Highways Department Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Highways Department Tender

Civil And Construction
Bridge Construction
Civil Construction
Eprocure
Opening Date22 Feb 2022
Closing Date28 Mar 2022
Tender Amount₹ 33,35,60,000 
Notes
Download

Costs

Summary

Tn.40 / Sl.no.2 / Tvlr Div / Gpundi Sub Ks Road2

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Km 5/0 - 10/6

15102

-

17.15

... More
Excavation including removal and satisfactory disposal of all materials necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer for road work. a) Box cutting for widening portion

-

-

-

... More
Km 5/0 - 10/6

4778

-

96.6

... More
Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with power roller, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification. For embankment

-

-

-

... More
Km 5/0 - 10/6

77344

-

246.3

... More
Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with power roller, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification. For Carted Earth with compaction for making up of low embankment

-

-

-

... More
Km 5/0 - 10/6

4778

-

22.94

... More
Granular Sub-base with Graded Material (Table:- 400-1) - Plant Mix Method (Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 ) - for grading- V Material

-

-

-

... More
Km 5/0 - 10/6

13545

-

2109.31

... More
Granular Sub-base with Graded Material (Table:- 400-1) - Plant Mix Method (Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 ) - for Grading III Material. as per MORT&H Rev. V specifications No.111,112,401,900.

-

-

-

... More
Km 5/0 - 10/6

6362

-

2204.85

... More
Wet Mix Macadam (Table 400-13) (Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density, including cost of materials, labour charges, rentals for machinery, fuel and all other incidental charges etc., Complete as per clause 406 of MORTH Rev.5

-

-

-

... More
Km 5/0 - 10/6

21684

-

2453.24

... More
Prime coat (Providing and applying primer coat with bitumen emulsion (SS-I type) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means - over WMM as per MORT&H Rev. V specifications No.111,112,502,900.

-

-

-

... More
Km 5/0 - 10/6

83525

-

69.41

... More
Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 - over WMM granular surfaces treated with primer as per MORT&H Rev. V specifications No.111,112,503,900.

-

-

-

... More
Km 5/0 - 10/6

83525

-

16.27

... More
Dense Graded Bituminous Macadam (Table - 500-10)(Providing and laying dense bituminous macadam with Hot Mix Plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade - 40) at percentage specified by JMF by weight of total mix of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compactionas per MORTH Rev. V Specification Grading II as per MORT&H Rev. V specifications No.111,112,505, 900.

-

-

-

... More
Km 5/0 - 10/6

8771

-

10443.4

... More
Bituminous Concrete (Table 500-17) (Providing and laying bituminous concrete with hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade - 40) at percentage specified by JMF of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction complete in all respectsas per MORTH Rev. V Specification - Grading II as per MORTH Rev. V Specification - No.111,112,504,900.

-

-

-

... More
Km 5/0 - 10/6

3341

-

11287.35

... More
Sub Estimate : Junction Improvements & Bus Lay Bay at Km 5/000 - 10/600 of Kavarapettai - Sathyavedu Road

-

-

-

... More
Picking the Existing Bituminous surface upto 50 mm depth as directed by the departmental officers and collecting the picked up salvaged metal and stacking the same for reuse and depositing the debrids excluding cost of materials including all labour charges for picking and all othe tools and plants employed of the work and including all other incidental charges etc., complete as per standard specifications.

-

-

-

... More
Km 5/0 - 10/6

186.77

-

17.15

... More
Excavation including removal and satisfactory disposal of all materials necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer for road work. a) Box cutting for widening portion

-

-

-

... More
Km 5/0 - 10/6

2570.44

-

96.6

... More
Granular Sub-base with Graded Material (Table:- 400-1) - Plant Mix Method (Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 ) - for grading- V Material

-

-

-

... More
Km 5/0 - 10/6

764.17

-

2109.31

... More
Granular Sub-base with Graded Material (Table:- 400-1) - Plant Mix Method (Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 ) - for Grading III Material. as per MORT&H Rev. V specifications No.111,112,401,900.

-

-

-

... More
Km 5/0 - 10/6

449.51

-

2204.85

... More
Wet Mix Macadam (Table 400-13) (Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density, including cost of materials, labour charges, rentals for machinery, fuel and all other incidental charges etc., Complete as per clause 406 of MORTH Rev.5

-

-

-

... More
Km 5/0 - 10/6

1205.49

-

2453.24

... More
Prime coat (Providing and applying primer coat with bitumen emulsion (SS-I type) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means - over WMM as per MORT&H Rev. V specifications No.111,112,502,900.

-

-

-

... More
Km 5/0 - 10/6

5312.23

-

69.41

... More
Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 - over WMM granular surfaces treated with primer as per MORT&H Rev. V specifications No.111,112,503,900.

-

-

-

... More
Km 5/0 - 10/6

5312.23

-

16.27

... More
Dense Graded Bituminous Macadam (Table - 500-10)(Providing and laying dense bituminous macadam with Hot Mix Plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade - 40) at percentage specified by JMF by weight of total mix of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compactionas per MORTH Rev. V Specification Grading II as per MORT&H Rev. V specifications No.111,112,505, 900.

-

-

-

... More
Km 5/0 - 10/6

265.61

-

10443.4

... More
Bituminous Concrete (Table 500-17) (Providing and laying bituminous concrete with hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade - 40) at percentage specified by JMF of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction complete in all respectsas per MORTH Rev. V Specification - Grading II as per MORTH Rev. V Specification - No.111,112,504,900.

-

-

-

... More
Km 5/0 - 10/6

159.35

-

11287.35

... More
Sub Estimate : Reconstruction of Box Culvert at km 5/2,5/8,5/10 & 8/2 of Kavarapettai - Sathyavedu Road

-

-

-

... More
Dismantling Culverts,bridges and other structures Dismantling salvaging and removal and disposing of resulting materials and back filling the resulting trenches and pits etc. For Plain Cement Concrete as per MORT&H Rev. V specifications No.111,112,202.

-

-

-

... More
Km 5/2,5/8,5/10 & 8/2

90

-

381

... More
Earth work excavation in all classes of soil except hard rock requiring blasting and depositing on bank as per SS20B including conveying the excavted earth wiht a lead of 5km with all leads and lifts and all other incidental charges such as bailing out water providing and maintaining necessary cofferdam, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter etc complete as per MORT&H Rev. V specifications No.111,112,301,305. for FOUNDATION

-

-

-

... More
Km 5/2,5/8,5/10 & 8/2

2003.53

-

227

... More
Filling with Quarry Dust including cost and conveyance of Stone Dust to work site including labour charges for filling, laying, compacting by manual labour under optimum moisture content to get the maximum density flooding with water as layers or built-up to the bottom level inclusive all other incidental charges etc., complete for foundation of Culvert & Wing Wall

-

-

-

... More
Km 5/2,5/8,5/10 & 8/2

83.1

-

595

... More
Vibrated Cement Concrete M15 grade (Nominal mix) using 40mm ISS size HBG metal including cost and conveyance of all materials from approved quarry to work site including cost of cement which has to be procured by the contractor including cost and labour charges for mixing the concrete, form work, transporting, laying, compacting, curing with all leads for soft portable water, working in all depths including hire, running and fuel charges for all tools and plants employed including as per MORTH Rev. V Specification for Footings of PCC For Culvert & & Wing Wall

-

-

-

... More
Km 5/2,5/8,5/10 & 8/2

157.11

-

6168.25

... More
Vibrated Reinforced Cement concrete in M25 using 20mm & 12 mm ISS graded HBG metal including cost and conveyance of all materials to site and cost of cement at site including soft water, labour charges for formwaork, centering, mixing, transporting, laying and curing concrete, tools and plants and incidental charges excluding cost of steel etc., complete as per MORTH Rev. V Specification for Box Culvert

-

-

-

... More
Km 5/2,5/8,5/10 & 8/2

320.21

-

11110.5

... More
Vibrated Reinforced Cement concrete in M30 using 20mm & 12 mm ISS graded HBG metal including cost and conveyance of all materials to site and cost of cement at site including soft water, labour charges for formwaork, centering, mixing, transporting, laying and curing concrete, tools and plants and incidental charges excluding cost of steel etc., complete as per MORTH Rev. V Specification for Approach Slab

-

-

-

... More
Km 5/2,5/8,5/10 & 8/2

162.96

-

8558.5

... More
Supply and fabrication of STEEL grade Fe500 D with suitable anticorrsive measure required for all the reinforced cement concrete items of work involved in the shedule including cost of steel, cost of fabrication, labour charges for cleaning the rods, straightening, cutting, bending, tying grills, hoisting and placing the reinforcement in position as specified in the drawing including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete.

-

-

-

... More
Km 5/2,5/8,5/10 & 8/2

46.49

-

83689

... More
Vibrated cement Concrete M30 design mix using ISS size HBG graded metal including cost and conveyance of all materials to worksite and cement at site including all labour charges for fixing concrete, laying, vibrating, hire charges for tools and plants, compacting, curing with all leads for soft water, including all other incidental charges,formwork,cost of premoulded expansion joints and fixing the same in position etc. excluding steel complete for Wearing coat of 75mm uniform thickness over deck slab as per MORTH Rev. V Specification

-

-

-

... More
Km 5/2,5/8,5/10 & 8/2

741.84

-

612.42

... More
Vibrated Reinforced Cement concrete in M25 using 20mm & 12 mm ISS graded HBG metal including cost and conveyance of all materials to site and cost of cement at site including soft water, labour charges for formwaork, centering, mixing, transporting, laying and curing concrete, tools and plants and incidental charges excluding cost of steel etc., complete as per MORTH Rev. V Specification for Wing Wall

-

-

-

... More
Km 5/2,5/8,5/10 & 8/2

188.94

-

10818.25

... More
Vibrated cement concrte M20(Nominal mix 1:1.5:3) using 40mm ISS HBG metal including cost and conveyance of all materials to site and cost of cement at site, including all labour charges for mixing concrete, laying, hire charges for Tools and plants, compacting, curing with all leads for soft water, including all other incidental charges, form work etc.. complete For Wing walls & Parapet Walls as per MORT&H Rev. V specifications No.100,1000, 1500,1600, 1700, 2100.

-

-

-

... More
Km 5/2,5/8,5/10 & 8/2

4.68

-

10196.5

... More
Sub Estimate : Widening Box Culvert at km7/2 of Kavarapettai - Sathyavedu Road

-

-

-

... More
Dismantling Culverts,bridges and other structures Dismantling salvaging and removal and disposing of resulting materials and back filling the resulting trenches and pits etc. For Plain Cement Concrete as per MORT&H Rev. V specifications No.111,112,202.

-

-

-

... More
Km 7/2

100.7

-

381

... More
Earth work excavation in all classes of soil except hard rock requiring blasting and depositing on bank as per SS20B including conveying the excavted earth wiht a lead of 5km with all leads and lifts and all other incidental charges such as bailing out water providing and maintaining necessary cofferdam, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter etc complete as per MORT&H Rev. V specifications No.111,112,301,305. for FOUNDATION

-

-

-

... More
Km 7/2

581.23

-

227

... More
Filling with Quarry Dust including cost and conveyance of Stone Dust to work site including labour charges for filling, laying, compacting by manual labour under optimum moisture content to get the maximum density flooding with water as layers or built-up to the bottom level inclusive all other incidental charges etc., complete for foundation of Culvert & Wing Wall

-

-

-

... More
Km 7/2

288.66

-

593

... More
Vibrated Cement Concrete M15 grade (Nominal mix) using 40mm ISS size HBG metal including cost and conveyance of all materials from approved quarry to work site including cost of cement which has to be procured by the contractor including cost and labour charges for mixing the concrete, form work, transporting, laying, compacting, curing with all leads for soft portable water, working in all depths including hire, running and fuel charges for all tools and plants employed including as per MORTH Rev. V Specification for Footings of PCC For Culvert & & Wing Wall

-

-

-

... More
Km 7/2

30.97

-

6164

... More
Vibrated Reinforced Cement concrete in M25 using 20mm & 12 mm ISS graded HBG metal including cost and conveyance of all materials to site and cost of cement at site including soft water, labour charges for formwaork, centering, mixing, transporting, laying and curing concrete, tools and plants and incidental charges excluding cost of steel etc., complete as per MORTH Rev. V Specification for Box Culvert

-

-

-

... More
Km 7/2

81.49

-

10202

... More
Supply and fabrication of STEEL grade Fe500 D with suitable anticorrsive measure required for all the reinforced cement concrete items of work involved in the shedule including cost of steel, cost of fabrication, labour charges for cleaning the rods, straightening, cutting, bending, tying grills, hoisting and placing the reinforcement in position as specified in the drawing including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete.

-

-

-

... More
Km 7/2

9.9

-

83689

... More
Vibrated cement Concrete M30 design mix using ISS size HBG graded metal including cost and conveyance of all materials to worksite and cement at site including all labour charges for fixing concrete, laying, vibrating, hire charges for tools and plants, compacting, curing with all leads for soft water, including all other incidental charges,formwork,cost of premoulded expansion joints and fixing the same in position etc. excluding steel complete for Wearing coat of 75mm uniform thickness over deck slab as per MORTH Rev. V Specification

-

-

-

... More
Km 7/2

51.12

-

612.1

... More
Vibrated Reinforced Cement concrete in M25 using 20mm & 12 mm ISS graded HBG metal including cost and conveyance of all materials to site and cost of cement at site including soft water, labour charges for formwaork, centering, mixing, transporting, laying and curing concrete, tools and plants and incidental charges excluding cost of steel etc., complete as per MORTH Rev. V Specification for Wing Wall

-

-

-

... More
Km 7/2

96.16

-

10695

... More
Vibrated cement concrte M20(Nominal mix 1:1.5:3) using 40mm ISS HBG metal including cost and conveyance of all materials to site and cost of cement at site, including all labour charges for mixing concrete, laying, hire charges for Tools and plants, compacting, curing with all leads for soft water, including all other incidental charges, form work etc.. complete For Wing walls & Parapet Walls as per MORT&H Rev. V specifications No.100,1000, 1500,1600, 1700, 2100.

-

-

-

... More
Km 7/2

3.24

-

9830

... More
Sub Estimate : Construction of Retaining Wall at Km 5/8 & 5/10 of Kavarapettai - Sathyavedu Road (SH-52)

-

-

-

... More
Earth work excavation in all classes of soil except hard rock requiring blasting and depositing on bank as per SS20B including conveying the excavted earth wiht a lead of 5km with all leads and lifts and all other incidental charges such as bailing out water providing and maintaining necessary cofferdam, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter etc complete as per MORT&H Rev. V specifications No.111,112,301,305. for FOUNDATION

-

-

-

... More
Km 5/8 & 5/10

2137.5

-

227

... More
Filling with Quarry Dust including cost and conveyance of Stone Dust to work site including labour charges for filling, laying, compacting by manual labour under optimum moisture content to get the maximum density flooding with water as layers or built-up to the bottom level inclusive all other incidental charges etc., complete for foundation of Culvert & Wing Wall

-

-

-

... More
Km 5/8 & 5/10

112.5

-

593

... More
Vibrated Cement Concrete M15 grade (Nominal mix) using 40mm ISS size HBG metal including cost and conveyance of all materials from approved quarry to work site including cost of cement which has to be procured by the contractor including cost and labour charges for mixing the concrete, form work, transporting, laying, compacting, curing with all leads for soft portable water, working in all depths including hire, running and fuel charges for all tools and plants employed including as per MORTH Rev. V Specification for Footings of PCC For Culvert & & Wing Wall

-

-

-

... More
Km 5/8 & 5/10

112.5

-

6164

... More
Vibrated cement concrte M20(Nominal mix 1:1.5:3) using 40mm ISS HBG metal including cost and conveyance of all materials to site and cost of cement at site, including all labour charges for mixing concrete, laying, hire charges for Tools and plants, compacting, curing with all leads for soft water, including all other incidental charges, form work etc.. complete For Wing walls & Parapet Walls as per MORT&H Rev. V specifications No.100,1000, 1500,1600, 1700, 2100.

-

-

-

... More
Km 5/8 & 5/10

700.5

-

8224

... More
Providing and fixing of PVC pipe 110mm dia with grating including cost and conveyance of pipes and grating and fixing them in position etc., complete

-

-

-

... More
Km 5/8 & 5/10

300

-

169.1

... More
Sub Estimate : Construction of Center Median at Km. 5/000 - 10/600 of of Kavarapettai - Sathyavedu Road (SH-52)

-

-

-

... More
Excavation for roadway and drainage:- Excavation including removal and satisfactory disposal of all materials necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer as per MORTH Rev. V clause No.111, 112, 201, 202, 301 to 305 a) Box cutting for CENTRE MEDIAN

-

-

-

... More
Km 5/0 - 10/6

523.56

-

96.6

... More
Plain Cement Concrete (1:2:4)M20 Nominal Mix using 20mm ISS HBG graded metal including cost and conveyance of all materials to site but excluding cost of cement at site including soft water, labour charges for mixing, transporting , laying and curing and compacting concrete, working at heights, hire charges for Tools and Plants and incidental Charges etc., complete as per standard specifications for FOUNDATION

-

-

-

... More
Km 5/0 - 10/6

179.33

-

6845

... More
Vibrated Cement Concrete (1:2:4) M20 Nominal Mix using 20mm ISS HBG graded metal including cost and conveyance of all materials to site but exclud ing cost of cement at site inclu ding soft water, labour charges for mixing, transpo rting, laying and curing and compacting concrete, working at heights, hire charges for Tools and Plants and incidental Charges etc., complete as per standard specifications for Footings for body wall (Above sill level).

-

-

-

... More
Km 5/0 - 10/6

565.48

-

7205

... More
Excavation including removal and satisfactory disposal of all materials necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer for spreading and Filling Inside the median using side pit earth as per SS20B including breaking clods, consolidating and sectioning using excavated earth (Earth filling)

-

-

-

... More
Km 5/0 - 10/6

1542.57

-

33.6

... More
Manufacturing, Supplying and Fixing of Stainless Steel Hand rails for staircase using 50mm dia 304L Grade Stainless Steel pipe of 1.60mm thick at required locations to a height of 900mm from finished floor level welded to 38mm dia Stainless Steel pipe post of 1.00mm thick as vertical at 900mm centre with 2 Nos. of 25mm dia intermediate horizontal stainless steel pipe of 1.60mm thick in between.The vertical pipe has to be welded to the 100 X 100 X 6mm MS base plate encased in the base concrete. The rate is inclusive of the charges for cutting, bending, welding, grinding, polishing, conveyance, electrical charges, etc.complete

-

-

-

... More
Km 5/0 - 10/6

900

-

5482

... More
Painting with synthetic Enamel paint over the new kerb including cost of paint and labour charges, etc., including all other incidental charges as directed by departmental officers.

-

-

-

... More
Km 5/0 - 10/6

3815.58

-

197.76

... More
Sub Estimate : Providing Km Stone, Hm Stone, Guide Post including Painting and Lettering from km 5/0 - 10/6 of Kavarapettai - Sathyavedu Road including

-

-

-

... More
Providing RCC M15 grade precast KM Stone of standard design as per IRC: 8 - 1980 and fixing in position including all incidental charges, etc., complete as per MORT&H specification No. 804 and as directed by the Engineer.

-

-

-

... More
Km 5/0 - 10/6

8

-

2168.47

... More
Providing RCC M15 grade precast 5th KM Stone of standard design as per IRC: 8 - 1980 and fixing in position including all incidental charges, etc., complete as per MORT&H specification No. 804 and as directed by the Engineer

-

-

-

... More
Km 5/0 - 10/6

2

-

3179.75

... More
Providing RCC M15 grade precast HM Stone of standard design as per IRC: 26 - 1976 and fixing in position including all incidental charges, etc., complete as per MORT&H specification No. 804 and as directed by the Engineer.

-

-

-

... More
Km 5/0 - 10/6

46

-

365.97

... More
Supply and fixing of RCC Guide post of size 0.20 x 0.20 x 1.20m using vibrated RCC 1:2:4 mix using 20mm ISS HBG metal and fixing 0.50m below GL and side packing CC 1:3:6 using 40mm HBG metal including cost and conveyance of all materials to site, including moulding and fixing charges and all other incidental charges, etc., complete as directed by the Engineer.

-

-

-

... More
Km 5/0 - 10/6

160

-

1333.13

... More
Painting with synthetic Enamel paint over the existing KM, HM Stones, boundary stones, Guide stones, Parapets of Culverts, Tree number back ground, etc., including cost of paint and labour charges, etc., including all other incidental charges as directed by departmental officers.

-

-

-

... More
Km 5/0 - 10/6

181.63

-

197.76

... More
White banding with White cem & Black banding with Japan Black over the Centre medians, Tree banding, etc., including cost of Japan Black and labour charges, etc., including all other incidental charges as directed by departmental officers.

-

-

-

... More
Km 5/0 - 10/6

79.86

-

29.35

... More
Letterings in KM & HM Stones, Culvert parapets / Bridges and tree numbers including cost of Paint and labour charges and all other incidental charges, etc., complete as directed by departmental Engineer.

-

-

-

... More
Km 5/0 - 10/6 Lettering 5 to 10 cm

950

-

5.93

... More
Km 5/0 - 10/6 Lettering 10 to 15 cm

124

-

9.88

... More
Black Banding over the existing Culverts, Parapet and minor bridge banding including cost of materials and labour charges etc, complete.

-

-

-

... More
Km 5/0 - 10/6

0.68

-

141.16

... More
Calculation of SubTotal, GST and Total Amount carried out by system automatically

-

-

-

... More
Basic cost of value put to tender as per estimate

1

-

297812778

... More
Add GST at 12%

1

-

35737533

... More
Total Value put to Tender

1

-

333550311

... More
Quoted value

1

-

-

... More
Final Quoted Value

1

-

-

... More
Add GST at 12% of Final Quoted Value

1

-

-

... More
Total Value of Contract Including 12% of GST

1

-

-

... More
Basic cost of value put to tender as per Estimate

-

-

-

... More
Quoted Rate in Figures (Total Value of Contract Including 12% of GST )

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.