Highways Department Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Highways Department Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date16 Sep 2024
Closing Date17 Oct 2024
Tender Amount₹ 2,69,40,000 
Notes
Download

Costs

Summary

Krishnagiri (h) Candm Sub Division (slm-79)

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
1.Widening from Single Lane to Intermediate Lane and Strengthening at km 2/0 - 5/0 of Orappam - Elathagiri - Varatanapalli road including CD works at Km 2/8,3/6, 3/10 & 4/6

899.6

1595368

1773.42

... More
Granular Sub-base with Graded Material (Table: 400-1) - Plant Mix Method: Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 111, 112, 401 & 900 of MORTH Vth Revision etc., complete - for Grading- III Material

-

-

-

... More
1.Widening from Single Lane to Intermediate Lane and Strengthening at km 2/0 - 5/0 of Orappam - Elathagiri - Varatanapalli road including CD works at Km 2/8,3/6, 3/10 & 4/6

514.06

957601

1862.82

... More
Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam 250mm thick, including premixing the materials with water at OMC in mechnanical mix plant,conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in SubBase/ Base course on well prepared surface and compacting with vibratory soil compactor to acheive the desired density including cost of material, labour charges, rentals for machinery,fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5 as per clause 111, 112, 406 & 900

-

-

-

... More
1.Widening from Single Lane to Intermediate Lane and Strengthening at km 2/0 - 5/0 of Orappam - Elathagiri - Varatanapalli road including CD works at Km 2/8,3/6, 3/10 & 4/6

1472.64

3232474

2195.02

... More
Providing and laying Prime Coat over WMM surface using 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 502 of MORTH Rev-5

-

-

-

... More
1.Widening from Single Lane to Intermediate Lane and Strengthening at km 2/0 - 5/0 of Orappam - Elathagiri - Varatanapalli road including CD works at Km 2/8,3/6, 3/10 & 4/6

5890.55

479255

81.36

... More
Providing and laying Tack Coat over WBM/ WMM surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 503 of MORTH Rev-5

-

-

-

... More
1.Widening from Single Lane to Intermediate Lane and Strengthening at km 2/0 - 5/0 of Orappam - Elathagiri - Varatanapalli road including CD works at Km 2/8,3/6, 3/10 & 4/6

5890.55

110271

18.72

... More
Providing and laying Tack Coat over Existing BT surface using 2 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 503 of MORTH Rev-5

-

-

-

... More
1.Widening from Single Lane to Intermediate Lane and Strengthening at km 2/0 - 5/0 of Orappam - Elathagiri - Varatanapalli road including CD works at Km 2/8,3/6, 3/10 & 4/6

9936

268073

26.98

... More
Providing and laying Tack Coat over Dry Lean Cement Concrete surface using 3.00 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 503 of MORTH Rev-5

-

-

-

... More
1.Widening from Single Lane to Intermediate Lane and Strengthening at km 2/0 - 5/0 of Orappam - Elathagiri - Varatanapalli road including CD works at Km 2/8,3/6, 3/10 & 4/6

57.2

1211

21.18

... More
Providing, laying 50mm consolidated thick Bituminous Macadam using 0.20cum of 26.50 13.20mm, 0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRC metal with 37 Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing the min required temperature using Central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 504 of MORTH Rev-5 - Grading II

-

-

-

... More
1.Widening from Single Lane to Intermediate Lane and Strengthening at km 2/0 - 5/0 of Orappam - Elathagiri - Varatanapalli road including CD works at Km 2/8,3/6, 3/10 & 4/6

794.19

6690717

8424.58

... More
Providing and laying Bituminous Concrete to 30mm thick using 0.13 cum of 19.00 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5- Grading II

-

-

-

... More
1.Widening from Single Lane to Intermediate Lane and Strengthening at km 2/0 - 5/0 of Orappam - Elathagiri - Varatanapalli road including CD works at Km 2/8,3/6, 3/10 & 4/6

476.51

5072306

10644.7

... More
Providing compaction for making up of low berms using the available box cut earth including all hire and fuel charges for power roller for compaction, water sprinkler, including all labour charges for laying, spreading, watering etc., complete and as directed by the departmental engineers.

-

-

-

... More
1.Widening from Single Lane to Intermediate Lane and Strengthening at km 2/0 - 5/0 of Orappam - Elathagiri - Varatanapalli road including CD works at Km 2/8,3/6, 3/10 & 4/6

1305

34765

26.64

... More
Dismantling Culverts, Bridges and other Structures Dismantling salvaging and removal and disposing of resulting materials and back filling the resulting trenches and pits etc as per clause No. 111, 112, 202 of MORTH vth Revision - Dismantling existing PCC

-

-

-

... More
1.1 Reconstruction of RCC Box Culvert (2.00mx2.00m) at Km 2/8 ,3/6, 3/10 & 4/6 of Orappam - Elathagiri - Varatanapalli road

160.6

78083

486.2

... More
Earth Work excavation in all classes of soil except hard rock not requiring blasting and deposting on bank as per SS20B with all leads and lifts and all other incidental charges such as baling out water shoring shrutting walling and forming protective bunds wherever necessary etc.,comlete as per relavant specification for Foundation 111, 112, 201, 202, 301 to 305 & 900 of MORTH Vth Revision

-

-

-

... More
1.1 Reconstruction of RCC Box Culvert (2.00mx2.00m) at Km 2/8 ,3/6, 3/10 & 4/6 of Orappam - Elathagiri - Varatanapalli road

228.88

28211

123.26

... More
Plain Cement Concrete of grade M15 Nominal Mix (1 : 2 : 4) using 40mm ISS size HBG metal including cost and conveyance of all materials to site complying with required standards and specifications. including cost of formwork, mixing, laying and compacting using vibrator including hire and fuel charges for all Tools and Plants and incidental charges such as maintaining of protective bunds, coffer dams strutting etc., complete as per relevant standard specification for Base concrete of Box Culvert and Wingwall as per clause 1000, 1500, 1700, 2100, 2200 & 2908 of MORTH Vth Revision

-

-

-

... More
1.1 Reconstruction of RCC Box Culvert (2.00mx2.00m) at Km 2/8 ,3/6, 3/10 & 4/6 of Orappam - Elathagiri - Varatanapalli road

44.6

270647

6068.34

... More
Vibrated Cement Concrete of grade M20 Nominal Mix (1 : 1.5 : 3) using 40mm ISS size HBG metal including cost and conveyance of all materials to site complying with required standards and specifications. including cost of formwork, mixing, laying and compacting using vibrator including hire and fuel charges for all Tools and Plants and incidental charges such as maintaining of protective bunds, coffer dams strutting etc., complete as per relevant standard specification for Parapet and Wing Wall as per clause 1000, 1500, 1700, 2100, 2200 & 2908 of MORTH Vth Revision

-

-

-

... More
1.1 Reconstruction of RCC Box Culvert (2.00mx2.00m) at Km 2/8 ,3/6, 3/10 & 4/6 of Orappam - Elathagiri - Varatanapalli road

77.52

678481

8752.34

... More
Vibrated Reinforced Cement Concrete of grade M25 Design mix using ISS size HBG graded metal including cost and conveyance of all materials to site but excluding cost and fabrication of steel but including cost and labour charges for formwork and centering labour charges for laying, compacting, curing, including all incidental charges etc., complete for Base Slab, Side Walls, Top Slab of Box Culvert as per clause 1000, 1500, 1600, 1700, 2100, 2200 & 2300 of MORTH Vth Revision

-

-

-

... More
1.1 Reconstruction of RCC Box Culvert (2.00mx2.00m) at Km 2/8 ,3/6, 3/10 & 4/6 of Orappam - Elathagiri - Varatanapalli road

157.68

1930482

12243.04

... More
Supply and fabrication of Steel Grade Fe500D required for all RCC items of works involved in the schedule including cost of steel, cost of fabrication, labour charges for cleaning the bars straightening, cutting, bending, tying grills, hoisting and placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete as per standard specification as per clause 1000, 1500, 1600, 1700, 2100 & 2300 of MORTH Vth Revision

-

-

-

... More
1.1 Reconstruction of RCC Box Culvert (2.00mx2.00m) at Km 2/8 ,3/6, 3/10 & 4/6 of Orappam - Elathagiri - Varatanapalli road

10.68

1021107

95609.27

... More
Refilling with excavated earth behind box culvert and wing wall including labour charges for filling in layers , watering , tamping under optimum moisture content to get the maximum density and all other incidental charges etc., complete as per clause 304 & 2907 of MORTH Vth Revision (Labour charges Only)

-

-

-

... More
1.1 Reconstruction of RCC Box Culvert (2.00mx2.00m) at Km 2/8 ,3/6, 3/10 & 4/6 of Orappam - Elathagiri - Varatanapalli road

128.92

5524

42.85

... More
Calculation of SubTotal, GST and Total Amount carried out by system automatically

-

-

-

... More
Basic cost of value put to tender as per estimate

1

-

22818799

... More
Add GST at 18%

1

-

4107384

... More
Total Value put to Tender

1

-

26926183

... More
Negotiated Percentage

1

-

-

... More
Final Negotiated Value

1

-

-

... More
Add GST at 18% of Final Negotiated Value

1

-

-

... More
Total Value of Contract Including 18% of GST

1

-

-

... More
Basic cost of value put to tender as per Estimate

-

22818799

-

... More
Quoted Rate in Figures (Total Value of Contract Including 18% of GST )

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.