Highways Department Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Highways Department Tender

Works
Civil And Construction
Bridge Construction
Eprocure
Opening Date22 Nov 2024
Closing Date9 Dec 2024
Tender Amount₹ 6,05,12,000 
Notes
Download

Costs

Summary

Mdu 034 Tn No 28 2024 25 Hdo Dated 18 11 2024

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Road A

3071.82

123

378632.53

... More
Road B

3654.1

123

450404.37

... More
Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per MORTH Specification clause 401 For Grading-V Material

-

-

-

... More
Road A

918.62

2175

1998494.56

... More
Km 7/8 - box culvert

15.13

2175

32915.92

... More
Km 7/10 - box culvert

15.13

2175

32915.92

... More
Km 8/10 - box culvert

23.98

2175

52169.45

... More
Road B

971.39

2096

2036363.71

... More
Km 1/8 - box culvert

15.13

2096

31717.62

... More
Km 1/10 - box culvert

16.67

2096

34945.99

... More
Km 2/4 - box culvert

15.13

2096

31717.62

... More
Construction of granularsub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achievethe desired density, complete as per clause 401 For Grading-III Material

-

-

-

... More
Road A

417.55

2266

946235.11

... More
Road B

485.69

2186

1062184.6

... More
Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam 250mm thick, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5

-

-

-

... More
Road A

1456.38

2272

3310308.05

... More
Km 7/8 - box culvert

2.66

2272

6046.1

... More
Km 7/10 - box culvert

2.66

2272

6046.1

... More
Km 8/10 - box culvert

2.66

2272

6046.1

... More
Road B

1214.24

2272

2759931.09

... More
Km 1/8 - box culvert

2.66

2272

6046.1

... More
Km 1/10 - box culvert

2.13

2272

4841.43

... More
Km 2/4 - box culvert

2.66

2272

6046.1

... More
Providing and laying Prime Coat over WBM/ WMM surface using 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 502 of MORTH Rev-5

-

-

-

... More
Road A

5825.55

81

476646.5

... More
Road B

4856.94

81

397346.26

... More
Providing and laying Tack Coat over WBM/ WMM surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 503 of MORTH Rev-5

-

-

-

... More
Road A

5825.55

18

110044.64

... More
Road B

4856.94

18

91747.6

... More
Advance patch work using 45 mm IRC size HBG metal for making the pot holes and patching using VG10 grade bitumen including mixing at the rate of 44 Kg / Cum of chips s after trimming the pot holes or depression to proper shape and depth side painting with tack coat and compacting the layers as directed by Departmental officers etc., complete as per MORTH Specification,

-

-

-

... More
Road B

65.11

3903

254130.84

... More
Providing and laying Tack Coat over Existing BT surface using 2 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 503 of MORTH Rev-5

-

-

-

... More
Road A

13704.45

27

371527.64

... More
Road B

15333.78

27

415698.78

... More
Providing and laying Tack Coat over Dry Lean Cement Concrete surface using 3.00Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 503 of MORTH Rev-5

-

-

-

... More
Road A

70

21

1496.6

... More
Road B

84.28

21

1801.91

... More
Providing, laying 50mm consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50-13.20mm, 0.25cum of 13.20-2.36mm and 0.23cum of 2.36mm & below and with 53.20Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site heating the bitumen, aggregate and mixing them in the required temperature in Central Hot Mix Plant 20-30 ton capacity, conveying the mix by tipper trucks to work site, spreading the mix to uniform thickness of 50mm using paver to the specified grades and cross sections and compacted by Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver at site etc., including hire and fuel charges for 20-30ton CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory rollers and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5

-

-

-

... More
Road A

292.29

10222

2987870.22

... More
Road B

291.41

10222

2978874.62

... More
Providing, laying 50mm consolidated thick Bituminous Macadam using 0.20cum of 26.5013.20mm, 0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRC metal with 37 Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 504 of MORTH Rev-5

-

-

-

... More
Road A

322.5

8757

2824255.05

... More
Road B

79.75

8757

698401.06

... More
Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.009.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5

-

-

-

... More
Road A

588

11052

6499005.24

... More
Road B

608.26

11052

6722933.55

... More
Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with power roller, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification. For berms

-

-

-

... More
Road A

2405

245

591581.9

... More
Road B

559.08

245

137522.5

... More
Earthwork excavation in all classes of soil not requiring blasting except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for FOUNDATION OF ABUTMENTS, PIERS AND WINGS.

-

-

-

... More
Km.7/8 - box culvert

180.71

290

52405.9

... More
Km.7/10 - box culvert

180.71

290

52405.9

... More
Km.8/10 - box culvert

785.23

290

227716.7

... More
Km 1/8 - box culvert

163.96

290

47548.4

... More
Km 1/10 - box culvert

376.3

290

109127

... More
Km 2/4 - box culvert

163.96

290

47548.4

... More
Plain Cement Concrete of grade M15 (Nominal mix) using 40mm ISS hard broken granite metal including cost and conveyance of all materials to site, including cost and labour charges for form work and centering, labour charges for compacting, curing and all incidental charges etc., complete as per standard specification for LEVELLING COURSE BELOW Box Culvert and Wing wall.

-

-

-

... More
Km.7/8 - box culvert

10.05

6407

64390.35

... More
Km.7/10 - box culvert

10.05

6407

64390.35

... More
Km.8/10 - box culvert

33.55

6418

215323.9

... More
Km 1/8 - box culvert

9.27

6349

58855.23

... More
Km 1/10 - box culvert

17.61

6349

111805.89

... More
Km 2/4 - box culvert

9.27

6360

58957.2

... More
Vibrated Reinforced Cement Concrete of grade M25 (Design mix) using 20mm ISShard broken granite metal including cost and conveyance of all materials to site and cost of cement excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for tools and plants including all other incidental charges etc., complete for Box culvert

-

-

-

... More
Km.7/8 - box culvert

36.76

12552

461411.52

... More
Km.7/10 - box culvert

36.76

12552

461411.52

... More
Km.8/10 - box culvert

46.47

12588

584964.36

... More
Km 1/8 - box culvert

36.76

12494

459279.44

... More
Km 1/10 - box culvert

83.62

12013

1004527.06

... More
Km 2/4 - box culvert

36.76

12505

459683.8

... More
Vibrated Reinforced Cement Concrete M20 (Nominal mix) Grade using 40mm ISS hard broken granite metal including cost and conveyance of all materials to site, including cost and labour charges for formwork, centering, labour charges for laying compacting, curing, and all incidental charges etc., complete for Wing Wall and Parapet

-

-

-

... More
Km.7/8 - box culvert

51.22

8721

446689.62

... More
Km.7/10 - box culvert

51.22

8721

446689.62

... More
Km.8/10 - box culvert

354.7

8536

3027719.2

... More
Km 1/8 - box culvert

42.17

8663

365318.71

... More
Km 1/10 - box culvert

92.55

8468

783713.4

... More
Km 2/4 - box culvert

42.17

8674

365782.58

... More
Supply and fabrication of STEEL grade Fe500 with suitable anticorrsive measure required for all the reinforced cement concrete items of work involved in the shedule including cost of steel, cost of fabrication, labour charges for cleaning the rods, straightening, cutting, bending, tying grills, hoisting and placing the reinforcement in position as specified in the drawing including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete.

-

-

-

... More
Km.7/8 - box culvert

2.69

95610

257190.9

... More
Km.7/10 - box culvert

2.69

95610

257190.9

... More
Km.8/10 - box culvert

3.15

95610

301171.5

... More
Km 1/8 - box culvert

2.69

95610

257190.9

... More
Km 1/10 - box culvert

5.3

95610

506733

... More
Km 2/4 - box culvert

2.69

95610

257190.9

... More
Vibrated cement concrete M30 Grade (Design mix) using 25mm, 12mm and 6mm IRC size hard broken granite metal including cost and conveyance of all materials to site cost of premoulded expansion joints and fixing the same in position including cost and labour charges for formwork, labour charges for laying, compacting, curing including all other incidental charges etc.,complete for WEARING COAT 75mm UNIFORM THICKNESS OVER DECK SLAB AND OVER APPROACH SLAB.

-

-

-

... More
Km.7/8 - box culvert

23.31

691

16118.87

... More
Km.7/10 - box culvert

23.31

691

16118.87

... More
Km.8/10 - box culvert

28.86

692

19979.78

... More
Km 1/8 - box culvert

23.31

687

16016.3

... More
Km 1/10 - box culvert

55.94

687

38436.37

... More
Km 2/4 - box culvert

23.31

688

16037.28

... More
Dismantling of RR Masonry walls, clearing away and carfully stacking useful materials for reuse etc., complete

-

-

-

... More
Km.7/8 - box culvert

41.85

111

4686.36

... More
Km.7/10 - box culvert

41.85

111

4686.36

... More
Km.8/10 - box culvert

41.85

111

4686.36

... More
Km 1/8 - box culvert

41.85

111

4686.36

... More
Km 1/10 - box culvert

41.85

111

4686.36

... More
Km 2/4 - box culvert

41.85

111

4686.36

... More
Earth Work excavation including removal and satisfactory disposal of all materials necessary for the construction of roadway and side drains in accordance with the specification and the lines , grades anr cross sections shown in the drawings or as indicated by the Engineer for forming diversion road.

-

-

-

... More
Km.7/8 - box culvert

333

245

81911.34

... More
Km.7/10 - box culvert

333

245

81911.34

... More
Km.8/10 - box culvert

333

245

81911.34

... More
Km 1/8 - box culvert

333

245

81911.34

... More
Km 1/10 - box culvert

333

245

81911.34

... More
Km 2/4 - box culvert

333

245

81911.34

... More
Plain Cement Concrete of grade M15 Nominal Mix,using 40mm ISS size HBG graded metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for CULVERT OFFSET FILLING

-

-

-

... More
Km.7/8 - box culvert

1.56

6407

9994.92

... More
Km.7/10 - box culvert

1.56

6407

9994.92

... More
Km.8/10 - box culvert

1.56

6418

10012.08

... More
Km 1/8 - box culvert

1.56

6349

9904.44

... More
Km 1/10 - box culvert

1.25

6349

7936.25

... More
Km 2/4 - box culvert

1.56

6360

9921.6

... More
Calculation of SubTotal, GST and Total Amount carried out by system automatically

-

-

-

... More
Basic cost of value put to tender as per estimate

1

51281297

-

... More
Add GST at 18%

1

9230633

-

... More
Total Value put to Tender

1

60511930

-

... More
Excess/Less Percentage

1

-

-

... More
Final Value

1

-

-

... More
Add GST at 18% of Final Value

1

-

-

... More
Total Value of Contract Including 18% of GST

1

-

-

... More
Basic cost of value put to tender as per Estimate

-

-

51281297

... More
Quoted Rate in Figures (Total Value of Contract Including 18% of GST )

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.