Highways Department Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Highways Department Tender

Works
Civil And Construction
Bridge Construction
Eprocure
Opening Date9 Sep 2024
Closing Date23 Sep 2024
Tender Amount₹ 2,08,90,000 
Notes
Download

Costs

Summary

Mdu No 076 Tn No 20 2024 25 Hdo Dated 03 09 2024

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Road C Box culvert km 23/4

44.33

968

21.84

... More
Granular Sub-base with Graded Material (Table:- 400-1) - Plant Mix Method Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 of MORTH Specification No.111, 112, 401,900 - for grading- V Material

-

-

-

... More
Road A Box culvert km 15/2

1.1

2155

1959.72

... More
Road B Box culvert km 1/2,3/8

2.8

5598

1999.32

... More
Road C Box culvert km 23/4

1.4

2743

1959.72

... More
Granular Sub-base with Graded Material (Table:- 400-1) - Plant Mix Method Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 of MORTH Specification No.111, 112, 401, 900 - for grading- III Material

-

-

-

... More
Road A Box culvert km 15/2

0.55

1127

2049.31

... More
Road B Box culvert km 1/2,3/8

1.4

2924

2088.91

... More
Road C Box culvert km 23/4

0.7

1434

2049.31

... More
Wet Mix Macadam (Table 400-13) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density, Complete as per clause 406 of MORTH Vth Revision Specification No.111,112,406,900

-

-

-

... More
Road A

165

366941

2223.89

... More
Road A Box culvert km 15/2

19.67

43743

2223.89

... More
Road B Box culvert km 1/2,3/8

3.5

7783

2223.89

... More
Road C Box culvert km 23/4

25.03

55663

2223.89

... More
Providing and laying Prime Coat over WMM surface using 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction overit, including cost of material, labour charges, rentals for machinery, fuel andall other incidental charges etc., complete as per Clause 502 of MORTH Rev-5 Specification No.111,112, 501,502,900

-

-

-

... More
Road A

1650

134673

81.62

... More
Road A Box culvert km 15/2

104.5

8529

81.62

... More
Road C Box culvert km 23/4

133

10855

81.62

... More
Providing and laying Tack Coat over WMM surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals formachinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5 Specification No.111, 112, 501, 503,900

-

-

-

... More
Road A

1650

31036

18.81

... More
Road A Box culvert km 15/2

104.5

1965

18.81

... More
Road C Box culvert km 23/4

133

2501

18.81

... More
Providing and laying Tack Coat over Existing BT surface using 2 Kg of Bitumen Emulsion (RS1) per10 sqm for preparatory to another bituminous construction overit including cost of material, labourcharges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5 Specification No. 111, 112, 501, 503, 900

-

-

-

... More
Road A

15308.75

414101

27.05

... More
Road A Box culvert km 15/2

55

1487

27.05

... More
Road B Box culvert km 1/2,3/8

923.13

24970

27.05

... More
Road C Box culvert km 23/4

98

2650

27.05

... More
Providing and laying Tack Coat over Dry Lean Cement Concrete surface using 3.00 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5 Specification 111,112,501,503,900

-

-

-

... More
Road A Box culvert km 15/2

17.05

362

21.29

... More
Road B Box culvert km 1/2,3/8

43.4

923

21.29

... More
Road C Box culvert km 23/4

21.7

461

21.29

... More
Providing and Laying 50mm thick Bituminous Macadam using course aggregate and VG30 bitumen which shall consist of construction in a single course base/ binder course confirming to the specfication on a previously prepared base, (using Mini Hot Mix Plant and Power Roller) including cost of material, labour charges, rentals for machinery, fuel and all otherincidental charges etc., complete as per clause 504 MORTH Rev-5 (For Patch Works)

-

-

-

... More
Road A

22.19

177851

8014.92

... More
Providing, laying 50mm consolidated thick Bituminous Macadam using 0.20cum of 26.50-13.20mm, 0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRC metal with 37Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperatureusing Central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix touniform thickness of 50mm with mechanical paver to the specified gradesand cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental chargesetc., complete as per specification using CMP as per clause 504 of MORTH Rev-5 Specification 111, 112, 501, 504, 900 - Grading II

-

-

-

... More
Road A

852.07

7279012

8542.74

... More
Road A Box culvert km 15/2

7.98

68171

8542.74

... More
Road B Box culvert km 1/2,3/8

46.15

394247

8542.74

... More
Road C Box culvert km 23/4

11.55

98668

8542.74

... More
Providing and laying Bituminous Concrete to 30/40mm thick using 0.13cum of 19.00-9.50mm, 0.17cum of 9.50-2.36mm and 0.26cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required densityetc., including labour for attending to paver to site etc., including hirecharges and fuel charges for20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 Specification No.111,112, 507, 900 - Grading II

-

-

-

... More
Road A

508.76

5506487

10823.35

... More
Road A Box culvert km 15/2

5.3

57363

10823.35

... More
Road B Box culvert km 1/2,3/8

29

313877

10823.35

... More
Road C Box culvert km 23/4

7.58

82040

10823.35

... More
Excavation Excavation including removal and satisfactory disposal of all materias necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer including compaction by power roller rolling as per MORTH Specification No.111, 112, 301, 305, 900 for formation of berms using Carted Earth with a lead of 2 km

-

-

-

... More
Road A

688.8

135672

196.97

... More
Road A Box culvert km 15/2 (For Diversion Road)

74.44

14662

196.97

... More
Road B Box culvert km 1/2,3/8 (For Diversion Road)

185.18

36474

196.97

... More
Road C Box culvert km 23/4 (For Diversion Road)

73.39

14455

196.97

... More
Earthwork excavation in all classes of soils except soft rock not requiring, blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour materials, tools, equipments and all incidental charges and sheeting, shoring and bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, Trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials, etc, complete as per MORTH specification No. 111, 112, 304 for Foundation

-

-

-

... More
Road A Box culvert km 15/2

59.45

17240

290

... More
Road B Box culvert km 1/2,3/8

142.2

41238

290

... More
Road C Box culvert km 23/4

59.45

17240

290

... More
Plain Cement Concrete M15 Grade (Nominal Mix) using 40mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for formwork and centering, labour charges, compacting, curing, and all incidental charges etc., complete as per MORTH Vth Revision Specification No. 111, 112, 1000, 1500, 1700, 2200 900 LEVELLING COURSE BELOW Box Culvert and Wing wall.

-

-

-

... More
Road A Box culvert km 15/2

5.57

33776

6064

... More
Road B Box culvert km 1/2,3/8

13.44

83361

6202.46

... More
Road C Box culvert km 23/4

5.79

35741

6173

... More
Vibrated Reinforced Cement Concrete [Design Mix] M25 grade using ISS size HBG graded metal crushed stone including cost and conveyance of all materials to site but excluding cost and fabrication for steel but including cost and labour charges for formwork and centering, labour charges, compacting, finishing and curing, including all incidental charges etc., complete as per MORTH Vth Revision Specification No. 111, 112, 1000, 1500, 1600, 1700, 2200, 2300 900 complete for BOX CULVERT.

-

-

-

... More
Road A Box culvert km 15/2

24.82

295928

11923

... More
Road B Box culvert km 1/2,3/8

59.56

716297

12026.49

... More
Road C Box culvert km 23/4

24.82

298634

12032

... More
Vibrated Cement Concrete M20 Grade (Nominal Mix) using 40mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for formwork and centering, labour charges, compacting, curing, and all incidental charges etc., complete as per MORTH Vth Revision Specification No. 111, 112, 1000, 1500, 1700, 2200, 900 for WING WALL AND PARAPET

-

-

-

... More
Road A Box culvert km 15/2

0.95

10501

11054

... More
Road B Box culvert km 1/2,3/8

1.9

21264

11191.58

... More
Road C Box culvert km 23/4

0.95

10603

11162

... More
Supply and fabrication of steel Grade Fe-500 required for all RCC items of works involved in the schedule including cost of steel cost of fabrication labour charges for cleaning the bars straightening cutting bending tying grills hoisting and placing the reinforcement in position as specified in the drawings including cost of binding wire provision of spacer bars, cover blocks and all other incidental charges etc. complete as per MORTH Vth Revision Specification No. 1000, 1500, 1600, 900

-

-

-

... More
Road A Box culvert km 15/2

1.91

182615

95610

... More
Road B Box culvert km 1/2,3/8

4.56

435981

95610

... More
Road C Box culvert km 23/4

1.91

182615

95610

... More
Calculation of SubTotal, GST and Total Amount carried out by system automatically

-

-

-

... More
Basic cost of value put to tender as per estimate

1

-

17700405

... More
Add GST at 18%

1

-

3186073

... More
Total Value put to Tender

1

-

20886478

... More
Excess/Less Percentage

1

-

-

... More
Final Value

1

-

-

... More
Add GST at 18% of Final Value

1

-

-

... More
Total Value of Contract Including 18% of GST

1

-

-

... More
Basic cost of value put to tender as per Estimate

-

17700405

-

... More
Quoted Rate in Figures (Total Value of Contract Including 18% of GST )

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.