Highways Department Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Highways Department Tender

Works
Civil And Construction
Bridge Construction
Eprocure
Opening Date24 Oct 2024
Closing Date11 Nov 2024
Tender Amount₹ 2,41,40,000 
Notes
Download

Costs

Summary

Mettur (h) (candm) Sub Division (slm-59)

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of granular sub-base by providing close graded Material,mixing in a mechanical mixplant at OMC, carriage of mixed Material to worksite, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory soil compactor to achieve the desired density, complete as per clause 111, 112, 401 & 900 of MORTH Vth Revision etc., complete - for Grading- V Material

-

-

-

... More
1) Construction of Box culvert at Km.0/2 of Periyathanda - Neethipuram road in lieu of existing causeway

110.42

2167

239357.43

... More
2) Construction of Box culvert at Km.4/8 of Karungalur - Govindapady road in lieu of existing causeway

75.64

2154

162966.38

... More
Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam of specified thickness, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory soil compactor to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 111, 112, 406 & 900 of MORTH Vth Revision

-

-

-

... More
1) Construction of Box culvert at Km.0/2 of Periyathanda - Neethipuram road in lieu of existing causeway

184.04

2180

401232.97

... More
2) Construction of Box culvert at Km.4/8 of Karungalur - Govindapady road in lieu of existing causeway

126.07

2180

274850.25

... More
Providing and laying Prime Coat over WMM surface using 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 111, 112, 501, 502 & 900 of MORTH Vth Revision

-

-

-

... More
1) Construction of Box culvert at Km.0/2 of Periyathanda - Neethipuram road in lieu of existing causeway

736.13

81

60001.96

... More
2) Construction of Box culvert at Km.4/8 of Karungalur - Govindapady road in lieu of existing causeway

504.25

81

41096.38

... More
Providing and laying Tack Coat over WMM surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 111, 112, 501, 503 & 900 of MORTH Vth Revision

-

-

-

... More
1) Construction of Box culvert at Km.0/2 of Periyathanda - Neethipuram road in lieu of existing causeway

736.13

18

13817.16

... More
2) Construction of Box culvert at Km.4/8 of Karungalur - Govindapady road in lieu of existing causeway

504.25

18

9464.77

... More
Providing and laying Tack Coat over Existing BT surface using 2.00 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 111, 112, 501, 503 & 900 of MORTH Vth Revision

-

-

-

... More
1) Construction of Box culvert at Km.0/2 of Periyathanda - Neethipuram road in lieu of existing causeway

93.75

27

2533.13

... More
2) Construction of Box culvert at Km.4/8 of Karungalur - Govindapady road in lieu of existing causeway

150

27

4053

... More
Providing and laying Tack Coat over Dry Lean Cement Concrete using 3.00 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 111, 112, 501, 503 & 900 of MORTH Vth Revision

-

-

-

... More
1) Construction of Box culvert at Km.0/2 of Periyathanda - Neethipuram road in lieu of existing causeway

97.73

21

2075.79

... More
2) Construction of Box culvert at Km.4/8 of Karungalur - Govindapady road in lieu of existing causeway

97.73

21

2075.79

... More
Providing, laying 50mm consolidated thick Bituminous Macadam using 0.20cum of 26.50-13.20mm, 0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRC metal with 37 Kgs of VG-30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 111, 112, 501, 504 & 900 of MORTH Vth Revision- Grading II (Table 500-7)

-

-

-

... More
1) Construction of Box culvert at Km.0/2 of Periyathanda - Neethipuram road in lieu of existing causeway

41.5

8447

350567.93

... More
2) Construction of Box culvert at Km.4/8 of Karungalur - Govindapady road in lieu of existing causeway

32.72

8447

276399.58

... More
Providing and laying Bituminous Concrete to 30mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG-30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per clause No. 111, 112, 501, 507 & 900 of MORTH Vth Revision- Grading II

-

-

-

... More
1) Construction of Box culvert at Km.0/2 of Periyathanda - Neethipuram road in lieu of existing causeway

27.83

10693

297607.9

... More
2) Construction of Box culvert at Km.4/8 of Karungalur - Govindapady road in lieu of existing causeway

22.56

10693

241251.68

... More
Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with power roller, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification. For formation of Diversion Road & Approach Road using Carted Earth with a lead of 5 Kms. as per MORTH specification clause No. 111, 112, 301 to 305 & 900 of MORTH Vth Revision

-

-

-

... More
1) Construction of Box culvert at Km.0/2 of Periyathanda - Neethipuram road in lieu of existing causeway

1902.21

208

397333.62

... More
2) Construction of Box culvert at Km.4/8 of Karungalur - Govindapady road in lieu of existing causeway

1018.74

208

212794.41

... More
Providing and laying of Gravel including cost and conveyance of the same to work site from approved quarry including stacking the same to departemental gauge for premeasurement including all labour charges for laying, spreading, including all hire and fuel charges for power roller for compaction, etc., complete for formation of Diversion Road as per clause 111,112, 401 & 900 of MORTH Vth Revision.

-

-

-

... More
1) Construction of Box culvert at Km.0/2 of Periyathanda - Neethipuram road in lieu of existing causeway

82.5

296

24485.18

... More
2) Construction of Box culvert at Km.4/8 of Karungalur - Govindapady road in lieu of existing causeway

82.5

296

24485.18

... More
Dismantling Culverts, bridges and other structures Dismantling salvaging and removal and disposing of resulting materials and back filling the resulting trenches and pits etc as per clause No. 111, 112, 202 of MORTH Vth Revision Dismantling Plain Cement Concrete

-

-

-

... More
1) Construction of Box culvert at Km.0/2 of Periyathanda - Neethipuram road in lieu of existing causeway

51.42

486

25000.4

... More
2) Construction of Box culvert at Km.4/8 of Karungalur - Govindapady road in lieu of existing causeway

51.42

486

25000.4

... More
Earth Work excavation in all classes of soil except hard rock not requiring blasting and deposting on bank with all leads and lifts as per SS20B including cost of all labour,materials,tools,equipments and all incidental charges and sheeting,shoring,bracing and their subsequent removal of all logs,stumps and other deleteriuos matter and obstructions,trimming of bottom of excavation, back filling and clearing the site and disposal of all surplus materials etc.,complete as per standard specification for Foundation of Box Culvert and Wing Wall per clause 111, 112, 201, 202, 301 to 305 & 900 of MORTH Vth Revision

-

-

-

... More
1) Construction of Box culvert at Km.0/2 of Periyathanda - Neethipuram road in lieu of existing causeway

508.31

123

62654.29

... More
2) Construction of Box culvert at Km.4/8 of Karungalur - Govindapady road in lieu of existing causeway

421.91

123

52004.63

... More
Plain Cement Concrete of grade M15 (Nominal Mix) using 40mm ISS size HBG metal including cost and conveyance of all materials from approved quarry to worksite including cost of cement including cost and labour charges for mixing the concrete, transporting, laying, vibrating, compacting, curing with all leads for soft potable water, working in all depths including hire, running and fuel charges for all tools and plants employed as per standard specification for Base concrete of Box Culvert, Wing Wall and Storm Water Drain as per clause 1000, 1500, 1700, 2100, 2200 & 2908 of MORTH Vth Revision

-

-

-

... More
1) Construction of Box culvert at Km.0/2 of Periyathanda - Neethipuram road in lieu of existing causeway

110.34

6111

674337.39

... More
2) Construction of Box culvert at Km.4/8 of Karungalur - Govindapady road in lieu of existing causeway

88.74

6050

536929.36

... More
Supply and fabrication of STEEL grade Fe500D for all the reinforced cement concrete items of work involved in the schedule including cost of steel, cost of fabrication, labour charges for cleaning the rods, straightening, cutting, bending, tying grills, hoisting and placing the reinforcement in position as specified in the drawing including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete. as per standard specification as per clause 1000, 1500, 1600, 1700, 2100 & 2300 of MORTH Vth Revision

-

-

-

... More
1) Construction of Box culvert at Km.0/2 of Periyathanda - Neethipuram road in lieu of existing causeway

13.41

95609

1281737.87

... More
2) Construction of Box culvert at Km.4/8 of Karungalur - Govindapady road in lieu of existing causeway

13.41

95609

1281737.87

... More
Vibrated Reinforced Cement Concrete of grade M25 (Design Mix) using 20mm and below ISS HBG metal including cost and conveyance of all materials to site and cost of cement excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for tools and plants including all other incidental charges etc., complete for Base Slab, Side Walls, Top Slab and Cover Slab of Box Culvert and Storm Water Drain as per clause 900, 1000, 1500, 1600, 1700, 2100, 2200 & 2300 of MORTH Vth Revision

-

-

-

... More
1) Construction of Box culvert at Km.0/2 of Periyathanda - Neethipuram road in lieu of existing causeway

155.58

11382

1770934.47

... More
2) Construction of Box culvert at Km.4/8 of Karungalur - Govindapady road in lieu of existing causeway

155.58

11321

1761465.87

... More
Providing and fixing Class I PVC seepage pipes of 100mm dia of required lengths for abutments and return walls including costs and conveyance of all materials to work site and labour charges for fixing etc., complete to drain from the back fill as per section 2706 of MORTH specification (Rev-V)

-

-

-

... More
1) Construction of Box culvert at Km.0/2 of Periyathanda - Neethipuram road in lieu of existing causeway

432

192

83160

... More
2) Construction of Box culvert at Km.4/8 of Karungalur - Govindapady road in lieu of existing causeway

336

192

64680

... More
Vibrated Reinforced Cement Concrete of grade M40 (Design Mix) using 20mm and below ISS HBG metal including cost and conveyance of all materials to site and cost of cement excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for tools and plants including all other incidental charges etc., complete for RCC CRASH BARRIERS OVER TOP SLAB as per clause 900, 1000, 1500, 1600, 1700, 2100, 2200 & 2300 of MORTH Vth Revision

-

-

-

... More
1) Construction of Box culvert at Km.0/2 of Periyathanda - Neethipuram road in lieu of existing causeway

6.14

16239

99711.88

... More
2) Construction of Box culvert at Km.4/8 of Karungalur - Govindapady road in lieu of existing causeway

6.14

16178

99338.2

... More
Providing and fixing of GI DRAINAGE SPOUTS 100mm dia as per GOI drawing SD/205 with grating arrangements at top as shown in the drawing and 100mm dia drainage spout projecting atleast 300mm beyond the bottom of deck slab as shown in the drawing, including cost and conveyance of Galvanised iron pipes and flats and fixing them in position etc, complete as per cl. 2705 of MORT&H specification (Vth Revision)

-

-

-

... More
1) Construction of Box culvert at Km.0/2 of Periyathanda - Neethipuram road in lieu of existing causeway

2

2498

4996.2

... More
2) Construction of Box culvert at Km.4/8 of Karungalur - Govindapady road in lieu of existing causeway

2

2498

4996.2

... More
Vibrated Cement Concrete of grade M20 (Nominal Mix) using 40mm ISS size HBG metal including cost and conveyance of all materials from approved quarry to worksite including cost of cement including cost and labour charges for formwork and centering mixing the concrete, transporting, laying, vibrating, compacting, curing with all leads for soft potable water, working in all depths including hire, running and fuel charges for all tools and plants employed as per standard specification for Wing wall and Parapet as per clause 1000, 1500, 1700, 2100, 2200 & 2908 of MORTH Vth Revision

-

-

-

... More
1) Construction of Box culvert at Km.0/2 of Periyathanda - Neethipuram road in lieu of existing causeway

680.1

7874

5355386.24

... More
2) Construction of Box culvert at Km.4/8 of Karungalur - Govindapady road in lieu of existing causeway

522.6

7813

4083366.46

... More
Supply of NP3class RCC 1000mm dia hume pipes of 2.50m length confirming to IS458/1989 cost of pipes including all other incidental charges , testing charges, including Loading and Unloading charges, transport and delivery in good condition at work site as directed by the departmental officers etc., complete as per clause 1013,2900 & 2911 of MORTH Vth Revision

-

-

-

... More
1) Construction of Box culvert at Km.0/2 of Periyathanda - Neethipuram road in lieu of existing causeway

15

4276

64152

... More
2) Construction of Box culvert at Km.4/8 of Karungalur - Govindapady road in lieu of existing causeway

15

4276

64152

... More
Hoisting and fixing of 1000 mm dia pipes to proper gradient including all labour charges and allother incidental charges etc.,complete as per clause 2905 & 2906 of MORTH Vth Revision

-

-

-

... More
1) Construction of Box culvert at Km.0/2 of Periyathanda - Neethipuram road in lieu of existing causeway

15

266

3993

... More
2) Construction of Box culvert at Km.4/8 of Karungalur - Govindapady road in lieu of existing causeway

15

266

3993

... More
Calculation of SubTotal, GST and Total Amount carried out by system automatically

-

-

-

... More
Basic cost of value put to tender as per estimate

1

20445318

-

... More
Add GST at 18%

1

3680157

-

... More
Total Value put to Tender

1

24125475

-

... More
Negotiated Percentage

1

-

-

... More
Final Negotiated Value

1

-

-

... More
Add GST at 18% of Final Negotiated Value

1

-

-

... More
Total Value of Contract Including 18% of GST

1

-

-

... More
Basic cost of value put to tender as per Estimate

-

-

20445318

... More
Quoted Rate in Figures (Total Value of Contract Including 18% of GST )

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.