Highways Department Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Highways Department Tender

Works
Civil And Construction
Eprocure
Opening Date23 Sep 2024
Closing Date17 Oct 2024
Tender Amount₹ 5,61,30,000 
Notes
Download

Costs

Summary

Pennagaram (h) Candm Sub Division (slm-94)

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
1) Widening from Two Lane to Two Lane with Paved Shoulders and Strengthening at Km.15/130-16/130 of Hogenakkal - Pennagaram - Dharmapuri - Thirupathur road including Reconstruction of Box Culvert at Km.15/2 & 16/2 and Construction of Storm Water Drain and Providing Paver Blocks at Km.15/130-16/130 (B/s) (SH60)

1994.59

245853

123.26

... More
1-1.5 Providing Paver Blocks at Km.15/130-16/130 (B/s) of Hogenakkal - Pennagaram - Dharmapuri - Thirupathur road (SH-60)

1080

133120

123.26

... More
Construction of granular sub-base by providing close graded Material,mixing in a mechanical mixplant at OMC, carriage of mixed Material to worksite, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory soil compactor to achieve the desired density, complete as per clause 111, 112, 401 & 900 of MORTH Vth Revision etc., complete - for Grading- V Material

-

-

-

... More
1) Widening from Two Lane to Two Lane with Paved Shoulders and Strengthening at Km.15/130-16/130 of Hogenakkal - Pennagaram - Dharmapuri - Thirupathur road including Reconstruction of Box Culvert at Km.15/2 & 16/2 and Construction of Storm Water Drain and Providing Paver Blocks at Km.15/130-16/130 (B/s) (SH60)

408.62

760989

1862.34

... More
1-1.5 Providing Paver Blocks at Km.15/130-16/130 (B/s) of Hogenakkal - Pennagaram - Dharmapuri - Thirupathur road (SH-60)

252

469309

1862.34

... More
Construction of granular sub-base by providing close graded Material,mixing in a mechanical mixplant at OMC, carriage of mixed Material to worksite, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory soil compactor to achieve the desired density, complete as per clause 111, 112, 401 & 900 of MORTH Vth Revision etc., complete - for Grading- III Material

-

-

-

... More
1) Widening from Two Lane to Two Lane with Paved Shoulders and Strengthening at Km.15/130-16/130 of Hogenakkal - Pennagaram - Dharmapuri - Thirupathur road including Reconstruction of Box Culvert at Km.15/2 & 16/2 and Construction of Storm Water Drain and Providing Paver Blocks at Km.15/130-16/130 (B/s) (SH60)

291.87

569593

1951.53

... More
1-1.5 Providing Paver Blocks at Km.15/130-16/130 (B/s) of Hogenakkal - Pennagaram - Dharmapuri - Thirupathur road (SH-60)

180

351275

1951.53

... More
Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam 250mm thickness, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory soil compactor to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 111, 112, 406 & 900 of MORTH Vth Revision

-

-

-

... More
1) Widening from Two Lane to Two Lane with Paved Shoulders and Strengthening at Km.15/130-16/130 of Hogenakkal - Pennagaram - Dharmapuri - Thirupathur road including Reconstruction of Box Culvert at Km.15/2 & 16/2 and Construction of Storm Water Drain and Providing Paver Blocks at Km.15/130-16/130 (B/s) (SH60)

729.68

1579779

2165.03

... More
1-1.5 Providing Paver Blocks at Km.15/130-16/130 (B/s) of Hogenakkal - Pennagaram - Dharmapuri - Thirupathur road (SH-60)

450

974263

2165.03

... More
Providing and laying 50 mm thick Bituminous Macadam using course aggregate and VG-30 Bitumen which shall consist of construction in a single course base/binder course confirming to the specification on a previously prepared base (using Mini Mix Plant and Power Roller) including cost of material,labour charges,rentals for machinary,fuel and all other incidental charges etc.,complete as per clause 111,112,504 & 900 of MORTH Rev-5 (For Patch Works)

-

-

-

... More
1) Widening from Two Lane to Two Lane with Paved Shoulders and Strengthening at Km.15/130-16/130 of Hogenakkal - Pennagaram - Dharmapuri - Thirupathur road including Reconstruction of Box Culvert at Km.15/2 & 16/2 and Construction of Storm Water Drain and Providing Paver Blocks at Km.15/130-16/130 (B/s) (SH60)

25.71

211036

8208.36

... More
Providing and laying Prime Coat over WMM surface using 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 111, 112, 501, 502 & 900 of MORTH Vth Revision

-

-

-

... More
Widening from Two Lane to Two Lane with Paved Shoulders and Strengthening at Km.15/130-16/130 of Hogenakkal - Pennagaram - Dharmapuri - Thirupathur road including Reconstruction of Box Culvert at Km.15/2 & 16/2 and Construction of Storm Water Drain and Providing Paver Blocks at Km.15/130-16/130 (B/s) (SH60)

2918.7

237698

81.44

... More
Providing and laying Tack Coat over WMM surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 111, 112, 501, 503 & 900 of MORTH Vth Revision

-

-

-

... More
1) Widening from Two Lane to Two Lane with Paved Shoulders and Strengthening at Km.15/130-16/130 of Hogenakkal - Pennagaram - Dharmapuri - Thirupathur road including Reconstruction of Box Culvert at Km.15/2 & 16/2 and Construction of Storm Water Drain and Providing Paver Blocks at Km.15/130-16/130 (B/s) (SH60)

2918.7

54725

18.75

... More
Providing and laying Tack Coat over Existing BT surface using 2.00 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 111, 112, 501, 503 & 900 of MORTH Vth Revision

-

-

-

... More
Widening from Two Lane to Two Lane with Paved Shoulders and Strengthening at Km.15/130-16/130 of Hogenakkal - Pennagaram - Dharmapuri - Thirupathur road including Reconstruction of Box Culvert at Km.15/2 & 16/2 and Construction of Storm Water Drain and Providing Paver Blocks at Km.15/130-16/130 (B/s) (SH60)

7527.3

203237

27

... More
Providing and laying Tack Coat over Dry Lean Cement Concrete using 3.00 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 111, 112, 501, 503 & 900 of MORTH Vth Revision

-

-

-

... More
1) Widening from Two Lane to Two Lane with Paved Shoulders and Strengthening at Km.15/130-16/130 of Hogenakkal - Pennagaram - Dharmapuri - Thirupathur road including Reconstruction of Box Culvert at Km.15/2 & 16/2 and Construction of Storm Water Drain and Providing Paver Blocks at Km.15/130-16/130 (B/s) (SH60)

42.3

897

21.21

... More
Providing, laying 50mm consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50-13.20mm, 0.25cum of 13.20-2.36mm and 0.23cum of 2.36mm & below and with 53.20 Kgs of VG-40 Grade bitumen for premixing per 10 sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in the required temperature in Central Hot Mix Plant 20-30 ton capacity, conveying the mix by tipper trucks to worksite, spreading the mix to uniform thickness of 50mm using paver to the specified grades and cross sections and compacted by Vibratory/ Pneumatic Roller to the required density etc., including labour for attending to paver at site etc., including hire and fuel charges for 20-30 ton CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory rollers and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5 Grading-II

-

-

-

... More
1) Widening from Two Lane to Two Lane with Paved Shoulders and Strengthening at Km.15/130-16/130 of Hogenakkal - Pennagaram - Dharmapuri - Thirupathur road including Reconstruction of Box Culvert at Km.15/2 & 16/2 and Construction of Storm Water Drain and Providing Paver Blocks at Km.15/130-16/130 (B/s) (SH60)

145.94

1470733

10077.66

... More
Providing, laying 55mm consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50-13.20mm, 0.25cum of 13.20-2.36mm and 0.23cum of 2.36mm & below and with 53.20 Kgs of VG-40 Grade bitumen for premixing per 10 sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in the required temperature in Central Hot Mix Plant 20-30 ton capacity, conveying the mix by tipper trucks to worksite, spreading the mix to uniform thickness of 55mm using paver to the specified grades and cross sections and compacted by Vibratory/ Pneumatic Roller to the required density etc., including labour for attending to paver at site etc., including hire and fuel charges for 20-30 ton CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory rollers and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5 Grading-II

-

-

-

... More
1) Widening from Two Lane to Two Lane with Paved Shoulders and Strengthening at Km.15/130-16/130 of Hogenakkal - Pennagaram - Dharmapuri - Thirupathur road including Reconstruction of Box Culvert at Km.15/2 & 16/2 and Construction of Storm Water Drain and Providing Paver Blocks at Km.15/130-16/130 (B/s) (SH60)

160.53

1617766

10077.66

... More
Providing and laying Bituminous Concrete to 40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG-40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per clause No. 111, 112, 501, 507 & 900 of MORTH Vth Revision Grade II

-

-

-

... More
1) Widening from Two Lane to Two Lane with Paved Shoulders and Strengthening at Km.15/130-16/130 of Hogenakkal - Pennagaram - Dharmapuri - Thirupathur road including Reconstruction of Box Culvert at Km.15/2 & 16/2 and Construction of Storm Water Drain and Providing Paver Blocks at Km.15/130-16/130 (B/s) (SH60)

419.53

4587371

10934.55

... More
Providing compaction for embankment/making up of low berms using the available box cut earth including all hire and fuel charges for power roller for compaction, water sprinkler, including all labour charges for laying, spreading, watering etc., completeandasdirected by the departmental engineers. as per clause No. 111, 112, 301 to 305 & 900 of MORTH vth Revision For making up of low berms. (Labour and Hire charges only)

-

-

-

... More
1) Widening from Two Lane to Two Lane with Paved Shoulders and Strengthening at Km.15/130-16/130 of Hogenakkal - Pennagaram - Dharmapuri - Thirupathur road including Reconstruction of Box Culvert at Km.15/2 & 16/2 and Construction of Storm Water Drain and Providing Paver Blocks at Km.15/130-16/130 (B/s) (SH60)

713.78

19043

26.68

... More
Dismantling Culverts and other structures Dismantling salvaging and removal and disposing of resulting materials and back filling the resulting trenches and pits etc as per clause No. 111, 112, 202 of MORTH Vth Revision Dismantling Plain Cement Concrete

-

-

-

... More
1-1.1 Reconstruction of Box culvert at Km.15/2 of Hogenakkal - Pennagaram - Dharmapuri - Thirupathur road (SH-60)

6.59

3204

486.2

... More
1-1.2 Reconstruction of Box culvert at Km.16/2 of Hogenakkal - Pennagaram - Dharmapuri - Thirupathur road (SH-60)

6.59

3204

486.2

... More
Earth Work excavation in all classes of soil except hard rock not requiring blasting and deposting on bank with all leads and lifts as per SS20B including cost of all labour,materials,tools,equipments and all incidental charges and sheeting,shoring,bracing and their subsequent removal of all logs,stumps and other deleteriuos matter and obstructions,trimming of bottom of excavation, back filling and clearing the site and disposal of all surplus materials etc.,complete as per standard specification for Foundation of Box Culvert, Wing Wall and Storm Water Drain as per clause 111, 112, 201, 202, 301 to 305 & 900 of MORTH Vth Revision

-

-

-

... More
1-1.1 Reconstruction of Box culvert at Km.15/2 of Hogenakkal - Pennagaram - Dharmapuri - Thirupathur road (SH-60)

34.14

4208

123.26

... More
1-1.2 Reconstruction of Box culvert at Km.16/2 of Hogenakkal - Pennagaram - Dharmapuri - Thirupathur road (SH-60)

34.14

4208

123.26

... More
1-1.3 Construction of Storm Water Drain at Km.15/130-16/130 [L/s] of Hogenakkal - Pennagaram - Dharmapuri - Thirupathur road (SH-60)

1766.4

217726

123.26

... More
1-1.4 Construction of Storm Water Drain at Km.15/130-16/130 [R/s] of Hogenakkal - Pennagaram - Dharmapuri - Thirupathur road (SH-60)

1804.8

222459

123.26

... More
Plain Cement Concrete of grade M15 (Nominal Mix) using 40mm ISS size HBG metal including cost and conveyance of all materials from approved quarry to worksite including cost of cement including cost and labour charges for mixing the concrete, transporting, laying, vibrating, compacting, curing with all leads for soft potable water, working in all depths including hire, running and fuel charges for all tools and plants employed as per standard specification for Base concrete of Box Culvert and Wing Wall as per clause 1000, 1500, 1700, 2100, 2200 & 2908 of MORTH Vth Revision

-

-

-

... More
1-1.1 Reconstruction of Box culvert at Km.15/2 of Hogenakkal - Pennagaram - Dharmapuri - Thirupathur road (SH-60)

6.82

42736

6266.3

... More
1-1.2 Reconstruction of Box culvert at Km.16/2 of Hogenakkal - Pennagaram - Dharmapuri - Thirupathur road (SH-60)

6.82

42656

6254.6

... More
1-1.3 Construction of Storm Water Drain at Km.15/130-16/130 [L/s] of Hogenakkal - Pennagaram - Dharmapuri - Thirupathur road (SH-60)

147.2

921251

6258.5

... More
1-1.4 Construction of Storm Water Drain at Km.15/130-16/130 [R/s] of Hogenakkal - Pennagaram - Dharmapuri - Thirupathur road (SH-60)

150.4

941278

6258.5

... More
Supply and fabrication of STEEL grade Fe500D for all the reinforced cement concrete items of work involved in the schedule including cost of steel, cost of fabrication, labour charges for cleaning the rods, straightening, cutting, bending, tying grills, hoisting and placing the reinforcement in position as specified in the drawing including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete. as per standard specification as per clause 1000, 1500, 1600, 1700, 2100 & 2300 of MORTH Vth Revision

-

-

-

... More
1-1.1 Reconstruction of Box culvert at Km.15/2 of Hogenakkal - Pennagaram - Dharmapuri - Thirupathur road (SH-60)

2.36

225829

95609.27

... More
1-1.2 Reconstruction of Box culvert at Km.16/2 of Hogenakkal - Pennagaram - Dharmapuri - Thirupathur road (SH-60)

2.36

225829

95609.27

... More
1-1.3 Construction of Storm Water Drain at Km.15/130-16/130 [L/s] of Hogenakkal - Pennagaram - Dharmapuri - Thirupathur road (SH-60)

30.16

2883958

95609.27

... More
1-1.4 Construction of Storm Water Drain at Km.15/130-16/130 [R/s] of Hogenakkal - Pennagaram - Dharmapuri - Thirupathur road (SH-60)

30.72

2937499

95609.27

... More
Vibrated Reinforced Cement Concrete of grade M25 (Design Mix) using 20mm and below ISS HBG metal including cost and conveyance of all materials to site and cost of cement excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for tools and plants including all other incidental charges etc., complete for Base Slab, Side Walls and Top Slab of Box Culvert as per clause 900, 1000, 1500, 1600, 1700, 2100, 2200 & 2300 of MORTH Vth Revision

-

-

-

... More
1-1.1 Reconstruction of Box culvert at Km.15/2 of Hogenakkal - Pennagaram - Dharmapuri - Thirupathur road (SH-60)

25.96

335659

12929.87

... More
1-1.2 Reconstruction of Box culvert at Km.16/2 of Hogenakkal - Pennagaram - Dharmapuri - Thirupathur road (SH-60)

25.96

335355

12918.17

... More
1-1.3 Construction of Storm Water Drain at Km.15/130-16/130 [L/s] of Hogenakkal - Pennagaram - Dharmapuri - Thirupathur road (SH-60)

705.29

10466567

14840.09

... More
1-1.4 Construction of Storm Water Drain at Km.15/130-16/130 [R/s] of Hogenakkal - Pennagaram - Dharmapuri - Thirupathur road (SH-60)

718.84

10667650

14840.09

... More
Filling behind the Box Culvert with Stone Dust including cost and conveyance to site including labour charges for filling in layers , watering , tamping under optimum moisture content to get the maximum density and all other incidental charges etc., complete as per clause 304 & 2907 of MORTH Vth Revision

-

-

-

... More
1-1.1 Reconstruction of Box culvert at Km.15/2 of Hogenakkal - Pennagaram - Dharmapuri - Thirupathur road (SH-60)

13.01

4563

350.74

... More
1-1.2 Reconstruction of Box culvert at Km.16/2 of Hogenakkal - Pennagaram - Dharmapuri - Thirupathur road (SH-60)

13.01

4485

344.77

... More
Filling with M-Sand below the concrete paver blocks including cost and conveyance to site including labour charges for filling in layers , watering , tamping under optimum moisture content to get the maximum density and all other incidental charges etc., complete as per clause 304 & 2907 of MORTH Vth Revision

-

-

-

... More
1-1.5 Providing Paver Blocks at Km.15/130-16/130 (B/s) of Hogenakkal - Pennagaram - Dharmapuri - Thirupathur road (SH-60)

54

94198

1744.42

... More
Supplying and laying of TAMIN Paver Block of size 80mm thick (Supply at site) over a base of crushed stone filling including cost and conveyance of all materials to worksite, including all labour charges for laying, compacting including hire and fuel charges for all tools and plants employed for this work and all other incidental charges etc., complete as per standard specification

-

-

-

... More
1-1.5 Providing Paver Blocks at Km.15/130-16/130 (B/s) of Hogenakkal - Pennagaram - Dharmapuri - Thirupathur road (SH-60)

1800

2830554

1572.53

... More
Refilling in between Drain and Road with excavated earth including cost and conveyence to site including labour charges for filling in layers , watering , tamping under optimum moisture content to get themaximum density and all other incidental charges etc., complete as per clause 304 & 2907 of MORTH Vth Revision Specifications (labour charges only)

-

-

-

... More
1-1.3 Construction of Storm Water Drain at Km.15/130-16/130 [L/s] of Hogenakkal - Pennagaram - Dharmapuri - Thirupathur road (SH-60)

202.4

8672

42.85

... More
1-1.4 Construction of Storm Water Drain at Km.15/130-16/130 [R/s] of Hogenakkal - Pennagaram - Dharmapuri - Thirupathur road (SH-60)

206.8

8861

42.85

... More
Providing and fixing of M.S.Gratings of 300 x 200 mm size with M.S flats of 25x10mm for outer frames, 20x10mm for inner races with mild steel grating and fixing them in position including cost and conveyance of materials to work site and all other incidental charges etc., complete

-

-

-

... More
1-1.3 Construction of Storm Water Drain at Km.15/130-16/130 [L/s] of Hogenakkal - Pennagaram - Dharmapuri - Thirupathur road (SH-60)

184

104696

569

... More
1-1.4 Construction of Storm Water Drain at Km.15/130-16/130 [R/s] of Hogenakkal - Pennagaram - Dharmapuri - Thirupathur road (SH-60)

188

106972

569

... More
Vibrated Cement Concrete of grade M20 (Nominal Mix) using 40mm ISS size HBG metal including cost and conveyance of all materials from approved quarry to worksite including cost of cement including cost and labour charges for formwork and centering mixing the concrete, transporting, laying, vibrating, compacting, curing with all leads for soft potable water, working in all depths including hire, running and fuel charges for all tools and plants employed as per standard specification for Wing wall and Parapet as per clause 1000, 1500, 1700, 2100, 2200 & 2908 of MORTH Vth Revision

-

-

-

... More
1-1.1 Reconstruction of Box culvert at Km.15/2 of Hogenakkal - Pennagaram - Dharmapuri - Thirupathur road (SH-60)

12.25

117199

9567.3

... More
1-1.2 Reconstruction of Box culvert at Km.16/2 of Hogenakkal - Pennagaram - Dharmapuri - Thirupathur road (SH-60)

12.25

117056

9555.6

... More
Disposal of Boxing earth and Foundation earth and conveyance them away from the site to the lead 3 Kms including all other incidental charges etc., complete as per clause 3301-305 of MORTH Vth Revision

-

-

-

... More
1) Widening from Two Lane to Two Lane with Paved Shoulders and Strengthening at Km.15/130-16/130 of Hogenakkal - Pennagaram - Dharmapuri - Thirupathur road including Reconstruction of Box Culvert at Km.15/2 & 16/2 and Construction of Storm Water Drain and Providing Paver Blocks at Km.15/130-16/130 (B/s) (SH60)

1280.81

45302

35.37

... More
1-1.3 Construction of Storm Water Drain at Km.15/130-16/130 [L/s] of Hogenakkal - Pennagaram - Dharmapuri - Thirupathur road (SH-60)

1564

55318

35.37

... More
1-1.4 Construction of Storm Water Drain at Km.15/130-16/130 [R/s] of Hogenakkal - Pennagaram - Dharmapuri - Thirupathur road (SH-60)

1598

56521

35.37

... More
1-1.5 Providing Paver Blocks at Km.15/130-16/130 (B/s) of Hogenakkal - Pennagaram - Dharmapuri - Thirupathur road (SH-60)

1080

38199

35.37

... More
Calculation of SubTotal, GST and Total Amount carried out by system automatically

-

-

-

... More
Basic cost of value put to tender as per estimate

1

-

47561108

... More
Add GST at 18%

1

-

8560999

... More
Total Value put to Tender

1

-

56122107

... More
Negotiated Percentage

1

-

-

... More
Final Negotiated Value

1

-

-

... More
Add GST at 18% of Final Negotiated Value

1

-

-

... More
Total Value of Contract Including 18% of GST

1

-

-

... More
Basic cost of value put to tender as per Estimate

-

47561108

-

... More
Quoted Rate in Figures (Total Value of Contract Including 18% of GST )

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.