 0/8 (i)

66.94

587526

8776.91

... More
Medical College Link Road Km 0/8 (ii)

66.94

587526

8776.91

... More
Medical College Link Road Km 0/10

66.94

587526

8776.91

... More
Medical College Link Road Km 1/2 (i)

66.94

587729

8779.94

... More
Medical College Link Road Km 1/2 (ii)

66.94

587729

8779.94

... More
Vibrated Reinforced Cement Concrete of grade M25 (Design mix) using 20mm ISShard broken granite metal using with M Sand, including cost and conveyance of all materials to site and cost of cement excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for tools and plants including all other incidental charges etc., complete as per relevant standard specifications as directed by the Engineer for BASE SLAB, STEM AND TOP SLAB OF Box culvert as per MORTH No. 111, 112, 900, 1000, 1500, 1600, 1700, 2100

-

-

-

... More
Pappakoil - Karunganni Road Km 0/2

53.51

686428

12828.04

... More
Pappakoil - Karunganni Road Km 0/4

53.51

686428

12828.04

... More
Pappakoil - Karunganni Road Km 0/6 (i)

97.72

1192678

12205.06

... More
Pappakoil - Karunganni Road Km 0/6 (ii)

53.51

686428

12828.04

... More
Pappakoil - Karunganni Road Km 0/8 (i)

53.51

686590

12831.07

... More
Pappakoil - Karunganni Road Km 0/8 (ii)

53.51

686590

12831.07

... More
Pappakoil - Karunganni Road Km 0/10

53.51

686590

12831.07

... More
Pappakoil - Karunganni Road Km 1/2

53.51

686915

12837.14

... More
Pappakoil - Karunganni Road Km 1/4 (i)

53.51

686915

12837.14

... More
Pappakoil - Karunganni Road Km 1/4 (ii)

74.65

957640

12828.41

... More
Pappakoil - Karunganni Road Km 1/6

53.51

686915

12837.14

... More
Medical College Link Road Km 0/2

53.51

687077

12840.17

... More
Medical College Link Road Km 0/4

53.51

687077

12840.17

... More
Medical College Link Road Km 0/6 (i)

53.51

687402

12846.24

... More
Medical College Link Road Km 0/6 (ii)

53.51

687402

12846.24

... More
Medical College Link Road Km 0/8 (i)

53.51

687402

12846.24

... More
Medical College Link Road Km 0/8 (ii)

53.51

687402

12846.24

... More
Medical College Link Road Km 0/10

53.51

687402

12846.24

... More
Medical College Link Road Km 1/2 (i)

53.51

687564

12849.27

... More
Medical College Link Road Km 1/2 (ii)

53.51

687564

12849.27

... More
Supply and fabrication of (HYSD) Steel Grade (as per steel schedule) required for all RCC items of works involved in the schedule of drawings including cost of steel, cost of fabrication, labour charges for cleaning the bars straightening, cutting, bending, tying grills, positioning and placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete as per standard specification. - MORTH Vth Rev., 1000, 1500, 1600 & 900

-

-

-

... More
Pappakoil - Karunganni Road Km 0/2

3.6

341295

94804.27

... More
Pappakoil - Karunganni Road Km 0/4

3.6

341295

94804.27

... More
Pappakoil - Karunganni Road Km 0/6 (i)

6.14

582098

94804.27

... More
Pappakoil - Karunganni Road Km 0/6 (ii)

3.6

341295

94804.27

... More
Pappakoil - Karunganni Road Km 0/8 (i)

3.6

341295

94804.27

... More
Pappakoil - Karunganni Road Km 0/8 (ii)

3.6

341295

94804.27

... More
Pappakoil - Karunganni Road Km 0/10

3.6

341295

94804.27

... More
Pappakoil - Karunganni Road Km 1/2

3.6

341295

94804.27

... More
Pappakoil - Karunganni Road Km 1/4 (i)

3.6

341295

94804.27

... More
Pappakoil - Karunganni Road Km 1/4 (ii)

5.04

477813

94804.27

... More
Pappakoil - Karunganni Road Km 1/6

3.6

341295

94804.27

... More
Medical College Link Road Km 0/2

3.6

341295

94804.27

... More
Medical College Link Road Km 0/4

3.6

341295

94804.27

... More
Medical College Link Road Km 0/6 (i)

3.6

341295

94804.27

... More
Medical College Link Road Km 0/6 (ii)

3.6

341295

94804.27

... More
Medical College Link Road Km 0/8 (i)

3.6

341295

94804.27

... More
Medical College Link Road Km 0/8 (ii)

3.6

341295

94804.27

... More
Medical College Link Road Km 0/10

3.6

341295

94804.27

... More
Medical College Link Road Km 1/2 (i)

3.6

341295

94804.27

... More
Medical College Link Road Km 1/2 (ii)

3.6

341295

94804.27

... More
Providing and fixing 110mm dia PVC SEEPAGE PIPES of required length for abutment and wing, retaining wall including cost and conveyance of all materials to worksite, cost and labour for semi-spherical backfill arrangements with 100mm size broken granite stones at the periphery and labour charges for fixing etc., complete to drain the backfill as per standard specification. -MORTH Vth Rev., 2700, 2706, 2707 & 900

-

-

-

... More
Pappakoil - Karunganni Road Km 0/2

23.21

4713

203.1

... More
Pappakoil - Karunganni Road Km 0/4

23.21

4713

203.1

... More
Pappakoil - Karunganni Road Km 0/6 (i)

65.66

13335

203.1

... More
Pappakoil - Karunganni Road Km 0/6 (ii)

23.21

4713

203.1

... More
Pappakoil - Karunganni Road Km 0/8 (i)

23.21

4713

203.1

... More
Pappakoil - Karunganni Road Km 0/8 (ii)

23.21

4713

203.1

... More
Pappakoil - Karunganni Road Km 0/10

23.21

4713

203.1

... More
Pappakoil - Karunganni Road Km 1/2

23.21

4713

203.1

... More
Pappakoil - Karunganni Road Km 1/4 (i)

23.21

4713

203.1

... More
Pappakoil - Karunganni Road Km 1/4 (ii)

23.21

4713

203.1

... More
Pappakoil - Karunganni Road Km 1/6

23.21

4713

203.1

... More
Medical College Link Road Km 0/2

23.21

4713

203.1

... More
Medical College Link Road Km 0/4

23.21

4713

203.1

... More
Medical College Link Road Km 0/6 (i)

23.21

4713

203.1

... More
Medical College Link Road Km 0/6 (ii)

23.21

4713

203.1

... More
Medical College Link Road Km 0/8 (i)

23.21

4713

203.1

... More
Medical College Link Road Km 0/8 (ii)

23.21

4713

203.1

... More
Medical College Link Road Km 0/10

23.21

4713

203.1

... More
Medical College Link Road Km 1/2 (i)

23.21

4713

203.1

... More
Medical College Link Road Km 1/2 (ii)

23.21

4713

203.1

... More
Calculation of SubTotal, GST and Total Amount carried out by system automatically

-

-

-

... More
Basic cost of value put to tender as per estimate

1

-

170217778

... More
Add GST at 18%

1

-

30639200

... More
Total Value put to Tender

1

-

200856978

... More
Quoted Percentage

1

-

-

... More
Total Value of Contract Including 18% of GST

1

-

-

... More
Contract Value of put to tender as per Estimate

-

200856978

-

... More
Quoted Rate in Figures (Total Value of Contract Including 18% of GST )

-

-

-

... More
Quoted Rate in Words

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.