Highways Department Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Highways Department Tender

Works
Civil And Construction
Eprocure
Opening Date30 Sep 2024
Closing Date22 Oct 2024
Tender Amount₹ 1,82,60,000 
Notes
Download

Costs

Summary

Try 76 Sirkali H C And M Sub Division

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Granular Sub-base with Graded Material (Table:- 400-1) - Plant Mix Method (Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory soil Compactor to achieve the desired density, complete as per clause 401 ) - for Grading V Material. as per MORT&H Rev. V

-

-

-

... More
Road A

284.84

810945

2847.02

... More
Granular Sub-base with Graded Material (Table:- 400-1) - Plant Mix Method (Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory soil Compactor to achieve the desired density, complete as per clause 401 ) - for Grading III Material. as per MORT&H Rev. V

-

-

-

... More
Road A

227.88

670457

2942.15

... More
Picking the existing BT Surface to 50mm depth as directed by the department officers and collecting the picked up salvages meta and sracking the same for reuse and depositing the debris the excluding cost of materials but including labour charges for picking and all other tools and plants employed for the work and including all other incidental charges etc.,complete as per standard specifications.

-

-

-

... More
Road A

1489

32519

21.84

... More
Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory soil compactor to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5

-

-

-

... More
Road A

1016.33

3096594

3046.84

... More
Providing and laying Prime Coat over WMM surface using Pressure Distributor at the rate of 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 502 of MORTH Rev-5

-

-

-

... More
Road A

6761.72

546076

80.76

... More
Providing and laying Tack Coat over WMM surface (treated with primer) using Pressure Distributor at the rate of 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5

-

-

-

... More
Road A

6761.72

125024

18.49

... More
Providing and laying Tack Coat over Cement Concrete surface using using Pressure Distributor at the rate 3.00Kg of Bitumen Emulsion (RS1) per 10sqm for preparatory to another bituminous construction over it including cost of material, labourcharges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5

-

-

-

... More
Road A

54.05

1129

20.9

... More
BM (Grade-II) 50mm Thick Using VG30 Providing, laying 50mm consolidated thick Bituminous Macadam using 0.20cum of 26.50- 13.20mm, 0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRC metal with 37 Kgs of VG30 Grade bitumen for premixing per 10sqm of 50mm thick including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 504 of MORTH Rev-5

-

-

-

... More
Road A

338.08

3093093

9149

... More
BC 30mm Thick (Grade-II) Using VG30 Bitumen Providing and laying Bituminous Concrete to 30mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm of 40mm thick including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5

-

-

-

... More
Road A

202.85

2286419

11271.48

... More
Providing and laying Bituminous Concrete to 50mm thick (Grade I) using 0.22 cum of 26.5-13.20 mm, 0.24 cum of 13.20-2.36 mm and 0.26 cum of 2.36 & below IRC HBG metal with 62.40 kgs of VG30 bitumen for premixing per 10 sqm of 50mm thick including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min required temperature in central hotmix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP clause 507 of MORTH. (For Culverts)

-

-

-

... More
Road A

2.71

29279

10804.1

... More
Providing compaction for making up of low berms using the available box cut earth including all hire and fuel charges for power roller for compaction, water sprinkler, including all labour charges for laying, spreading, watering etc., complete and as directed by the departmental engineers.

-

-

-

... More
Road A

429.86

11460

26.66

... More
BOX CULVERT

-

-

-

... More
Dismantling Culverts,bridges and other structures Dismantling clearing away and carefully stacking material useful for re-use including salvaging and removal and disposing of resulting unusable materials and back filling the resulting trenches and pits etc.including all labour and incidental charges complying with MORTH 111, 112, 202 a)Dismantling brick masonry in cement mortar

-

-

-

... More
At km 0/2

2.83

801

283.14

... More
At km 0/8

2.83

801

283.14

... More
Earth work Excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges and sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavtion backfilling, and clearing the site and disposal of all surplus materials etc. complete and in accordance with standard specification for foundation of Body wall , box culvert as per MORTH Vth Rev., 304.

-

-

-

... More
At km 0/2

88.92

25730

289.37

... More
At km 0/8

265.1

76711

289.37

... More
Cement Concrete of grade M15 nominal mix using 40mm ISS size HBG graded metal using with M-Sand including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labor charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for LEVELLING COURSE BELOW Box Culvert and Wing wall as per MORTH Vth Rev., 1000, 1500, 1700, 2100 & 900.

-

-

-

... More
At km 0/2

4.97

35853

7214.05

... More
At km 0/8

9.32

67320

7223.26

... More
Vibrated Cement Concrete M 20 grade nominal mix using 40mm ISS size hard broken granite metal using with M-Sand including cost and conveyance of all materials from approved quarry to worksite including cost of cement including cost and labour charges for formwork and centering mixing the concrete, transporting, laying, vibrating, compacting, curing with all leads for soft potable water, working in all depths including hire, running and fuel charges for all tools and plants employed and in accordance with standard specification for as per MORTH Vth Rev., 1000, 1500, 1700, 2100 & 900 - for foundation of wing wall

-

-

-

... More
At km 0/2

0.67

4960

7403.24

... More
At km 0/8

0.9

6671

7412.44

... More
Vibrated Cement Concrete M 20 grade nominal mix using 40mm ISS size hard broken granite metal using with M-Sand including cost and conveyance of all materials from approved quarry to worksite including cost of cement including cost and labour charges for formwork and centering mixing the concrete, transporting, laying, vibrating, compacting, curing with all leads for soft potable water, working in all depths including hire, running and fuel charges for all tools and plants employed and in accordance with standard specification for as per MORTH Vth Rev., 1000, 1500, 1700, 2100 & 900 - for Parapet and wingwall,

-

-

-

... More
At km 0/2

11.13

117669

10572.28

... More
At km 0/8

30.95

303447

9804.43

... More
Vibrated Reinforced Cement Concrete of grade M25 (Design mix) using 20mm ISShard broken granite metal using with M-Sand, including cost and conveyance of all materials to site and cost of cement excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for tools and plants including all other incidental charges etc., complete as per relevant standard specifications as directed by the Engineer for BASE SLAB, STEM AND TOP SLAB OF Box culvert as per MORTH No. 111, 112, 900, 1000, 1500, 1600, 1700, 2100

-

-

-

... More
At km 0/2

31.2

417099

13368.56

... More
At km 0/8

71.54

911350

12739.04

... More
Supply and fabrication of (HYSD) Steel 500 Grade (as per steel schedule) required for all RCC items of works involved in the schedule of drawings including cost of steel, cost of fabrication, labour charges for cleaning the bars straightening, cutting, bending, tying grills, positioning and placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete as per standard specification. - MORTH Vth Rev., 1000, 1500, 1600 & 900

-

-

-

... More
At km 0/2

2.24

214164

95609.27

... More
At km 0/8

4.51

431197

95609.27

... More
Providing and fixing 100mm dia PVC SEEPAGE PIPES of required length for abutment and wing, retaining wall including cost and conveyance of all materials to worksite, cost and labour for semi-spherical backfill arrangements with 100mm size broken granite stones at the periphery and labour charges for fixing etc., complete to drain the backfill as per standard specification. -MORTH Vth Rev., 2700, 2706, 2707 & 900

-

-

-

... More
At km 0/2

8

1540

192.5

... More
At km 0/8

8

1540

192.5

... More
Stone Dust Filling in between the box culvert and wing wall including cost and conveyance to site including labour charges for filling in layers, watering tamping under optimum moisture content to get the maximum density all incidental charges etc., complete. MORTH Vth Rev.

-

-

-

... More
At km 0/2

11.24

8730

776.76

... More
At km 0/8

44.42

34712

781.45

... More
Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with and avarage lead of 10 km and lifts as per SS20B including cost of all labour charges,materials, tools, equipments and all incidental charges, including compacting with power roller, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification. For Carted Earth with compaction for making up of low berms (For Diversion)

-

-

-

... More
At km 0/2

52.5

16086

306.41

... More
At km 0/8

52.5

16086

306.41

... More
Collection and supply of Gravel soling including cost and conveyance to worksite and stacking them on road side for taking premeasurements and spreading the same in the berms as directed by the Engineer with initial lift including all labour charges and consolidation with power roller including all tools and plants and all other incidental charges etc., complete for Diversion road in accordance with standard specificationsas per MORTH Vth Rev., 111, 112, 408 & 900.for diversion road.

-

-

-

... More
At km 0/2

20.63

20126

975.6

... More
At km 0/8

20.63

20321

985.03

... More
Granular Sub-base with Graded Material (Table:- 400-1) - Plant Mix Method (Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory soil Compactor to achieve the desired density, complete as per clause 401 ) - for Grading V Material. as per MORT&H Rev. V for Culvert Portion

-

-

-

... More
At km 0/2

1.1

3117

2833.82

... More
At km 0/8

2.2

6263

2847.02

... More
Granular Sub-base with Graded Material (Table:- 400-1) - Plant Mix Method (Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory soil Compactor to achieve the desired density, complete as per clause 401 ) - for Grading III Material. as per MORT&H Rev. V for Culvert Portion

-

-

-

... More
At km 0/2

0.89

2606

2928.95

... More
At km 0/8

1.78

5237

2942.15

... More
Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory soil compactor to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5. for Culvert Portion

-

-

-

... More
At km 0/2

2.25

6855

3046.84

... More
At km 0/8

4.5

13710

3046.84

... More
C.C Retaining wall

-

-

-

... More
Earth work Excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges and sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavtion backfilling, and clearing the site and disposal of all surplus materials etc. complete and in accordance with standard specification for foundation and footings of as per MORTH Vth Rev., 304.

-

-

-

... More
At km 0/4

130

37618

289.37

... More
Vibrated Cement Concrete of grade M20 nominal mix using 40mm ISS size HBG metal and M Sand including cost and conveyance of all materials from approved quarry to work site including cost of cement which has to be procured by the contractor including cost and labour charges for mixing the concrete, transporting, laying, compacting, curing with all leads for soft portable water, working in all depths including hire, running and fuel charges for all tools and plants employed including as per MORTH Rev. V Specification for footing and Body Wall (Below Sill).

-

-

-

... More
At km 0/4

97.64

805185

8246.47

... More
Vibrated Cement Concrete of grade M20 nominal mix using 40mm ISS size HBG metal and using M Sand including cost and conveyance of all materials from approved quarry to work site including cost of cement which has to be procured by the contractor including cost and labour charges for mixing the concrete, transporting, laying, compacting, curing with all leads for soft portable water, working in all depths including hire, running and fuel charges for all tools and plants employed including as per MORTH Rev. V Specification for footing and Body Wall (Above sill).

-

-

-

... More
At km 0/4

101.9

1006720

9879.49

... More
Providing and fixing 100mm dia PVC SEEPAGE PIPES of required length for abutment and wing, retaining wall including cost and conveyance of all materials to worksite, cost and labour for semi-spherical backfill arrangements with 100mm size broken granite stones at the periphery and labour charges for fixing etc., complete to drain the backfill as per standard specification. -MORTH Vth Rev., 2700, 2706, 2707 & 900

-

-

-

... More
At km 0/4

62.7

12069

192.5

... More
Refilling with avialable excavated box cut earth in between protective wall and embankments including cost and conveyance of the same to work site including stacking the same to departmental gauge for premeasurement including all labour charges for laying, spreading, compaction, etc., complete and as directed by the departmental Engineers.

-

-

-

... More
At km 0/4

86.67

3713

42.85

... More
Collection and supply of Carted earth with an average lead of 10km including cost and conveyance to worksite and stacking them on road side for taking premeasurements and spreading the same in the low berms as directed by the Engineer with initial lift including all labour charges and consolidation with power roller including all tools and plants and all other incidental charges etc., complete for formation of side berms in accordance with standard specifications as per MORTH Vth Rev., 111, 112, 408 & 900

-

-

-

... More
At km 0/4

87.85

26918

306.41

... More
Calculation of SubTotal, GST and Total Amount carried out by system automatically

-

-

-

... More
Basic cost of value put to tender as per estimate

1

-

15474023

... More
Add GST at 18%

1

-

2785324

... More
Total Value put to Tender

1

-

18259347

... More
Quoted Percentage

1

-

-

... More
Quoted Value

1

-

-

... More
Add GST at 18% of Final Quoted Value

1

-

-

... More
Total Value of Contract Including 18% of GST

1

-

-

... More
Basic cost of value put to tender as per Estimate

-

15474023

-

... More
Quoted Rate in Figures (Total Value of Contract Including 18% of GST )

-

-

-

... More
Quoted Rate in Words

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.