Highways Department Tender

... More
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Highways Department Tender

Works
Civil And Construction
Bridge Construction
Eprocure
Opening Date21 Sep 2024
Closing Date8 Oct 2024
Tender Amount₹ 2,24,50,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Road - A

760.98

93798

123.26

... More
Road - B

1553.47

191480

123.26

... More
Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory soil compactor to achieve the desired density, complete as per clause 401 Grade-V (Morth No. 111, 112, 401, 900)

1

-

-

... More
Road - A

191.14

371398

1943.07

... More
Road - B

332.28

641257

1929.87

... More
Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory soil compactor to achieve the desired density, complete as per clause 401 Grade-III (Morth No. 111, 112, 401, 900)

1

-

-

... More
Road - A

152.9

310749

2032.37

... More
Road - B

265.82

536735

2019.17

... More
Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam 250mm thick, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory soil compactor to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5 (Morth No. 111, 112, 406, 900)

1

-

-

... More
Road - A

382.23

832829

2178.87

... More
Road - B

664.54

1447946

2178.87

... More
Providing and laying Prime Coat over WMM surface using 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 502 of MORTH Rev-5 (Morth No. 111, 112, 501, 502, 900)

1

-

-

... More
Road - A

1528.93

124883

81.68

... More
Road - B

2658.17

217119

81.68

... More
Providing and laying Tack Coat over WMM surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5 (Morth No. 111, 112, 501, 503, 900)

1

-

-

... More
Road - A

1528.93

28789

18.83

... More
Road - B

2658.17

50053

18.83

... More
Providing and laying Tack Coat over Existing BT surface using 2 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 503 of MORTH Rev-5 (Morth No. 111, 112, 501, 503, 900)

1

-

-

... More
Road - A

4598.58

124483

27.07

... More
Road - B

3156.83

85455

27.07

... More
Providing and Laying 50mm thickn Bituminous Macadamusing course aggregate andVG30 bitumenwhich shall consist of construction in a single course base/binder course confirming to the specfication on a previously prepared base,(using Mini Hot Mix Plant and Power Roller)including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 504 MORTH Rev-5(For Patch Works) (Morth No. 111, 112, 501, 504, 900, 3004)

1

-

-

... More
Road - A

13.88

112040

8072.08

... More
Road - B

5.59

45031

8055.74

... More
Providing, laying 75mm consolidated thick Dense Bituminous Macadam using 0.40cum of 37.50-13.20mm, 0.35cum of 13.20-2.36mm and 0.36cum of 2.36mm & below size IRC metal with 71.30kgs ofVG30 grade bitumen for premixing per10sqm includingcost andconveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in the required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to site, spreading the mix to uniform thickness of 75mm with mechanical paver to the specified grades and cross sections and consolidated by Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete asper specification using CMP asper clause 505 of MORTH rev-5. (Morth No. 111, 112, 505, 900)

1

-

-

... More
Road - A

137.61

1269745

9227.13

... More
Road - B

239.24

2207498

9227.13

... More
Providing, laying 50mm consolidated thick Bituminous Macadam using 0.20cum of 26.50- 13.20mm, 0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm &below size IRC metal with 37 Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heatingthe bitumen, aggregate and mixing them in required temperature usingCentral hot mix plant 20-30ton capacity, conveyingthe mix bytipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by8-10 tonne VibratoryRoller to the required densityetc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratoryroller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 504 of MORTH Rev-5 (Morth No. 111, 112, 504, 900)

1

-

-

... More
Road - A

229.93

1957026

8511.4

... More
Road - B

157.84

1343439

8511.4

... More
Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc.,complete as per specification using CMP as per clause 507 of MORTH Rev-5 (Morth No. 111, 112, 501, 507, 900)

1

-

-

... More
Road - A

183.83

1986426

10805.78

... More
Road - B

174.45

1885068

10805.78

... More
Providing compaction for making up of low berms using the available box cut earth including all hire and fuel charges for power roller for compaction, water sprinkler, including all labour charges for laying, spreading, watering etc., complete and as directed by the departmental engineers.

1

-

-

... More
Road - A

237.6

6324

26.62

... More
Road - B

222.3

5917

26.62

... More
BOX CULVERT

1

-

-

... More
Dismantling salvaging and removal and disposing of resulting materials and back filling the resulting trenches and pits including all labour, materials, tools, equipment, safe guards, incidental necessary to complete the work as directed by the Engineer for Brick work in Cement Mortar as per MORTH No.111,112,202

1

-

-

... More
Road - A

21.71

6146

283.14

... More
Earthwork excavation in all classes of soils except hard rock requiring, blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour materials, tools, equipments and all incidental charges and sheeting, shoring and bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, Trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials, etc, complete as per standard specification for foundation. (Morth No. 111, 112, 301, 305, 900)

1

-

-

... More
Road - A

321.13

79164

246.52

... More
Road - B

101.86

25110

246.52

... More
Filling under the box culvert with Quarry Dust filling including cost and conveyance of dust to worksite, laying, handling charges and filling in layers, tamping under optimum moisture content to get the maximum density including watering, with all leads for water and all other incidental charges etc, complete for filling under the Box culvert . (Morth No. 111, 112, 304, 900)

1

-

-

... More
Road - A

15.23

3780

248.21

... More
Road - B

4.35

1114

256.29

... More
Vibrated Cement concrete of grade M15 (Nominal mix) using 40mm ISS HBG granite metal including cost and conveyance of all materials to site including cement at site, including cost of form work, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevent standard specification for LEVELLING COURSE BELOW Box Culvert. (Morth No. 111, 112, 1000, 1500, 1700, 2200, 900)

1

-

-

... More
Road - A

21.48

130770

6088.03

... More
Road - B

6.07

37042

6102.55

... More
Vibrated Cement concrete of grade M20 (Nominal mix) using 40mm ISS HBG granitemetal including cost and conveyance of all materials to site including cement at site,including cost of form work, soft water, labour charges for mixing, transporting, layingand curing concrete, worikingat depths, Tools and Plants and incidental charges suchas maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as perrel event standard specification for Footing of Abutments, Returnsand (Morth No. 111, 112, 1000, 1500, 1700, 2200, 900)

1

-

-

... More
Road - A

65.7

556347

8468

... More
Road - B

21.9

185767

8482.52

... More
Vibrated Reinforced Cement Concrete M25 Grade (Design Mix) using ISS graded HBG metal with M-Sand including cost and conveyance of all materials to site excluding cost and fabrication of steel but including cost ofcement, formwork and centering, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants employed etc., complete as per relevant standard specifications as directed by the Engineer as per MORTH No. 111, 112, 900, 1000, 1500, 1600, 1700, 2200 for Bed Block

1

-

-

... More
Road - A

83.49

1076976

12899.47

... More
Road - B

23.85

306499

12851.14

... More
Vibrated cement concrete M15 (Nominal mix)using 40mmISS size hard brokengranite metal including cost and conveyance of all materials to site including cost andlabour charges for formwork, centering, labour charges for laying, compacting, curing all incidental chargesetc., complete for Parapet. (Morth No. 111, 112, 1000, 1500, 1700, 2200, 900)

1

-

-

... More
Road - A

2.85

31254

10966.66

... More
Road - B

0.95

10432

10981.18

... More
Supply and fabrication of STEEL grade Fe500D for all the reinforced cement concrete items of work involved in the shedule including cost of steel, cost of fabrication, labourcharges for cleaning the rods, straightening, cutting, bending, tying grills, hoisting andplacing the reinforcement in position as specified in the drawing including cost ofbinding wire, provision of spacer bars, cover blocks and all other incidental chargesetc.,complete. (Morth No. 1000, 1500, 1600, 900)

1

-

-

... More
Road - A

5.33

509601

95610

... More
Road - B

1.53

146283

95610

... More
Providing and fixing 110mm dia PVC SEEPAGE PIPES of required length for abutment and wing, retaining wall including cost and conveyance of all materials to worksite cost and labour for semi-sperical back fill arrangements with 100mm size broken granite stones at the periphery and labour charges for fixing etc., complete to drain the back fill as per standard specifications (Morth No. 2706, 900)

1

-

-

... More
Road - A

13.5

2741

203.1

... More
Road - B

4.5

913

203.1

... More
Calculation of SubTotal, GST and Total Amount carried out by system automatically

-

-

-

... More
Basic cost of value put to tender as per estimate

1

-

18987087

... More
Add GST at 18%

1

-

3417676

... More
Total Value put to Tender

1

-

22404763

... More
Differnce Amount (Excess/Less)

1

-

-

... More
Quoted Amount (Basic Rate Only)

1

-

-

... More
Add GST at 18% of of Quoted Amount

1

-

-

... More
Total Value of Quoted Amount Including 18% of GST

1

-

-

... More
Basic cost of value put to tender as per Estimate

-

18987087

-

... More
Quoted Rate in Figures (Total Value of Quoted Amount Including 18% of GST )

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.