Highways Department Tender

... More
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Highways Department Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date31 Aug 2024
Closing Date23 Sep 2024
Tender Amount₹ 3,05,50,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory soil compactor to achieve the desired density, complete as per clause 401- for grading- III Material (Morth No. 111, 112, 401, 900)

513.78

1018800

1982.95

... More
Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam 250mm thick, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory soil compactor to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5.(Morth No. 111, 112, 406, 900)

1284.45

2872826

2236.62

... More
Providing and laying Prime Coat over WMM surface using 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 502 of MORTH Rev-5 (Morth No. 111, 112, 501, 502, 900)

5137.78

420321

81.81

... More
Providing and laying Tack Coat over WMM surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as Specification (Morth No. 111, 112, 501, 503, 900)

5137.78

97052

18.89

... More
Providing and Laying 50mm thick Bituminous Macadam using course aggregate and VG30 bitumen which shall consist of construction in a single course base/binder course confirming to the specfication on a previously prepared base, (using Mini Hot Mix Plant and Power Roller) including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 504 MORTH Rev-5 For Patch Works.(Morth No. 111, 112, 504, 900)

47.05

390826

8306.62

... More
Providing and laying Tack Coat over Existing BT surface using 2Kg of Bitumen Emulsion (RS1) per 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5 (Morth No. 111, 112, 501, 503, 900)

12139.22

329094

27.11

... More
Providing, laying 50mm consolidated thick Bituminous Macadam using 0.20cum of 26.50- 13.20mm, 0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRC metal with 37 Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 504 of MORTH Rev-5- Grading - II

606.1

5219321

8611.32

... More
Providing, laying 75mm consolidated thick Dense Bituminous Macadam using 0.40cum of 37.50-13.20mm, 0.35cum of 13.20-2.36mm and 0.36cum of 2.36mm & below size IRC metal with 71.30kgs of VG30 grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in the required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to site, spreading the mix to uniform thickness of 75mm with mechanical paver to the specified grades and cross sections and consolidated by Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 505 of MORTH rev-5 Grading I (Morth No. 111, 112, 505, 900)

411.02

3836246

9333.48

... More
Providing and laying Bituminous Concrete to 30mm thick using 0.13cumof 19.00 9.50mm, 0.17cum of 9.50-2.36mm and 0.26cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grade sand cross sections and consolidated by8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 - Grading - II. (Morth No. 111, 112, 501, 507, 900)

518.31

5656824

10913.98

... More
Providing compaction for embankment /making up of low berms using the available box cut earth including all hire and fuel charges for power roller for compaction, water sprinkler, including all labour charges for laying, spreading, watering etc., complete and as directed by the departmental engineers (Morth No. 111, 112, 301, 305, 900)

662.4

17633

26.62

... More
BOX CULVERT

1

-

-

... More
Dismantling the RR masonry walls, clearing away and carefully stacking materials useful for reuse for any thickness of walls etc, complete (Morth No. 111, 112, 202)

1

-

-

... More
Km 2/4,2/6

8.03

2273

283.14

... More
Km 2/10

10.6

3001

283.14

... More
Km 3/8

10.21

2890

283.14

... More
Earthwork excavation in all classes of soils except hard rock requiring, blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour materials, tools, equipments and all incidental charges and sheeting, shoring and bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, Trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials, etc, complete as per standard specification for foundation. (Morth No. 111, 112, 301, 305, 900)

1

-

-

... More
Km 2/4,2/6

114.07

28120

246.52

... More
Km 2/10

274

67546

246.52

... More
Km 3/8

59.59

14690

246.52

... More
Filling with Quarry fines including cost and conveyance of material to work site including labour charges for filling, laying, compacting by manual labour under optimum moisture content to get the maximum density flooding with water as layers or built-up to the bottom level inclusive all other incidental charges etc., (Morth No. 111, 112, 304, 900)

1

-

-

... More
Km 2/4,2/6

14.08

4780

339.54

... More
Km 2/10

17.87

6174

345.51

... More
Km 3/8

7.04

2474

351.48

... More
Vibrated Cement Concrete of grade M15 (Nominal mix) using 40mm ISS hard broken granite metal including cost and conveyance of all materials to site, including cost and labour charges for form work and centering, labour charges for compacting, curing and all incidental charges etc., complete as per standard specification for LEVELLING COURSE BELOW Box Culvert. (Morth No. 111, 112, 1000, 1500, 1700, 2200, 900)

1

-

-

... More
Km 2/4,2/6

7.04

43730

6211.68

... More
Km 2/10

8.94

55637

6223.38

... More
Km 3/8

3.52

21947

6235.09

... More
Vibrated Reinforced Cement Concrete [Design Mix] M25 grade using 20mm ISShard broken granite metal including cost and conveyance of all materials to site and cost of cement excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for tools and plants including all other incidental charges etc., complete for Box culvert. (Morth No. 111, 112, 1000, 1500, 1600, 1700, 2300,900)

1

-

-

... More
Km 2/4,2/6

35.1

425063

12110.06

... More
Km 2/10

67.19

749837

11159.96

... More
Km 3/8

17.55

212942

12133.47

... More
Supply and fabrication of STEEL grade Fe 500 D with suitable anticorrsive measure required for all the reinforced cement concrete items of work involved in the shedule including cost of steel, cost of fabrication, labour charges for cleaning the rods, straightening, cutting, bending, tying grills, hoisting and placing the reinforcement in position as specified in the drawing including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete. (Morth No. 1000, 1500, 1600, 900)

1

-

-

... More
Km 2/4,2/6

2.48

237112

95610

... More
Km 2/10

4.22

403474

95610

... More
Km 3/8

1.24

118556

95610

... More
Vibrated Cement Concrete M20 (Nominal Mix) Grade using 40mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for formwork and centering, labour charges, compacting, curing, and all incidental charges etc., complete for wing Wall foundation (Morth No. 111, 112, 1000, 1500, 1700, 2200, 900)

1

-

-

... More
Km 2/4,2/6

4.14

26181

6324.08

... More
Km 2/10

14.85

94086

6335.79

... More
Km 3/8

3.45

21898

6347.49

... More
Vibrated Cement Concrete M20 (Nominal Mix) Grade using 40mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for formwork and centering, labour charges, compacting, curing, and all incidental charges etc., complete for Body Wall of wing wall (Morth No. 111, 112, 1000, 1500, 1700, 2200, 900)

1

-

-

... More
Km 2/4,2/6

26.88

248730

9253.36

... More
Km 2/10

159.6

1333421

8354.77

... More
Km 3/8

22.4

205135

9157.84

... More
Vibrated Cement Concrete M15 (Nominal Mix) Grade using 40mm ISS size hard broken granite metal including cost and conveyance of all materials to site including cost and labour charges for formwork, centering, labour charges for laying, compacting, curing all incidental charges etc., complete for Wing wall and Parapet. (Morth No. 111, 112, 1000, 1500, 1700, 2200, 900)

1

-

-

... More
Km 2/4,2/6

1.73

19678

11374.67

... More
Km 2/10

2.72

28922

10633.45

... More
Km 3/8

0.86

9827

11427.59

... More
Providing and fixing 110mm dia PVC SEEPAGE PIPES of required length for abutment and wing, retaining wall including cost and conveyance of all materials to worksite cost and labour for semi-sperical back fill arrangements with 100mm size broken granite stones at the periphery and labour charges for fixing etc., complete to drain the back fill as per standard specifications (Morth No. 2706, 900)

1

-

-

... More
Km 2/4,2/6

16

3249

203.1

... More
Km 2/10

56

11373

203.1

... More
Km 3/8

16

3249

203.1

... More
Refilling with available cut earth including cost and conveyance to site including labour charges for filling inlayers, watering tamping under optimum moisture content to get the maximum density all incidental charges etc., complete (Morth No. 111, 112, 304, 900)

1

-

-

... More
Km 2/4,2/6

13.44

575

42.85

... More
Km 2/10

89.1

3817

42.85

... More
Km 3/8

11.2

479

42.85

... More
Calculation of SubTotal, GST and Total Amount carried out by system automatically

-

-

-

... More
Basic cost of value put to tender as per estimate

1

-

25871708

... More
Add GST at 18%

1

-

4656907

... More
Total Value put to Tender

1

-

30528615

... More
Differnce Amount (Excess/less)

1

-

-

... More
Quoted Amount (Basic Rate Only)

1

-

-

... More
Add GST at 18% of Quoted Amount

1

-

-

... More
Total Value of Quoted Amount including 18% of GST

1

-

-

... More
Basic cost of value put to tender as per Estimate

-

25871708

-

... More
Quoted Rate in Figures (Total Value of Quoted Amount Including 18% of GST )

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.