Highways Department Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Highways Department Tender

Works
Civil And Construction
Eprocure
Opening Date28 Sep 2024
Closing Date15 Oct 2024
Tender Amount₹ 4,46,05,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Road A

2182.8

668744

306.37

... More
Construction of Granular Sub-base-V by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory soil compactor to achieve the desired density, complete as per Clause 401

-

-

-

... More
Road A

654.85

1372539

2095.96

... More
Picking 5cm to 10cm old metalled surface and sectioning 1Sqm and clearing away from the site and depositing the debris including labour charges for picking etc., complete as directed by the Engineer as per standard specification and also as per MORTH No.111,112,202

-

-

-

... More
Road A

2934.36

64086

21.84

... More
Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam 250mm thick, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory soil compactor to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5

-

-

-

... More
Road A

2414.24

5147618

2132.19

... More
Providing and laying Prime Coat over WBM/ WMM surface using 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 502 of MORTH Rev-5

-

-

-

... More
Road A

13184.48

1064514

80.74

... More
Providing and laying Tack Coat over WBM/ WMM surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5

-

-

-

... More
Road A

13184.48

243649

18.48

... More
Providing and laying Tack Coat over Existing BT surface using 2 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5

-

-

-

... More
Road B

6486.75

173715

26.78

... More
Providing and laying Tack Coat over Dry Lean Cement Concrete surface using 3.00 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5

-

-

-

... More
Road A

133.22

2782

20.89

... More
Providing, laying 50mm consolidated thick Bituminous Macadam using 0.20cum of 26.50- 13.20mm, 0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRC metal with 37 Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 504 of MORTH Rev-5

-

-

-

... More
Road A

659.2

5371768

8148.92

... More
Providing and Laying 50mm thick Bituminous Macadam using course aggregate and VG30 bitumen which shall consist of construction in a single course base/binder course confirming to the specfication on a previously prepared base, (using Mini Hot Mix Plant and Power Roller) including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 504 MORTH Rev-5 (For Patch Works)

-

-

-

... More
Road B

32.31

264874

8197.92

... More
Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5

-

-

-

... More
Road A

399.52

4105347

10275.7

... More
Road B

194.65

1998714

10268.25

... More
Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with power roller, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification. For making up of low berms with conveyance

-

-

-

... More
Road B Lead - 10 km

204

62499

306.37

... More
Providing compaction for embankment/making up of low berms using the available box cut earth including all hire and fuel charges for power roller for compaction, water sprinkler, including all labour charges for laying, spreading, watering etc., complete and as directed by the departmental engineers

-

-

-

... More
Road A

313

8332

26.62

... More
Culvert

-

-

-

... More
Dismantling salvaging and removal and disposing of resulting materials and back filling the resulting trenches and pits including all labour, materials, tools, equipment, safe guards, incidental necessary to complete the work as directed by the Engineer for PCC as per MORTH No.111,112,202

-

-

-

... More
Road A

36.54

17765

486.2

... More
Earthwork excavation in all classes of soil except soft disintegrated rock and medium rock not requiring blasting and hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for FOUNDATION OF BOX CULVERT as per MORTH No. 111, 112, 304

-

-

-

... More
Road A

838.98

206825

246.52

... More
Plain cement concrete of grade M15 Nominal Mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and cement at site including cost of formwork, soft water,labour charges for mixing, transporting, laying and curing concrete, working at depths,Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification for BASE COURSE BELOW BOX PORTION as per MORTH No. 111, 112, 900, 1000, 1500, 1700, 2100

-

-

-

... More
Road A

37.21

242364

6513.42

... More
Vibrated Reinforced Cement Concrete of grade M25 DESIGN MIX using ISS size graded HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for Box culvert as per MORTH No. 111, 112, 900, 1000, 1500, 1600, 1700, 2200

-

-

-

... More
Road A

205.08

2549011

12429.35

... More
Vibrated cement concrete of grade M20 Nominal Mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and cement at site including cost of formwork, soft water,labour charges for mixing, transporting, laying and curing concrete, working at depths,Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification for Wing wall Below Sill as per MORTH No. 111,112,900,1000, 1500, 1700, 2200

-

-

-

... More
Road A

85.17

687305

8069.81

... More
Vibrated cement concrete of grade M20 Nominal Mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and cement at site including cost of formwork, soft water,labour charges for mixing, transporting, laying and curing concrete, working at depths,Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification for Wing wall & Parapets Above Sill as per MORTH No. 111,112,900,1000, 1500, 1700, 2200

-

-

-

... More
Road A

73

696004

9534.31

... More
Supply and fabrication of Fe 500 grade Steel required for all RCC items of works involved in the schedule including cost of steel and cost of fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills, including over lapping to the required length wherever necessary and providing to the reinforcement placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc. complete as directed by the Engineer as per MORTH No. 111, 112, 900, 1000

-

-

-

... More
Road A

15.46

1478130

95610

... More
Filling behind Abutmants and wings with clean gritty gravel including cost and conveyance of gravel toworksite,laying,handling charges and filling in layers,tamping under optimum moisture content to get the maximum density including watering,with all leads for water and all other incidental charges etc,complete for filling behind the abutment and wings as per MORTH No. for filling box culvert Approach.

-

-

-

... More
Road A

22.76

13487

592.59

... More
Diversion Road

-

-

-

... More
Supply of NP3 class RCC pipe with flush joint to a size of 1000mm inner diameter with wall thickness 115mm. to a length of 2.5m in RCC M35 with reinforcement as per table 5 of IS :458:2003 to a ultimate load capacity of 71.58 KN/Linearmeter including cost of conveyance of all matrials and steel including moulding charges, all labour charge, hire charges for all T & P including conveyance and supply of pipe to worksite and other incidental charges etc., as per the specification IS : 458:2003 as per MORTH No. 111, 112, 2900, 900

-

-

-

... More
Road A

17.5

74844

4276.8

... More
Hoisting and fixing of 1000 mm dia NP3 pipes to proper gradient including labour and all other incidental charges as directed by the Engineer as per MORTH No.2900

-

-

-

... More
Road A

17.5

4658

266.2

... More
Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with power roller, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification. For making Diversion road as per MORTH No. 111, 112, 304

-

-

-

... More
Road A

285.26

92635

324.74

... More
Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam 150mm thick, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory soil compactor to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5 - For Diversion Road

-

-

-

... More
Road A

19.7

42004

2132.19

... More
Retaining wall

-

-

-

... More
Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour, equipments and all incidental charges such as bailing out water, providing and maintaining necessary coffer dams, sheeting,shoring and bracing and their subsequent removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavation back filing,clearing up the site and disposal of all surplus materials etc., complete as per MORT&H No.304 for Foundation of RCC Retaining Walls as per MORTH No. 111, 112, 304

-

-

-

... More
Road C

950.04

234203

246.52

... More
Cement Concrete of Grade M15 (Nominal mix) using 40 mm ISS size HBG metal including cost and conveyance of all materials to site and cost of cement at site including cost of form work, soft water, labour charges for mixing, Transporting, laying compacting, curing concrete, working at depths, tools and plants and incidental charges bailing out water, maintaining of protective bunds, coffer dams, shoring structing etc, complete as per relevant standard specifications etc., for Levelling course for base slab of RCC Retaining wall as per MORT&H Specification No.1000, 1500, 1700

-

-

-

... More
Road C

67.88

437176

6440.43

... More
Vibrated Reinforced Cement Concrete of Grade M25 (Design mix) using 20 mm ISS size HBG Graded metal including cost and conveyance all materials to site and cost of cement at site but excluding cost and fabrication of steel, but including cost of form work, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants including all other incidental charges etc, complete, for Base slab of RCC Retaining Wall as per MORT&H No.1000,1500,1700

-

-

-

... More
Road C

385.74

4070640

10552.81

... More
Vibrated Reinforced Cement Concrete of Grade M25 using 20 mm ISS size HBG Graded metal including cost and conveyance all materials to site including cost of cement at site, but excluding cost and fabrication of steel but including cost of form work, labour charges for mixing transporting, laying curing concrete, working at heights, soft water, hire charges for tools and plants including all other incidental charges etc., complete, for Stem of RCC Retaining Wall as per MORT&H No.1500,1700 & 2200

-

-

-

... More
Road C

210.29

2912487

13849.86

... More
Supply and fabrication of Fe 500 grade Steel required for all RCC items of works involved in the schedule including cost of steel and cost of fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills, including over lapping to the required length wherever necessary and providing to the reinforcement placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc. complete as directed by the Engineer as per MORTH No. 111, 112, 900, 1000

-

-

-

... More
Road C

25.58

2446086

95610

... More
Vibrated Cement Concrete M20 nominal mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and cost of cement at site but excluding cost and fabrication of steel but including cost of formwork, labour charges for mixing, transporting, laying, curing concrete, Working at heights, soft water, hire charges for tools and Plants, including all other incidental charges, etc., complete for Guide pillars over Retaining wall as per MORTH No. 111,112,900,1000, 1500, 1700, 2200

-

-

-

... More
Road C

13.05

139983

10726.72

... More
Providing and fixing 110mm dia PVC seepage pipes of required length for Abutments and wings including cost and conveyance of all materials to work site, cost and labour semi spherical backfill arrangements with 100mm size granite stone at the periphery and labour charges for fixing etc., complete to drain the backfill as per standard specification as per MORTH No.2706

-

-

-

... More
Road C

180

36558

203.1

... More
Refilling of Excavated Earth having minimum CBR of 10 including conveyance, laying, watering and consolidation etc., complete as directed by Engineer for filling inbetween Retaining wall MORTH No.111,112 , 305, 900.

-

-

-

... More
Road C

663.52

28431

42.85

... More
Approach Road

-

-

-

... More
Providing compaction for embankment / making up of low berms using the available box cut earth including all hire and fuel charges for power roller for compaction, water sprinkler, including all labour charges for laying, spreading, watering etc., complete and as directed by the departmental engineers.

-

-

-

... More
Road C

114.4

3045

26.62

... More
Construction of granular sub-base-III by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory soil compactor to achieve the desired density, complete as per clause 401

-

-

-

... More
Road C

31.2

66110

2118.94

... More
Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam 250mm thick, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory soil compactor to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5

-

-

-

... More
Road C

52

110873

2132.19

... More
Providing and laying Prime Coat over WBM/ WMM surface using 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 502 of MORTH Rev-5

-

-

-

... More
Road C

208

16789

80.72

... More
Providing and laying Tack Coat over WBM/ WMM surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 503 of MORTH Rev-5

-

-

-

... More
Road C

208

3841

18.47

... More
Providing, laying 50mm consolidated thick Bituminous Macadam using 0.20cum of 26.50- 13.20mm, 0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRC metal with 37 Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 504 of MORTH Rev-5

-

-

-

... More
Road C

10.4

84703

8144.52

... More
Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5

-

-

-

... More
Road C

6.24

64073

10268.25

... More
Calculation of SubTotal, GST and Total Amount carried out by system automatically

-

-

-

... More
Basic cost of value put to tender as per estimate

1

-

37796631

... More
Add GST at 18%

1

-

6803394

... More
Total Value put to Tender

1

-

44600025

... More
Difference in Value

1

-

-

... More
Bidder quoted value

1

-

-

... More
Add GST at 18% of Final quoted Value

1

-

-

... More
Total Value of Contract Including 18% of GST

1

-

-

... More
Basic cost of value put to tender as per Estimate

-

37796631

-

... More
Quoted Rate in Figures (Total Value of Contract Including 18% of GST )

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.