Highways Department Tender

... More
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Highways Department Tender

Works
Civil And Construction
Bridge Construction
Eprocure
Opening Date10 Oct 2024
Closing Date18 Oct 2024
Tender Amount₹ 5,43,25,000 
Notes
Download

Costs

Summary

Tn 17 24 25 Tirupur Division Tpr 001

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Excavation for Roadway and drainage Excavation including removal and satisfactory disposal of all materials necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer, as per MORTH Specification. Box cutting for widening portion. Morth No. 111, 112, 301, 305, 900

1

-

-

... More
Road A

1033.4

123

127376.88

... More
Road B

699.3

123

86195.72

... More
Road C

2290.7

123

282351.68

... More
Excavation for Roadway and drainage Excavation including removal and satisfactory disposal of all materials necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer, as per MORTH Specification. Forming of Embankment 95% Compaction. Morth No. 111, 112, 301, 305, 900

1

-

-

... More
Road A

151

171

25901.03

... More
Excavation for Roadway and drainage Excavation including removal and satisfactory disposal of all materials necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer, as per MORTH Specification. Forming of Embankment 97% Compaction. Morth No. 111, 112, 301, 305, 900

1

-

-

... More
Road A

674

174

117276

... More
Road B

154.7

174

26917.8

... More
Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory soil compactor to achieve the desired density, complete as per clause 401 - for grading- V

1

-

-

... More
Road A

189

2210

417703.23

... More
Road B

67.4

2302

155186.48

... More
Road C

366.4

2038

746895.41

... More
Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surfac and compacting with vibratory soil compactor to achieve the desired density, complete as per clause 401 - for grading- III Material. MORTH No. 111, 112, 401, 900

1

-

-

... More
Road A

140

2299

321965

... More
Road B

51.8

2392

123913.37

... More
Road C

348.9

2128

742511.54

... More
Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam 250mm thick, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory soil compactor to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5

1

-

-

... More
Road A

350

2236

782817

... More
Road B

129.5

2236

289642.29

... More
Road C

1067.5

2236

2387591.85

... More
Construction of dry lean cement concrete Sub base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, concrete strength not to be less than 10 Mpa at 7 days, mixed at site, compacted using vibrator, finishing and curing.

1

-

-

... More
Road A

525.4

5100

2679807.95

... More
Road B

346.6

5186

1797585.44

... More
Providing and laying Prime Coat over WBM/ WMM surface using 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 502 of MORTH Rev-5.

1

-

-

... More
Road A

1400

81

114618

... More
Road B

518

81

42408.66

... More
Road C

4269.7

81

349517.64

... More
Providing and laying Tack Coat over WBM/ WMM surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 503 of MORTH Rev-5

1

-

-

... More
Road A

1400

18

26474

... More
Road B

518

18

9795.38

... More
Road C

4269.7

18

80697.33

... More
Providing and laying Tack Coat over Dry Lean Cement Concrete surface using 3.00 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 503 of MORTH Rev-5

1

-

-

... More
Road A

3040.1

21

65058.14

... More
Road B

2016.8

21

43179.69

... More
Road C

29.4

21

629.16

... More
Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 of MORTH Specification- over bituminous surfaces. MORTH No. 111,112,501,503,900

1

-

-

... More
Road A

11287.4

27

306227.16

... More
Road B

6928.8

27

187978.34

... More
Road C

11400.9

27

309306.42

... More
Providing, laying 75mm consolidated thick Dense Bituminous Macadam using 0.40cum of 37.50-13.20mm, 0.35cum of 13.20-2.36mm and 0.36cum of 2.36mm & below size IRC metal with 71.30kgs of VG30 grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in the required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to site, spreading the mix to uniform thickness of 75mm with mechanical paver to the specified grades and cross sections and consolidated by Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 505 of MORTH rev-5.

1

-

-

... More
Road A

357.5

9336

3337695.08

... More
Road B

202.1

9336

1886848.04

... More
Providing, laying 75mm consolidated thick Dense Bituminous Macadam using 0.40cum of 37.50 -13.20mm, 0.35cum of 13.20-2.36mm and 0.36cum of 2.36mm & below size IRC metal with 71.30kgs of VG40 grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in the required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to site, spreading the mix to uniform thickness of 75mm with mechanical paver to the specified grades and cross sections and consolidated by Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 505 of MORTH rev-5.

1

-

-

... More
Road C

386.6

9553

3693502.95

... More
Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5

1

-

-

... More
Road A

629.1

10917

6868262.16

... More
Road B

378.6

10917

4133403.36

... More
Road C

628

11205

7037022.6

... More
Excavation for Roadway and drainage Excavation including removal and satisfactory disposal of all materials necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer, as per MORTH Specification. Using Excess Box Cut Earth for Berms including Compaction by power roller. For making of berms using Box cut earth. MORTH No. 111, 112, 301, 305, 900

1

-

-

... More
Road A

324

26

8624.88

... More
Road B

351

26

9343.62

... More
Road C

607.5

26

16171.65

... More
Dismantling salvaging and removal and disposing of resulting materials and back filling the resulting trenches and pits etc,as per MORTH Specification Dismantling Stone / Masonry Cement mortar walls under 3m high. MORTH No. 111, 112, 202

1

-

-

... More
Road A

9.98

283

2825.74

... More
Road B

62.74

283

17764.2

... More
Road C

24.9

283

7050.19

... More
Earth work Excavation in all classes of soils except hard rock not requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges and sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavtion, backfilling, and clearing the site and disposal of all surplus materials etc. complete as per standard specification for Foundation for Box culvert

1

-

-

... More
Road A

310.17

289

89753.89

... More
Road B

258.64

289

74842.66

... More
Road C

243.99

289

70603.39

... More
Plain Cement Concrete M15 Grade using 40mm ISS Size hard broken granite metal including cost and conveyance of all materials to site cost and labour charges for formwork centering, labour charges for laying, compacting curing, all incidental charges complete for Leveling course for below Box culvert and Wing wall.

1

-

-

... More
Road A

25.96

6164

160034.57

... More
Road B

9.81

6254

61357.63

... More
Road C

15.94

5917

94332.76

... More
Vibrated cement concrete M20 (Nominal mix) using 40mm ISS size hard broken granite metal including cost and conveyance of all materials to site including cost and labour charges for formwork, centering, labour charges for laying, compacting, curing all incidental charges etc., complete for Wing wall and Retaining wall

1

-

-

... More
Road A

131.52

8520

1120593.8

... More
Road B

60.99

8464

516260.22

... More
Road C

45.89

8030

368528.36

... More
Vibrated Reinforced cement concrete of grade M25 (Design mix) using ISS hard broken granite metal including cost and conveyance of all materials to site and cost of cement excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for tools and plants including all other incidental charges etc., complete for Box culvert

1

-

-

... More
Road A

54.16

12172

659269.64

... More
Road B

70.87

11472

813077.34

... More
Road C

72.6

11869

861758.37

... More
Supply and fabrication of steel Grade Fe-500 D required for all RCC items of works involved in the schedule including cost of steel cost of fabrication labour charges for cleaning the bars straightening cutting bending tying grills hoisting and placing the reinforcement in position as specified in the drawings including cost of binding wire provision of spacer bars, cover blocks and all other incidental charges etc. complete as per standard specification. MORTH No. 111, 112, 1000, 1500, 1600, 1700, 2200, 2300, 900

1

-

-

... More
Road A

4.77

95610

456346.53

... More
Road B

4.62

95610

442100.64

... More
Road C

5.82

95610

556163.37

... More
Providing and fixing 110mm dia PVC SEEPAGE PIPES of required length for abutment and wing, retaining wall including cost and conveyance of all materials to worksite cost and labour for semi-sperical back fill arrangements with 100mm size broken granite stones at the periphery and labour charges for fixing etc., complete to drain the back fill as per standard specifications. MORTH No. 2706, 900

1

-

-

... More
Road A

50.34

203

10224.05

... More
Road B

10.7

203

2173.17

... More
Road C

6.92

203

1405.45

... More
Calculation of SubTotal, GST and Total Amount carried out by system automatically

-

-

-

... More
Basic cost of value put to tender as per estimate

1

46032319

-

... More
Add GST at 18%

1

8285817

-

... More
Total Value put to Tender

1

54318136

-

... More
Differnce Amount (Excess/Less)

1

-

-

... More
Quoted Amount (Basic Rate Only)

1

-

-

... More
Add GST at 18% of of Quoted Amount

1

-

-

... More
Total Value of Quoted Amount Including 18% of GST

1

-

-

... More
Basic cost of value put to tender as per Estimate

-

-

46032319

... More
Quoted Rate in Figures (Total Value of Contract Including 18% of GST )

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.