Highways Department Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Highways Department Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date2 Sep 2024
Closing Date23 Sep 2024
Tender Amount₹ 5,05,10,000 
Notes
Download

Costs

Summary

Rasipuram (h) Candm Sub Division (slm-21)

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Earth Work excavation in all classes of soil except hard rock not requiring blasting and deposting on bank with all leads and lifts as per SS20B including cost of all labour,materials,tools,equipments and all incidental charges and sheeting, shoring,bracing and their subsequent removal of all logs,stumps and other deleteriuos matter and obstructions,trimming of bottom of excavation,backfilling and clearing the site and disposal of all surplus materials away from the site with an average lead of 3.00 km etc.,complete as per standard specification for Boxing as per clause 111, 112, 201, 202, 301 to 305 & 900 of MORTH Vth Revision

-

-

-

... More
1) Widening from Two Lane to Two Lane with paved shoulder and Strengthening at Km 35/0-35/2, 36/2-37/2 of Malliakarai - Rasipuram - Tiruchengode - Erode Road including Construction of Retaining Wall at Km 36/6-37/2, Reconstruction of Culvert at Km 36/2 (ii), 36/10

2635.59

324862

123.26

... More
2) Widening from Intermediate Lane to Two Lane and Strengthening at km 2/0 - 3/0 of Goundam palayam - Anaipalayam - Pachal road including Construction of Drain and Reconstruction of Culvert at Km 2/2, 2/4, 2/6, 2/8

1557.26

191947

123.26

... More
Construction of granular sub-base by providing close graded Material,mixing in a mechanical mixplant at OMC, carriage of mixed Material to worksite, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory soil compactor to achieve the desired density, complete as per clause 111, 112, 401 & 900 of MORTH Vth Revision etc., complete - for Grading- V Material

-

-

-

... More
1) Widening from Two Lane to Two Lane with paved shoulder and Strengthening at Km 35/0-35/2, 36/2-37/2 of Malliakarai - Rasipuram - Tiruchengode - Erode Road including Construction of Retaining Wall at Km 36/6-37/2, Reconstruction of Culvert at Km 36/2 (ii), 36/10

648.8

1154513

1779.46

... More
2) Widening from Intermediate Lane to Two Lane and Strengthening at km 2/0 - 3/0 of Goundam palayam - Anaipalayam - Pachal road including Construction of Drain and Reconstruction of Culvert at Km 2/2, 2/4, 2/6, 2/8

432.69

741397

1713.46

... More
Construction of granular sub-base by providing close graded Material,mixing in a mechanical mixplant at OMC, carriage of mixed Material to worksite, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory soil compactor to achieve the desired density, complete as per clause 111, 112, 401 & 900 of MORTH Vth Revision etc., complete - for Grading- III Material

-

-

-

... More
1) Widening from Two Lane to Two Lane with paved shoulder and Strengthening at Km 35/0-35/2, 36/2-37/2 of Malliakarai - Rasipuram - Tiruchengode - Erode Road including Construction of Retaining Wall at Km 36/6-37/2, Reconstruction of Culvert at Km 36/2 (ii), 36/10

360.44

673460

1868.44

... More
Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam of specified thickness, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory soil compactor to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 111, 112, 406 & 900 of MORTH Vth Revision

-

-

-

... More
1) Widening from Two Lane to Two Lane with paved shoulder and Strengthening at Km 35/0-35/2, 36/2-37/2 of Malliakarai - Rasipuram - Tiruchengode - Erode Road including Construction of Retaining Wall at Km 36/6-37/2, Reconstruction of Culvert at Km 36/2 (ii), 36/10

1279.1

2729471

2133.9

... More
2) Widening from Intermediate Lane to Two Lane and Strengthening at km 2/0 - 3/0 of Goundam palayam - Anaipalayam - Pachal road including Construction of Drain and Reconstruction of Culvert at Km 2/2, 2/4, 2/6, 2/8

1171.08

2498967

2133.9

... More
Providing and laying 50 mm thick Bituminous Macadam using course aggregate and VG-30 Bitumen which shall consist of construction in a single course base/binder course confirming to the specification on a previously prepared base (using Mini Mix Plant and Power Roller) including cost of material,labour charges,rentals for machinary,fuel and all other incidental charges etc.,complete as per clause 111,112,504 & 900 of MORTH Rev-5 (For Patch Works)

-

-

-

... More
1) Widening from Two Lane to Two Lane with paved shoulder and Strengthening at Km 35/0-35/2, 36/2-37/2 of Malliakarai - Rasipuram - Tiruchengode - Erode Road including Construction of Retaining Wall at Km 36/6-37/2, Reconstruction of Culvert at Km 36/2 (ii), 36/10

29.8

242815

8148.17

... More
Advance patch work 50mm thick using 45 mm IRC size HBG metal for making the pot holes and patching using VG 10 grade bitumen including mixing at the rate of 44 Kg / Cum of chips after trimming the pot holes or depression to proper shape and depth side painting with tack coat and compacting the layers as directed by Departmental officers etc., complete as per clause 111, 112, 501, 3004 & 900 of MORTH Vth Revision

-

-

-

... More
2) Widening from Intermediate Lane to Two Lane and Strengthening at km 2/0 - 3/0 of Goundam palayam - Anaipalayam - Pachal road including Construction of Drain and Reconstruction of Culvert at Km 2/2, 2/4, 2/6, 2/8

6

21873

3645.54

... More
Advance patch work 25mm thick using 13.20 mm IRC size HBG metal for making the pot holes and patching using VG 10 grade bitumen including mixing at the rate of 44 Kg / Cum of chips after trimming the pot holes or depression to proper shape and depth side painting with tack coat and compacting the layers as directed by Departmental officers etc., complete as per clause 111, 112, 501, 3004 & 900 of MORTH Vth Revision

-

-

-

... More
2) Widening from Intermediate Lane to Two Lane and Strengthening at km 2/0 - 3/0 of Goundam palayam - Anaipalayam - Pachal road including Construction of Drain and Reconstruction of Culvert at Km 2/2, 2/4, 2/6, 2/8

5

20980

4196.04

... More
Providing and laying Prime Coat over WMM surface using 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 111, 112, 501, 502 & 900 of MORTH Vth Revision

-

-

-

... More
1) Widening from Two Lane to Two Lane with paved shoulder and Strengthening at Km 35/0-35/2, 36/2-37/2 of Malliakarai - Rasipuram - Tiruchengode - Erode Road including Construction of Retaining Wall at Km 36/6-37/2, Reconstruction of Culvert at Km 36/2 (ii), 36/10

6124.4

500424

81.71

... More
2) Widening from Intermediate Lane to Two Lane and Strengthening at km 2/0 - 3/0 of Goundam palayam - Anaipalayam - Pachal road including Construction of Drain and Reconstruction of Culvert at Km 2/2, 2/4, 2/6, 2/8

6004.3

490671

81.72

... More
Providing and laying Tack Coat over WMM surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 111, 112, 501, 503 & 900 of MORTH Vth Revision

-

-

-

... More
1) Widening from Two Lane to Two Lane with paved shoulder and Strengthening at Km 35/0-35/2, 36/2-37/2 of Malliakarai - Rasipuram - Tiruchengode - Erode Road including Construction of Retaining Wall at Km 36/6-37/2, Reconstruction of Culvert at Km 36/2 (ii), 36/10

6124.4

115444

18.85

... More
2) Widening from Intermediate Lane to Two Lane and Strengthening at km 2/0 - 3/0 of Goundam palayam - Anaipalayam - Pachal road including Construction of Drain and Reconstruction of Culvert at Km 2/2, 2/4, 2/6, 2/8

6004.3

113241

18.86

... More
Providing and laying Tack Coat over Existing BT surface using 2 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 111, 112, 501, 503 & 900 of MORTH Vth Revision

-

-

-

... More
1) Widening from Two Lane to Two Lane with paved shoulder and Strengthening at Km 35/0-35/2, 36/2-37/2 of Malliakarai - Rasipuram - Tiruchengode - Erode Road including Construction of Retaining Wall at Km 36/6-37/2, Reconstruction of Culvert at Km 36/2 (ii), 36/10

6155.6

166693

27.08

... More
2) Widening from Intermediate Lane to Two Lane and Strengthening at km 2/0 - 3/0 of Goundam palayam - Anaipalayam - Pachal road including Construction of Drain and Reconstruction of Culvert at Km 2/2, 2/4, 2/6, 2/8

2633.25

71334

27.09

... More
Providing and laying Tack Coat over Dry Lean Cement Concrete surface using 3.00 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 111, 112, 501, 503 & 900 of MORTH Vth Revision

-

-

-

... More
1) Widening from Two Lane to Two Lane with paved shoulder and Strengthening at Km 35/0-35/2, 36/2-37/2 of Malliakarai - Rasipuram - Tiruchengode - Erode Road including Construction of Retaining Wall at Km 36/6-37/2, Reconstruction of Culvert at Km 36/2 (ii), 36/10

288.92

6162

21.33

... More
2) Widening from Intermediate Lane to Two Lane and Strengthening at km 2/0 - 3/0 of Goundam palayam - Anaipalayam - Pachal road including Construction of Drain and Reconstruction of Culvert at Km 2/2, 2/4, 2/6, 2/8

65.73

1402

21.34

... More
Providing, laying 100mm consolidated thick Dense Bituminous Macadam using 0.40cum of 37.50-13.20mm, 0.35 cum of 13.20-2.36 mm and 0.36 cum of 2.36 mm & below size IRC metal with 71.30 kgs of VG40 grade bitumen for premixing per 10 sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing the min the required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to site, spreading the mix to uniform thickness of 100 mm with mechanical paver to the specified grades and cross section sand consolidated by Vibratory Roller to the required density etc., including labour for attending to paver to site etc.,including hire and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and allother tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per MoRTH specification clause No.111,112,501,505 & 900 - Grading I

-

-

-

... More
1) Widening from Two Lane to Two Lane with paved shoulder and Strengthening at Km 35/0-35/2, 36/2-37/2 of Malliakarai - Rasipuram - Tiruchengode - Erode Road including Construction of Retaining Wall at Km 36/6-37/2, Reconstruction of Culvert at Km 36/2 (ii), 36/10

612.44

5754614

9396.21

... More
Providing, laying 70 mm consolidated thick Dense Bituminous Macadam using 0.24 cum of 26.50-13.20 mm, 0.25 cumof 13.20-2.36 mm and 0.23 cum of 2.36 mm & below and with 53.20 Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of allmaterials to CMP site, heating the bitumen, aggregate and mixing the min the required temperature in Central Hot Mix Plant 20-30 ton capacity, conveying the mix by tipper trucks to worksite, spread ing the mix to uniform thickness of 70 mm using paver to the specified grade sand crosssection sand compacted by Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver at site etc., including hire and fuel charges for 20-30ton CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller sand all other tools and plant required, including all other incidental charges etc.,complete as per specification using CMP as per clause 505 MORTH Rev-5 as per clause No.111,112,501,505 & 900 - of MORTH rev-5.-Grading II

-

-

-

... More
2) Widening from Intermediate Lane to Two Lane and Strengthening at km 2/0 - 3/0 of Goundam palayam - Anaipalayam - Pachal road including Construction of Drain and Reconstruction of Culvert at Km 2/2, 2/4, 2/6, 2/8

420.31

4169651

9920.42

... More
Providing, laying 50mm consolidated thick Bituminous Macadam using 0.20cum of 26.50- 13.20mm, 0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRC metal with 37 Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 111, 112, 501, 504 & 900 of MORTH Vth Revision- Grading II

-

-

-

... More
2) Widening from Intermediate Lane to Two Lane and Strengthening at km 2/0 - 3/0 of Goundam palayam - Anaipalayam - Pachal road including Construction of Drain and Reconstruction of Culvert at Km 2/2, 2/4, 2/6, 2/8

7.94

67259

8470.94

... More
Providing and laying Bituminous Concrete to 40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG 40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per clause No. 111, 112, 501, 507 & 900 of MORTH vth Revision

-

-

-

... More
1) Widening from Two Lane to Two Lane with paved shoulder and Strengthening at Km 35/0-35/2, 36/2-37/2 of Malliakarai - Rasipuram - Tiruchengode - Erode Road including Construction of Retaining Wall at Km 36/6-37/2, Reconstruction of Culvert at Km 36/2 (ii), 36/10

502.76

5550007

11039.08

... More
Providing and laying Bituminous Concrete to 30mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG 30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per clause No. 111, 112, 501, 507 & 900 of MORTH vth Revision

-

-

-

... More
2) Widening from Intermediate Lane to Two Lane and Strengthening at km 2/0 - 3/0 of Goundam palayam - Anaipalayam - Pachal road including Construction of Drain and Reconstruction of Culvert at Km 2/2, 2/4, 2/6, 2/8

261.12

2807361

10751.23

... More
Refilling the boxing earth to the extra width of the boxing portion including labour charges for filling in layers , watering , tamping under optimum moisture content to get the maximum density and all other incidental charges etc., complete as per clause 111, 112, 201, 202, 301 to 305, 900 of MORTH Vth Revision (Labour and Hire charges only)

-

-

-

... More
1) Widening from Two Lane to Two Lane with paved shoulder and Strengthening at Km 35/0-35/2, 36/2-37/2 of Malliakarai - Rasipuram - Tiruchengode - Erode Road including Construction of Retaining Wall at Km 36/6-37/2, Reconstruction of Culvert at Km 36/2 (ii), 36/10

220

5869

26.68

... More
2) Widening from Intermediate Lane to Two Lane and Strengthening at km 2/0 - 3/0 of Goundam palayam - Anaipalayam - Pachal road including Construction of Drain and Reconstruction of Culvert at Km 2/2, 2/4, 2/6, 2/8

160

4268

26.68

... More
Dismantling Culverts, Bridges and other Structures Dismantling salvaging and removal and disposing of resulting materials and back filling the resulting trenches and pits etc as per clause No. 111, 112, 202 of MORTH vth Revision Dismantling Plain Cement Concrete

-

-

-

... More
1.2) Reconstruction of Culvert at Km 36/2 (ii), 36/10

21.54

10472

486.2

... More
2.1) Reconstruction of Culvert at Km 2/2, 2/4, 2/6, 2/8

21.54

10472

486.2

... More
Earth Work excavation in all classes of soil except hard rock not requiring blasting and deposting on bank with all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges and sheeting, shoring, bracing and their subsequent removal of all logs,stumps and other deleteriuos matter and obstructions,trimming of bottom of excavation,backfilling and clearing the site and disposal of all surplus materials etc.,complete as per standard specification for Foundation of Culvert and Retaining Wall as per clause 111, 112, 201, 202, 301 to 305 & 900 of MORTH Vth Revision

-

-

-

... More
1.1) Construction of Retaining Wall at Km 36/6-37/2

695.83

85768

123.26

... More
1.2) Reconstruction of Culvert at Km 36/2 (ii), 36/10

213.31

26292

123.26

... More
2.1) Reconstruction of Culvert at Km 2/2, 2/4, 2/6, 2/8

422.02

52018

123.26

... More
Vibrated Cement Concrete of grade M15 Nominal Mix using 40mm ISS size HBG metal including cost and conveyance of all materials to site complying with required standards and specifications. including cost of formwork, mixing, laying and compacting using vibrator including hire and fuel charges for all Tools and Plants and incidental charges such as maintaining of protective bunds, coffer dams strutting etc., complete as per relevant standard specification for Base Concrete of Culverts and Retaining Wall as per clause as per clause 1000, 1500, 1700, 2100, 2200 & 2908 of MORTH Vth Revision

-

-

-

... More
1.1) Construction of Retaining Wall at Km 36/6-37/2

160.58

982290

6117.14

... More
1.2) Reconstruction of Culvert at Km 36/2 (ii), 36/10

14.23

85954

6040.35

... More
2.1) Reconstruction of Culvert at Km 2/2, 2/4, 2/6, 2/8

23.94

143880

6010.06

... More
Vibrated Cement Concrete of grade M20 (Nominal mix) using 40mm ISS size HBG metal including cost and conveyance of all materials to site and cost cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths Tools and Plants and incidental charges etc., complete as per relevent standard specification for Stem and Parapets of the retaining wall,Body Wall and Parapets of Culverts as per clause 1000, 1500, 1700, 2100, 2200 & 2908 of MORTH Vth Revision

-

-

-

... More
1.1) Construction of Retaining Wall at Km 36/6-37/2

1004.07

8670074

8634.93

... More
1.2) Reconstruction of Culvert at Km 36/2 (ii), 36/10

28

261307

9332.4

... More
2.1) Reconstruction of Culvert at Km 2/2, 2/4, 2/6, 2/8

96.8

877073

9060.68

... More
Vibrated Reinforced Cement Concrete of grade M25 (Design mix) using 20mm and below ISS HBG metal including cost and conveyance of all materials to site and cost of cement excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for tools and plants including all other incidental charges etc., complete for Base Slab, Side Walls, Top Slab, Cover Slab of Box Culvert as per clause 900, 1000, 1500, 1600, 1700, 2100, 2200 & 2300 of MORTH Vth Revision

-

-

-

... More
1.2) Reconstruction of Culvert at Km 36/2 (ii), 36/10

64.4

820185

12735.8

... More
2.1) Reconstruction of Culvert at Km 2/2, 2/4, 2/6, 2/8

81.09

1032875

12737.4

... More
Supply and fabrication of STEEL grade Fe500 D for all the reinforced cement concrete items of work involved in the schedule including cost of steel, cost of fabrication, labour charges for cleaning the rods, straightening, cutting, bending, tying grills, hoisting and placing the reinforcement in position as specified in the drawing including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete. as per standard specification as per clause 1000, 1500, 1600, 1700, 2100 & 2300 of MORTH Vth Revision

-

-

-

... More
1.2) Reconstruction of Culvert at Km 36/2 (ii), 36/10

4.92

470588

95609.27

... More
2.1) Reconstruction of Culvert at Km 2/2, 2/4, 2/6, 2/8

6.26

598609

95609.27

... More
Providing and fixing Class I PVC seepage pipes of 110mm dia of required lengths for abutments and return walls including costs and conveyance of all materials to work site and labour charges for fixing etc., complete to drain from the back fill as per section 2706 of MORTH specification (Rev- V)

-

-

-

... More
1.1) Construction of Retaining Wall at Km 36/6-37/2

191.7

36902

192.5

... More
1.2) Reconstruction of Culvert at Km 36/2 (ii), 36/10

8.4

1617

192.5

... More
2.1) Reconstruction of Culvert at Km 2/2, 2/4, 2/6, 2/8

24.48

4712

192.5

... More
Providing and fixing of Bitumen Felt of 15mm thick Pad of required length for abutment and returns including cost and conveyance of all materials to worksite, cost and labour for semisperical backfill arrangements with 100mm size broken granite stones at the periphery and labour charges for fixing etc.,

-

-

-

... More
1.2) Reconstruction of Culvert at Km 36/2 (ii), 36/10

9.83

2303

234.3

... More
2.1) Reconstruction of Culvert at Km 2/2, 2/4, 2/6, 2/8

19.65

4604

234.3

... More
Refilling in between Retaining wall and Road with excavated earth including cost and conveyence to site including labour charges for filling in layers , watering , tamping under optimum moisture content to get themaximum density and all other incidental charges etc., complete as per clause 304 & 2907 of MORTH Vth Revision Specifications (labour charges only)

-

-

-

... More
1.1) Construction of Retaining Wall at Km 36/6-37/2

1440.79

61737

42.85

... More
1.2) Reconstruction of Culvert at Km 36/2 (ii), 36/10

51.52

2207

42.85

... More
2.1) Reconstruction of Culvert at Km 2/2, 2/4, 2/6, 2/8

80.54

3451

42.85

... More
Supply of NP3class RCC 1000mm dia hume pipes of 2.50m length confirming to IS458/1989 cost of pipes including all other incidental charges , testing charges, including Loading and Unloading charges, transport and delivery in good condition at work site as directed by the departmental officers etc., complete as per clause 1013,2900 & 2911 of MORTH Vth Revision

-

-

-

... More
2.1) Reconstruction of Culvert at Km 2/2, 2/4, 2/6, 2/8

20

85536

4276.8

... More
Hoisting and fixing of 1000 mm dia pipes to proper gradient including all labour charges and allother incidental charges etc.,complete as per clause 2905 & 2906 of MORTH Vth Revision

-

-

-

... More
2.1) Reconstruction of Culvert at Km 2/2, 2/4, 2/6, 2/8

20

5324

266.2

... More
Calculation of SubTotal, GST and Total Amount carried out by system automatically

-

-

-

... More
Basic cost of value put to tender as per estimate

1

-

42803329

... More
Add GST at 18%

1

-

7704599

... More
Total Value put to Tender

1

-

50507928

... More
Negotiated Percentage

1

-

-

... More
Final Negotiated Value

1

-

-

... More
Add GST at 18% of Final Negotiated Value

1

-

-

... More
Total Value of Contract Including 18% of GST

1

-

-

... More
Basic cost of value put to tender as per Estimate

-

42803329

-

... More
Quoted Rate in Figures (Total Value of Contract Including 18% of GST )

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.