Highways Department Tender

... More
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Highways Department Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date18 Sep 2024
Closing Date14 Oct 2024
Tender Amount₹ 5,93,50,000 
Notes
Download

Costs

Summary

Tnv 31 Tenkasi H C And M Sub Division

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Granular Sub-Base with Close Graded Material Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory soil compactor to achieve the desired density, complete as per clause 401 For Grading-V Material (Filter/ Separation Layer at Bottom) Material as per MORTH Rev. V Clause No. 111, 112, 401 & 900.

-

-

-

... More
ROAD-A

1064.72

1978952

1858.66

... More
ROAD-B

231.78

427740

1845.46

... More
Granular Sub-Base with Close Graded Material Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory soil compactor to achieve the desired density, complete as per clause 401 For Grading-III Material (Drainage Layer at Top)Material as per MORTH Rev. V Clause No. 111, 112, 401 & 900.

-

-

-

... More
ROAD-B

144.85

280202

1934.43

... More
WET MIX MACADAM Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam 250mm thick, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory soil compactor to acheive the desired density including cost of material, labour charges, rentals for machinery,fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5 Clause No. 111, 112, 406 & 900.

-

-

-

... More
ROAD-A

1663.64

3549958

2133.85

... More
ROAD-B

362.14

772752

2133.85

... More
Prime Coat Over WBM/ WMM Surface Providing and laying Prime Coat over WBM/ WMM surface using 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 502 of MORTH Rev-5 as per MORTH Rev. V Clause No. 111,112,501,502 &900 .

-

-

-

... More
ROAD-A

6654.54

544341

81.8

... More
ROAD-B

1448.59

118509

81.81

... More
Tack Coat Over Primed Surface Providing and laying Tack Coat over WBM/ WMM surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 503 of MORTH Rev-5 as per MORTH Rev. V Clause No.111, 112,501, 503 & 900.

-

-

-

... More
ROAD-A

6654.54

125637

18.88

... More
ROAD-B

1448.59

27349

18.88

... More
Tack Coat Over Existing BT Surface Providing and laying Tack Coat over Existing BT surface using 2 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel andall other incidental charges etc., complete as perClause 503 of MORTH Rev-5 as per MORTH Rev. V Clause No.111, 112,501, 503 & 900.

-

-

-

... More
ROAD-A

7193.7

195021

27.11

... More
ROAD-B

3654.58

99075

27.11

... More
Tack Coat over Dry Lean Cement Concrete Surface Providing and laying Tack Coat over Dry Lean Cement Concrete surface using 3.00 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery,fuel and all other incidental charges etc., complete as perClause 503 of MORTH Rev-5

-

-

-

... More
ROAD-A

151.76

3243

21.37

... More
BM (Grade-II) 50mm Thick Using VG30 (Providing, laying 50mm consolidated thick Bituminous Macadam using 0.20cum of 26.50-13.20mm, 0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRC metal with 37Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the itumen, aggregate and mixing them in required temperatureusing Central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site,spreading the mix to uniform thickness of 50mm with mechanical paver to the specified gradesand cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc.,including labour for attending to paver to site etc., including hire and fuel charges for 20-30tCMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 504 ) of MORTH Rev-5

-

-

-

... More
ROAD-A

756.7

6502913

8593.78

... More
Providing, laying 50mm consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50-13.2mm, 0.25cum of 13.20-2.36mm and 0.23cum of 2.36mm & below size IRC metal with 53.20kgs of VG40 grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in the required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 505 of MORTH rev-5. as per Clause No.111, 112, 501, 507 & 900 of MORT &H specifications.

-

-

-

... More
ROAD-B

201

2076748

10332.08

... More
Providing, laying 75mm consolidated thick Dense Bituminous Macadam using 0.40cum of 37.50-13.20mm, 0.35cum of 13.20-2.36mm and 0.36cum of 2.36mm & below size IRC metal with 71.30kgs of VG40 grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in the required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to site, spreading the mix to uniform thickness of 75mm with mechanical paver to the specified grades and cross sections and consolidated by Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 505 of MORTH rev-5. as per Clause No.111, 112, 501, 507 & 900 of MORT &H specifications.

-

-

-

... More
ROAD-B

130.38

1244471

9544.96

... More
Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5

-

-

-

... More
ROAD-B

204.12

2294386

11240.38

... More
Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5

-

-

-

... More
ROAD-A

420

4607274

10969.7

... More
Providing compaction for embankment / making up of low berms using the available box cut earth including all hire and fuel charges for power roller for compaction, water sprinkler, including all labour charges for laying, spreading, watering etc., complete and as directed by the departmental engineers.

-

-

-

... More
ROAD-A

364

9711

26.68

... More
ROAD-B

40

1067

26.68

... More
Dismantling the existing Random Rubble Masonry in Cement Mortar in the existing causeway / bridge and clearing away from the work site and carefully stacking the usefull materials for reuse on the road side as directed by the departmental officers including all labour and incidental charges etc., complete.

-

-

-

... More
ROAD-A-Box culvert Km 1/6(i)

0.9

254

283.14

... More
ROAD-A-Box culvert Km 1/6(ii)

0.9

254

283.14

... More
ROAD-A-Box culvert Km 1/8

0.9

254

283.14

... More
ROAD-A-Box culvert Km 2/2

0.9

254

283.14

... More
ROAD-A-Box culvert Km 2/4

0.9

254

283.14

... More
ROAD-A-Box culvert Km 2/6

12.6

3567

283.14

... More
Dismantling the existing PCC in the existing causeway / bridge and clearing away from the work site and carefully stacking the usefull materials for reuse on the road side as directed by the departmental officers including all labour and incidental charges etc., complete.

-

-

-

... More
ROAD-A-Box culvert Km 1/6(i)

2.25

1093

486.2

... More
ROAD-A-Box culvert Km 1/6(ii)

2.25

1093

486.2

... More
ROAD-A-Box culvert Km 1/8

2.25

1093

486.2

... More
ROAD-A-Box culvert Km 2/2

2.25

1093

486.2

... More
ROAD-A-Box culvert Km 2/4

2.25

1093

486.2

... More
ROAD-A-Box culvert Km 2/6

7.88

3831

486.2

... More
ROAD-B-Widening of slab culvert Km 120/8

0.81

393

486.2

... More
Earthwork excavation in all classes of soils except hard rock requring blasting depositing on bank with all leads and lifts as per SS 20B including cost of all labour,materials, tools, equipments and all incidential charges such as bailing out water providing and maintaining necessary conferdams, sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and cleaning the site and disposal of all surplus materials etc complete as per relevant standard specifiation for FOUNDATION

-

-

-

... More
ROAD-A-Retaining wall at km 1/8

138.6

17083

123.26

... More
ROAD-A-Retaining wall at km 2/2

110

13558

123.26

... More
ROAD-A-Retaining wall at km 2/4

330

40675

123.26

... More
ROAD-A-Retaining wall at km 2/6 & 2/8

264

32540

123.26

... More
ROAD-B-Centre median at Km 120/10

11.62

1432

123.26

... More
Earthwork excavation in all classes of soils except hard rock requring blasting depositing on bank with all leads and lifts as per SS 20B including cost of all labour,materials, tools, equipments and all incidential charges such as bailing out water providing and maintaining necessary conferdams, sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and cleaning the site and disposal of all surplus materials etc complete as per relevant standard specifiation FOUNDATION OF BOX CULVERT AND RETURN WALL.

-

-

-

... More
ROAD-A-Box culvert Km 1/6(i)

92.27

11373

123.26

... More
ROAD-A-Box culvert Km 1/6(ii)

69.53

8570

123.26

... More
ROAD-A-Box culvert Km 1/8

69.53

8570

123.26

... More
ROAD-A-Box culvert Km 2/2

66.24

8164

123.26

... More
ROAD-A-Box culvert Km 2/4

66.24

8164

123.26

... More
ROAD-A-Box culvert Km 2/6

192.49

23726

123.26

... More
ROAD-B-Retaining wall at km 120/10

43.2

5324

123.26

... More
Earthwork excavation in all classes of soils except hard rock requring blasting depositing on bank with all leads and lifts as per SS 20B including cost of all labour,materials, tools, equipments and all incidential charges such as bailing out water providing and maintaining necessary conferdams, sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and cleaning the site and disposal of all surplus materials etc complete as per relevant standard specifiation FOUNDATION

-

-

-

... More
ROAD-B-Widening of slab culvert Km 120/8

116.94

28828

246.52

... More
Plain Cement Concrete M20 grade mix using 40mm ISS size hard granite broken metal including cost and conveyance of all materials to site, including cost of cement at site including cost of form work soft water labour charges for mixing transporting laying and curing concrete working at heights,hire charges for all tools and plants and maintaining of protective bunds, coffer dams, shoring strutting etc., complete as per standard specification for Foundation of Retaining Wall

-

-

-

... More
ROAD-A-Retaining wall at km 1/8

41.58

256806

6176.2

... More
ROAD-A-Retaining wall at km 2/2

33

203365

6162.59

... More
ROAD-A-Retaining wall at km 2/4

99

610096

6162.59

... More
ROAD-A-Retaining wall at km 2/6 & 2/8

79.2

488077

6162.59

... More
ROAD-B-Retaining wall at km 120/10

21.6

128976

5971.14

... More
Vibrated Cement Concrete M20 grade using 40mm ISS size HBG metal including cost and conveyance of all materials to site, including cost of cement at site including cost of form work soft water labour charges for mixing transporting laying and curing concrete working at heights, tools and plants and maintaining of protective bunds, coffer dams, shoring strutting etc., complete as per standard specification for STEM OF PCC RETAINING WALL (below sill level)

-

-

-

... More
ROAD-A-Retaining wall at km 1/8

57.58

455814

7916.19

... More
ROAD-A-Retaining wall at km 2/2

49.35

376312

7625.38

... More
ROAD-A-Retaining wall at km 2/4

148.05

1124965

7598.55

... More
ROAD-A-Retaining wall at km 2/6 & 2/8

118.44

901032

7607.5

... More
ROAD-B-Centre median at Km 120/10

11.5

69615

6053.49

... More
ROAD-B-Widening of slab culvert Km 120/8

80.65

543465

6738.57

... More
ROAD-B-Retaining wall at km 120/10

14.92

107205

7185.34

... More
Vibrated Cement Concrete M20 grademix using 40mm ISS size HBG metal including cost and conveyance of all materials to site, including cost of cement at site including cost of form work soft water labour charges for mixing transporting laying and curing concrete working at heights, tools and plants and maintaining of protective bunds, coffer dams, shoring strutting etc., complete as per standard specification for STEM OF PCC RETAINING WALL (above sill level)

-

-

-

... More
ROAD-A-Retaining wall at km 1/8

73.08

772219

10566.77

... More
ROAD-A-Retaining wall at km 2/2

76.8

756612

9851.73

... More
ROAD-A-Retaining wall at km 2/4

230.4

2264451

9828.35

... More
ROAD-A-Retaining wall at km 2/6 & 2/8

184.32

1811561

9828.35

... More
ROAD-B-Centre median at Km 120/10

15.61

226045

14480.79

... More
ROAD-B-Widening of slab culvert Km 120/8

43.6

329118

7548.58

... More
ROAD-B-Retaining wall at km 120/10

48.21

428637

8891.05

... More
Plain Cement Concrete M15 grade (Nominal Mix 1:2:4) using 40mm ISS size hard granite broken metal including cost and conveyance of all materials to site, including cost of cement at site including cost of form work soft water labour charges for mixing transporting laying and curing concrete working at heights,hire charges for all tools and plants and maintaining of protective bunds, coffer dams, shoring strutting etc., complete as per standard specification for LEVELLING COURSE OF BOX CULVERT

-

-

-

... More
ROAD-A-Box culvert Km 1/6(i)

10.69

64822

6063.81

... More
ROAD-A-Box culvert Km 1/6(ii)

6.95

42143

6063.81

... More
ROAD-A-Box culvert Km 1/8

6.95

42143

6063.81

... More
ROAD-A-Box culvert Km 2/2

6.95

42048

6050.2

... More
ROAD-A-Box culvert Km 2/4

6.95

42048

6050.2

... More
ROAD-A-Box culvert Km 2/6

19.83

119975

6050.2

... More
Vibrated Reinforced Cement Concrete M25 Grade using 20mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for formwork and centering, labour charges, compacting, curing, and all incidental charges etc., complete for BOTTOM SLAB OF BOX CULVERT.

-

-

-

... More
ROAD-A-Box culvert Km 1/6(i)

28.43

264977

9320.36

... More
ROAD-A-Box culvert Km 1/6(ii)

16.42

156547

9533.98

... More
ROAD-A-Box culvert Km 1/8

16.42

156547

9533.98

... More
ROAD-A-Box culvert Km 2/2

16.42

156324

9520.37

... More
ROAD-A-Box culvert Km 2/4

16.42

156324

9520.37

... More
Vibrated Reinforced Cement Concrete M30 Grade using 20mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for formwork and centering, labour charges, compacting, curing, and all incidental charges etc., complete for BOTTOM SLAB OF BOX CULVERT.

-

-

-

... More
ROAD-A-Box culvert Km 2/6

82.73

767290

9274.63

... More
Vibrated Reinforced Cement Concrete M25 Grade using 20mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for formwork and centering, labour charges, compacting, curing, and all incidental charges etc., complete for BODY WALL OF BOX CULVERT.

-

-

-

... More
ROAD-A-Box culvert Km 1/6(i)

20.7

290322

14025.25

... More
ROAD-A-Box culvert Km 1/6(ii)

14.94

238815

15984.99

... More
ROAD-A-Box culvert Km 1/8

11.34

181113

15971.18

... More
ROAD-A-Box culvert Km 2/2

11.34

180958

15957.57

... More
ROAD-A-Box culvert Km 2/4

11.34

180958

15957.57

... More
Vibrated Reinforced Cement Concrete M30 Grade using 20mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for formwork and centering, labour charges, compacting, curing, and all incidental charges etc., complete for BODY WALL OF BOX CULVERT.

-

-

-

... More
ROAD-A-Box culvert Km 2/6

31.31

430244

13741.45

... More
Vibrated Cement Concrete M25 Grade using 20mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for formwork and centering, labour charges, compacting, curing, and all incidental charges etc., complete for TOP SLAB OF BOX CULVERT.

-

-

-

... More
ROAD-A-Box culvert Km 1/6(i)

22.81

250463

10980.41

... More
ROAD-A-Box culvert Km 1/6(ii)

13.26

150701

11365.13

... More
ROAD-A-Box culvert Km 1/8

13.26

150701

11365.13

... More
ROAD-A-Box culvert Km 2/2

13.26

150521

11351.52

... More
ROAD-A-Box culvert Km 2/4

13.26

150521

11351.52

... More
Vibrated Cement Concrete M30 Grade using 20mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for formwork and centering, labour charges, compacting, curing, and all incidental charges etc., complete for TOP SLAB OF BOX CULVERT.

-

-

-

... More
ROAD-A-Box culvert Km 2/6

76.69

814373

10619.03

... More
Vibrated reinforced cement concrete M30 grade Design Mix using ISS size hard granite broken graded metal including cost and conveyance of all materials to site and cement at site including labour charges for mixing, transporting, laying, curing concrete, working at heights, hire charges for tools and plants, including all other incidental chargeas, etc., complete for BEDBLOCK OVER ABUTMENTS AND PIERS. -1 Cum

-

-

-

... More
ROAD-B-Widening of slab culvert Km 120/8

4.97

48403

9739.14

... More
Vibrated reinforced cement concrete M30 grade Design Mix using ISS size hard granite broken graded metal including cost and conveyance ofall materials to site including cement which will be supplied by the Department at the departmental stores or at site of work and its cost recovered as stipulated in the special conditions appended herewith including cost of form work, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and incidental charges such as baling cut water, maintaining of protective bunds, cofferdams, shoring, structting etc., complete asper relevent standard specification, for DECKSLAB AND KERB -1Cum

-

-

-

... More
ROAD-B-Widening of slab culvert Km 120/8

10.22

100384

9822.34

... More
Supply and fabrication of steel Grade Fe-500 / required for all RCC items of works involved in the schedule including cost of steel cost of fabrication labour charges for cleaning the bars straightening cutting bending tying grills hoisting and placing the reinforcement in position as specified in the drawings including cost of binding wire provision of spacer bars, cover blocks and all other incidental charges etc. complete as per standard specification.

-

-

-

... More
ROAD-A-Box culvert Km 1/6(i)

4.55

435309

95609.27

... More
ROAD-A-Box culvert Km 1/6(ii)

2.97

283672

95609.27

... More
ROAD-A-Box culvert Km 1/8

2.73

261395

95609.27

... More
ROAD-A-Box culvert Km 2/2

2.73

261395

95609.27

... More
ROAD-A-Box culvert Km 2/4

2.73

261395

95609.27

... More
ROAD-A-Box culvert Km 2/6

16.59

1586157

95609.27

... More
ROAD-B-Widening of slab culvert Km 120/8

1.33

127447

95609.27

... More
Vibrated Cement Concrete M20 Grade using 40mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for formwork and centering, labour charges, compacting, curing, and all incidental charges etc., complete for Parapet.

-

-

-

... More
ROAD-A-Box culvert Km 1/6(i)

1.73

12840

7422.03

... More
ROAD-A-Box culvert Km 1/6(ii)

1.17

8683

7422.03

... More
ROAD-A-Box culvert Km 1/8

1.17

8683

7422.03

... More
ROAD-A-Box culvert Km 2/2

1.17

8667

7408.42

... More
ROAD-A-Box culvert Km 2/4

1.17

8667

7408.42

... More
ROAD-A-Box culvert Km 2/6

4.37

32374

7408.42

... More
Vibrated Cement Concrete of grade M20 Nominal Mix, using 40mm ISS size HBG graded metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for FOOTINGS OF RETURN WALL.

-

-

-

... More
ROAD-A-Box culvert Km 1/6(i)

20.2

126310

6252.98

... More
ROAD-A-Box culvert Km 1/6(ii)

20.14

125935

6252.98

... More
ROAD-A-Box culvert Km 1/8

20.14

125935

6252.98

... More
ROAD-A-Box culvert Km 2/2

18.02

112433

6239.37

... More
ROAD-A-Box culvert Km 2/4

18.02

112433

6239.37

... More
ROAD-A-Box culvert Km 2/6

34.83

217317

6239.37

... More
Vibrated Cement Concrete of grade M20 Nominal Mix, using 40mm ISS size HBG graded metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for STEM OF RETURN WALL- BELOW SILL LEVEL

-

-

-

... More
ROAD-A-Box culvert Km 1/6(i)

8.89

67910

7638.99

... More
ROAD-A-Box culvert Km 1/6(ii)

8.6

66041

7679.23

... More
ROAD-A-Box culvert Km 1/8

8.38

64629

7712.31

... More
ROAD-A-Box culvert Km 2/2

7.19

56877

7910.63

... More
ROAD-A-Box culvert Km 2/4

7.19

56877

7910.63

... More
ROAD-A-Box culvert Km 2/6

9.76

74441

7627.17

... More
Vibrated Cement Concrete of grade M20 Nominal Mix, using 40mm ISS size HBG graded metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for STEM OF RETURN WALL- ABOVE SILL LEVEL

-

-

-

... More
ROAD-A-Box culvert Km 1/6(i)

33.36

322439

9665.44

... More
ROAD-A-Box culvert Km 1/6(ii)

31.37

305735

9746.1

... More
ROAD-A-Box culvert Km 1/8

21.71

220902

10175.14

... More
ROAD-A-Box culvert Km 2/2

20.09

207503

10328.71

... More
ROAD-A-Box culvert Km 2/4

20.09

207503

10328.71

... More
ROAD-A-Box culvert Km 2/6

38.05

359823

9456.6

... More
Excavation including removal and satisfactory disposal of all materials necessary for the construction of road way and side drains in accordance with specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer for Carted Eath with a lead of 5 km for formation of Diversion Road for 95% compacion.

-

-

-

... More
ROAD-A-Box culvert Km 1/6(i)

516.02

107270

207.88

... More
ROAD-A-Box culvert Km 1/6(ii)

516.02

107270

207.88

... More
ROAD-A-Box culvert Km 1/8

516.02

107270

207.88

... More
ROAD-A-Box culvert Km 2/2

516.02

107270

207.88

... More
ROAD-A-Box culvert Km 2/4

516.02

107270

207.88

... More
ROAD-A-Box culvert Km 2/6

516.02

107270

207.88

... More
Excavation including removal and satisfactory disposal of all materials necessary for the construction of road way and side drains in accordance with specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer for Carted Eath with a lead of 5 km for formation of Diversion Road for 97% compacion and for approach road on both sides of culvert

-

-

-

... More
ROAD-A-Box culvert Km 1/6(i)

64.86

13548

208.89

... More
ROAD-A-Box culvert Km 1/6(ii)

65.15

13609

208.89

... More
ROAD-A-Box culvert Km 1/8

65.37

13655

208.89

... More
ROAD-A-Box culvert Km 2/2

66.56

13903

208.89

... More
ROAD-A-Box culvert Km 2/4

66.56

13903

208.89

... More
ROAD-A-Box culvert Km 2/6

63.99

13366

208.89

... More
Supply and Hoisting of NP 3 class RCC 1000 mm dia. pipes supplied by the Contractor at his own cost specified below confirming to IS 458 / 1989 cost of pipe as a finished work including all other incidental charges, testing charges including loading and unloading transport and delivery in good condition at work site as directed by the departmental officers etc., complete.

-

-

-

... More
ROAD-A-Box culvert Km 1/6(i)

12.5

56787

4543

... More
ROAD-A-Box culvert Km 1/6(ii)

12.5

56787

4543

... More
ROAD-A-Box culvert Km 1/8

12.5

56787

4543

... More
ROAD-A-Box culvert Km 2/2

12.5

56787

4543

... More
ROAD-A-Box culvert Km 2/4

12.5

56787

4543

... More
ROAD-A-Box culvert Km 2/6

12.5

56787

4543

... More
Providing and laying Gravel soling for specified thick with clean good gritty gravel over the well prepared sub grade from the approved quarry including cost and conveyance of material, laying in accordance with the requirements and specification. The materials shall be laid in one or more layers as sub-base according to the line and grade and cross action shown in the drawing or as directed by the Engineers for DIVERSION ROAD

-

-

-

... More
ROAD-A-Box culvert Km 1/6(i)

82.5

22880

277.34

... More
ROAD-A-Box culvert Km 1/6(ii)

82.5

22880

277.34

... More
ROAD-A-Box culvert Km 1/8

82.5

22880

277.34

... More
ROAD-A-Box culvert Km 2/2

82.5

22880

277.34

... More
ROAD-A-Box culvert Km 2/4

82.5

22880

277.34

... More
ROAD-A-Box culvert Km 2/6

82.5

22880

277.34

... More
ROAD-B-Widening of slab culvert Km 120/8

1.09

302

277.34

... More
Filling with excavated earth excluding cost and conveyance of earth to work site including labour charges for filling in layers as specified by the departmental officers including watering with all leads for water including labour charges for compacting,tamping and ramming under optimum moisture to obtain the maximun density and all other incidential charges etc., complete as per standard specification (using cut earth)

-

-

-

... More
ROAD-A-Retaining wall at km 1/8

138.6

5939

42.85

... More
ROAD-A-Retaining wall at km 2/2

110

4713

42.85

... More
ROAD-A-Retaining wall at km 2/4

330

14140

42.85

... More
ROAD-A-Retaining wall at km 2/6 & 2/8

264

11312

42.85

... More
ROAD-B-Retaining wall at km 120/10

43.2

1851

42.85

... More
Filling with earth including cost and conveyance of earth to work site including labour charges for filling in layers as specified by the departmental officers including watering with all leads for water including labour charges for compacting,tamping and ramming under optimum moisture to obtain the maximun density and all other incidential charges etc., complete as per standard specification (Using conveyed earth)

-

-

-

... More
ROAD-A-Retaining wall at km 2/2

45.45

7549

166.11

... More
ROAD-A-Retaining wall at km 2/4

136.35

22649

166.11

... More
ROAD-A-Retaining wall at km 2/6 & 2/8

109.08

18119

166.11

... More
ROAD-B-Centre median at Km 120/10

153.13

25436

166.11

... More
ROAD-B-Retaining wall at km 120/10

24.44

4059

166.11

... More
Providing and fixing SEEPAGE PIPES of 110mm dia PVC pipes of required length for Retaining Walls including cost and conveyance of all materials to worksite, cost and labour for 900mm dia. Semi-spherical back fill arrangements with 100mm size broken granite chips at the periphery and labour charges for fixing etc., to drain of the Backfill in the Retaining Wall

-

-

-

... More
ROAD-A-Retaining wall at km 1/8

45.5

9241

203.1

... More
ROAD-A-Retaining wall at km 2/2

32.5

6600

203.1

... More
ROAD-A-Retaining wall at km 2/4

97.5

19802

203.1

... More
ROAD-A-Retaining wall at km 2/6 & 2/8

78

15841

203.1

... More
ROAD-B-Widening of slab culvert Km 120/8

40

8124

203.1

... More
ROAD-B-Retaining wall at km 120/10

29.76

6044

203.1

... More
Providing and fixing kraft paper for full width of seating of deck spab and including cost and conveyance to worksite labour for fixing the same in correct position and all other incidental charges etc. complete.

-

-

-

... More
ROAD-B-Widening of slab culvert Km 120/8

9.94

1093

110

... More
Providing and fixing 20mm thick PVC expansion joint including cost and conveyance of expansion joints, Shalimar pad and joint sealants and fixing them position etc. Complete in deck slab over abutment.

-

-

-

... More
ROAD-B-Widening of slab culvert Km 120/8

9.7

6337

653.4

... More
Providing filter media behind the abutments and wings with clean III graded material 53mm to 5.6mm to 600mm thick and well compacted in layers with smaller sized towards the soil and bigger size towards the wall including cost and conveyance to work site including all labours and other incidental charges including hire charges for tools and plants employed etc., for filter media as per MOST's (Roads Wing) specifications for Roads and Bridges " Fourth Revision Cl. 309-3-2-13 and 305 -4-4 etc., complete- 1Cum.

-

-

-

... More
ROAD-B-Widening of slab culvert Km 120/8

11.02

13317

1208.52

... More
Calculation of SubTotal, GST and Total Amount carried out by system automatically

-

-

-

... More
Basic cost of value put to tender as per estimate

1

-

50281578

... More
Add GST at 18%

1

-

9050684

... More
Total Value put to Tender

1

-

59332262

... More
Negotiated Percentage

1

-

-

... More
Final Negotiated Value

1

-

-

... More
Add GST at 18% of Final Negotiated Value

1

-

-

... More
Total Value of Contract Including 18% of GST

1

-

-

... More
Basic cost of value put to tender as per Estimate

-

50281578

-

... More
Quoted Rate in Figures (Total Value of Contract Including 18% of GST )

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.