Highways Department Tender

... More
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Highways Department Tender

Works
Civil And Construction
Bridge Construction
Eprocure
Opening Date24 Aug 2024
Closing Date23 Sep 2024
Tender Amount₹ 5,42,60,000 
Notes
Download

Costs

Summary

Mdu No 012 Tn No 06 2024 25 Hdo Dated 16 08 2024

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Granular Sub-base with Graded Material (Table:- 400-1) - Plant Mix Method Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 of MORTH Specification no.111, 112, 401,900 - for grading- V Material

-

-

-

... More
Road B

49.03

82346

1679.51

... More
Road C

48.91

83436

1705.91

... More
Road D Box culvert at Km 0/2

33

55859

1692.71

... More
Road E Box culvert at Km 0/8

41.25

73091

1771.91

... More
Granular Sub-base with Graded Material (Table:- 400-1) - Plant Mix Method Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 of MORTH Specification no.111, 112, 401,900 - for grading- III Material

-

-

-

... More
Road B

21.24

37553

1768.07

... More
Road C

34.94

62698

1794.47

... More
Picking the existing BT surface upto 50mm depth as directed by the departmental officers and levelling the surface including all labour charges for pickig and all other tools and plants employed of the work and including all other incidental charges etc., complete as per standard specifications.

-

-

-

... More
Road A

151.67

3312

21.84

... More
Road B

22.29

486

21.84

... More
Road C

149.04

3255

21.84

... More
Advance B.T. Patches with bituminous premix chips upto 50mm thick using standard 45mm IRC size HBG metal cum of metal premix with 44Kgs of 80/100 grade bitumen per cum of metal in accordance with the requirement of the specifications to serve as base course and in conformity with the drawing or as directed by the Engineer.

-

-

-

... More
Road A

249.09

915453

3675.19

... More
Wet Mix Macadam (Table 400-13) Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam 250mm thick, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5 Specification no.111,112,406,900

-

-

-

... More
Road A

68.25

150872

2210.59

... More
Road B

54.32

112470

2070.52

... More
Road C

234.81

486178

2070.52

... More
Road D Box culvert at Km 0/2

55

113878

2070.52

... More
Road E Box culvert at Km 0/8

68.75

142348

2070.52

... More
Prime coat Providing and laying Prime Coat over WBM/ WMM surface using 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 502 of MORTH Rev-5 Specification no. 111, 112, 501,502,900- over WMM

-

-

-

... More
Road A

455

37250

81.87

... More
Road B

224.58

18386

81.87

... More
Road C

1274.14

104301

81.86

... More
Road D Box culvert at Km 0/2

220

18009

81.86

... More
Road E Box culvert at Km 0/8

275

22514

81.87

... More
Tack coat - Providing and laying Tack Coat over WBM/ WMM surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 503 of MORTH Rev-5 Specification no.111,112,501, 503,900

-

-

-

... More
Road A

455

8604

18.91

... More
Road B

224.58

4246

18.91

... More
Road C

1274.14

24093

18.91

... More
Road D Box culvert at Km 0/2

220

4160

18.91

... More
Road E Box culvert at Km 0/8

275

5200

18.91

... More
Tack coat - Providing and laying Tack Coat over Existing BT surface using 2 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 503 of MORTH Rev-5 Specification no.111,112,501, 503,900

-

-

-

... More
Road A

65862.5

1786849

27.13

... More
Road B

2052.75

55691

27.13

... More
Road C

1014.42

27521

27.13

... More
Bituminous Macadam :Providing, laying 50mm consolidated thick Bituminous Macadam using 0.20cum of 26.50-13.20mm, 0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRC metal with 37Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 504 of MORTH Rev-5 Specification no.111,112,501,503,900 - Grading II

-

-

-

... More
Road A

795.85

6851058

8608.48

... More
Road B

11.19

94576

8451.84

... More
Road C

63.7

538382

8451.84

... More
Road D Box culvert at Km 0/2

11

92970

8451.84

... More
Road E Box culvert at Km 0/8

13.75

116212

8451.84

... More
Dense Bituminous Macadam :Providing, laying 75mm consolidated thick Dense Bituminous Macadam using 0.40cum of 37.50-13.20mm, 0.35cum of13.20-2.36mm and 0.36cum of 2.36mm & below size IRC metal with 71.30 kgs of VG30 grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in the required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to site, spreading the mix to uniform thickness of 75mm with mechanical paver to the specified grades and cross sections and consolidated by Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 505 of MORTH rev-5 Specification no.111,112,501,503,900 - Grading I

-

-

-

... More
Road B

5.18

47508

9171.43

... More
Bituminous Concrete (Table 500-17) Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00-9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 Specification no. 111, 112, 507, 900 complete in all respects - Grading II

-

-

-

... More
Road A

1989.54

21741991

10928.15

... More
Road B

71.79

773135

10769.4

... More
Road C

68.66

739427

10769.4

... More
Road D Box culvert at Km 0/2

6.6

71078

10769.4

... More
Road E Box culvert at Km 0/8

8.25

88847

10769.4

... More
Providing compaction for embankment / making up of low berms using the available box cut earth including all hire and fuel charges for power roller for compaction, water sprinkler, including all labour charges for laying, spreading, watering etc., complete and as directed by the departmental engineers (Earth work compaction only)

-

-

-

... More
Road C

45

1198

26.64

... More
Filling Carted Earth in between gap for median and island and above road level with approved materials deposited at site from roadway cutting and excavation for drain and foundation of other structures, spread, greaded and compacted as per CL:407 of MORTH

-

-

-

... More
Road B

16.92

3332

196.97

... More
Road C

39.58

7796

196.97

... More
Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with power roller, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification. For making up of low berms with conveyance (Conveyed earth avg lead 2km)

-

-

-

... More
Road A for Berms

3780

744546

196.97

... More
Refilling the Excavated Earth including removal and Satisfactory removal disposal of all materials necessary for the construction of Road way and side drains in accordance with the specification and the lines, grads and cross section shown in the drawings or as instructed by the Engineer. as per MORT & H Specification (Vth Revision) no.111, 112, 301, 300, 900

-

-

-

... More
Road B Toe wall

16.59

710

42.85

... More
Dismantling Dismantling the existing RR masonry with cement mortor / PCC / RCC / Cut Stone Slab salvaging and removal and disposing of resulting materials and back filling the resulting trenches and pits etc,as per MORTH Specification no.111,112,202

-

-

-

-

-

-

... More
Road C

2.86

1390

486.2

... More
Road D Box culvert at Km 0/2

48.75

23702

486.2

... More
Road E Box culvert at Km 0/8

61.25

29779

486.2

... More
Earth work excavation in all classes of soil except hard rock requiring blasting and depositing on bank as per SS20B with all leads and lifts and all other incidental charges such as bailing out water shoring, strutting, walling and forming protective bunds wherever necessary etc., complete as per relevant standard specification for Paver Block portion, Foundation of Retaing wall, Drain and dressing the bed up to sill level for Culverts. etc, complete as per standard specification 111,112,304

-

-

-

... More
Road B Toe wall

16.59

2044

123.26

... More
Road D Box culvert at Km 0/2

57.7

7112

123.26

... More
Road E Box culvert at Km 0/8

57.7

7112

123.26

... More
Earth work Excavation in all classes of soils except hard rock not requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges and sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavtion, backfilling, and clearing the site and disposal of all surplus materials etc. complete as per standard specification no 111,112,304

-

-

-

... More
Road D Box culvert at Km 0/2

216.38

62613

289.37

... More
Road E Box culvert at Km 0/8

166.49

48177

289.37

... More
Vibrated Cement Concrete M15 using 40mm ISS size HBG graded metal crushed stone including cost and conveyance of all materials to site including cost and labour charges for formwork and centering, labour charges, compacting, finishing and curing, including all incidental charges etc., complete as per MORTH Specification no.111, 112, 1000, 1500, 1700, 2200, 900 For Leveling Course and Foundation and FOOTINGS OF PCC RETAINING WALL

-

-

-

... More
Road B Toe wall

16.59

100867

6080

... More
Road B RCC Crash Barrier Median

5.49

33379

6080

... More
Road D Box culvert at Km 0/2

23.74

142175

5988.84

... More
Road E Box culvert at Km 0/8

21.47

129651

6038.71

... More
Vibrated Cement Concrete M15 using 40mm ISS size HBG graded metal crushed stone including cost and conveyance of all materials to site including cost and labour charges for formwork and centering, labour charges, compacting, finishing and curing, including all incidental charges etc., complete as per MORTH Specification no.111, 112, 1000, 1500, 1700, 2200, 900 For Below sill level

-

-

-

... More
Road B Toe wall

38.71

350623

9057.69

... More
Vibrated Reinforced Cement Concrete M25 (Design Mix) using crushed ISS size HBG graded metal of including cost and conveyance of all materials to site but excluding cost and fabrication of steel but including cost and labour charges for formwork and centering, labour charges for formwork and centering, labour charges compacting, finishing and curing including all incidental charges etc., completed as per MORTH Specification no.1000,1500,1600,1700,2300, 900 for BOX CULVERT

-

-

-

... More
Road D Box culvert at Km 0/2

132.48

1446693

10920.09

... More
Road E Box culvert at Km 0/8

132.48

1453301

10969.97

... More
Supply and fabrication of steel Grade Fe-500 required for all RCC items of works involved in the schedule including cost of steel cost of fabrication labour charges for cleaning the bars straightening cutting bending tying grills hoisting and placing the reinforcement in position as specified in the drawings including cost of binding wire provision of spacer bars, cover blocks and all other incidental charges etc. complete as per MORTH Vth Revision Specification No. 1000, 1500, 1600, 900

-

-

-

... More
Road D Box culvert at Km 0/2

12.22

1168345

95609.27

... More
Road E Box culvert at Km 0/8

13.33

1274758

95609.27

... More
Providing and fixing of G.I. Drainage spouts 100mm dia as per MOST drawing No.SD/205 with grating arrangements at top as shown in the drawing including cost and conveyance of GI pipes and flats and fixing them in position etc., complete

-

-

-

... More
Road D Box culvert at Km 0/2

6

14988

2498.1

... More
Road E Box culvert at Km 0/8

6

14988

2498.1

... More
Vibrated Cement Concrete M30 Grade (Design mix) Using IRC size hard granite metal including cost and conveyance of all materials to site cost of premoulded expansion joints and fixing the same in position including cost and labour charges for formwork, labour charges for laying compacting curing, including all incidental charges etc., complete standard specification 1000,1500,1600,1700,2702 & 900 for WEARING COAT 75MM uniform thickness OVER DECK SLAB AND APPROACH SLAB

-

-

-

... More
Road D Box culvert at Km 0/2

97.73

61151

625.72

... More
Road E Box culvert at Km 0/8

97.73

61812

632.48

... More
Vibrated Cement Concrete M20 Nominal mix using 40mm ISS HBG metal including cost and conveyance of all materials to site, complying to the required standard and specifications including cost and formwork, mixing, laying, compacting using vibrator including hire and fuel charges for all tools and plants engaged in curing and all other incidental charges such as bailing out water wherever necessary forming protective bunds coffer dams etc., complete for for Wings walls, & parapet wall.. as per MORTH Specification no. 111,112,1000, 1500, 1700,2200,900

-

-

-

... More
Road D Box culvert at Km 0/2

78.32

644940

8234.68

... More
Road E Box culvert at Km 0/8

53.94

454585

8427.62

... More
Earthwork excavation including removal and satisfactory disposal of all materials necessary for the construction of roadway and side drains inaccordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer. Formation of embankment using carted earth with a lead of 2 km. for Diversion Road

-

-

-

... More
Road D Box culvert at Km 0/2

108

21272

196.97

... More
Road E Box culvert at Km 0/8

135

26590

196.97

... More
Removing and refixing the existing Center median of size 0.610 m at bottom 0.250 m at middle 0.150 at top and to a height of 0.860 m and length of 1.00m including labour charges, Machinary charges and all other Incidental charges etc., complete

-

-

-

... More
Road B

20

4977

248.86

... More
Providing Barrier Type Kerb for median/ islands using vibrated cement concrete of grade M20 (1:1.5:3) using 20 and 12mm ISS HBG metal from approvedquarry, including cost and conveyance of all materials to work site, including hire and fue lcharges of all the machineries employed for this work, including all labour charges for mixing, laying, curing, painting, including all other incidental charges etc., complete as per drawing and standard specification.

-

-

-

... More
Road B

88.48

49439

558.76

... More
Road C

303.83

170238

560.31

... More
Providing R.C.C Centre Median of size 0.610 m at bottom 0.250 m at middle 0.150 m at top and to height of 1.05 m from the road level including cost and conveyance of all materials to work site including picking the existing B.T surface if necessary , and providing form work for shuttering on both sides and chamfered edges at top, including cost of steel reinforcements as per the Bar bending schedule appended here with , fabrication and placing in position of steel grills including cost of binding wire, laying of R.C.C M25 concrete using ISS HBG graded metal including cost and conveyance of all materials to work site from the approved sources including labour charges for mixing, laying, curing etc, and cost and laying of 100mm dia PVC pipes [ for service utilities ] at the middle of the median as directed by the departmental officers , Rendering smoothness over the CC surfaces with 10 Kg of cement for 10 m2 area and painting two coats over the CC surfaces with best approved quality of cement paint including primer etc, including all labour charges ,hire and fuel charges for the tools and plants employed and as per the standard specification and in accordance with the drawings appended here with and as directed by the departmental officers etc, complete.

-

-

-

... More
Road B RCC Crash Barrier Median

90

725259

8058.44

... More
Providing and Fixing Highmast lighting (16 Metre) with 8 Nos. 150W LED Fitting (PWD SOR Sl.No M-2138)

-

-

-

... More
Road B

2

1056200

528100

... More
Calculation of SubTotal, GST and Total Amount carried out by system automatically

-

-

-

... More
Basic cost of value put to tender as per estimate

1

-

45981387

... More
Add GST at 18%

1

-

8276650

... More
Total Value put to Tender

1

-

54258037

... More
Excess/Less Percentage

1

-

-

... More
Final Value

1

-

-

... More
Add GST at 18% of Final Value

1

-

-

... More
Total Value of Contract Including 18% of GST

1

-

-

... More
Basic cost of value put to tender as per Estimate

-

45981387

-

... More
Quoted Rate in Figures (Total Value of Contract Including 18% of GST )

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.