Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Highways Department Tender

Bridge Construction
Eprocure
Opening Date9 Jun 2020
Closing Date7 Jul 2020
Tender Amount₹ 6,61,19,000 
Notes
Download

Costs

Summary

Package 48 Widening Improvements Including Cd Works To Government Roads In Nanguneri H C And M Sub Division

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Improvements of Nanguneri - Moolaikaraipatti Road. at km 3/0 - 3/300 (MD 292) including upkeeping for a period of 60 months

550

-

15.31

... More
Providing Paver blockof Eruvadi - Mavadi Road at km 2/6 - 2/8

250

-

15.31

... More
Excavation for Roadway and Drainage Excavation including removal and satisfactory disposal of all materias necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer as per MORTH Rev. V Clause No. 111, 112, 301 to 305. a) Box Cutting for widening portion.

-

-

-

... More
Widening from intermediate lane to Two lane and Improvements of Reddiyarpatti- Vijayanarayanam road at km. 19/2-20/6 Including CD works at Km. 19/6 (MD 403) Including upkeeping for a period of 60 months

865.43

-

84

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 20/6 - 22/0 (MD 403) including upkeeping for a period of 60 months

869.4

-

84

... More
Granular Sub-base with Graded Material (Table:- 400-1) - Plant Mix Method (Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 ) - for grading-V Material

-

-

-

... More
Widening from intermediate lane to Two lane and Improvements of Reddiyarpatti- Vijayanarayanam road at km. 19/2-20/6 Including CD works at Km. 19/6 (MD 403) Including upkeeping for a period of 60 months

418.08

-

1319.27

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 20/6 - 22/0 (MD 403) including upkeeping for a period of 60 months

420

-

1319.27

... More
Reconstruction of Minor Bridge at km 2/10 of Parappadi - Chithoor Road

28.13

-

1319.27

... More
Reconstruction of Culvert at km 0/4 (ii) of Nanguneri - Kalakad Road. (MD 291)

31.5

-

1319.27

... More
Granular Sub-base with Graded Material (Table:- 400-1) - Plant Mix Method (Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 ) - for grading-III Material

-

-

-

... More
Widening from intermediate lane to Two lane and Improvements of Reddiyarpatti- Vijayanarayanam road at km. 19/2-20/6 Including CD works at Km. 19/6 (MD 403) Including upkeeping for a period of 60 months

303.11

-

1407.88

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 20/6 - 22/0 (MD 403) including upkeeping for a period of 60 months

304.5

-

1407.88

... More
Wet Mix Macadam (Table 400-13) (Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density, Complete as per clause 406) as per MORTH Rev. V Clause No. 111, 112, 406 & 900.

-

-

-

... More
Widening from intermediate lane to Two lane and Improvements of Reddiyarpatti- Vijayanarayanam road at km. 19/2-20/6 Including CD works at Km. 19/6 (MD 403) Including upkeeping for a period of 60 months

2438.8

-

1655.57

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 20/6 - 22/0 (MD 403) including upkeeping for a period of 60 months

2450

-

1655.57

... More
Improvements of Nanguneri - Moolaikaraipatti Road. at km 3/0 - 3/300 (MD 292) including upkeeping for a period of 60 months

412.5

-

1655.57

... More
Reconstruction of Minor Bridge at km 2/10 of Parappadi - Chithoor Road

28.13

-

1655.57

... More
Reconstruction of Culvert at km 0/4 (ii) of Nanguneri - Kalakad Road. (MD 291)

31.5

-

1655.57

... More
Providing Providing Paver blockof Eruvadi - Mavadi Road at km 2/6 - 2/8

275

-

1655.57

... More
Prime Coat (Providing and applying primer coat with bitumen emulsion (SS-I type) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per clause 502) - over WMM/ WBM as per MORTH Rev. V Clause No. 111, 112,501,502 &900 .

-

-

-

... More
Widening from intermediate lane to Two lane and Improvements of Reddiyarpatti- Vijayanarayanam road at km. 19/2-20/6 Including CD works at Km. 19/6 (MD 403) Including upkeeping for a period of 60 months

9755.2

-

51.27

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 20/6 - 22/0 (MD 403) including upkeeping for a period of 60 months

9800

-

51.27

... More
Improvements of Nanguneri - Moolaikaraipatti Road. at km 3/0 - 3/300 (MD 292) including upkeeping for a period of 60 months

1650

-

51.28

... More
Reconstruction of Minor Bridge at km 2/10 of Parappadi - Chithoor Road

187.5

-

51.29

... More
Reconstruction of Culvert at km 0/4 (ii) of Nanguneri - Kalakad Road. (MD 291)

210

-

51.28

... More
Tack Coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 - over granular surfaces treated with primer as per MORTH Rev. V Clause No. 111, 112,501, 503 & 900.

-

-

-

... More
Widening from intermediate lane to Two lane and Improvements of Reddiyarpatti- Vijayanarayanam road at km. 19/2-20/6 Including CD works at Km. 19/6 (MD 403) Including upkeeping for a period of 60 months

9755.2

-

10.95

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 20/6 - 22/0 (MD 403) including upkeeping for a period of 60 months

9800

-

10.95

... More
Improvements of Nanguneri - Moolaikaraipatti Road. at km 3/0 - 3/300 (MD 292) including upkeeping for a period of 60 months

1650

-

10.96

... More
Reconstruction of Minor Bridge at km 2/10 of Parappadi - Chithoor Road

187.5

-

10.96

... More
Reconstruction of Culvert at km 0/4 (ii) of Nanguneri - Kalakad Road. (MD 291)

210

-

10.95

... More
Tack Coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 - over bituminous surfaces as per MORTH Rev. V Clause No. 111, 112, 503 & 900.

-

-

-

... More
Improvements to Riding Quality at km 6/0 - 7/8 of Vijayanarayanam - Ittamozhi Road including upkeeping for a period of 60 months

6834.38

-

17.13

... More
Bituminous Macadam (Providing and laying 50mm bituminous macadam with hot mix plant using crushed aggregates of specified grading premixed with bituminous binder (Viscosity Grade 30), transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction, complete as directed by the Engineeper clause 504) - as per MORTH Rev. V Clause No. 111, 112, 501, 504 & 900.

-

-

-

... More
Improvements of Nanguneri - Moolaikaraipatti Road. at km 3/0 - 3/300 (MD 292) including upkeeping for a period of 60 months

82.5

-

5512.56

... More
Improvements to Riding Quality at km 6/0 - 7/8 of Vijayanarayanam - Ittamozhi Road including upkeeping for a period of 60 months

67.5

-

5512.56

... More
Reconstruction of Minor Bridge at km 2/10 of Parappadi - Chithoor Road

9.38

-

5512.56

... More
Reconstruction of Culvert at km 0/4 (ii) of Nanguneri - Kalakad Road. (MD 291)

10.5

-

5512.56

... More
Dense Graded Bituminous Macadam (Table - 500-10) (Providing and laying dense bituminous macadam with Hot Mix Plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade 30) at percentage specified by JMF by weight of total mix of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No.505) Grading II as per MORTH Rev. V Clause No. 111, 112, 501, 502, 503, 505 & 900. 75mm thick

-

-

-

... More
Widening from intermediate lane to Two lane and Improvements of Reddiyarpatti- Vijayanarayanam road at km. 19/2-20/6 Including CD works at Km. 19/6 (MD 403) Including upkeeping for a period of 60 months

487.76

-

6423.5

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 20/6 - 22/0 (MD 403) including upkeeping for a period of 60 months

490

-

6423.5

... More
Bituminous Concrete (Table 500-17) (Providing and laying bituminous concrete with hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade-30) at percentage specified by Job Mix Formula of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects) - Grading II as per MORTH Rev. V Clause No. 111, 112, 501, 507 & 900.

-

-

-

... More
Widening from intermediate lane to Two lane and Improvements of Reddiyarpatti- Vijayanarayanam road at km. 19/2-20/6 Including CD works at Km. 19/6 (MD 403) Including upkeeping for a period of 60 months

292.66

-

6885.75

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 20/6 - 22/0 (MD 403) including upkeeping for a period of 60 months

294

-

6885.75

... More
Improvements of Nanguneri - Moolaikaraipatti Road. at km 3/0 - 3/300 (MD 292) including upkeeping for a period of 60 months

49.5

-

6885.75

... More
Improvements to Riding Quality at km 6/0 - 7/8 of Vijayanarayanam - Ittamozhi Road including upkeeping for a period of 60 months

205.03

-

6885.75

... More
Reconstruction of Minor Bridge at km 2/10 of Parappadi - Chithoor Road

5.63

-

6885.75

... More
Reconstruction of Culvert at km 0/4 (ii) of Nanguneri - Kalakad Road. (MD 291)

6.3

-

6885.75

... More
Excavation including removal and satisfactory disposal of all materials necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer. a. Formation of embankment using Side Earth including compaction by Power Roller as per MORTH Rev. V Clause No. 111, 112, 301 to 305, 900

-

-

-

... More
Widening from intermediate lane to Two lane and Improvements of Reddiyarpatti- Vijayanarayanam road at km. 19/2-20/6 Including CD works at Km. 19/6 (MD 403) Including upkeeping for a period of 60 months

514.23

-

103.7

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 20/6 - 22/0 (MD 403) including upkeeping for a period of 60 months

516.6

-

103.7

... More
Improvements of Nanguneri - Moolaikaraipatti Road. at km 3/0 - 3/300 (MD 292) including upkeeping for a period of 60 months

297

-

103.7

... More
Improvements to Riding Quality at km 6/0 - 7/8 of Vijayanarayanam - Ittamozhi Road including upkeeping for a period of 60 months

540

-

103.7

... More
Earth Filling to site including labour charges for filling in layers, watering tamping under optimum moisture content to get the maximum density including watering, with all leads for water and all other incidental charges etc., complete as per MORTH Rev. V Clause No. 304. (Labour Charges)

-

-

-

... More
Widening from intermediate lane to Two lane and Improvements of Reddiyarpatti- Vijayanarayanam road at km. 19/2-20/6 Including CD works at Km. 19/6 (MD 403) Including upkeeping for a period of 60 months

865.43

-

29.3

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 20/6 - 22/0 (MD 403) including upkeeping for a period of 60 months

869.4

-

29.3

... More
Providing RCC M15 grade Precast KM Stones of standard design as per IRC 8-1980 and fixing in position including painting and printing etc. complete.

-

-

-

... More
Improvements to Riding Quality at km 6/0 - 7/8 of Vijayanarayanam - Ittamozhi Road including upkeeping for a period of 60 months

2

-

808

... More
Providing RCC M15 grade Precast HM Stones of standard design as per IRC 8-1980 and fixing in position including painting and printing etc. complete.

-

-

-

... More
Improvements to Riding Quality at km 6/0 - 7/8 of Vijayanarayanam - Ittamozhi Road including upkeeping for a period of 60 months

8

-

228

... More
Dismantling the existing cut stone culvert in the existing Parapet and body wall abutment and wings and cleaning away from the site and carefully stacking the useful materials for reuse in the road side as directed by the departmental officers etc., complete. MORTH Rev. V Clause No. 111, 112,202

-

-

-

... More
Reconstruction of Culvert at km 0/4 (ii) of Nanguneri - Kalakad Road. (MD 291)

11.46

-

193

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 19/2 - 20/6 including CD works at km 19/6(MD 403) including upkeeping for a period of 60 months

13.1

-

193

... More
Dismantling the existing structure and cleaning away carefully the site and stacking useful materials for reuse for any thickness (Cut stone slab).

-

-

-

... More
Reconstruction of Culvert at km 0/4 (ii) of Nanguneri - Kalakad Road. (MD 291)

5.94

-

350

... More
Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour, materials tool and equipments and all other incidental charges such as baling our water,sheeting, shoring, bracing and their subsequent removal, removal and obstructions, trimming bottom of excavation backfilling and clearing the site and disposal of all surplus materials etc., indicated by the Engineer as per DRESSING THE BED UPTO SILL LEVEL

-

-

-

... More
Reconstruction of Minor Bridge at km 2/10 of Parappadi - Chithoor Road

126.4

-

84

... More
Reconstruction of Culvert at km 0/4 (ii) of Nanguneri - Kalakad Road. (MD 291)

88.12

-

84

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 19/2 - 20/6 including CD works at km 19/6(MD 403) including upkeeping for a period of 60 months

62.98

-

84

... More
Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour, materials tool and equipments and all other incidental charges such as baling our water,sheeting, shoring, bracing and their subsequent removal, removal and obstructions, trimming bottom of excavation backfilling and clearing the site and disposal of all surplus materials etc., indicated by the Engineer for Foundation of Retaining Wall

-

-

-

... More
Construction of Retaining wall at km 0/100 - 0/400 of Maruthakulam - Karuppukkatti Road

293.76

-

126

... More
Construction of Retaining wall at km 1/4 - 1/8 of Kadampoduvazhvu Road

393.12

-

126

... More
Construction of Retaining wall at km 4/0 - 5/0 of Ilayarkulam - Subramaniapuram Road

1683.6

-

126

... More
Reconstruction of Minor Bridge at km 2/10 of Parappadi - Chithoor Road

273.93

-

126

... More
Reconstruction of Culvert at km 0/4 (ii) of Nanguneri - Kalakad Road. (MD 291)

144.27

-

126

... More
Reconstruction of Box Culvert at km 1/6 (i) (ii) of Koonthankulam Road

237.46

-

126

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 19/2 - 20/6 including CD works at km 19/6(MD 403) including upkeeping for a period of 60 months

264.74

-

126

... More
Plain Cement Concrete M10 1:3:6 Nominal Mix using 40mm ISS HBG graded metal including cost and conveyance of all materials to site but excluding cost of cement at site including soft water, labour charges for mixing, transporting, laying and curing and compacting concrete, working at heights, hire charges for Tools and Plants and incidental Charges etc., complete as per standard specifications leveling course

-

-

-

... More
Reconstruction of Minor Bridge at km 2/10 of Parappadi - Chithoor Road

15.65

-

4443

... More
Reconstruction of Culvert at km 0/4 (ii) of Nanguneri - Kalakad Road. (MD 291)

12.02

-

4236.59

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 19/2 - 20/6 including CD works at km 19/6(MD 403) including upkeeping for a period of 60 months

42.94

-

4394.94

... More
Vibrated Cement Concrete M20 (Nominal Mix 1:1.5:3) using 40mm ISS HBG size hard broken granite graded metal including cost and conveyance of all materials to site, and cost of cement at site, but excluding cost and fabrication of steel but including cost and labour charges for form work and centering, labour charges, for laying compacting finishing and curing including all incidental charges etc., complete as per standard specifications for Substructure of Body Wall - Below Sill Level.

-

-

-

... More
Reconstruction of Minor Bridge at km 2/10 of Parappadi - Chithoor Road

183.81

-

5867.3

... More
Reconstruction of Culvert at km 0/4 (ii) of Nanguneri - Kalakad Road. (MD 291)

95.72

-

5786.09

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 19/2 - 20/6 including CD works at km 19/6(MD 403) including upkeeping for a period of 60 months

158.24

-

6096.02

... More
Vibrated Cement Concrete M20 (Nominal Mix 1:1.5:3) using 40mm ISS HBG size hard broken granite graded metal including cost and conveyance of all materials to site, and cost of cement at site, but excluding cost and fabrication of steel but including cost and labour charges for form work and centering, labour charges, for laying compacting finishing and curing including all incidental charges etc., complete as per standard specifications for Substructure of Body Wall - Above Sill Level.

-

-

-

... More
Reconstruction of Minor Bridge at km 2/10 of Parappadi - Chithoor Road

72.33

-

7061.62

... More
Reconstruction of Culvert at km 0/4 (ii) of Nanguneri - Kalakad Road. (MD 291)

69.95

-

7123.76

... More
Reconstruction of Box Culvert at km 1/6 (i) (ii) of Koonthankulam Road

56.3

-

7626.18

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 19/2 - 20/6 including CD works at km 19/6(MD 403) including upkeeping for a period of 60 months

134.45

-

7177.68

... More
Vibrated Reinforced Cement Concrete of Grade M30 Design mix using 20mm ISS HBG graded metal including cost and conveyance of all materials to site cost and fabrication of steel and cement at site including soft water, labour charges for mixing, transporting, laying and curing and compacting concrete, working at heights, hire charges for Tools and Plants and incidental Charges etc., complete as per standard specifications for DIRT WALL CUM BED BLOCK

-

-

-

... More
Reconstruction of Minor Bridge at km 2/10 of Parappadi - Chithoor Road

5.65

-

12657.06

... More
Reconstruction of Culvert at km 0/4 (ii) of Nanguneri - Kalakad Road. (MD 291)

6.76

-

12092.57

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 19/2 - 20/6 including CD works at km 19/6(MD 403) including upkeeping for a period of 60 months

7.08

-

14858.19

... More
Plain Cement concrete M15 Grade (Nominal Mix 1:2:4) using 40 mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for form work and centering, labour charges for laying, compacting, curing, and all incidental charges etc., complete for Leveling Course.

-

-

-

... More
Construction of Retaining wall at km 0/100 - 0/400 of Maruthakulam - Karuppukkatti Road

97.92

-

5003.34

... More
Construction of Retaining wall at km 1/4 - 1/8 of Kadampoduvazhvu Road

131.04

-

5003.34

... More
Construction of Retaining wall at km 4/0 - 5/0 of Ilayarkulam - Subramaniapuram Road

420.9

-

5194.31

... More
Reconstruction of Box Culvert at km 1/6 (i) (ii) of Koonthankulam Road

13.82

-

5167.44

... More
Providing Paver blockof Eruvadi - Mavadi Road at km 2/6 - 2/8

21

-

4949.21

... More
Vibrated Cement concrete M15 Grade (Nominal Mix 1:2:4) using 40 mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for form work and centering, labour charges for laying, compacting, curing, and all incidental charges etc., complete for Core Wall

-

-

-

... More
Providing Paver blockof Eruvadi - Mavadi Road at km 2/6 - 2/8

36

-

5393.61

... More
Vibrated Cement Concrete of Grade M20 1:1.5:3 Nominal mix using 40mm ISS HBG graded metal including cost and conveyance of all materials to site but excluding cost of cement at site including soft water, labour charges for mixing, transporting, laying and curing and compacting concrete, working at heights, hire charges for Tools and Plants and incidental Charges etc., complete as per standard specifications for retaining wall - below sill level

-

-

-

... More
Construction of Retaining wall at km 0/100 - 0/400 of Maruthakulam - Karuppukkatti Road

124.85

-

6252.25

... More
Construction of Retaining wall at km 1/4 - 1/8 of Kadampoduvazhvu Road

167.08

-

6245.66

... More
Construction of Retaining wall at km 4/0 - 5/0 of Ilayarkulam - Subramaniapuram Road

842.72

-

6377.32

... More
Vibrated Cement Concrete of Grade M20 1:1.5:3 Nominal mix using 40mm ISS HBG graded metal including cost and conveyance of all materials to site but excluding cost of cement at site including soft water, labour charges for mixing, transporting, laying and curing and compacting concrete, working at heights, hire charges for Tools and Plants and incidental Charges etc., complete as per standard specifications for retaining wall - above sill level

-

-

-

... More
Construction of Retaining wall at km 0/100 - 0/400 of Maruthakulam - Karuppukkatti Road

146.88

-

7539.92

... More
Construction of Retaining wall at km 1/4 - 1/8 of Kadampoduvazhvu Road

196.56

-

7539.92

... More
Construction of Retaining wall at km 4/0 - 5/0 of Ilayarkulam - Subramaniapuram Road

953.16

-

7708.51

... More
Providing and Fixing PVC Seepage pipes of 100mm dia of required lengths for abutments wings and Retaining walls including cost and conveyance of all materials to worksite and labour charges for fixing, etc. complete to drain the backfill as per standard specification

-

-

-

... More
Construction of Retaining wall at km 4/0 - 5/0 of Ilayarkulam - Subramaniapuram Road

610

-

172.8

... More
Reconstruction of Minor Bridge at km 2/10 of Parappadi - Chithoor Road

68

-

172.8

... More
Reconstruction of Culvert at km 0/4 (ii) of Nanguneri - Kalakad Road. (MD 291)

34

-

172.8

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 19/2 - 20/6 including CD works at km 19/6(MD 403) including upkeeping for a period of 60 months

56

-

172.8

... More
Providing and Fixing KRAFT PAPER for full width of seating of deck slab and including cost and conveyance to work site labour for fixing the same in correct position and all other incidental charges etc., complete as per MORTH Rev. V Clause No. 2600.

-

-

-

... More
Reconstruction of Minor Bridge at km 2/10 of Parappadi - Chithoor Road

10.68

-

100

... More
Reconstruction of Culvert at km 0/4 (ii) of Nanguneri - Kalakad Road. (MD 291)

10.68

-

100

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 19/2 - 20/6 including CD works at km 19/6(MD 403) including upkeeping for a period of 60 months

10.68

-

100

... More
Supply and fabrication of Fe-500 steel required for all RCC items of works involved in the schedule and cost of TOR steel conforming to IS:1786 at site, including fabrication, labour charges for cleaning the rods, straightening, cutting, bending, tying grills, including overlapping to the required length wherever necessary and placing the reinforcement in position as specified in the drawings,including cost of binding wire, provision of spacer bars, cover blocks and all other incidential charges etc., complete as per standard specifications Slab culvert. Fe-500 Grade as per MORTH Rev. V Clause No. 1900.

-

-

-

... More
Reconstruction of Minor Bridge at km 2/10 of Parappadi - Chithoor Road

6.76

-

73382.79

... More
Reconstruction of Culvert at km 0/4 (ii) of Nanguneri - Kalakad Road. (MD 291)

2.09

-

73382.79

... More
Reconstruction of Box Culvert at km 1/6 (i) (ii) of Koonthankulam Road

4.58

-

73382.79

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 19/2 - 20/6 including CD works at km 19/6(MD 403) including upkeeping for a period of 60 months

3.34

-

73382.79

... More
Providing and fixing Bitumen Felt Expansion Joints including cost and conveyance of expansion joints, shamiler pad and joint sealants and fixing them in position etc., complete in deck slab over abutment and pier as per MORTH Rev. V Clause No. 2600.

-

-

-

... More
Reconstruction of Minor Bridge at km 2/10 of Parappadi - Chithoor Road

9.92

-

705

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 19/2 - 20/6 including CD works at km 19/6(MD 403) including upkeeping for a period of 60 months

13.8

-

705

... More
Providing and fixing of GI drainage spouts 100mm dia as per GOI drawig SD / 205th grating arrangements at top as shown in the drawing and 100mm dia drainage spouts projecting atleast 300mm beyond the bottom of Deck slab as shown in the drawing including cost and conveyance of Galvanized Iron pipes and flats and fixing them in position etc., complete

-

-

-

... More
Reconstruction of Minor Bridge at km 2/10 of Parappadi - Chithoor Road

2

-

2163

... More
Reconstruction of Culvert at km 0/4 (ii) of Nanguneri - Kalakad Road. (MD 291)

2

-

2163

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 19/2 - 20/6 including CD works at km 19/6(MD 403) including upkeeping for a period of 60 months

2

-

2163

... More
Vibrated Reinforced Cement Concrete of Grade M30 Design mix using 20mm ISS HBG graded metal including cost and conveyance of all materials to site cost and fabrication of steel and cement at site including soft water, labour charges for mixing, transporting, laying and curing and compacting concrete, working at heights, hire charges for Tools and Plants and incidental Charges etc., complete as per standard specifications for DECK SLAB

-

-

-

... More
Reconstruction of Minor Bridge at km 2/10 of Parappadi - Chithoor Road

52.92

-

9102.39

... More
Reconstruction of Culvert at km 0/4 (ii) of Nanguneri - Kalakad Road. (MD 291)

19.8

-

9308.14

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 19/2 - 20/6 including CD works at km 19/6 (MD 403) including upkeeping for a period of 60 months

32.64

-

9511.29

... More
Vibrated Cement Concrete of Grade M15 1:2:4 Nominal Mix using 40mm ISS HBG graded metal including cost and conveyance of all materials to site but excluding cost of cement at site including soft water, labour charges for mixing, transporting, laying and curing and compacting concrete, working at heights, hire charges for Tools and Plants and incidental Charges etc., complete as per standard specifications for Base Course Approach Slab .MORTH Rev. V Clause No. 1000,1500, 1700,2100,2104

-

-

-

... More
Reconstruction of Minor Bridge at km 2/10 of Parappadi - Chithoor Road

10.46

-

5448.16

... More
Vibrated Reinforced Cement Concrete of Grade M30 Design mix using 20mm ISS HBG graded metal including cost and conveyance of all materials to site but excluding cost and fabrication of steel and cement at site including soft water, labour charges for mixing, transporting, laying and curing and compacting concrete, working at heights, hire charges for Tools and Plants and incidental Charges etc., complete as per standard specifications for Approach Slab.MORTH Rev. V Clause No. 1000,1500, 1700,2100,2200

-

-

-

... More
Reconstruction of Minor Bridge at km 2/10 of Parappadi - Chithoor Road

26.71

-

7600.06

... More
Providing Filter Media behind the abutments and wings for 600mm thickness using filter materials confirming to Cl.309.3.2B of MOST well packed with smaller sized towards the soil and bigger size towards the wall including cost and conveyance to worksite including all other incidental charges etc., complete. MORTH 2501,2502,2503,2504

-

-

-

... More
Reconstruction of Minor Bridge at km 2/10 of Parappadi - Chithoor Road

42

-

1172.23

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 19/2 - 20/6 including CD works at km 19/6(MD 403) including upkeeping for a period of 60 months

34.4

-

1136.63

... More
Gravel Filling behind the Abutments and Wings with clean good gritty gravel including cost and conveyance to site including labour charges for filling in layers, watering tamping under optimum moisture content to get the maximum density including watering, with all leads for Filling, Laying & Tamping charges etc., complete for over pipe portion.Morth 304,2907

-

-

-

... More
Reconstruction of Minor Bridge at km 2/10 of Parappadi - Chithoor Road

235.85

-

280.9

... More
Reconstruction of Culvert at km 0/4 (ii) of Nanguneri - Kalakad Road. (MD 291)

153.63

-

239.3

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 19/2 - 20/6 including CD works at km 19/6(MD 403) including upkeeping for a period of 60 months

86.83

-

270.5

... More
Vibrated Reinforced Cement Concrete of Grade M40 Design mix using 20mm ISS HBG graded metal including cost and conveyance of all materials to site but excluding cost and fabrication of steel and cement at site including soft water, labour charges for mixing, transporting, laying and curing and compacting concrete, working at heights, hire charges for Tools and Plants and incidental Charges etc., complete as per standard specifications for Crash BarrierMORTH Rev. V Clause No. 1000,1500, 1700,2100,2200

-

-

-

... More
Reconstruction of Minor Bridge at km 2/10 of Parappadi - Chithoor Road

4.35

-

12560.07

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 19/2 - 20/6 including CD works at km 19/6(MD 403) including upkeeping for a period of 60 months

3.34

-

12512.01

... More
Reconstruction of Culvert at km 0/4 (ii) of Nanguneri - Kalakad Road. (MD 291)

2.3

-

12492.05

... More
Vibrated Cement Concrete of Grade M15 1:2:4 Nominal Mix using 40mm ISS HBG graded metal including cost and conveyance of all materials to site but excluding cost of cement at site including soft water, labour charges for mixing, transporting, laying and curing and compacting concrete, working at heights, hire charges for Tools and Plants and incidental Charges etc., complete as per standard specifications for PCC Parapet Over Wings.

-

-

-

... More
Reconstruction of Minor Bridge at km 2/10 of Parappadi - Chithoor Road

7.22

-

8710.21

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 19/2 - 20/6 including CD works at km 19/6(MD 403) including upkeeping for a period of 60 months

7.22

-

8260.16

... More
Vibrated Cement Concrete of M30 Grade design mix using ISS graded hard granite broken metal including cost and conveyance of all materials to site including cost of cement at site, cost of formwork, soft water, labour charges for mixing, transporting, laying and curing of concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for wearing coat of 75mm uniform thickness over deck slab . MORTH Rev. V Clause No. 1000,1500, 1700,2100,2200

-

-

-

... More
Reconstruction of Minor Bridge at km 2/10 of Parappadi - Chithoor Road

167.86

-

525.18

... More
Reconstruction of Culvert at km 0/4 (ii) of Nanguneri - Kalakad Road. (MD 291)

48.4

-

509.43

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 19/2 - 20/6 including CD works at km 19/6(MD 403) including upkeeping for a period of 60 months

69.76

-

521.52

... More
Excavation including removal and satisfactory disposal of all materials necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer. a. Formation of embankment using Available Earth Refilling Behind the Retaining wall as per MORTH Rev. V Clause No. 111, 112, 301 to 305, 900

-

-

-

... More
Construction of Retaining wall at km 4/0 - 5/0 of Ilayarkulam - Subramaniapuram Road

1683.6

-

11.34

... More
Providing and Laying of Carted Earth including cost and conveyance of the same to work site with an average lead of 1 km including stacking the same to departmental gauge for premeasurement including all labour charges for laying spreading etc complete and as directed by departmental engineers for filling the earth behind the retaining wall per MORTH Rev. V Clause No. 111, 112,202, 301 to 305, 900

-

-

-

... More
Construction of Retaining wall at km 4/0 - 5/0 of Ilayarkulam - Subramaniapuram Road

288.23

-

134.9

... More
Vibrated Reinforced Cement Concrete of Grade M25 Design mix using 20mm ISS HBG graded metal including cost and conveyance of all materials to site cost and fabrication of steel and cement at site including soft water, labour charges for mixing, transporting, laying and curing and compacting concrete, working at heights, hire charges for Tools and Plants and incidental Charges etc., complete as per standard specifications forBox Culvert

-

-

-

... More
Reconstruction of Box Culvert at km 1/6 (i) (ii) of Koonthankulam Road

62.4

-

8859.91

... More
Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour, materials tool and equipments and all other incidental charges such as baling our water,sheeting, shoring, bracing and their subsequent removal, removal and obstructions, trimming bottom of excavation backfilling and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for DIVERSION ROAD.

-

-

-

... More
Reconstruction of Minor Bridge at km 2/10 of Parappadi - Chithoor Road

150

-

84

... More
Reconstruction of Culvert at km 0/4 (ii) of Nanguneri - Kalakad Road. (MD 291)

180

-

84

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 19/2 - 20/6 including CD works at km 19/6(MD 403) including upkeeping for a period of 60 months

247.5

-

84

... More
Providing and laying and Compacting Well gravel including cost and conveyance to work site laying handling charges for filling in layers, rolling including watering with all leads for water and all other incidental charges etc., complete for Diversion road

-

-

-

... More
Reconstruction of Minor Bridge at km 2/10 of Parappadi - Chithoor Road

75

-

192.39

... More
Reconstruction of Culvert at km 0/4 (ii) of Nanguneri - Kalakad Road. (MD 291)

90

-

192.39

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 19/2 - 20/6 including CD works at km 19/6(MD 403) including upkeeping for a period of 60 months

123.75

-

192.39

... More
Supply and fixing of NP3 Class RCC 1000mm dia pipes supplied by the contractor at his own cost specified below confirming to IS 458/2003 cost of pipes as a finished work including loading and unloading transport and delivery in good condition at work site as directed by the departmental officers etc., complete for culvert as per MORTH Rev. V Clause No. 111, 112,900,2600,2900

-

-

-

... More
Reconstruction of Minor Bridge at km 2/10 of Parappadi - Chithoor Road

10

-

3938

... More
Reconstruction of Culvert at km 0/4 (ii) of Nanguneri - Kalakad Road. (MD 291)

7.5

-

3938

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 19/2 - 20/6 including CD works at km 19/6(MD 403) including upkeeping for a period of 60 months

15

-

3938

... More
Quarry Dust FILLING including cost and conveyance to the site including labour charges for filling in layers, watering, tamping under optimum moisture content to get the maximum density and all incidental charges etc. complete as per MORTH Rev. V Clause No. 304

-

-

-

... More
Providing Paver blockof Eruvadi - Mavadi Road at km 2/6 - 2/8

33

-

199.38

... More
Providing colour designed concrete paver block floor finish used with concrete block of TAMIN 80mm.The rate including the cost concrete concrete block loading and conveyance to site and cost of labour for fixing in position the joints should be filled with sand including compacting by using power compactor etc.,complete complying with standard specification and also the rate including the labour charges for clearing the heavy and scrub,jungle,levelling the sites, diversion of water and sanitary pipe lines,dismantling the existing masonry structures etc.,complete complying as directed by the departmental officers.

-

-

-

... More
Providing Paver blockof Eruvadi - Mavadi Road at km 2/6 - 2/8

1100

-

825.84

... More
Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour, materials tool and equipments and all other incidental charges such as baling our water,sheeting, shoring, bracing and their subsequent removal, removal and obstructions, trimming bottom of excavation backfilling and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for Core wall.

-

-

-

... More
Providing Paver blockof Eruvadi - Mavadi Road at km 2/6 - 2/8

21

-

84

... More
SUB - ESTIMATE

-

-

-

... More
Sub - Estimate for Upkeeping

-

-

-

... More
Clearing the Light jungles including weeding out shrubs, bushes, vegetable growth, etc. as per specifications & directions of Engineer-in-charge (Two times per year)

-

-

-

... More
I Year

-

-

-

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 19/2 - 20/6 including CD works at km 19/6(MD 403) including upkeeping for a period of 60 months

1680

-

4.4

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 20/6 - 22/0 (MD 403) including upkeeping for a period of 60 months

1680

-

4.4

... More
Improvements of Nanguneri - Moolaikaraipatti Road. at km 3/0 - 3/300 (MD 292) including upkeeping for a period of 60 months

360

-

4.4

... More
Improvements to Riding Quality at km 6/0 - 7/8 of Vijayanarayanam - Ittamozhi Road including upkeeping for a period of 60 months

2160

-

4.4

... More
II Year

-

-

-

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 19/2 - 20/6 including CD works at km 19/6(MD 403) including upkeeping for a period of 60 months

1680

-

4.4

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 20/6 - 22/0 (MD 403) including upkeeping for a period of 60 months

1680

-

4.4

... More
Improvements of Nanguneri - Moolaikaraipatti Road. at km 3/0 - 3/300 (MD 292) including upkeeping for a period of 60 months

360

-

4.4

... More
Improvements to Riding Quality at km 6/0 - 7/8 of Vijayanarayanam - Ittamozhi Road including upkeeping for a period of 60 months

2160

-

4.4

... More
III Year

-

-

-

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 19/2 - 20/6 including CD works at km 19/6(MD 403) including upkeeping for a period of 60 months

1680

-

4.4

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 20/6 - 22/0 (MD 403) including upkeeping for a period of 60 months

1680

-

4.4

... More
Improvements of Nanguneri - Moolaikaraipatti Road. at km 3/0 - 3/300 (MD 292) including upkeeping for a period of 60 months

360

-

4.4

... More
Improvements to Riding Quality at km 6/0 - 7/8 of Vijayanarayanam - Ittamozhi Road including upkeeping for a period of 60 months

2160

-

4.4

... More
IV Year

-

-

-

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 19/2 - 20/6 including CD works at km 19/6(MD 403) including upkeeping for a period of 60 months

1680

-

4.4

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 20/6 - 22/0 (MD 403) including upkeeping for a period of 60 months

1680

-

4.4

... More
Improvements of Nanguneri - Moolaikaraipatti Road. at km 3/0 - 3/300 (MD 292) including upkeeping for a period of 60 months

360

-

4.4

... More
Improvements to Riding Quality at km 6/0 - 7/8 of Vijayanarayanam - Ittamozhi Road including upkeeping for a period of 60 months

2160

-

4.4

... More
V Year

-

-

-

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 19/2 - 20/6 including CD works at km 19/6(MD 403) including upkeeping for a period of 60 months

1680

-

4.4

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 20/6 - 22/0 (MD 403) including upkeeping for a period of 60 months

1680

-

4.4

... More
Improvements of Nanguneri - Moolaikaraipatti Road. at km 3/0 - 3/300 (MD 292) including upkeeping for a period of 60 months

360

-

4.4

... More
Improvements to Riding Quality at km 6/0 - 7/8 of Vijayanarayanam - Ittamozhi Road including upkeeping for a period of 60 months

2160

-

4.4

... More
Forming and raising the Berms with side earth with side earth with a lead of 1 km from the approved source to work site including cost of earth, conveyance charges and filling levelling to the lines, grades and cross sections shown in the drawings or as indicated by the Engineer for making up the berms (Yearly two times) as directed by the dept. officers (during South west & North east monsoon) as per MORT&H Rev. V specifications No. 100, 111, 112, 202, 301, to 305, 900

-

-

-

... More
I Year

-

-

-

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 19/2 - 20/6 including CD works at km 19/6(MD 403) including upkeeping for a period of 60 months

42

-

103.7

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 20/6 - 22/0 (MD 403) including upkeeping for a period of 60 months

42

-

103.7

... More
Improvements of Nanguneri - Moolaikaraipatti Road. at km 3/0 - 3/300 (MD 292) including upkeeping for a period of 60 months

21

-

103.7

... More
Improvements to Riding Quality at km 6/0 - 7/8 of Vijayanarayanam - Ittamozhi Road including upkeeping for a period of 60 months

54

-

103.7

... More
II Year

-

-

-

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 19/2 - 20/6 including CD works at km 19/6(MD 403) including upkeeping for a period of 60 months

42

-

103.7

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 20/6 - 22/0 (MD 403) including upkeeping for a period of 60 months

42

-

103.7

... More
Improvements of Nanguneri - Moolaikaraipatti Road. at km 3/0 - 3/300 (MD 292) including upkeeping for a period of 60 months

21

-

103.7

... More
Improvements to Riding Quality at km 6/0 - 7/8 of Vijayanarayanam - Ittamozhi Road including upkeeping for a period of 60 months

54

-

103.7

... More
III Year

-

-

-

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 19/2 - 20/6 including CD works at km 19/6(MD 403) including upkeeping for a period of 60 months

42

-

103.7

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 20/6 - 22/0 (MD 403) including upkeeping for a period of 60 months

42

-

103.7

... More
Improvements of Nanguneri - Moolaikaraipatti Road. at km 3/0 - 3/300 (MD 292) including upkeeping for a period of 60 months

21

-

103.7

... More
Improvements to Riding Quality at km 6/0 - 7/8 of Vijayanarayanam - Ittamozhi Road including upkeeping for a period of 60 months

54

-

103.7

... More
IV Year

-

-

-

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 19/2 - 20/6 including CD works at km 19/6(MD 403) including upkeeping for a period of 60 months

42

-

103.7

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 20/6 - 22/0 (MD 403) including upkeeping for a period of 60 months

42

-

103.7

... More
Improvements of Nanguneri - Moolaikaraipatti Road. at km 3/0 - 3/300 (MD 292) including upkeeping for a period of 60 months

21

-

103.7

... More
Improvements to Riding Quality at km 6/0 - 7/8 of Vijayanarayanam - Ittamozhi Road including upkeeping for a period of 60 months

54

-

103.7

... More
V Year

-

-

-

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 19/2 - 20/6 including CD works at km 19/6(MD 403) including upkeeping for a period of 60 months

42

-

103.7

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 20/6 - 22/0 (MD 403) including upkeeping for a period of 60 months

42

-

103.7

... More
Improvements of Nanguneri - Moolaikaraipatti Road. at km 3/0 - 3/300 (MD 292) including upkeeping for a period of 60 months

21

-

103.7

... More
Improvements to Riding Quality at km 6/0 - 7/8 of Vijayanarayanam - Ittamozhi Road including upkeeping for a period of 60 months

54

-

103.7

... More
Excavation including removal and satisfactory disposal of all materials necessary for the construction of road way and side drains in accordance with specifications and the lines , grades and cross sections shown in the drawings or as indicated by the Engineer for Clearing the vent way of CD works as per MORT&H Rev. V specifications No. 100, 111, 112, 301 to 305 (One time per year) by using JCB

-

-

-

... More
I year

-

-

-

... More
Improvements of Nanguneri - Moolaikaraipatti Road. at km 3/0 - 3/300 (MD 292) including upkeeping for a period of 60 months

4

-

700

... More
II year

-

-

-

... More
Improvements of Nanguneri - Moolaikaraipatti Road. at km 3/0 - 3/300 (MD 292) including upkeeping for a period of 60 months

4

-

700

... More
III year

-

-

-

... More
Improvements of Nanguneri - Moolaikaraipatti Road. at km 3/0 - 3/300 (MD 292) including upkeeping for a period of 60 months

4

-

700

... More
IV Year

-

-

-

... More
Improvements of Nanguneri - Moolaikaraipatti Road. at km 3/0 - 3/300 (MD 292) including upkeeping for a period of 60 months

4

-

700

-

-

-

... More
Improvements of Nanguneri - Moolaikaraipatti Road. at km 3/0 - 3/300 (MD 292) including upkeeping for a period of 60 months

4

-

700

... More
Painting the existing KM stone as per IRC standard including the cost of labour charges and Materials etc., complete

-

-

-

... More
I Year

-

-

-

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 19/2 - 20/6 including CD works at km 19/6(MD 403) including upkeeping for a period of 60 months

1

-

90.2

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 20/6 - 22/0 (MD 403) including upkeeping for a period of 60 months

2

-

90.2

... More
Improvements of Nanguneri - Moolaikaraipatti Road. at km 3/0 - 3/300 (MD 292) including upkeeping for a period of 60 months

1

-

90.2

... More
Improvements to Riding Quality at km 6/0 - 7/8 of Vijayanarayanam - Ittamozhi Road including upkeeping for a period of 60 months

2

-

90.2

... More
II Year

-

-

-

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 19/2 - 20/6 including CD works at km 19/6(MD 403) including upkeeping for a period of 60 months

1

-

90.2

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 20/6 - 22/0 (MD 403) including upkeeping for a period of 60 months

2

-

90.2

... More
Improvements of Nanguneri - Moolaikaraipatti Road. at km 3/0 - 3/300 (MD 292) including upkeeping for a period of 60 months

1

-

90.2

... More
Improvements to Riding Quality at km 6/0 - 7/8 of Vijayanarayanam - Ittamozhi Road including upkeeping for a period of 60 months

2

-

90.2

... More
III Year

-

-

-

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 19/2 - 20/6 including CD works at km 19/6(MD 403) including upkeeping for a period of 60 months

1

-

90.2

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 20/6 - 22/0 (MD 403) including upkeeping for a period of 60 months

2

-

90.2

... More
Improvements of Nanguneri - Moolaikaraipatti Road. at km 3/0 - 3/300 (MD 292) including upkeeping for a period of 60 months

1

-

90.2

... More
Improvements to Riding Quality at km 6/0 - 7/8 of Vijayanarayanam - Ittamozhi Road including upkeeping for a period of 60 months

2

-

90.2

... More
IV Year

-

-

-

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 19/2 - 20/6 including CD works at km 19/6(MD 403) including upkeeping for a period of 60 months

1

-

90.2

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 20/6 - 22/0 (MD 403) including upkeeping for a period of 60 months

2

-

90.2

... More
Improvements of Nanguneri - Moolaikaraipatti Road. at km 3/0 - 3/300 (MD 292) including upkeeping for a period of 60 months

1

-

90.2

... More
Improvements to Riding Quality at km 6/0 - 7/8 of Vijayanarayanam - Ittamozhi Road including upkeeping for a period of 60 months

2

-

90.2

... More
V Year

-

-

-

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 19/2 - 20/6 including CD works at km 19/6(MD 403) including upkeeping for a period of 60 months

1

-

90.2

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 20/6 - 22/0 (MD 403) including upkeeping for a period of 60 months

2

-

90.2

... More
Improvements of Nanguneri - Moolaikaraipatti Road. at km 3/0 - 3/300 (MD 292) including upkeeping for a period of 60 months

1

-

90.2

... More
Improvements to Riding Quality at km 6/0 - 7/8 of Vijayanarayanam - Ittamozhi Road including upkeeping for a period of 60 months

2

-

90.2

... More
Painting the existing HM stone as per IRC standard including the cost of labour charges and Materials etc., complete

-

-

-

... More
I Year

-

-

-

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 19/2 - 20/6 including CD works at km 19/6(MD 403) including upkeeping for a period of 60 months

7

-

18.48

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 20/6 - 22/0 (MD 403) including upkeeping for a period of 60 months

5

-

18.48

... More
Improvements of Nanguneri - Moolaikaraipatti Road. at km 3/0 - 3/300 (MD 292) including upkeeping for a period of 60 months

1

-

18.48

... More
Improvements to Riding Quality at km 6/0 - 7/8 of Vijayanarayanam - Ittamozhi Road including upkeeping for a period of 60 months

8

-

18.48

... More
II Year

-

-

-

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 19/2 - 20/6 including CD works at km 19/6(MD 403) including upkeeping for a period of 60 months

7

-

18.48

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 20/6 - 22/0 (MD 403) including upkeeping for a period of 60 months

5

-

18.48

... More
Improvements of Nanguneri - Moolaikaraipatti Road. at km 3/0 - 3/300 (MD 292) including upkeeping for a period of 60 months

1

-

18.48

... More
Improvements to Riding Quality at km 6/0 - 7/8 of Vijayanarayanam - Ittamozhi Road including upkeeping for a period of 60 months

8

-

18.48

... More
III Year

-

-

-

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 19/2 - 20/6 including CD works at km 19/6(MD 403) including upkeeping for a period of 60 months

7

-

18.48

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 20/6 - 22/0 (MD 403) including upkeeping for a period of 60 months

5

-

18.48

... More
Improvements of Nanguneri - Moolaikaraipatti Road. at km 3/0 - 3/300 (MD 292) including upkeeping for a period of 60 months

1

-

18.48

... More
Improvements to Riding Quality at km 6/0 - 7/8 of Vijayanarayanam - Ittamozhi Road including upkeeping for a period of 60 months

8

-

18.48

... More
IV Year

-

-

-

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 19/2 - 20/6 including CD works at km 19/6(MD 403) including upkeeping for a period of 60 months

7

-

18.48

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 20/6 - 22/0 (MD 403) including upkeeping for a period of 60 months

5

-

18.48

... More
Improvements of Nanguneri - Moolaikaraipatti Road. at km 3/0 - 3/300 (MD 292) including upkeeping for a period of 60 months

1

-

18.48

... More
Improvements to Riding Quality at km 6/0 - 7/8 of Vijayanarayanam - Ittamozhi Road including upkeeping for a period of 60 months

8

-

18.48

... More
V Year

-

-

-

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 19/2 - 20/6 including CD works at km 19/6(MD 403) including upkeeping for a period of 60 months

7

-

18.48

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 20/6 - 22/0 (MD 403) including upkeeping for a period of 60 months

5

-

18.48

... More
Improvements of Nanguneri - Moolaikaraipatti Road. at km 3/0 - 3/300 (MD 292) including upkeeping for a period of 60 months

1

-

18.48

... More
Improvements to Riding Quality at km 6/0 - 7/8 of Vijayanarayanam - Ittamozhi Road including upkeeping for a period of 60 months

8

-

18.48

... More
Lettering the existing KM stone as per IRC standard including the cost of labour charges and Materials etc., complete.,

-

-

-

... More
I Year

-

-

-

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 19/2 - 20/6 including CD works at km 19/6(MD 403) including upkeeping for a period of 60 months

1

-

9.6

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 20/6 - 22/0 (MD 403) including upkeeping for a period of 60 months

2

-

10.65

... More
Improvements of Nanguneri - Moolaikaraipatti Road. at km 3/0 - 3/300 (MD 292) including upkeeping for a period of 60 months

1

-

10.65

... More
Improvements to Riding Quality at km 6/0 - 7/8 of Vijayanarayanam - Ittamozhi Road including upkeeping for a period of 60 months

2

-

10.65

... More
II Year

-

-

-

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 19/2 - 20/6 including CD works at km 19/6(MD 403) including upkeeping for a period of 60 months

1

-

9.6

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 20/6 - 22/0 (MD 403) including upkeeping for a period of 60 months

2

-

10.65

... More
Improvements of Nanguneri - Moolaikaraipatti Road. at km 3/0 - 3/300 (MD 292) including upkeeping for a period of 60 months

1

-

10.65

... More
Improvements to Riding Quality at km 6/0 - 7/8 of Vijayanarayanam - Ittamozhi Road including upkeeping for a period of 60 months

2

-

10.65

... More
III Year

-

-

-

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 19/2 - 20/6 including CD works at km 19/6(MD 403) including upkeeping for a period of 60 months

1

-

9.6

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 20/6 - 22/0 (MD 403) including upkeeping for a period of 60 months

2

-

10.65

... More
Improvements of Nanguneri - Moolaikaraipatti Road. at km 3/0 - 3/300 (MD 292) including upkeeping for a period of 60 months

1

-

10.65

... More
Improvements to Riding Quality at km 6/0 - 7/8 of Vijayanarayanam - Ittamozhi Road including upkeeping for a period of 60 months

2

-

10.65

... More
IV Year

-

-

-

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 19/2 - 20/6 including CD works at km 19/6(MD 403) including upkeeping for a period of 60 months

1

-

9.6

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 20/6 - 22/0 (MD 403) including upkeeping for a period of 60 months

2

-

10.65

... More
Improvements of Nanguneri - Moolaikaraipatti Road. at km 3/0 - 3/300 (MD 292) including upkeeping for a period of 60 months

1

-

10.65

... More
Improvements to Riding Quality at km 6/0 - 7/8 of Vijayanarayanam - Ittamozhi Road including upkeeping for a period of 60 months

2

-

10.65

... More
V Year

-

-

-

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 19/2 - 20/6 including CD works at km 19/6(MD 403) including upkeeping for a period of 60 months

1

-

9.6

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 20/6 - 22/0 (MD 403) including upkeeping for a period of 60 months

2

-

10.65

... More
Improvements of Nanguneri - Moolaikaraipatti Road. at km 3/0 - 3/300 (MD 292) including upkeeping for a period of 60 months

1

-

10.65

... More
Improvements to Riding Quality at km 6/0 - 7/8 of Vijayanarayanam - Ittamozhi Road including upkeeping for a period of 60 months

2

-

10.65

... More
Lettering the existing HM stone as per IRC standard including the cost of labour charges and Materials etc., complete.,

-

-

-

... More
I Year

-

-

-

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 19/2 - 20/6 including CD works at km 19/6(MD 403) including upkeeping for a period of 60 months

7

-

7.07

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 20/6 - 22/0 (MD 403) including upkeeping for a period of 60 months

5

-

7.07

... More
Improvements of Nanguneri - Moolaikaraipatti Road. at km 3/0 - 3/300 (MD 292) including upkeeping for a period of 60 months

1

-

7.07

... More
Improvements to Riding Quality at km 6/0 - 7/8 of Vijayanarayanam - Ittamozhi Road including upkeeping for a period of 60 months

8

-

7.07

... More
II Year

-

-

-

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 19/2 - 20/6 including CD works at km 19/6(MD 403) including upkeeping for a period of 60 months

7

-

7.07

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 20/6 - 22/0 (MD 403) including upkeeping for a period of 60 months

5

-

7.07

... More
Improvements of Nanguneri - Moolaikaraipatti Road. at km 3/0 - 3/300 (MD 292) including upkeeping for a period of 60 months

1

-

7.07

... More
Improvements to Riding Quality at km 6/0 - 7/8 of Vijayanarayanam - Ittamozhi Road including upkeeping for a period of 60 months

8

-

7.07

... More
III Year

-

-

-

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 19/2 - 20/6 including CD works at km 19/6(MD 403) including upkeeping for a period of 60 months

7

-

7.07

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 20/6 - 22/0 (MD 403) including upkeeping for a period of 60 months

5

-

7.07

... More
Improvements of Nanguneri - Moolaikaraipatti Road. at km 3/0 - 3/300 (MD 292) including upkeeping for a period of 60 months

1

-

7.07

... More
Improvements to Riding Quality at km 6/0 - 7/8 of Vijayanarayanam - Ittamozhi Road including upkeeping for a period of 60 months

8

-

7.07

... More
IV Year

-

-

-

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 19/2 - 20/6 including CD works at km 19/6(MD 403) including upkeeping for a period of 60 months

7

-

7.07

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 20/6 - 22/0 (MD 403) including upkeeping for a period of 60 months

5

-

7.07

... More
Improvements of Nanguneri - Moolaikaraipatti Road. at km 3/0 - 3/300 (MD 292) including upkeeping for a period of 60 months

1

-

7.07

... More
Improvements to Riding Quality at km 6/0 - 7/8 of Vijayanarayanam - Ittamozhi Road including upkeeping for a period of 60 months

8

-

7.07

... More
V Year

-

-

-

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 19/2 - 20/6 including CD works at km 19/6(MD 403) including upkeeping for a period of 60 months

7

-

7.07

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 20/6 - 22/0 (MD 403) including upkeeping for a period of 60 months

5

-

7.07

... More
Improvements of Nanguneri - Moolaikaraipatti Road. at km 3/0 - 3/300 (MD 292) including upkeeping for a period of 60 months

1

-

7.07

... More
Improvements to Riding Quality at km 6/0 - 7/8 of Vijayanarayanam - Ittamozhi Road including upkeeping for a period of 60 months

8

-

7.07

... More
White washing over the existing Culverts, parapets, avenues and Guide post including cost of Materials and Labour charges etc., complete

-

-

-

... More
I Year

-

-

-

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 19/2 - 20/6 including CD works at km 19/6(MD 403) including upkeeping for a period of 60 months

6.62

-

26.1

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 20/6 - 22/0 (MD 403) including upkeeping for a period of 60 months

5.5

-

26.1

... More
Improvements of Nanguneri - Moolaikaraipatti Road. at km 3/0 - 3/300 (MD 292) including upkeeping for a period of 60 months

35.33

-

26.1

... More
Improvements to Riding Quality at km 6/0 - 7/8 of Vijayanarayanam - Ittamozhi Road including upkeeping for a period of 60 months

22.43

-

26.1

... More
II Year

-

-

-

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 19/2 - 20/6 including CD works at km 19/6(MD 403) including upkeeping for a period of 60 months

6.62

-

26.1

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 20/6 - 22/0 (MD 403) including upkeeping for a period of 60 months

5.5

-

26.1

... More
Improvements of Nanguneri - Moolaikaraipatti Road. at km 3/0 - 3/300 (MD 292) including upkeeping for a period of 60 months

35.33

-

26.1

... More
Improvements to Riding Quality at km 6/0 - 7/8 of Vijayanarayanam - Ittamozhi Road including upkeeping for a period of 60 months

22.43

-

26.1

... More
III Year

-

-

-

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 19/2 - 20/6 including CD works at km 19/6(MD 403) including upkeeping for a period of 60 months

6.62

-

26.1

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 20/6 - 22/0 (MD 403) including upkeeping for a period of 60 months

5.5

-

26.1

... More
Improvements of Nanguneri - Moolaikaraipatti Road. at km 3/0 - 3/300 (MD 292) including upkeeping for a period of 60 months

35.33

-

26.1

... More
Improvements to Riding Quality at km 6/0 - 7/8 of Vijayanarayanam - Ittamozhi Road including upkeeping for a period of 60 months

22.43

-

26.1

... More
IV Year

-

-

-

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 19/2 - 20/6 including CD works at km 19/6(MD 403) including upkeeping for a period of 60 months

6.62

-

26.1

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 20/6 - 22/0 (MD 403) including upkeeping for a period of 60 months

5.5

-

26.1

... More
Improvements of Nanguneri - Moolaikaraipatti Road. at km 3/0 - 3/300 (MD 292) including upkeeping for a period of 60 months

35.33

-

26.1

... More
Improvements to Riding Quality at km 6/0 - 7/8 of Vijayanarayanam - Ittamozhi Road including upkeeping for a period of 60 months

22.43

-

26.1

... More
V Year

-

-

-

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 19/2 - 20/6 including CD works at km 19/6(MD 403) including upkeeping for a period of 60 months

6.62

-

26.1

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 20/6 - 22/0 (MD 403) including upkeeping for a period of 60 months

5.5

-

26.1

... More
Improvements of Nanguneri - Moolaikaraipatti Road. at km 3/0 - 3/300 (MD 292) including upkeeping for a period of 60 months

35.33

-

26.1

... More
Improvements to Riding Quality at km 6/0 - 7/8 of Vijayanarayanam - Ittamozhi Road including upkeeping for a period of 60 months

22.43

-

26.1

... More
Black banding over the existing Culverts, parapets, avenues and Guide post including cost of Materials and Labour charges etc., complete

-

-

-

... More
I Year

-

-

-

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 19/2 - 20/6 including CD works at km 19/6(MD 403) including upkeeping for a period of 60 months

6.62

-

97.08

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 20/6 - 22/0 (MD 403) including upkeeping for a period of 60 months

5.5

-

97.08

... More
Improvements of Nanguneri - Moolaikaraipatti Road. at km 3/0 - 3/300 (MD 292) including upkeeping for a period of 60 months

0.28

-

97.08

... More
Improvements to Riding Quality at km 6/0 - 7/8 of Vijayanarayanam - Ittamozhi Road including upkeeping for a period of 60 months

22.43

-

97.08

... More
II Year

-

-

-

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 19/2 - 20/6 including CD works at km 19/6(MD 403) including upkeeping for a period of 60 months

6.62

-

97.08

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 20/6 - 22/0 (MD 403) including upkeeping for a period of 60 months

5.5

-

97.08

... More
Improvements of Nanguneri - Moolaikaraipatti Road. at km 3/0 - 3/300 (MD 292) including upkeeping for a period of 60 months

0.28

-

97.08

... More
Improvements to Riding Quality at km 6/0 - 7/8 of Vijayanarayanam - Ittamozhi Road including upkeeping for a period of 60 months

22.43

-

97.08

... More
III Year

-

-

-

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 19/2 - 20/6 including CD works at km 19/6(MD 403) including upkeeping for a period of 60 months

6.62

-

97.08

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 20/6 - 22/0 (MD 403) including upkeeping for a period of 60 months

5.5

-

97.08

... More
Improvements of Nanguneri - Moolaikaraipatti Road. at km 3/0 - 3/300 (MD 292) including upkeeping for a period of 60 months

0.28

-

97.08

... More
Improvements to Riding Quality at km 6/0 - 7/8 of Vijayanarayanam - Ittamozhi Road including upkeeping for a period of 60 months

22.43

-

97.08

... More
IV Year

-

-

-

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 19/2 - 20/6 including CD works at km 19/6(MD 403) including upkeeping for a period of 60 months

6.62

-

97.08

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 20/6 - 22/0 (MD 403) including upkeeping for a period of 60 months

5.5

-

97.08

... More
Improvements of Nanguneri - Moolaikaraipatti Road. at km 3/0 - 3/300 (MD 292) including upkeeping for a period of 60 months

0.28

-

97.08

... More
Improvements to Riding Quality at km 6/0 - 7/8 of Vijayanarayanam - Ittamozhi Road including upkeeping for a period of 60 months

22.43

-

97.08

... More
V Year

-

-

-

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 19/2 - 20/6 including CD works at km 19/6(MD 403) including upkeeping for a period of 60 months

6.62

-

97.08

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 20/6 - 22/0 (MD 403) including upkeeping for a period of 60 months

5.5

-

97.08

... More
Improvements of Nanguneri - Moolaikaraipatti Road. at km 3/0 - 3/300 (MD 292) including upkeeping for a period of 60 months

0.28

-

97.08

... More
Improvements to Riding Quality at km 6/0 - 7/8 of Vijayanarayanam - Ittamozhi Road including upkeeping for a period of 60 months

22.43

-

97.08

... More
Tack Coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 - over bituminous surfaces as per MORTH Rev. V Clause No. 111, 112, 503 & 900.

-

-

-

... More
IV Year

-

-

-

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 19/2 - 20/6 including CD works at km 19/6(MD 403) including upkeeping for a period of 60 months

292.66

-

17.13

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 20/6 - 22/0 (MD 403) including upkeeping for a period of 60 months

294

-

17.13

... More
Improvements of Nanguneri - Moolaikaraipatti Road. at km 3/0 - 3/300 (MD 292) including upkeeping for a period of 60 months

49.5

-

17.13

... More
Improvements to Riding Quality at km 6/0 - 7/8 of Vijayanarayanam - Ittamozhi Road including upkeeping for a period of 60 months

205.03

-

17.13

... More
V Year

-

-

-

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 19/2 - 20/6 including CD works at km 19/6(MD 403) including upkeeping for a period of 60 months

487.76

-

17.13

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 20/6 - 22/0 (MD 403) including upkeeping for a period of 60 months

490

-

17.13

... More
Improvements of Nanguneri - Moolaikaraipatti Road. at km 3/0 - 3/300 (MD 292) including upkeeping for a period of 60 months

825

-

17.13

... More
Improvements to Riding Quality at km 6/0 - 7/8 of Vijayanarayanam - Ittamozhi Road including upkeeping for a period of 60 months

341.72

-

17.13

... More
Bituminous Concrete (Table 500-17) (Providing and laying bituminous concrete with hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade-30) at percentage specified by Job Mix Formula of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects) - Grading II as per MORTH Rev. V Clause No. 111, 112, 501, 507 & 900.

-

-

-

... More
IV Year

-

-

-

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 19/2 - 20/6 including CD works at km 19/6(MD 403) including upkeeping for a period of 60 months

8.78

-

6885.75

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 20/6 - 22/0 (MD 403) including upkeeping for a period of 60 months

8.82

-

6885.75

... More
Improvements of Nanguneri - Moolaikaraipatti Road. at km 3/0 - 3/300 (MD 292) including upkeeping for a period of 60 months

1.49

-

6885.75

... More
Improvements to Riding Quality at km 6/0 - 7/8 of Vijayanarayanam - Ittamozhi Road including upkeeping for a period of 60 months

6.15

-

6885.75

... More
V Year

-

-

-

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 19/2 - 20/6 including CD works at km 19/6(MD 403) including upkeeping for a period of 60 months

14.63

-

6885.75

... More
Widening from Intermediate lane to Two lane and Improvements of Reddiyarpatti - Vijayanarayanam Road. at km 20/6 - 22/0 (MD 403) including upkeeping for a period of 60 months

14.7

-

6885.75

... More
Improvements of Nanguneri - Moolaikaraipatti Road. at km 3/0 - 3/300 (MD 292) including upkeeping for a period of 60 months

2.48

-

6885.75

... More
Improvements to Riding Quality at km 6/0 - 7/8 of Vijayanarayanam - Ittamozhi Road including upkeeping for a period of 60 months

10.25

-

6885.75

... More
Calculation of SubTotal, GST and Total Amount carried out by system automatically

-

-

-

... More
Basic cost of value put to tender as per estimate

1

-

59033193

... More
Add GST at 12%

1

-

7083983

... More
Total Value put to Tender

1

-

66117176

... More
Negotiated Percentage

1

-

-

... More
Final Negotiated Value

1

-

-

... More
Add GST at 12% of Final Negotiated Value

1

-

-

... More
Total Value of Contract Including 12% of GST

1

-

-

... More
Basic cost of value put to tender as per Estimate

-

-

-

... More
Quoted Rate in Figures (Total Value of Contract Including 12% of GST )

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.