Highways Department Tender

... More
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Highways Department Tender

Civil Works Roads
Eprocure
Opening Date28 Aug 2020
Closing Date21 Sep 2020
Tender Amount₹ 7,99,00,000 
Notes
Download

Costs

Summary

Package51 Impts Impts To Riding Quality Construction Of Retaining Wall Construction Of Drain Construction And Reconstruction Of Culvert To Government Roads In Nagercoil Hcandm Sub Division Including Upkeeping For A Period Of 60 Months

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Granular Sub-base with Graded Material (Table:- 400-1) - Plant Mix Method (Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 ) - for grading- III Material as per MORTH Rev. V Clause No. 111, 112, 401 & 900..

-

-

-

... More
Road D

4.13

-

1537.67

... More
Road J

4.13

-

1537.67

... More
Road K

11.25

-

1542.07

... More
Wet Mix Macadam (Table 400-13) (Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density, Complete as per clause 406) as per MORTH Rev. V Clause No. 111, 112, 406 & 900.

-

-

-

... More
Road A

22.75

-

1776.35

... More
Road D

39.51

-

1776.35

... More
Road E

605

-

1776.35

... More
Road I

218.4

-

1776.35

... More
Road J

6.88

-

1776.35

... More
Road K

18.75

-

1776.35

... More
Road L

36.88

-

1776.35

... More
Road M

22.51

-

1776.35

... More
Road Q

107.8

-

1776.35

... More
Prime Coat (Providing and applying primer coat with bitumen emulsion (SS-I type) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per clause 502) - over WMM/ WBM as per MORTH Rev. V Clause No. 111, 112, 900 & 502.

-

-

-

... More
Road A

91

-

51.34

... More
Road D

92.75

-

51.34

... More
Road E

2100

-

51.34

... More
Road J

27.5

-

51.33

... More
Road K

75

-

51.34

... More
Road L

177

-

51.33

... More
Road M

90

-

51.34

... More
Road Q

539

-

51.34

... More
Tack Coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 - over granular surfaces treated with primer as per MORTH Rev. V Clause No. 111, 112, 503 & 900.

-

-

-

... More
Road A

91

-

10.98

... More
Road D

92.75

-

10.98

... More
Road E

2100

-

10.98

... More
Road J

27.5

-

10.97

... More
Road K

75

-

10.98

... More
Road L

177

-

10.97

... More
Road M

90

-

10.98

... More
Road Q

539

-

10.98

... More
Tack Coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 - over bituminous surfaces as per MORTH Rev. V Clause No. 111, 112, 503 & 900.

-

-

-

... More
Road E

13300

-

17.14

... More
Road F

19989

-

17.14

... More
Road G

21700

-

17.14

... More
Road H

22983

-

17.15

... More
Road I

8828.76

-

17.15

... More
Road N

13922.76

-

17.14

... More
Road O

16341.3

-

17.14

... More
Road P

2263.38

-

17.14

... More
Road Q

11603.75

-

17.14

... More
Road R

5752.25

-

17.15

... More
Road S

4061

-

17.15

... More
Bituminous Macadam (50-75mm) (Table - 500-10) (Providing and laying Bituminous Macadam with Hot Mix Plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade 30) at percentage specified by JMF by weight of total mix of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No.505) Grading II as per MORTH Rev. V Clause No. 111, 112, 505 & 900.

-

-

-

... More
Road A

4.55

-

5667.16

... More
Road D

4.64

-

5667.16

... More
Road E

770

-

5667.16

... More
Road F

202.65

-

5667.16

... More
Road G

222.95

-

5667.16

... More
Road H

229.6

-

5667.16

... More
Road I

441.44

-

5667.16

... More
Road J

1.38

-

5667.16

... More
Road K

3.75

-

5667.16

... More
Road L

8.85

-

5667.16

... More
Road M

4.51

-

5667.16

... More
Road N

142.31

-

5667.16

... More
Road O

163.63

-

5667.16

... More
Road P

22.5

-

5667.16

... More
Road Q

121.03

-

5667.16

... More
Road R

55.69

-

5667.16

... More
Road S

40.5

-

5667.16

... More
Bituminous Concrete (Table 500-17) (Providing and laying bituminous concrete with hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade-40) at percentage specified by Job Mix Formula of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects) - Grading II as per MORTH Rev. V Clause No. 111, 112, 507 & 900.

-

-

-

... More
Road A

2.73

-

7045.28

... More
Road D

2.79

-

7045.28

... More
Road E

616

-

7045.28

... More
Road F

599.68

-

7045.28

... More
Road G

651

-

7045.28

... More
Road H

689.53

-

7045.28

... More
Road I

264.86

-

7045.28

... More
Road J

0.83

-

7045.28

... More
Road K

2.25

-

7045.28

... More
Road L

5.31

-

7045.28

... More
Road M

2.71

-

7045.28

... More
Road N

417.7

-

7045.28

... More
Road O

490.27

-

7045.28

... More
Road P

67.9

-

7045.28

... More
Road Q

364.29

-

7045.28

... More
Road R

172.57

-

7045.28

... More
Road S

121.83

-

7045.28

... More
Providing and laying of hot applied thermoplastic compound 2.5mm thick including reflectorising glass beads @ 250 gms per sqm, area thickness of 2.5mm exclusive of surface applied glass beads as per IRC:35. The finished surface to be level uniform and free from streaks and holes etc., complete as directed by the departmental Engineer.

-

-

-

... More
Road E

732.6

-

841

... More
Road F

966

-

841

... More
Road G

1032.3

-

841

... More
Road H

1077.3

-

841

... More
Road Q

660

-

841

... More
Dismantling Culvert and other structures Dismantling salvaging and removal and disposing of resulting materials and back filling the resulting trenches and pits etc., as per MORTH Rev, V Clause No.111, 112 & 202. Dismantling RR Masonry

-

-

-

... More
Road A

6.72

-

193

... More
Road D

5.28

-

193

... More
Road L

8

-

193

... More
Road M

3.84

-

193

... More
Removal the existing cut stone culvert in the existing Parapet and body wall abutment and wings and cleaning away from the site and carefully stacking the useful materials for reuse in the road side as directed by the departmental officers etc., complete

-

-

-

... More
Road A

4.2

-

350

... More
Road D

3.3

-

350

... More
Road L

8

-

350

... More
Road M

2.4

-

350

... More
Earthwork excavation in ordinary soils such as stiff clay requiring blasting and depositing on bank with all leads and lifts as per SS20B and all other incidental charges such as baling out water, shoring, strutting, walling and forming protective bunds, wherever necessary etc., complete as per standard specification for dressing the bed up to sill level

-

-

-

... More
Road D

10.84

-

56.1

... More
Road L

21.38

-

56.1

... More
Road M

9.8

-

56.1

... More
Earthwork excavationin all classes of soils except hard rock, requiring blasting and depositing on bank, with all leads and lifts as per SS 20B, including all over incidental charges such as bailing out water, shoring, struting, walling & forming protective bunds wherever necessary etc., complete, as per relevant standard MORTH specifation for FOUNDATION

-

-

-

... More
Road C

381.15

-

168

... More
Road K

74.34

-

168

... More
Road L

62.64

-

168

... More
Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour, materials tool and equipments and all other incidental charges such as baling our water,sheeting, shoring, bracing and their subsequent removal, removal and obstructions, trimming bottom of excavation backfilling and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for Foundation of Abutment. MORTH Rev. V Clause No. 111, 112, 202, 301 to 305, 900

-

-

-

... More
Road A

37.03

-

193

... More
Road D

42.56

-

193

... More
Road M

39.12

-

193

... More
Road L

81.13

-

193

... More
Earthwork excavation including removal and satisfactory disposalof all materials necessary for the construction of roadway and side drains in accordance with the specifications and the lines,grades and cross sections shown in the drawings or as indicated by the Engineer incharge as per MORT&H IV Clause 111, 112, 202, 301, 302, 303, 305 & 900.

-

-

-

... More
Road B

57.81

-

84

... More
Road E

136.8

-

84

... More
Road I

373.46

-

84

... More
Road M

62.48

-

84

... More
Plain Cement Concrete M10 grade mix using 40mm ISS size hard broken granite metal including cost and conveyance of all materials from approved quarry to worksite including cost of cement including cost and labour charges for mixing the concrete, transporting, laying, vibrating, compacting, curing with all leads for soft potable water, working in all depths including hire, running and fuel charges for all tools and plants employed as per standard specification for Levelling course below the body wall.

-

-

-

... More
Road B

4.63

-

4168.2

... More
Road M

7.35

-

4188.91

... More
Plain Cement Concrete M15 grade mix using 40mm ISS size hard broken granite metal including cost and conveyance of all materials from approved quarry to worksite including cost of cement including cost and labour charges for mixing the concrete, transporting, laying, vibrating, compacting, curing with all leads for soft potable water, working in all depths including hire, running and fuel charges for all tools and plants employed as per standard specification for Levelling course below the body wall.

-

-

-

... More
Road C

190.58

-

5087.45

... More
Road K

37.17

-

5063.42

... More
Road L

31.32

-

5099.46

... More
Vibrated Cement Concrete M20 grade mix using 40mm ISS size hard broken granite metal including cost and conveyance of all materials from approved quarry to worksite including cost of cement including cost and labour charges for formwork and centering mixing the concrete, transporting, laying, vibrating, compacting, curing with all leads for soft potable water, working in all depths including hire, running and fuel charges for all tools and plants employed as per standard specification

-

-

-

... More
Road A

3.37

-

5387.64

... More
Road D

14.89

-

5293.18

... More
Road L

26.49

-

5365.27

... More
Road M

13.69

-

5439.42

... More
Vibrated Cement Concrete M20 grade mix using 40mm ISS size hard broken granite metal including cost and conveyance of all materials from approved quarry to worksite including cost of cement including cost and labour charges for formwork and centering mixing the concrete, transporting, laying, vibrating, compacting, curing with all leads for soft potable water, working in all depths including hire, running and fuel charges for all tools and plants employed as per standard specification for Body wall.(Below Sill Level)

-

-

-

... More
Road B

6.94

-

5314.71

... More
Road C

125.24

-

6509.2

... More
Road D

21.11

-

6012.58

... More
Road E

50.4

-

6903.39

... More
Road I

137.59

-

7019.5

... More
Road K

25.05

-

6242.95

... More
Road L

36.12

-

6137.47

... More
Road L

19.23

-

6597.78

... More
Road M

19.26

-

6178.62

... More
Road M

11.03

-

5335.42

... More
Vibrated Cement Concrete M20 grade mix using 20mm ISS size hard broken granite metal including cost and conveyance of all materials from approved quarry to worksite including cost of cement including cost and labour charges for formwork and centering mixing the concrete, transporting, laying, vibrating, compacting, curing with all leads for soft potable water, working in all depths including hire, running and fuel charges for all tools and plants employed as per standard specification for Body wall.(Above Sill Level)

-

-

-

... More
Road A

0.71

-

7103.64

... More
Road B

29.6

-

6119.31

... More
Road M

25.2

-

6873.17

... More
Vibrated Cement Concrete M20 grade mix using 40mm ISS size hard broken granite metal including cost and conveyance of all materials from approved quarry to worksite including cost of cement including cost and labour charges for formwork and centering mixing the concrete, transporting, laying, vibrating, compacting, curing with all leads for soft potable water, working in all depths including hire, running and fuel charges for all tools and plants employed as per standard specification for Body wall.(Above Sill Level)

-

-

-

... More
Road C

343.04

-

8230.42

... More
Road D

12.81

-

8441.92

... More
Road K

99.95

-

7665.72

... More
Road L

32.05

-

7984.81

... More
Road L

53.77

-

8298

... More
Road M

11.8

-

8632.26

... More
Providing and fixing seepage pipes of 110mm dia(4kg/Cm2) PVC pipes of required lengths for abutments and wngs including cost and conveyance of all materials to work site, cost and labour for 900mm dia. semi-spherical back fill arrangements with 100mm size broken granite chips at the periphery and labour charges for fixing, etc.,to drain of the backfill in the Retaining wall.

-

-

-

... More
Road C

432

-

172.8

... More
Road D

5.6

-

172.8

... More
Road K

29

-

172.8

... More
Road L

9.8

-

172.8

... More
Road L

20.4

-

172.8

... More
Road M

5.6

-

172.8

... More
Filling with excavated earth excluding cost and conveyance of earth to work site including labour charges for filling in layers as specified by the departmental officers including watering with all leads for water including labour charges for compacting,tamping and ramming under optimum moisture to obtain the maximun density and all other incidential charges etc., complete as per standard specification

-

-

-

... More
Road C

163.35

-

104.44

... More
Road K

65.93

-

104.44

... More
Road L

18.36

-

104.44

... More
Providing and laying of Available Earth including cost and conveyence of the same to work sire with an average lead of 1km including stacking the same to departmental guage for premeasurement including all labour charges for laying spreading etc., complete and as directed by departmental engineers for filling behind protective wall including compaction by Power roller as per MORTH Rev. V Clause No 111, 112, 202, 301 to 305, 900

-

-

-

... More
Road C

381.15

-

29.3

... More
Supply and fixing of RCC guide posts of size 1.20 x 0.20 x 0.20m with Reflective star stickers with in M.S. sheet with two side packing and top cover of 0.75 inches in IRC 1:2:4 mix using 20mm. HBG ISS metal with 10mm. dia bars as vertical with 8mm. dia stirrups including 8.25 inches x 4.25 feet mould with star shape of 5 inches and top Projection by Projection by 0.75 inches x 3 inches including cost and conveyance of materials to worksite etc. complete.

-

-

-

... More
Road C

27

-

828

... More
Road K

5

-

828

... More
Road L

4

-

828

... More
Providing and fixing Bitumen Pad Expansion Joints including cost and conveyance of expansion joints, shamiler pad and joint scalants and fixing them in position etc., complete in deck slab over abutment and pier as per MORTH Rev Clause No.2600.

-

-

-

... More
Road C

23.22

-

230

... More
Road D

3.6

-

230

... More
Road K

3.39

-

230

... More
Road L

4.8

-

230

... More
Road L

2.78

-

230

... More
Road M

3.2

-

230

... More
Filling with Stone Dust from approved source for cutting portion to a requaired thickness including cost and conveyance of all materials from source to site including all leads and lift and conveyance charges and filling charges etc., complete.

-

-

-

... More
Road E

9.6

-

239.16

... More
Road I

26.21

-

298.25

... More
Providing colour designed concrete paver block floor finish with TAMIN Paver block of size 80mm thick which has a compressive strength of 16.00mt/ Sqm. or its equialent. The rate including the cost concrete block loading and conveyance to site and cost of labour for fixing in postition the joints should be filled with sand including compacting by using power compactor etc., complete complying with standard specificationand also the rate including the labour charges for clearing the heavy and scrub jungle, levelling the sites, diversion of water and sanitary pipe lines, dismantling the existing masonry structures etc., complete complying as directed by the departmental officers.

-

-

-

... More
Road E

320

-

832.3

... More
Road I

873.6

-

832.3

... More
Vibrated reinforced cement concrete M30 (Design mix) using ISS size hard broken granite graded metal 20 mm and below crushed stone including cost and conveyance of all materials to site, but excluding cost and fabrication of steel but including cost and labour charges for form work and centering, labour charges, for laying compacting finishing and curing including all incidental charges etc., complete for bed block cum dirt wall over abutment and bed block over pier.

-

-

-

... More
Road A

16.26

-

14268.73

... More
Road D

4.39

-

11444.73

... More
Road L

6.57

-

11702.22

... More
Road M

3.9

-

11626.42

... More
Supply and fabrication of Steel Grade Fe – 500 / steel grade S.240 required for all RCC items of works involved in the schedule including cost of steel cost of fabrication, labour charges for cleaning the bars, straightening, cutting, bending, tying grills, hoisting and placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of space bars, cover blocks and all other incidental charges etc., complete as per standard specification.

-

-

-

... More
Road A

4.02

-

73382.79

... More
Road D

0.72

-

73382.79

... More
Road L

1.29

-

73382.79

... More
Road M

0.64

-

73382.79

... More
Vibrated reinforced cement concrete design mix M30 (Design mix) using crushed ISS, hard broken granite graded metal of 20 mm and below including cost and conveyance of all materials to site, but excluding cost and fabrication of steel but including cost and labour charges for formwork and centering, labour charges for laying, compacting, curing, including all incidental charges etc., complete for Deck Slab.

-

-

-

... More
Road D

2.88

-

10271.85

... More
Road L

9.36

-

9885.24

... More
Road M

2.56

-

10444.54

... More
Providing and fixing KRAFT PAPER for full width of seating of deck slab and including cost and conveyance to work site labour for fixing the same in correct position for fixing the same in correct position and all other incidental charges etc., complete.

-

-

-

... More
Road D

6.21

-

100

... More
Road L

8.28

-

100

... More
Road M

5.52

-

100

... More
Vibrated Cement Concrete of grade M30 75mm thick using 25mm, 12mm, 6mm IRC HBG metal including cost and conveyance of all materials to work site including cement at site, including all labour charges for mixing concrete, laying hire charges for tools and plants compacting curing with all leads for soft water, including all other incidental charges formwork, cost of premoulded expansion joints and fixing the same in position etc., complete for WEARING COAT.

-

-

-

... More
Road A

12.1

-

529.66

... More
Road D

12.96

-

522.45

... More
Road L

28.86

-

527.95

... More
Road M

11.36

-

533.61

... More
Pipe Culvert

-

-

-

... More
Earth work Excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges and sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavtion backfilling, and clearing the site and disposal of all surplus materials etc. complete as per standard specification for foundation of Body wall and pipes.

-

-

-

... More
Road D

73.2

-

168

... More
Road J

73.2

-

168

... More
Road K

32.63

-

168

... More
Plain Cement Concrete M15 grade mix using 40mm ISS size hard broken granite metal including cost and conveyance of all materials from approved quarry to worksite including cost of cement including cost and labour charges for mixing the concrete, transporting, laying, vibrating, compacting, curing with all leads for soft potable water, working in all depths including hire, running and fuel charges for all tools and plants employed as per standard specification

-

-

-

... More
Road D

11.07

-

5039.39

... More
Road J

8.28

-

5051.41

... More
Road K

6.3

-

5063.42

... More
Vibrated Cement Concrete M20 grade mix using 40mm ISS size hard broken granite metal including cost and conveyance of all materials from approved quarry to worksite including cost of cement including cost and labour charges for formwork and centering mixing the concrete, transporting, laying, vibrating, compacting, curing with all leads for soft potable water, working in all depths including hire, running and fuel charges for all tools and plants employed as per standard specification for Body wall.

-

-

-

... More
Road D

55.63

-

5501.2

... More
Road J

55.63

-

5513.21

... More
Road K

22.16

-

5525.23

... More
Supply of 1000mm dia RCC NP3 class pipes confirming to IS 458 specification as directed by the departmental officers including cost and conveyance of pipes to the worksite and all other incidental charges etc., complete as per standard specification.

-

-

-

... More
Road D

10

-

3700

... More
Road J

10

-

3700

... More
Road K

7.5

-

3700

... More
Gravel Filling behind the Abutments and Wings with clean good gritty gravel including cost and conveyance to site including labour charges for filling in layers, watering tamping under optimum moisture content to get the maximum density including watering, with all leads for Filling, Laying & Tamping charges etc., complete for over pipe portion.

-

-

-

... More
Road J

32.94

-

230.44

... More
Road D

15.74

-

230.44

... More
Road D

32.94

-

230.44

... More
Road K

6.67

-

230.44

... More
Road L

30.79

-

230.44

... More
Road M

14.21

-

230.44

... More
Up keeping Component :

-

-

-

... More
Clearing the Light jungles including weeding out shrubs, bushes, vegetable growth, etc. as per specifications & directions of Engineer-in-charge (Twice a year)

-

-

-

... More
Ist year

-

-

-

... More
Road E

2112

-

4.4

... More
Road F

2880

-

4.4

... More
Road G

2976

-

4.4

... More
Road H

2880

-

4.4

... More
Road I

2304

-

4.4

... More
Road N

11160

-

4.4

... More
Road O

2880

-

4.4

... More
Road P

576

-

4.4

... More
Road Q

2112

-

4.4

... More
Road R

1344

-

4.4

... More
Road S

1020

-

4.4

... More
IInd year

-

-

-

... More
Road E

2112

-

4.4

... More
Road F

2880

-

4.4

... More
Road G

2976

-

4.4

... More
Road H

2880

-

4.4

... More
Road I

2304

-

4.4

... More
Road N

11160

-

4.4

... More
Road O

2880

-

4.4

... More
Road P

576

-

4.4

... More
Road Q

2112

-

4.4

... More
Road R

1344

-

4.4

... More
Road S

1020

-

4.4

... More
IIIrd year

-

-

-

... More
Road E

2112

-

4.4

... More
Road F

2880

-

4.4

... More
Road G

2976

-

4.4

... More
Road H

2880

-

4.4

... More
Road I

2304

-

4.4

... More
Road N

11160

-

4.4

... More
Road O

2880

-

4.4

... More
Road P

576

-

4.4

... More
Road Q

2112

-

4.4

... More
Road R

1344

-

4.4

... More
Road S

1020

-

4.4

... More
IVth year

-

-

-

... More
Road E

2112

-

4.4

... More
Road F

2880

-

4.4

... More
Road G

2976

-

4.4

... More
Road H

2880

-

4.4

... More
Road I

2304

-

4.4

... More
Road N

11160

-

4.4

... More
Road O

2880

-

4.4

... More
Road P

576

-

4.4

... More
Road Q

2112

-

4.4

... More
Road R

1344

-

4.4

... More
Road S

1020

-

4.4

... More
Vth year

-

-

-

... More
Road E

2112

-

4.4

... More
Road F

2880

-

4.4

... More
Road G

2976

-

4.4

... More
Road H

2880

-

4.4

... More
Road I

2304

-

4.4

... More
Road N

11160

-

4.4

... More
Road O

2880

-

4.4

... More
Road P

576

-

4.4

... More
Road Q

2112

-

4.4

... More
Road R

1344

-

4.4

... More
Road S

1020

-

4.4

... More
Forming and raising the Berms with side earth including cost of earth and filling levelling to the lines, grades and compaction by power rollers, cross sections shown in the drawings or as indicated by the Engineer for making up the berms (Yearly once) as directed by the dept. officers as per MORT&H Rev. V specifications No. 100, 111, 112, 202, 301, to 305, 900

-

-

-

... More
Ist year

-

-

-

... More
Road E

52.8

-

103.74

... More
Road F

72

-

103.74

... More
Road G

74.4

-

103.74

... More
Road H

72

-

103.74

... More
Road I

57.6

-

103.74

... More
Road N

532.8

-

103.74

... More
Road O

72

-

103.74

... More
Road P

14.4

-

103.74

... More
Road Q

52.8

-

103.74

... More
Road R

33.6

-

103.74

... More
Road S

25.5

-

103.74

... More
IInd year

-

-

-

... More
Road E

52.8

-

103.74

... More
Road F

72

-

103.74

... More
Road G

74.4

-

103.74

... More
Road H

72

-

103.74

... More
Road I

57.6

-

103.74

... More
Road N

532.8

-

103.74

... More
Road O

72

-

103.74

... More
Road P

14.4

-

103.74

... More
Road Q

52.8

-

103.74

... More
Road R

33.6

-

103.74

... More
Road S

25.5

-

103.74

... More
IIIrd year

-

-

-

... More
Road E

52.8

-

103.74

... More
Road F

72

-

103.74

... More
Road G

74.4

-

103.74

... More
Road H

72

-

103.74

... More
Road I

57.6

-

103.74

... More
Road N

532.8

-

103.74

... More
Road O

72

-

103.74

... More
Road P

14.4

-

103.74

... More
Road Q

52.8

-

103.74

... More
Road R

33.6

-

103.74

... More
Road S

25.5

-

103.74

... More
IVth year

-

-

-

... More
Road E

52.8

-

103.74

... More
Road F

72

-

103.74

... More
Road G

74.4

-

103.74

... More
Road H

72

-

103.74

... More
Road I

57.6

-

103.74

... More
Road N

532.8

-

103.74

... More
Road O

72

-

103.74

... More
Road P

14.4

-

103.74

... More
Road Q

52.8

-

103.74

... More
Road R

33.6

-

103.74

... More
Road S

25.5

-

103.74

... More
Vth year

-

-

-

... More
Road E

52.8

-

103.74

... More
Road F

72

-

103.74

... More
Road G

74.4

-

103.74

... More
Road H

72

-

103.74

... More
Road I

57.6

-

103.74

... More
Road N

532.8

-

103.74

... More
Road O

72

-

103.74

... More
Road P

14.4

-

103.74

... More
Road Q

52.8

-

103.74

... More
Road R

33.6

-

103.74

... More
Road S

25.5

-

103.74

... More
Excavation including removal and satisfactory disposal of all materials necessary for the construction of road way and side drains in accordance with specifications and the lines , grades and cross sections shown in the drawings or as indicated by the Engineer for Clearing the vent way of CD works as per MORT&H Rev. V specifications No. 100, 111, 112, 301 to 305 (One time per year)

-

-

-

... More
Ist year

-

-

-

... More
Road E

16

-

700

... More
Road F

22

-

700

... More
Road G

16

-

700

... More
Road H

12

-

700

... More
Road I

8

-

700

... More
Road N

12

-

700

... More
Road O

4

-

700

... More
Road Q

6

-

700

... More
Road R

6

-

700

... More
Road S

2

-

700

... More
IInd year

-

-

-

... More
Road E

16

-

700

... More
Road F

22

-

700

... More
Road G

16

-

700

... More
Road H

12

-

700

... More
Road I

8

-

700

... More
Road N

12

-

700

... More
Road O

4

-

700

... More
Road Q

6

-

700

... More
Road R

6

-

700

... More
Road S

2

-

700

... More
IIIrd year

-

-

-

... More
Road E

16

-

700

... More
Road F

22

-

700

... More
Road G

16

-

700

... More
Road H

12

-

700

... More
Road I

8

-

700

... More
Road N

12

-

700

... More
Road O

4

-

700

... More
Road Q

6

-

700

... More
Road R

6

-

700

... More
Road S

2

-

700

... More
IVth year

-

-

-

... More
Road E

16

-

700

... More
Road F

22

-

700

... More
Road G

16

-

700

... More
Road H

12

-

700

... More
Road I

8

-

700

... More
Road N

12

-

700

... More
Road O

4

-

700

... More
Road Q

6

-

700

... More
Road R

6

-

700

... More
Road S

2

-

700

... More
Vth year

-

-

-

... More
Road E

16

-

700

... More
Road F

22

-

700

... More
Road G

16

-

700

... More
Road H

12

-

700

... More
Road I

8

-

700

... More
Road N

12

-

700

... More
Road O

4

-

700

... More
Road Q

6

-

700

... More
Road R

6

-

700

... More
Road S

2

-

700

... More
Painting the existing KM stone as per IRC standard including the cost of labour charges and Materials etc., complete

-

-

-

... More
Ist year

-

-

-

... More
Road E

3

-

90.2

... More
Road F

3

-

90.2

... More
Road G

3

-

90.2

... More
Road H

3

-

90.2

... More
Road I

2

-

90.2

... More
Road N

3

-

90.2

... More
Road O

3

-

90.2

... More
Road Q

2

-

90.2

... More
Road R

1

-

90.2

... More
Road S

1

-

90.2

... More
IInd year

-

-

-

... More
Road E

3

-

90.2

... More
Road F

3

-

90.2

... More
Road G

3

-

90.2

... More
Road H

3

-

90.2

... More
Road I

2

-

90.2

... More
Road N

3

-

90.2

... More
Road O

3

-

90.2

... More
Road Q

2

-

90.2

... More
Road R

1

-

90.2

... More
Road S

1

-

90.2

... More
IIIrd year

-

-

-

... More
Road E

3

-

90.2

... More
Road F

3

-

90.2

... More
Road G

3

-

90.2

... More
Road H

3

-

90.2

... More
Road I

2

-

90.2

... More
Road N

3

-

90.2

... More
Road O

3

-

90.2

... More
Road Q

2

-

90.2

... More
Road R

1

-

90.2

... More
Road S

1

-

90.2

... More
IVth year

-

-

-

... More
Road E

3

-

90.2

... More
Road F

3

-

90.2

... More
Road G

3

-

90.2

... More
Road H

3

-

90.2

... More
Road I

2

-

90.2

... More
Road N

3

-

90.2

... More
Road O

3

-

90.2

... More
Road Q

2

-

90.2

... More
Road R

1

-

90.2

... More
Road S

1

-

90.2

... More
Vth year

-

-

-

... More
Road E

3

-

90.2

... More
Road F

3

-

90.2

... More
Road G

3

-

90.2

... More
Road H

3

-

90.2

... More
Road I

2

-

90.2

... More
Road N

3

-

90.2

... More
Road O

3

-

90.2

... More
Road Q

2

-

90.2

... More
Road R

1

-

90.2

... More
Road S

1

-

90.2

... More
Painting the existing HM stone as per IRC standard including the cost of labour charges and Materials etc., complete

-

-

-

... More
Ist year

-

-

-

... More
Road E

10

-

18.48

... More
Road F

12

-

18.48

... More
Road G

12

-

18.48

... More
Road H

13

-

18.48

... More
Road I

8

-

18.48

... More
Road N

11

-

18.48

... More
Road O

12

-

18.48

... More
Road P

3

-

18.48

... More
Road Q

8

-

18.48

... More
Road R

6

-

18.48

... More
Road S

4

-

18.48

... More
IInd year

-

-

-

... More
Road E

10

-

18.48

... More
Road F

12

-

18.48

... More
Road G

12

-

18.48

... More
Road H

13

-

18.48

... More
Road I

8

-

18.48

... More
Road N

11

-

18.48

... More
Road O

12

-

18.48

... More
Road P

3

-

18.48

... More
Road Q

8

-

18.48

... More
Road R

6

-

18.48

... More
Road S

4

-

18.48

... More
IIIrd year

-

-

-

... More
Road E

10

-

18.48

... More
Road F

12

-

18.48

... More
Road G

12

-

18.48

... More
Road H

13

-

18.48

... More
Road I

8

-

18.48

... More
Road N

11

-

18.48

... More
Road O

12

-

18.48

... More
Road P

3

-

18.48

... More
Road Q

8

-

18.48

... More
Road R

6

-

18.48

... More
Road S

4

-

18.48

... More
IVth year

-

-

-

... More
Road E

10

-

18.48

... More
Road F

12

-

18.48

... More
Road G

12

-

18.48

... More
Road H

13

-

18.48

... More
Road I

8

-

18.48

... More
Road N

11

-

18.48

... More
Road O

12

-

18.48

... More
Road P

3

-

18.48

... More
Road Q

8

-

18.48

... More
Road R

6

-

18.48

... More
Road S

4

-

18.48

... More
Vth year

-

-

-

... More
Road E

10

-

18.48

... More
Road F

12

-

18.48

... More
Road G

12

-

18.48

... More
Road H

13

-

18.48

... More
Road I

8

-

18.48

... More
Road N

11

-

18.48

... More
Road O

12

-

18.48

... More
Road P

3

-

18.48

... More
Road Q

8

-

18.48

... More
Road R

6

-

18.48

... More
Road S

4

-

18.48

... More
Lettering the existing KM stone as per IRC standard including the cost of labour charges and Materials etc., complete.,

-

-

-

... More
Ist year

-

-

-

... More
Road E

3

-

10.95

... More
Road F

3

-

10.95

... More
Road G

3

-

10.95

... More
Road H

3

-

10.95

... More
Road I

2

-

10.95

... More
Road N

3

-

10.95

... More
Road O

3

-

10.95

... More
Road Q

2

-

10.95

... More
Road R

1

-

10.95

... More
Road S

1

-

10.95

... More
IInd year

-

-

-

... More
Road E

3

-

10.95

... More
Road F

3

-

10.95

... More
Road G

3

-

10.95

... More
Road H

3

-

10.95

... More
Road I

2

-

10.95

... More
Road N

3

-

10.95

... More
Road O

3

-

10.95

... More
Road Q

2

-

10.95

... More
Road R

1

-

10.95

... More
Road S

1

-

10.95

... More
IIIrd year

-

-

-

... More
Road E

3

-

10.95

... More
Road F

3

-

10.95

... More
Road G

3

-

10.95

... More
Road H

3

-

10.95

... More
Road I

2

-

10.95

... More
Road N

3

-

10.95

... More
Road O

3

-

10.95

... More
Road Q

2

-

10.95

... More
Road R

1

-

10.95

... More
Road S

1

-

10.95

... More
IVth year

-

-

-

... More
Road E

3

-

10.95

... More
Road F

3

-

10.95

... More
Road G

3

-

10.95

... More
Road H

3

-

10.95

... More
Road I

2

-

10.95

... More
Road N

3

-

10.95

... More
Road O

3

-

10.95

... More
Road Q

2

-

10.95

... More
Road R

1

-

10.95

... More
Road S

1

-

10.95

... More
Vth year

-

-

-

... More
Road E

3

-

10.95

... More
Road F

3

-

10.95

... More
Road G

3

-

10.95

... More
Road H

3

-

10.95

... More
Road I

2

-

10.95

... More
Road N

3

-

10.95

... More
Road O

3

-

10.95

... More
Road Q

2

-

10.95

... More
Road R

1

-

10.95

... More
Road S

1

-

10.95

... More
Lettering the existing HM stone as per IRC standard including the cost of labour charges and Materials etc., complete.,

-

-

-

... More
Ist year

-

-

-

... More
Road E

10

-

7.3

... More
Road F

12

-

7.3

... More
Road G

12

-

7.3

... More
Road H

13

-

7.3

... More
Road I

8

-

7.3

... More
Road N

11

-

7.3

... More
Road O

12

-

7.3

... More
Road P

3

-

7.3

... More
Road Q

8

-

7.3

... More
Road R

6

-

7.3

... More
Road S

4

-

7.3

... More
IInd year

-

-

-

... More
Road E

10

-

7.3

... More
Road F

12

-

7.3

... More
Road G

12

-

7.3

... More
Road H

13

-

7.3

... More
Road I

8

-

7.3

... More
Road N

11

-

7.3

... More
Road O

12

-

7.3

... More
Road P

3

-

7.3

... More
Road Q

8

-

7.3

... More
Road R

6

-

7.3

... More
Road S

4

-

7.3

... More
IIIrd year

-

-

-

... More
Road E

10

-

7.3

... More
Road F

12

-

7.3

... More
Road G

12

-

7.3

... More
Road H

13

-

7.3

... More
Road I

8

-

7.3

... More
Road N

11

-

7.3

... More
Road O

12

-

7.3

... More
Road P

3

-

7.3

... More
Road Q

8

-

7.3

... More
Road R

6

-

7.3

... More
Road S

4

-

7.3

... More
IVth year

-

-

-

... More
Road E

10

-

7.3

... More
Road F

12

-

7.3

... More
Road G

12

-

7.3

... More
Road H

13

-

7.3

... More
Road I

8

-

7.3

... More
Road N

11

-

7.3

... More
Road O

12

-

7.3

... More
Road P

3

-

7.3

... More
Road Q

8

-

7.3

... More
Road R

6

-

7.3

... More
Road S

4

-

7.3

... More
Vth year

-

-

-

... More
Road E

10

-

7.3

... More
Road F

12

-

7.3

... More
Road G

12

-

7.3

... More
Road H

13

-

7.3

... More
Road I

8

-

7.3

... More
Road N

11

-

7.3

... More
Road O

12

-

7.3

... More
Road P

3

-

7.3

... More
Road Q

8

-

7.3

... More
Road R

6

-

7.3

... More
Road S

4

-

7.3

... More
Numbering of avenues including cutting of space for numbering including cost of Materials and Labour charges etc., complete

-

-

-

... More
Ist year

-

-

-

... More
Road E

16

-

7.1

... More
Road F

56

-

7.1

... More
Road G

19

-

7.1

... More
Road H

58

-

7.1

... More
Road I

70

-

7.1

... More
Road N

45

-

7.1

... More
Road O

18

-

7.1

... More
Road P

1

-

7.1

... More
Road Q

13

-

7.1

... More
Road R

4

-

7.1

... More
IInd year

-

-

-

... More
Road E

16

-

7.1

... More
Road F

56

-

7.1

... More
Road G

19

-

7.1

... More
Road H

58

-

7.1

... More
Road I

70

-

7.1

... More
Road N

45

-

7.1

... More
Road O

18

-

7.1

... More
Road P

1

-

7.1

... More
Road Q

13

-

7.1

... More
Road R

4

-

7.1

... More
IIIrd year

-

-

-

... More
Road E

16

-

7.1

... More
Road F

56

-

7.1

... More
Road G

19

-

7.1

... More
Road H

58

-

7.1

... More
Road I

70

-

7.1

... More
Road N

45

-

7.1

... More
Road O

18

-

7.1

... More
Road P

1

-

7.1

... More
Road Q

13

-

7.1

... More
Road R

4

-

7.1

... More
IVth year

-

-

-

... More
Road E

16

-

7.1

... More
Road F

56

-

7.1

... More
Road G

19

-

7.1

... More
Road H

58

-

7.1

... More
Road I

70

-

7.1

... More
Road N

45

-

7.1

... More
Road O

18

-

7.1

... More
Road P

1

-

7.1

... More
Road Q

13

-

7.1

... More
Road R

4

-

7.1

... More
Vth year

-

-

-

... More
Road E

16

-

7.1

... More
Road F

56

-

7.1

... More
Road G

19

-

7.1

... More
Road H

58

-

7.1

... More
Road I

70

-

7.1

... More
Road N

45

-

7.1

... More
Road O

18

-

7.1

... More
Road P

1

-

7.1

... More
Road Q

13

-

7.1

... More
Road R

4

-

7.1

... More
White washing over the existing Culverts, parapets, avenues and Guide post including cost of Materials and Labour charges etc., complete (Two times per year)

-

-

-

... More
Ist year

-

-

-

... More
Road E

65.71

-

26.1

... More
Road F

96.01

-

26.1

... More
Road G

95.73

-

26.1

... More
Road H

74.08

-

26.1

... More
Road I

205.92

-

26.1

... More
Road N

130.79

-

26.1

... More
Road O

90.96

-

26.1

... More
Road P

5.41

-

26.1

... More
Road Q

51.62

-

26.1

... More
Road R

27.47

-

26.1

... More
Road S

17.09

-

26.1

... More
IInd year

-

-

-

... More
Road E

65.71

-

26.1

... More
Road F

96.01

-

26.1

... More
Road G

95.73

-

26.1

... More
Road H

74.08

-

26.1

... More
Road I

205.92

-

26.1

... More
Road N

130.79

-

26.1

... More
Road O

90.96

-

26.1

... More
Road P

5.41

-

26.1

... More
Road Q

51.62

-

26.1

... More
Road R

27.47

-

26.1

... More
Road S

17.09

-

26.1

... More
IIIrd year

-

-

-

... More
Road E

65.71

-

26.1

... More
Road F

96.01

-

26.1

... More
Road G

95.73

-

26.1

... More
Road H

74.08

-

26.1

... More
Road I

205.92

-

26.1

... More
Road N

130.79

-

26.1

... More
Road O

90.96

-

26.1

... More
Road P

5.41

-

26.1

... More
Road Q

51.62

-

26.1

... More
Road R

27.47

-

26.1

... More
Road S

17.09

-

26.1

... More
IVth year

-

-

-

... More
Road E

65.71

-

26.1

... More
Road F

96.01

-

26.1

... More
Road G

95.73

-

26.1

... More
Road H

74.08

-

26.1

... More
Road I

205.92

-

26.1

... More
Road N

130.79

-

26.1

... More
Road O

90.96

-

26.1

... More
Road P

5.41

-

26.1

... More
Road Q

51.62

-

26.1

... More
Road R

27.47

-

26.1

... More
Road S

17.09

-

26.1

... More
Vth year

-

-

-

... More
Road E

65.71

-

26.1

... More
Road F

96.01

-

26.1

... More
Road G

95.73

-

26.1

... More
Road H

74.08

-

26.1

... More
Road I

205.92

-

26.1

... More
Road N

130.79

-

26.1

... More
Road O

90.96

-

26.1

... More
Road P

5.41

-

26.1

... More
Road Q

51.62

-

26.1

... More
Road R

27.47

-

26.1

... More
Road S

17.09

-

26.1

... More
Black banding over the existing Culverts, parapets, avenues and Guide post including cost of Materials and Labour charges etc., complete

-

-

-

... More
Ist year

-

-

-

... More
Road E

35.16

-

97.25

... More
Road F

56.76

-

97.25

... More
Road G

53.03

-

97.25

... More
Road H

64.27

-

97.25

... More
Road I

54.32

-

97.25

... More
Road N

46.66

-

97.25

... More
Road O

56.16

-

97.25

... More
Road P

5.41

-

97.25

... More
Road Q

34.92

-

97.25

... More
Road R

21.62

-

97.25

... More
Road S

11.59

-

97.25

... More
IInd year

-

-

-

... More
Road E

35.16

-

97.25

... More
Road F

56.76

-

97.25

... More
Road G

53.03

-

97.25

... More
Road H

64.27

-

97.25

... More
Road I

54.32

-

97.25

... More
Road N

46.66

-

97.25

... More
Road O

56.16

-

97.25

... More
Road P

5.41

-

97.25

... More
Road Q

34.92

-

97.25

... More
Road R

21.62

-

97.25

... More
Road S

11.59

-

97.25

... More
IIIrd year

-

-

-

... More
Road E

35.16

-

97.25

... More
Road F

56.76

-

97.25

... More
Road G

53.03

-

97.25

... More
Road H

64.27

-

97.25

... More
Road I

54.32

-

97.25

... More
Road N

46.66

-

97.25

... More
Road O

56.16

-

97.25

... More
Road P

5.41

-

97.25

... More
Road Q

34.92

-

97.25

... More
Road R

21.62

-

97.25

... More
Road S

11.59

-

97.25

... More
IVth year

-

-

-

... More
Road E

35.16

-

97.25

... More
Road F

56.76

-

97.25

... More
Road G

53.03

-

97.25

... More
Road H

64.27

-

97.25

... More
Road I

54.32

-

97.25

... More
Road N

46.66

-

97.25

... More
Road O

56.16

-

97.25

... More
Road P

5.41

-

97.25

... More
Road Q

34.92

-

97.25

... More
Road R

21.62

-

97.25

... More
Road S

11.59

-

97.25

... More
Vth year

-

-

-

... More
Road E

35.16

-

97.25

... More
Road F

56.76

-

97.25

... More
Road G

53.03

-

97.25

... More
Road H

64.27

-

97.25

... More
Road I

54.32

-

97.25

... More
Road N

46.66

-

97.25

... More
Road O

56.16

-

97.25

... More
Road P

5.41

-

97.25

... More
Road Q

34.92

-

97.25

... More
Road R

21.62

-

97.25

... More
Road S

11.59

-

97.25

... More
Tack Coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 - over bituminous surfaces as per MORTH Rev. V Clause No. 111, 112, 503 & 900.

-

-

-

... More
IVth year

-

-

-

... More
Road E

462

-

17.14

... More
Road F

630

-

17.14

... More
Road G

651

-

17.14

... More
Road H

630

-

17.15

... More
Road I

270

-

17.15

... More
Road N

417.68

-

17.14

... More
Road O

495

-

17.14

... More
Road P

67.5

-

17.14

... More
Road Q

363

-

17.14

... More
Road R

157.5

-

17.15

... More
Road S

120.38

-

17.15

... More
Vth year

-

-

-

... More
Road E

770

-

17.14

... More
Road F

1050

-

17.14

... More
Road G

1085

-

17.14

... More
Road H

1050

-

17.15

... More
Road I

450

-

17.15

... More
Road N

696.14

-

17.14

... More
Road O

825

-

17.14

... More
Road P

112.5

-

17.14

... More
Road Q

605

-

17.14

... More
Road R

262.5

-

17.15

... More
Road S

200.63

-

17.15

... More
Bituminous Concrete (Table 500-17) (Providing and laying bituminous concrete with hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade-40) at percentage specified by Job Mix Formula of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects) - Grading II as per MORTH Rev. V Clause No. 111, 112, 507 & 900.

-

-

-

... More
IVth year

-

-

-

... More
Road E

17.64

-

7045.28

... More
Road F

18.9

-

7045.28

... More
Road G

19.53

-

7045.28

... More
Road H

18.9

-

7045.28

... More
Road I

8.1

-

7045.28

... More
Road N

12.53

-

7045.28

... More
Road O

14.85

-

7045.28

... More
Road P

2.03

-

7045.28

... More
Road Q

10.89

-

7045.28

... More
Road R

4.73

-

7045.28

... More
Road S

3.61

-

7045.28

... More
Vth year

-

-

-

... More
Road E

29.4

-

7045.28

... More
Road F

31.5

-

7045.28

... More
Road G

32.55

-

7045.28

... More
Road H

31.5

-

7045.28

... More
Road I

13.5

-

7045.28

... More
Road N

20.88

-

7045.28

... More
Road O

24.75

-

7045.28

... More
Road P

3.38

-

7045.28

... More
Road Q

18.15

-

7045.28

... More
Road R

7.88

-

7045.28

... More
Road S

6.02

-

7045.28

... More
Calculation of SubTotal, GST and Total Amount carried out by system automatically

-

-

-

... More
Basic cost of value put to tender as per estimate

1

-

71301716

... More
Add GST at 12%

1

-

8556206

... More
Total Value put to Tender

1

-

79857922

... More
Negotiated Percentage

1

-

-

... More
Final Negotiated Value

1

-

-

... More
Add GST at 12% of Final Negotiated Value

1

-

-

... More
Total Value of Contract Including 12% of GST

1

-

-

... More
Basic cost of value put to tender as per Estimate

-

-

-

... More
Quoted Rate in Figures (Total Value of Contract Including 12% of GST )

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.